09 September 2021
RE: Inglewood Sub No. 2
3250 E Victory Rd., Meridian
Nampa -Meridian Irrigation District
McDonald Lateral 41+70
Sec. 21, T3N, R1E, BM.
Sonya Allen:
FP-2021-0037
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
TEL: (206) 344-1141
FAX:(208)344-1437
RECEIVED
NM —1078, 1078V
Boise Project approves of this project with the following being noted:
SEP 13 2021
CITY OFC ,,,w,
CITY CLERKS OFFICE
' The United States' McDonald Lateral lies within the boundary of the above -mentioned
location. The easement for this canal is held in the name of the United States through the
Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 3910,
43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this canal. We
assert the federal easement 20 feet south and west and 21 feet north and east of the
canal's centerline. Whereas this area is for the operation and maintenance of our facility,
no activity should hinder our ability to do so.
The Boise Project does not approve landscaping including trees and/or shrubs (other than
grass or gravel) within its easements, as this will certainly increase our cost of
maintenance. All fences and paths must be just off the edge of all Boise Project
easements and they mast remain a flat drivable surface.
Parking lots, curbing, light poles, signs, etc.. and the placing of asphalt and/or cement
over Project facility easements must be approved by Boise Project Board of Control prioi
to construction.
Project facilities and/or easements that parallel, and are within and/or intended to be
within road right -of --ways due to any development of this property must be relocated
outside of road right-of-ways. The easements of Boise Project facilities will remain the
same unless agreed upon and/or approved with written permission from Boise Project
Board of Control.
The construction of any roadway crossings must be conducted only during the non -
irrigation season when the canal is dewatered. In any case no work shall take place
within the easement before the proper crossing agreements have been secured through the
Bureau of Reclamation and the Boise Project Board of Control.
Utilities planning to cross any project facility must do so in accordance with the master
policies now held between the Bureau of Reclamation and most of the utilities. In any
case, no work shall take place within the easement before proper crossing agreements
have been secured through both the Bureau of Reclamation and the Boise Project Board
of Control.
Crossing agreements must be secured and signed by all parties prior to March lst of each
year. A time schedule for the construction to be done during the non -irrigation season
must be approved by Boise Project prior to any activity within Project easements. No
construction will be allowed within the easement boundaries of the Boise Project Board
of Control facilities after March 15'h of each year. However, on a case -by -case basis,
overhead utilities and utilities boring underneath a Project facility may be allowed after
March 15t` if reviewed and approved by the Boise Project.
The piping and relocation of any Lateral, Canal and/or Drain must be reviewed and
approved by the Project and is (to include all appurtenant boxes and/or structures) and
must be warranted by the landowner for a period of (5) five -years. The Warrantee
Agreement must be secured prior to ANY disturbance of that facility. A relocation
agreement must also be procured through the Bureau of Reclamation prior to any
construction within the above -mentioned easement.
Boise Project Board of Control must approve any requests and/or relocation of delivery
points prior to construction.
Storm Drainage and/or Street Runoff must be retained on site.
NO DISCHARGE into any live irrigation system is permitted.
Local irrigation/drainage ditches that cross this property, in order to serve
neighboring properties, must remain unobstructed and protected by an appropriate
easement per Idaho Code
This development is subject to Idaho Code 31-3805, in accordance, this office is
requesting a copy of the irrigation and drainage plans.
Whereas this property lies within the Nampa- Meridian Irrigation District it is important
that representatives of this development contact NMID offices as soon as possible to
discuss a pressure system prior to any costly design work. If applicable, the irrigation
system will have to be built to specific specifications as set by the Districts / Project.
Boise Project Board of Control must receive a written response from Nampa -Meridian
Irrigation District as to who will own and operate the pressure irrigation system prior to
review and approval of an irrigation plan by Boise Project Board of Control.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statues, Title 424209.
Future preliminary and final plats must call out the Project easements and the plats must
also note, which lots have surface irrigation water rights and which lots do not.
Whereas this development is in its preliminary stages, Boise Project Board of Control
reserves the right to review plans and require changes when our easements and/or
facilities are affected by unknown factors after construction begins. The contractor must
contact our division 2 watermaster at 20&342-5086 prior to any construction within
the above -mentioned easement.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Ritthaler
Assistant Project Manager, BPBC