HomeMy WebLinkAboutApplicant Response to Staff ReportDecember 6, 2007
Mr. Bill Parsons
City of Meridian Planning Department
660 East Watertower, Suite 202
Meridian, ID 83642
Via Email: parsonsb meridiancit .or
Re: Verona Commercial
Dear Mr. Parsons:
�■ Quadrant
Consulting, Inc.
RECEIVED
DEC - 6 2007
City ofMeridian
City Clerk Office
We have reviewed the staff report for the above -referenced project. With the follow'
revisions, the staff report is acceptable to the property owner:
mg minor
1• PLANNING DEPARTMENT
REZONE COMMENTS/PROVISIONS
1.1.3
Add Item 4.3: The proposed commercial and office buildings shall be constructed
high quality materials, including but not limited to.: teltured concrete stucco, with
Add Item 4.4: Development of the property shall generall comply, wood ... .
Planning Director, with the conceptual site plan submitted with RZ-07-017 _
Y ply, as determined by the
022. A minimum of 9 4 buildings with no one building exceeding �g gA8 and PP-07
feet shall .... 60,000 square
2. PUBLIC WOE DEPARTMENT
2.15 It shall be the responsibility of the applicant to ensure that all deve
comply with the Americans with Disabilities Act lopment features
Thanks for your help with this project.
Sincerely,
QUADRANT CONSULTING, INC.
Chuc Christensen
Project Manager
If You have any questions, please let me know.
1904 1N. Overland • Boise. ID 83705 . Phone i208j 342-009 t Civil Engineering • Surveying • Construction 3Mannagementail quadrant@quadrpnt.cc