HomeMy WebLinkAboutChange Order 1 with J.C. Constructors, Inc. for WWTP Expansion Project City of Meridian Public Works Dept. RECEIVED FEB - 3 2006 City Of Meridian City Clerk Office Memo To: William Berg, Jr.; Tara Green From: Clint Doisby, P.E., Staff Engineer cc: Brad Watson, P.E., Public Works Director Date: 02102/2006 Re: Proposed Agenda Items for February 7,2006 City Council Meeting The Public Works Department respectfully requests the following item be placed on the February 7 City Council agenda, under consent agenda, for Council's consideration: ChanQe Order No.1 for the Wastewater Treatment Plant ExDansion Project. Additional work is required for the wastewater treatment plant expansion project. This change order consists of the following work, which is 1.12% of the original contract amount for the project: . Relocate non-potable water (NPW) underground piping out of excavation for Aeration Basins. Construct new biosolids storage pad to make room for construction of Secondary Clarifier 5. Provide temporary drains for DAFT 1 and 2 during construction of the aeration basins. Relocate potable water (PW) supply to the Mechanical Building. Supply standby VFD for existing ABI pumps. Relocate fencing from northwest area of plant site. . . . . . JC Constructors, Inc. submitted a cost for this change order as summarized below: . JC Constructors, Inc. $93,971.56 Recommended Council Action: The Public Works Department recommends that City Council approves Change Order No.1 for the Wastewater Treatment Plant Expansion with JC Constructors, Inc. for $93,971.56 and authorize the Mayor to sign it. Thank you for your consideration. Please contact me if you have any questions regarding any of these items. ePage1 CHANGE ORDER 1 PROJECT: Cíty of Meridian Wastewater Treatment Plant Expansion Project DATE OF ISSUANCE: January 25, 2006 OWNER: City of Meridian CONTRACTOR: IC Constructors, Inc., EFFECTNE DATE: : January 25,2006 ENGINEER: Carono Engineers You are directed to make the following changes in the Contract Documents. 1. Relocate non-potable water (NPW) underground piping out of excavation for Aeration Basins (WCD 001) 2. Construct new biosolids storage pad to make room for construction of Secondary Clarifier 5. (WCD 002) 3. Provide temporary drains for DAFT 1 and 2 during construction of the Aeration Basins. (WCD 003) 4. Relocate potable water (PW) supply to the Mechanical Building (WCD 004) 5. Supply standby VFD for existing ABI pumps (WCD 005) 6. Relocate fencing from northwest area of plant site. (WCD 007) Reason for Change Order: Resolve conflicts with underground utilities different than the locations on the Drawings.(WCD 001 ,003 & 004) Coordinate biosolids handling requirements not included in the Contract (WCD 002). Attachments: IC Constructors Change Proposal 1, Nov. 21, 2005, $7,909.80 (WCD 001) IC Constructors Change Proposal 2, Nov. 16,2005, $53,935.83 (WCD 002) IC Constructors Change Proposal 4, Dec. 7, 2005, $7,361.34 (WCD 003) IC Constructors Change Proposal 3, Dec. 1,2005, $4,832.49 (WCD 004) IC Constructors Change ProposalS, Dec. 21,2005, $5,893.60 (WCD 005) Meridian Fence Quotation dated Se t 22,2005, $14,038.50 (WCD 007) CHANGE IN CONTRACT PRICE: ' CHANGE IN CONTRACT TIMES; Original Contract Price Original Contract Times Substantial Completion: 670 Days - September 1. 2007 Ready for Final Payment: 730 Days - November 1. 