Loading...
HomeMy WebLinkAboutLetter from Briggs Engineering . - v v . ,. ,¡, '" No. 3555 P. 1 ~. BRIGGS ENGINEERING, Inc. ENGINEERS I PLANNERs I SURVEYORS 1800 West OveIfand Road Boise, ktaho 83705-3142 Voice (208) 344-9100 Fax (208) 34&.2950 February 6, 2006 .'~fJ:~.',;':'< ,f ,'",. Sonya Watters Assistant City Planner City of Meridian 660 E. Watertower Lane Meridian ID 83642 ~:'E'1~1 ,~"} 2006 ""f) " ~. . oi' Me,¡¿¡iÜ', C.lt)' I ~. '",Hie', ~:!ty C ~rh ,- .. Re: Messina Meadows Subdivision No.1 (FP-Os.076) Dear Sonya: The applicant, Tuscany Development, Inc. agrees with all of the conditions in the Staff Report dated February 3, 2006 with the followIng exceptions: Site So9CiRC #12: As part of the development agreement for this property. the applicant is required to connect S. Burgo A venue to the norlh. Prior to signature on the final plat by the City Enginee~ revise plat to include the portion of right-of-way needed to connect Burgo Avenue to the nofth. or include the warranty deed instrument number of the portion of land that was dedicated to ACHD. The applicant agrees to build the roadway extensIon of Burgo Avenue over the Ten Mile Feedsr Canal as rsquested. However, we don't believe that it is necessary to dedicate the right-of-way for the crossing to ACHD. The Bureau of Reclamation has an existIng crossing agreement with ACHD to allow for construction of roadways over their facilities. An agreement will be prepared by the Bureau and signed by all interested partlss allowing construction of the roadway and granting easements for pubJJc utilities prior to signing of the final plat by the City Engineer. General #1: All inigation ditches. laterals or canals. exclusive of natural waterways. intersecting. crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-eA-6... The applicant herby requests approval to re-route, in an open ditch, the Ten Mile Feeder Canal that traverses the SUbject property. ThIs waterway Is a high flow canal that is owned, operated, and maintained by the US Bureau of Reclamation. The design flow rate of this waterway is 3,500 mIners inches or 70 cubic feet per 5O602-Mess1na No.1 FEB 07 '06 17:12 PAr,F.C11 , . ,.." '" No. )JJJ P. 2 ,. }, " ,:. SRI ENGINEE G Inc. -1800 West Overland Road, Boise, Idaho 83705 - (208) 344-9700 second (CFS). The size of pipe required to accommodate this flow Is 54" diameter. Thank you for your continued cooperation in seeing this project to completion. If you have any questions or concerns, please don't hesitate to contact me. Sincerely, ¡J M1 11-, Ben Thomas, PE 2 02106/06 FEB 07 '06 17:12 PAGE. 02