Loading...
HomeMy WebLinkAboutAgency CommentsSUPERINTENDENT Dr. Linda Clark August 2, 2006 Joint School District 2 911 Meridian Road • Meridian' No. , Idaho 83642 • (208) 855-4500 • Fax (208) 888-6700 City of Meridian 660 E. Watertower Lane Suite 202 Meridian, ID 83642 Dear Planners: 4 t.n &..` R 1 1. The Meridian School District has experienced phenomenal student growth the last ten Years. The high schools, middle schools, and elementary schools throughout are operating over capacity. the district Approval of the Regency at River Valley will have a significant impact on school enrollments at Ustick Element4M Lewis & Clark Middle and Mountain View Hi School. We can predict that these homes, when completed, will house seventy-one (71) elementary aged children, fifty-six (56) middle school aged children, and forty (40) senior high aged students. Additional students will further compound the current overcrowded situation. Residents cannot be assured of attending the neighborhood school, as it ma be necessary to bus students to other schools across the district. y School capacity is addressed in Idaho Code 67-6508. The Meridian School District is currently operating beyond capacity. Future development will continue to have an impact on the district's capacity. If you have any questions, please contact me at 855-4500. S iY.c�u2-el endel Bi rn l gham Building & Construction Manager CqHEALTH CENTRAL DISTRICT CENTF,..L DISTRICT HEALTH DEFRTMENT DEPARTMENT Environmental Health Division Rezone # Conditional Use # _ Preliminary / Final / Short Plat - Z 06 -03 5 Return to: ❑ Boise ❑ Eagle ❑ Garden City ridian ❑ Kuna ❑ACZ ❑ Star 141." %-./ � -L V ❑ 1. We have No Objections to this Proposal. ❑ 2. We recommend Denial of this Proposal. :FFR f A ❑ 3. Specific knowledge as to the exact type of use must be provided before we can comme t on this Proposal. ❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concernin the depth ❑ high seasonal ground water ❑ waste flow characteristics g P of. ❑ or bedrock from original grade ❑ other ❑ 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or surface waters. ❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. 0"8. After written a proval from appropriate entities are submitted, we can approve this proposal for: g ❑ community sewage system ❑ community water well ❑ interim sewage central water ❑ individual sewage ❑ individual water �9. The following plan(s) must be submitted to and approved by the Idaho Department Division of Environmental Quality:of Health &Welfare, central sewage ❑ community sewa e s stem 1-1 sewage d lin g y ❑ community water ry es central water Z(10. Run-off is not to create a mosquito breedingproblem. p blem. ❑ 11. This Department would recommend deferral until high seasonal ground water can be determined if considerations indicate approval. other ❑ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho Sewage Regulations. o State ❑ 13. We will require plans be submitted for a plan review for any: ❑ food establishment ❑ swimming pools or spas ❑ beverage establishment ❑ grocery store ❑ 14. Please see attached stormwater management recommendations ❑ 15. ❑ child care center Date: / c / o Reviewed By: Review Sheet � f1 V 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 11 August 2006 Anna Canning Planning & Zoning Commission City of Meridian 660 F. Watertower Lane Suite 202 Meridian, ID 83642 RE: AZ 06-035; CUP 006-022/Regency @ River Valley Dear Anna: Phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 L 00 AZ 06-035: Nampa & Meridian Irrigation District has no comment on annexation & zoning. CUP 06-022: Nampa & Meridian Irrigation District requires that a Land Use Change Application be filed, for review, prior to final platting. Please contact Donna Moore at 466-7861 for further information. All laterals and waste ways must be protected. The District's Finch Lateral courses along the north boundary of this proposed project. This easement must be protected and any encroachment without a signed License Agreement and approved plan, before any construction is started, is unacceptable. All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site, the Nampa & Meridian Irrigation District must review drainage plans. The developer must comply with Idaho Code 31-3805. It is recommended that irrigation water be made available to all developments within the Nampa &'Meridian Irrigation District. Sincerely, Bill Henson Asst. Water Superintendent Nampa & Meridian Irrigation District BfPdbg C: File - Office/Shop APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 14 August 2006 Greg Rindlisbacher RAMI, LLC 2785 W. 9000 S Jordan, UT 84088 s 