2007 - days or datos $8,367,500.00 Net Changes from previous Change Orders No- ~ to No.....Q Net Changes from previous Change Orders No. L to No- 0 $ 0.00 Pays Contract Price prior to this Change Order Contract Times prior to this Change order Substantial Completion: 670 Days - September 1. 2007 Ready for Final Payment: _: 730 Days - November 1. 2007 days or datos $8,367,500.00 Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order) $ 93,971.56 0 days Contract Price with all approved Change Orders $8.461.471.56 Contract Times with all approved Change Orders Substantial Completion: 670 Days - September 1. 2007 Ready for final payment: 730 Days - November 1. 2007 days or dares Date: ACCEPTED BY CON~Z2OR' Co tor (Ar.z°rized rgnature) Da e' , Z. s- (7 ~ , I RECOMMENDED BY ENGINEER: APPROVED BY OWNER: ø~~-- Brad Watson, PE, Pubhc Works Date: /-"Z 1-CJ( {'I Tammy de Weerd, Mayor Attest: Wíllíam G. Berg, IL, City Clerk Date: Date: CHANGE PROPOSAL REQUEST ,," .- '!OJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal # MERIDIAN WWTF JC CONSTRUCTORS 148 1 IMPROVEMENTS 5.CONTRACTNO: 6.PROPOSAL DATE 21-Nov...oS DESCRIPTION OF CHANGE Change due to Work Change Directive #1 on 4" NPW System extension to centrifuge COST SUMMARY A.. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR 1. Direct labor wI labor fringes ( Attach supporting detail estimates with man-houl1> and rates) $ 2,362.21 2. Insurance and Labor Taxes $ 523.53 3. Materials and Equipment. Detailed quantities attached. $ 3,627.75 4. Overhead & Fee @ 15% $ 977.02 $ - TIme Extentlon Requested 2 workinQ day JC Constructon¡' Cost $ 7,490.51 ,.-" "~"r work to be perfonned by subcontractors, per proposals and detailed breakdowns I: SUBCONTRACTOR NAME ~ CATEGORY OF WORK AMOUNT . C & A Paving Asphalt Patch 4' x 24'; 96 SF (â), $3/SF $ 288.00 - . / roTAl SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P); $ 288.00 I XJNTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT @ 5 PERCENT: $ 14.40 ;ONTRACTORS BOND COST@ $.018/1000 $ 116.89 ::. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ 7,909.80 JC CONSTRUCTORS, INC. ß~- A~ CONTRACTOR NAME Jim Co [ - -...... PRINTED NAME ON PROPOSAL SIGNA TU~E ' ~ .. - Page 1, JCC .--c__JC CONSTRUCTORS, INC. -- = Change Proposal Request # Date: 21~Nov-O5 Scope of change: a Change due to Work Change Directive #1 on 4" NPW System extension to centrifuge 0 a a 1 LABOR Foreman Hours 4.00 Labor Rate w/Fringe $ 41.13 Carpenter/Operator Hours 30.00 Labor Rate w/Fringe $ 35.46 Ironworker/Pipe Fitter Hours 0.00 Labor Rate w/Fringe $ 35.46 Laborer/Carp Apprentice Hours 24.00 Labor Rate w/Fringe $ 30.57 Project Management Hours 8.00 Labor Rate w/Fringe $ 50.00 TOTAL LABOR COSTS INCLUDING LABOR FRINGES MATERIAL ,-'--- , ; - ) Material listed below'or from attached detailed material sheets - Sales Tax on Mat'l Other direct material not specifically included in detailed take-off - Consumables, etc. Frei ht from vendor to .ob site if not alread íncluded in above material costs. TOTAL MATERIAL COSTS FOR CHANGE ORDER EQUIPMENT Equipment Description - Equipment Description Est Usage 20 Rate Est Usage 10 Rate Est Usage Rate Est Usage' Rate Est Usage Rate Est Usa e Rate- 35 35 Backhoe Hoe Pac Equipment Description Equipment Description Equipment Description TOTAL EQUIPMENT COSTS FOR CHANGE ORDER Page 2 64.52 063.90 0.00 33.79 00.00 362.21 455.00 22.75 0.00 577.75 00.00 50.00 0.00 0.00 0.00 0.00 050.00 1 7 4 2 2 1 2 7 3 1, C CONSTRUCTORS, INC. ~hange Proposal Request # 1 21 ~Nov-O5 ntrifuge Material ours $/Unit Cost 12.00 3.50 840.00 1.00 150.00 300.00 2.00 210.00 