Loading...
HomeMy WebLinkAboutApplicant Response to Staff ReportDecember 6, 2007 Mr. Bill Parsons City of Meridian Planning Department 660 East Watertower, Suite 202 Meridian, ID 83642 Via Email: parsonsb meridiancit .or Re: Verona Commercial Dear Mr. Parsons: �■ Quadrant Consulting, Inc. RECEIVED DEC - 6 2007 City ofMeridian City Clerk Office We have reviewed the staff report for the above -referenced project. With the follow' revisions, the staff report is acceptable to the property owner: mg minor 1• PLANNING DEPARTMENT REZONE COMMENTS/PROVISIONS 1.1.3 Add Item 4.3: The proposed commercial and office buildings shall be constructed high quality materials, including but not limited to.: teltured concrete stucco, with Add Item 4.4: Development of the property shall generall comply, wood ... . Planning Director, with the conceptual site plan submitted with RZ-07-017 _ Y ply, as determined by the 022. A minimum of 9 4 buildings with no one building exceeding �g gA8 and PP-07 feet shall .... 60,000 square 2. PUBLIC WOE DEPARTMENT 2.15 It shall be the responsibility of the applicant to ensure that all deve comply with the Americans with Disabilities Act lopment features Thanks for your help with this project. Sincerely, QUADRANT CONSULTING, INC. Chuc Christensen Project Manager If You have any questions, please let me know. 1904 1N. Overland • Boise. ID 83705 . Phone i208j 342-009 t Civil Engineering • Surveying • Construction 3Mannagementail quadrant@quadrpnt.cc