HomeMy WebLinkAboutMemo from Dave McKinnon
RECEIVED
FEB - 7 2006
City Of Meridian
City Clerk Office
DATE:
February 6,2006
ATTN:
Mayor and City Council, City of Meridian
RE:
Tustin Subdivision No. I Final Plat Staff Report
Dear Mayor and Council,
We have reviewed the staff report for Tustin Subdivision No. I and are in agreement with
the recommendation and the "Site Specific Requirements". However, we would like to
clarify one of the recommendations as follows:
Page 2, requirement No. 10 requires the installation of a "pressure reduction
vault" (PRV) to stitch together two separate water pressure zones that come
together on this piece of property. The PR V was not required as a part ofthe
preliminary plat approval and was not included in the construction drawings (or
budget) prepared for this subdivision. We are happy to install the concrete vault
but we would like to see the City install the internal parts of the vault connecting
the two pressure zones. The construction ofthe PRY will effectively loop the
City's water system and we would like to work cooperatively with the City to
loop the system.
We hope that this is agreeable to the City, and we look forward to meeting with you soon.
If you have any questions please contact me at 353-2515 or via e-mail at
dm ckinnon(@,congergroup.com.
Sincerely,
Dave McKinnon
CMG