420.00 1.00 150.00 300.00 1.00 80.00 160.00 3.00 40_00 240.00 0.50 60.00 60-00 3.00 1.00 100.00 0.00 5.00 5.00 0.00 5.00 10.00 0.00 5.00 20-00 0.40 0.00 0.20 0.00 0.00 0.00 0.00 0.00 0.00 4.10 Mat" 2455.00 cope of change: 0 Change due to Work Change Directive #1 on 4" NPW System extension to ce 0 0 0 Description Quantíty Unit Labor HrslUnit BUY/INSTALL 4" C-900 PIPE 240.00 LF 0.05 B&I 4" MJ 45 BEND WI MEGALUG 2.00 EA 0.50 8&1 4" MJ TEE WI MEGALUG 2.00 EA 1_00 B&I 4" MJ 90 DEG 8END 2-00 EA 0-50 8&1 4" DRESSER COUPL 2.00 EA 0.50 B&I 4" C-900 BELL RESTR 6-00 EA 0-50 . B&I 4" MJ CAP W/ MEGALUG X 2" NPT 1.00 EA 0_50 8&12" SCH 80 PIPE 100.00 LF 0-03 .,1 2" SCH 80 MALE ADAPTER 1.00 EA 8&1 2" SCH 80 45 DEG BEND 2.00 EA 8&1 2" SCH 80 COUPL 4.00 EA EXC 340' WATERLINE w 4' BURY 340.00 LF 0.06 BACKFILL WATERLINE - 340' 340.00 LF 0.03 Hours Page 3 H 2 5 . q CHANGE PROPOSAL REQUEST ).PROJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal Request No. MERIDIAN WWTP EXPANSION. 148 2 PROJECT JC CONSTRUCTORS 5-CONTRACT NO: 6.PROPOSAL DATE 16.Nov...()S DESCRIPTION OF CHANGE Additional cost to supply a 200' x 140' asphalt sludge drying bed in the Northwestern area of the plant Scope includes; necessary piping systems for drainage, required dirtwork and sloped asphalt with substrate. COST SUMMARY A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR 1. Direct labor wI labor fringes (Attach supporting detail estimates with man-hours and rates) $ 1,713.50 2. Insurance and Labor Taxes $ 423.59 3. Materials wI frgt and SST. Detailed quantities attached. $ 1,030.00 4. Equipment Expense $ 2,300.00 5. Ovemead & Fee @ 15% $ 475.06 $ - Time Extention Requested 3 workina days JC Constructors Proposal Cost $ 5,942.15 '. ! ...: For work to be perfonned by subcontractors, per proposals and detailed breakdowns 1. SUecONTRACTORNAME CATEGORY OF WORK AMOUNT C& A Paving Paving Subcontractors 28,000 sf $ 44,800.00 2 TOTAL SUBCONTRACTOR AMOUNT (INCLUOING SUB. OH&p): $ 44,800.00 3 CONTRACTORS COMMISSION ON TOTAL SUecONTRACTOR AMOUNT @ 5 PeRCENT: $ 2,240.00 CONTRACTORS BOND COST@$.018/1ooo $ 953.68 C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ 53,935.83 JC CONSTRUCTORS, INC. ¡¿,, !J COIVTRACTOR NAME Tim Foley - PRINTED NAME ON PROPOSAL SIG~TURE/DA1E ~ .. ~ Page 1, JCC "' e phalt 5.20 9.20 9.10 .00 0.00 13.50 30.00 .00 .00 30.00 75.00 5.00 .00 .00 .00 .00 00.00- c-"'",- JC CONSTRUCTORS, INC. , -.; Change Proposal Request # Date: 16-Nov-oS Scope of change: Additional cost to supply a 200' x 140' asphalt sludge drying bed in the Northwestern area of th plant. Scope includes; necessary piping systems for drainage, required dirtwork and sloped as with substrate. 0 0 2 LABOR Foreman Hours 15.00 Labor Rate w/Fringe $ 41.68 Cðrpenter/Operator Hours 20.00 Labor Rate w/Frínge $ 33.96 Ironworker/Pipe Fitter Hours 10.00 Labor Rate w/Fringe $ 31.91 Laborer/Carp Apprentice Hours 0.00 Labor Rate w/Fringe $ 29'.07 Project Management Hours 2.00 Labor Rate w/Fringe $ 45.00 TOTAL LABOR COSTS INCLUDING LABOR FRINGES MATERIAL ":::::'::::" ¡ ,/ Material listed below or from attached detailed material sheets - Other dírect material not specíficafly included in detailed take--off - Consumables, etc. Frei ht from vendor to 'ob site if not arread included in above material costs. TOTAL MATERIAL COSTS FOR CHANGE ORDER EQUIPMENT Equipment Description Equipment Description Est Usage Est Usage 25 Rate 5 Rate 75 85 0-5 Dozer Front End Loader Est Usage Est Usage Est Usage Est Usa e TOTAL EQUIPMENT COSTS FOR CHANGE ORDER Rate Rate Equipment Descríption Equipment Description Equipment Description Rate Rate - Page 2 62 67 31 0 9 17 10 a 0 10 18 42 0 0 0 0 2,3 IC CONSTRUCTORS, INC. ~_hange Proposal Request # 2 --~: 16-Nov-OS ~ope of change~ Additional cost to supply a 200' x 140' asphalt sludge drying bed in the Northwestern area of the plant. Scope includes; necessary piping systems for drainage, required dirtwork and sloped asphalt with substrate. 