Loading...
HomeMy WebLinkAbout2021-10-01 COMPASSCommunities in Motion 2040 2.0 Development Review The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization (MPO) for Ada and Canyon Counties. COMPASS has developed this review as a tool for local governments to evaluate whether land developments are consistent with the goals of Communities in Motion 2040 2.0 (CIM 2040), the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document based on CIM 2040 2.0 goals. Recommendations State Highway 16 is the #4 priority in the Communities in Motion 2040 2.0 plan. State Highway 16 serves as the main commuter route from Gem County to the Treasure Valley. State Highway 16 is the #4 priority in the Communities in Motion 2040 2.0 plan. State Highway 16 serves as the main commuter route from Gem County to the Treasure Valley. Idaho Transportation Department has programmed funding for preliminary engineering and right-of-way acquisition on SH-16 between I-84 and US 20/26 (FY2021- 2027 Regional Transportation Improvement Program Key Number 20788). Current documents show construction as unfunded; however, ITD now has State funding for construction of Phase 2, which will build the entire corridor with at-grade intersections. The construction funds are expected to be added to the programs this fall. Design for Phase 3, was recently added to design the interchanges for this segment; however, funding is not yet available to construct the interchanges. This location is not served by bus routes and ValleyConnect 2.0 does not plan for public transportation to this site. More information about COMPASS and Communities in Motion 2040 2.0: Web: www.compassidaho.org Email info@compassidaho.org More information about the development review process: http://www.compassidaho.org/dashboard/devreview.htm Development Name: Aviator Springs Agency: Meridian CIM Vision Category: Future Neighborhoods New households: 93 New jobs: ±25 Exceeds CIM forecast: No Farmland contributes to the local economy, creates additional jobs, and provides food security to the region. Development in farm areas decreases the productivity and sustainability of farmland. Farmland consumed: Yes Farmland within 1 mile: 1,169 acres Housing within 1 mile: 620 Jobs within 1 mile: 130 Jobs/Housing Ratio: 0.2 Nearest bus stop: 3.3 miles Nearest public school: 0.1 miles Nearest public park: 1.8 miles Nearest grocery store: 3.3 miles CIM Corridor: None Pedestrian level of stress: N/A Bicycle level of stress: N/A A good jobs/housing balance – a ratio between 1 and 1.5 – reduces traffic congestion. Higher numbers indicate the need for more housing and lower numbers indicate an employment need. Residents who live or work less than ½ mile from critical services have more transportation choices. Walking and biking reduces congestion by taking cars off the road, while supporting a healthy and active lifestyle. Level of Stress considers facility type, number of vehicle lanes, and speed. Roads with G or PG ratings better support bicyclists and pedestrians of all ages and comfort levels. Nearest police station: >4 miles Nearest fire station: >4 miles Developments within 1.5 miles of police and fire stations ensure that emergency services are more efficient and reduce the cost of these important public services. Requesting Agency: Total Cost (Prev. + Prog.):$387 Key # :22927 Project Description :Supplement the local pavement preservation program to complete pavement improvements on federal-aid roadways in the Boise Urbanized Area. Work includes improvements to adjoining sidewalks to meet American's with Disabilities Act (ADA) requirements. This project could convert to federal-aid if funds become available. Segments will be determined prior to the obligation in the the design year. Roadway and ADA Improvements, Part 3, Boise Area – FY2027 COMPASS PM: Total Previous Expenditures:$0 Inflated Project Year:2027 Total Programmed Cost:$387 Federal PM:Regionally Significant: ACHD Maintenance Local Match 100.00%Program Hwy - Local PartnershipsFunding Source Local Participating TotalCost Year* Preliminary Engineering Preliminary Engineering Consulting Right-of-Way Utilities Construction Engineering Construction Federal Share Local Share 2025 76 0500 810 0 81 2027 0 306000 3060 0 306 $387Fund Totals:$0$387$306$0$0$0$76$5 Requesting Agency: Total Cost (Prev. + Prog.):$98,640 Key # :20788 Project Description :Preliminary engineering and right-of-way acquisition only on State Highway 16 between Interstate 84 and US Highway 20/26 (Chinden Boulevard) and State Highway 44 (State Street) in Ada and Canyon Counties. Funds will be used to update the environmental re-evaluation, preliminary design through final design, and right-of-way acquisition. (Right-of-way is partially funded and construction is considered "unfunded.") SH-16, I-84 to US 20/26 and SH-44, Ada and Canyon Counties COMPASS PM: Total Previous Expenditures:$91,140 Inflated Project Year:2019-2021 Total Programmed Cost:$7,500 Federal PM:Regionally Significant: ITD Support Local Match 7.34%Program State Hwy - RestorationFunding Source IM TotalCost Year* Preliminary Engineering Preliminary Engineering Consulting Right-of-Way Utilities Construction Engineering Construction Federal Share Local Share 2021 0 007,500 0 7,5000 6,950 551 $551Fund Totals:$6,950$7,500$0$0$0$7,500$0$0 Monday, April 05, 2021 2:22 PM Page 61 of 94*PD = Preliminary Development (projects with development activity but no programmed year of construction) Sorted by Project Name All Values in Thousands of Dollars 124 Fiscal Impact Analysis Supplemental for the Development Review Checklist The purpose of the fiscal impact analysis is to better estimate expected revenues and costs to local governments as a result of new development so that the public, stakeholders, and the decision- makers can better manage growth. Capital and operating expenditures are determined by various factors that determine service and infrastructure needs, including persons per household, student generation rates, lot sizes, street frontages, vehicle trip and trip adjustment factors, average trip lengths, construction values, income, discretionary spending, and employment densities. The COMPASS Development Checklist considers the level of fiscal benefits, how many public agencies benefit or are burdened by additional growth, and how long the proposal will take to achieve a fiscal break-even point, if at all. More information about the COMPASS Fiscal Impact Tool is available at: www.compassidaho.org/prodserv/fiscalimpact.htm. Overall Net Fiscal Impact Net Fiscal Impact, by Agency City Highway District Break Even: County School District