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 Phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 RE: Land Use Change Application — The Regency at River Valley Please note the District now requires three (31 sets of Plans Dear Mr. Rindlisbacher: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above -referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with John P. Anderson, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office, or John P. Anderson, at the District's shop. Sincerely, b'ctated by Ms. Moore and mailed without signature In her absence to avoid delay Donna N. Moore, Asst. Secretary/Treasurer NAMPA & MERIDIAN IRRIGATION DISTRICT DNM/smc cc: File Water Superintendent Meridian City Planning & Zoning Commission enc. The Regency at River Valley, LLC, 2785 W 9000 S, West Jordan, UT 84088 APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,00o r" SETT�RS` IRRIGATION DSOTR ICT P.O. BOX 7571 BO!SE, IDAHO 83707-1571 PHONE. 344-2471 FAX: 343-1642 August 2, 2006 Benjamin Clegg Bach Builders & Developers 2785 W. 9000 S. West Jordan, UT 84088 Re: CUP 06-022 Regency at River Valley Dear Mr. Clegg: After review of the Preliminary Plat of the above -mentioned applications Settlers Irrigation District requests the following: 1, All irrigation/drainage facilities along with their easements must be protected and continue to function. 2. A Land Use Change Application must be on file prior to any approvals. 3. A license agreement MUST be signed and recorded prior to construction of any SID facilities, or within its easements. 4. Any changes to the existing irrigation system such as relocation, water delivery, tiling, and landscaping must be approved by Settlers Irrigation District's Board of Directors. 5. All storm drainage must be retained on -site. 6. A pressure irrigation system must be provided to service all lots with irrigation water. If you have any questions please call 343-5271. Sinc r ly, Nathan D er, Manager Settlers Irrigation District Enclosures Cc: City of Meridian Planning Department (w/o enclosures) IDAHO TRANSPORTATION DEPARTMENT P.O, Box 8028 Boise, ID 83707-2028 (208) 33 itd. ide, August 22, 2006 City of MeridianUENED TRANSPORTATION BOARD 33 East Idaho Avenue ;Ib Frank Brunee( Meridian, ID 83642 -" � 4ee C/hai/man Attn: William Berg `if1iY of Meridian John X. Combo CitY Clerk Office 6%ice Chairman Fax: (208) 888-4433 District 6 John McHugh Re: Annexation & Zoning/Conditional /Conditional Use Permit District 1 g Location: East of Eagle Rd & North of Fairview Bruce Sweeney Hearing Date: August 31, 2006 District 2 Applicant/Case #AZ 06-035/CUP 06-022 The Regency at River Monte McClure Valley District 3 Gary Blick Dear Mr. Berg: District 4 Neil Miller The Idaho Transportation Department ITD a District 5 comment on the above referenced application. ppreciates the opportunity to David Ekern; PE Access: Oirectof The application shows access to Eagle Road via River Valley Street and Sue Higgins Regency Lane. The access at Regency is shown as a temporary full BoardSecretaiy access, to be modified to a permanent right in/out access when improvements to River Valley are complete. The location of Regency Lane does not meet ITD spacing requirement. Regency Lane was not shown as a proposed access point in the Eagle Road Study. It would require a variance to ITD policy and Meridian ordinance. No permit application has been submitted to ITD for access to Regency Lane. Without more information, I assume nearly 400 drivers would use this as a primary access for an unidentified period of time. The development is primarily residential with some office space. It will have good access at River Valley Street. I do not believe an additional permanent access point at Regency is needed, or in the interest of the traveling public. Improvements to Eagle Road: ITD requests a copy of the Traffic Impact Study to determine impacts to Eagle Road from the development, and propose development conditions for improvements to mitigate the impact. Typical conditions are construction of turn lanes and signals. Connectivity: Intent to provide connectivity to the adjacent parcels was noted in the application but ) was unsure if the site plan clearly designated cross access to the parcel at the NW corner. Roadside: I did not see any landscaping or sidewalks proposed along Eagle Road. Given the c funding situation for Eagle Road improvements, I would recommend the city requireurrent construction of those features. Y Contacts for further information: Kevin Sablan Matt Ward Sue Sullivan Sincerely, Sue Sullivan Senior Planner Traffic Engineer Permits Coordinator Senior Planner 334-8340 334-8341 334-8955