0 0 Description Quantity Unit Labor Material HrsJUnit Hours $/Unit Cost LABOR JC Prepare Suborade for ABC 28000.00 sf 0.15 4200.00 0.00 Excavate, Install and Backfill 8" Drain Line 160.00 If 10.00 1600.00 4.25 680.00 Ramp Preparation 500.00 sf 0.50 250.00 0.00 Buy and Install Catch Basin 1.00 Is 200.00 200.00 350.00 350.00 0.00 0.00 --- 0.00 0.00 0.00 0.00 MATERIAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hours 6250.00 Mat'l 1030.00 Page 3 -.- Iron Worker Laborer & LABOR RATES Foreman Carpenter Operator & Pipe Carp Fitter Appren Current Wage Rate $30.00 $21.00 $23.00 $20.00 $17.00 Retirement, Sick, Vacation Fringe $ 3.75 $ 3.75 $ 3.75 $ 3.75 $ 3.75 Tatar Base + Fringe $33.75 $24.75 $26.75 $ 23.75 $20.75 FICA/Medicare $ 2.70 $ 1.98 $ 2.14 $ 1.90 $ 1.66 Worker's Compensation Insurance $ 4.22 $ 3.09 $ 3.34 $ 2.97 $ 2.59 SUI/FUI $ 2.09 $ 1.53 $ 1.66 $ 1.47 $ 1..29 Liability Insurance $ 1.69 $ 1.24 $ 1.34 $ 1.19 $ 1.04 Total Insurance Burden $10.70 $ 7.85 $ 8.48 $ 7-53 $ 6.58 Holiday $ 0.93 $ 0.69 $ 0.74 $ 0.66 $ 0.57 Medical Insurance $ 3.50 $ 3.50 $ 3.50 $ 3.50 $ 3.50 Indirect Labor Costs Safety $ 1.00 $ 1.25 $ 1.25 $ 1.25 $ 1.50 Small Tools $ 1.50 $ 1.50 $ 1.50 $ 1.50 $ 1.25 Training $ 1.00 $ 1.25 $ 1.25 $ 1.25 $ 1.50 Grand Total Wages & Labor Burden $52.38 $40.78 $43.47 $ 39.44 $35.65 Overtime Rate $73.22 $56.32 $60.21 $ 54.37 $48.90 STRAIGHT TIME The Deduction of Insurance Costs from the Total Gross Amount . Gross $52.38 $40.78 $43.47 $ 39.44 $35.65 Insurance $10.70 $ 7-85 $ 8,48 $ 7.53 $ 6.58 Total Direct Labor Cost $41.68 $32.94 $34.99 $31.91 $29.07 OVERTIME The Deduction of Insurance Costs from the Total aT Gross Amount Gross OT $73.22 $56.32 $60.21 $54.37 $48.90 Insurance $10.70 $ 7-85 $ 8.48 $ 7.53 $ 6.58 Total Direct Labor Cost $62.52 $48.47 $51.73 $ 46.84 $42.33 Page 4 CHANGE PROPOSAL REQUEST 1.PROJECT 2.CONTRACTOR MERIDIAN WWTF IMPROVEMENTS JC CONSTRUCTORS 3.PROJECT NO. 148 5_CONTRACT NO: AMOUNT Change Proposal # 4 SAL DATE 7 -Oec-O5 ns for 1,431.68 326-19 2.540.00 644.68 ~ 4.942.56 2,200-00 2,200,00 110.00 108.79 7.361.34 6.PROPO DESCRIPTION OF CHANGE Additional cost to modify the 2 DAFT drain line systems in and around the excavatio aeration basins 3 I 4 and the new SPS. COST SUMMARY Þ.. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR 1. Direct laborwflaborfringes (Attach supporting detaíl estimates with man-hours and rates) 2. Insurance and Labor Taxes 3. Materials and Equipment Oetaíled quantities attached. 4. Overhead & Fee @ 15% Time Extention Requested 3 workinQ day 6. For work to be perlonned by subcontractors, per proposals and detailed breakdowns I. 3UBCONTRACTOR NAME CATEGORY OF WORK Custom EJec.tric roTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P); I :OtH~ACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT @ 5 PERCENT: ~OI'fffiACTORS BOND COST@ s.o16/10oo C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) JC CONSTRUCTORS, INC. CONTRACTOR NAME Jim Cox PRINTED NAME ON PROPOSAL Page 1, JCC $ $ $ $ $ JC Constructors' Cost $ $ $ $ $ $ JC