HomeMy WebLinkAboutG1.01 - COMPOSITE SITE PLANIV
IV
IV
IV
IV
IVIV
IVIV
IVIV IV IV
IV
IV
IV
IV
MTRMTRCO
CO
CO
CANOPY:CALIPER:
CANOPY:CALIPER:
CANOPY:CALIPER:CANOPY:CALIPER:
CANOPY:CALIPER:
CANOPY:CALIPER:
SD
CO SD
CO
SD
MW
MW
MW
MW
GMTR
CO
COMW
3'(typ. sides & back)10.96'
10'2"
10'2"
10'2"
10'2"
10'2"
10'2"
GENERAL NOTES
A. PRIOR TO START OF CONSTRUCTION, CONTRACTOR TO VERIFY
POSITION AND CONDITION OF ALL EXISTING BENCHMARKS.
B. EXISTING BENCHMARKS ARE NOT TO BE DISTURBED.
C. COORDINATE WITH CIVIL FOR GRADING AND DRAINAGE ELEVATIONS.
D. ANY DISCREPANCIES IN ACTUAL FIELD CONDITIONS, IF AT ODDS WITH
INDICATIONS IN THESE DOCUMENTS, SHALL BE IMMEDIATELY
BROUGHT TO THE ATTENTION OF THE ARCHITECT OR
CONSTRUCTION MANAGER.
E. FOR THE SOILS INVESTIGATION REPORT OF THIS SITE, REFERENCE
PART 'C'-GEOTECHNICAL INFORMATION IN THE SPECIFICATIONS.
COPIES OF THE SOILS INVESTIGATION REPORT ARE AVAILABLE FROM
THE CONSTRUCTION MANAGER, THE GEOTECHNICAL ENGINEER, AND
THE ARCHITECT.
F. ALL ROAD/UTILITY IMPROVEMENT WORK WHICH IS INTERRELATED
WITH SIMILAR WORK ON ADJACENT PROPERTIES SHALL BE FULLY
COORDINATED BETWEEN CONTRACTORS. VERIFY WITH
CONSTRUCTION MANAGER.
G. FINAL POSITIONING OF ALL SITE FIRE UTILITIES SHALL BE SUBJECT
TO THE APPROVAL OF THE APPROPRIATE FIRE AUTHORITIES.
CONTRACTOR SHALL VERIFY.
H. IN CASE OF CONFLICT BETWEEN ARCHITECTURAL & CIVIL DRAWINGS,
AS TO EXACT LOCATIONS/EXTENT OF CAST-IN-PLACE CONCRETE
CURBS ONLY, VS CAST-IN-PLACE CURB/GUTTER, CIVIL DRAWINGS
SHALL GOVERN.
C.I.P. CONCRETE CURB WORK INCLUDED AS PART
OF PREVIOUS BID PACKAGE (COORDINATE WITH
CIVIL DRAWINGS)
C.I.P. CONCRETE CURB/GUTTER WORK INCLUDED
AS PART OF PREVIOUS BID PACKAGE (COORDINATE
WITH CIVIL DRAWINGS)
SWINGING GATE
PROPERTY LINE
FENCING
PROPERTY LINE CORNER PIN
MONUMENT
LEGEND
PHASE 2
(N) HARD TOP PAVING
(E) HARD TOP PAVING
(N) BUILDING
(N) CONCRETE
(E) CONCRETE
(N) LANDSCAPE
AREA, RE:
LANDSCAPE PLANS
(E) LANDSCAPE
AREA, RE:
LANDSCAPE PLANS
EAST CENTRAL DRIVE
IDAHO FINE ARTS ACADEMY PHASE 1
IDAHO FINE ARTS ACADEMY PHASE 2
FF -100' -0" =
CIVIL ELEV. 2,626' -0"
BUILDING AREA: 41,418 SF R9'27' - 5 71/128"FIRE TRUCK
(AERIAL APPARATUS)R 28' - 0"23' - 11 21/128"
R 31' - 6"APPARATUS ACCESS150' - 0"60' - 3 217/256"
R 30' - 0 23/128"R 29' - 11 237/256"32.07 (3 RACKS,
6 STALLS)
32.01
HYDRANT SPACING
2 5 0 ' - 0"32.08
104413.G 10.03
EDDIE D.
DANIELS
AR-2606
OHADI,ESI
OBLICENSE D A RCHI
TECTSTATE O F ID AH OP r o j e c t :
S h e e t :
P r o j e c t N o :
D r a w n B y :
C h e c k e d B y :
D a t e :
R e v i s i o n s :
S h e e t N o :
E
D
C
B
A
1 2 3 4 5 6
9/29/2020 12:13:27 PMIDAHO FINE ARTS ACADEMY
915 EAST CENTRAL DRIVE
MERIDIAN, ID 83642
COMPOSITE SITE PLAN
19008
TH
ZL
9/29/2020
G1.01BID SET -08/24/20REFERENCE NOTES
10.03 COORDINATE EXACT LOCATION WITH FIRE MARSHALL PRIOR TO
INSTALLATION
32.01 NEW FIRE HYDRANT. RE: CIVIL DRAWINGS
32.07 NEW BIKE RACKS. RE: CIVIL DRAWINGS.
32.08 FDC
KEYNOTES
104413.G KNOX BOX
1" = 40'-0"G1.01
A2 SITE PLAN
NORTH2 DBS BACKCHECK 02 09/28/20
THIS PATHWAY TO BE AMENDED FROM PHASE 1 OF
THE PROJECT AND TO BE INSTALLED DURING
PHASE 2, PER RECOMMENDATION FROM KIM
MEYERS WARREN, PATHWAYS PROJECT MANAGER
FOR THE CITY OF MERIDIAN. PLEASE REFER TO
EMAIL DOCUMENTATION FROM SEPTEMBER 24TH,
2021 - "0924_2021_IFAA_PATHWAY AMENDMENT
CORRESPONDENCE".