CONSTRUCTORS, INC. Change Proposal Request # 4 Date: 7 -Dec-OS Scope of change: Additional cost to modify the 2 DAFT drain line systems in and around the excavations for aeration basins 3 / 4 and the new SPS. 0 a 0 LABOR Foreman Hours 5.00 Labor Rate w/Fringe $ 41-13 205-65 Carpenter/Operator Hours 6.00 Labor Rate w/Fringe $ 35.46 212.78 Ironworker/Pipe Fitter Hours 10.00 Labor Rate w/Fringe $ 35.46 354.63 Laborer/Carp Apprentice Hours 15.00 Labor Rate w/Fringe $ 30.57 458.62 Project Management - Hours 4-00 Labor Rate w/Fringe $ 50-00 200.00 TOTAL LABOR COSTS INCLUDING LABOR FRINGES 1431.68 MATERIAL Material listed below or from attached detailed material sheets - 0-00 Buy Pump with Float System 1200.00 Buy PVC piping «100') 250.00 Buy Drain line Manhole 950.00 '-.. - Other direct material not specifically included in detailed take-off - Consumables, etc. 0.00 Frejqht from vendor to job site if not already included in above material costs. TOTAL MATERIAL COSTS FOR CHANGE ORDER 2400.00 EQUIPMENT Equipment Description Trackhoe Est Usage 1 Rate 95 95.00 Equipment Description Compactor Est Usage 1 Rate 45 45.00 Equipment Description Est Usage Rate 0-00 Equipment Description Est Usage Rate 0-00 Equipment Description Est Usage Rate 0-00 Equipment Description Est Usage Rate 0.00 TOTAL EQUIPMENT COSTS FOR CHANGE ORDER 140.00 Page 2 <> ' CHANGE PROPOSAL REQUEST 'ROJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal # MERIDIAN WWTF JC CONSTRUCTORS 148 3 IMPROVEMENTS 5.CONTRACT NO: 6.PROPOSAl DATE 1-Dec~5 =SCRIPTION OF CHANGE tditional cost to install a heat traced, insulated and 1" galvanized line from the North Section of e facility to the existing mechanical building. ST SUMMARY °OR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR ¡irect labor wi labor fringes ( Attach supporting detail estimates with man.-hours and rates) $ 435.08 lsurance and Labor Taxes $ 95.42 ~aterials and Equipment. Detailed quantities attached. $ 140.00 )verhead & Fee @ 15% $ 100.57 $ - Time Extention Requested 0 warkinq day JC Constructonö' Cost $ 771.07 'or work to be perfonned by subcontractors, per proposals and detailed breakdowns :ONTRACTOR NAME CATEGORY OF WORK AMOUNT starn Electric $ 2,300.00 pital City Plumbing $ 1,500.00 . "- SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P): $ 3,800.00 IRACTORS COMMISSiON ON TOTAl SUBCONTRACTOR /\MOUNT @ 5 PERCENT: $ 190.00 fRAGTORS BOND COST @ $.01811000 $ 71.42 .OTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ 4,832.49 JC CONSTRUCTORS, INC. 12LA /~ CONTRACTOR NAME Jim Cox hGNA TURE I VA TE "" ~ PRfNTEV NAME ON PROPOSAL -- Page 1, JCC I ~, ': "". ð. . JC CONSTRUCTORS, INC. Change Proposal Request # 3 Date: 1-Dec-O5 Scope of change: Additional cost to install a heat traced, insulate,d and 1" galvanized line from the North Section of the facility to the existing mechanical building. 0 0 0 LABOR Foreman Hours 0.00 Labor Rate wlFringe $ 41.13 0.00 Carpenter/Operator Hours 6.00 Labor Rate w/Fringe $ 35.46 212.78 Ironworker/Pipe Fitter Hours 0.00 Labor Rate w/Fringe $ 35.46 0.00 Laborer/Carp Apprentice Hours 4.00 Labor Rate wlFringe $ 30.57 122.30 Project Management Hours 2.00 Labor Rate w/Fringe $ 50.00 100.00 TOTAL LABOR COSTS INCLUDING LABOR'FRINGES 435.08 MATERIAL Materiallísted below or from attached detailed material sheets - 0.00 Other direct material not specifically included in detailed take-off - Consumables. etc. 0.00 FreiQht from vendor to iob site if not alreadY included in above material costs. TOTAL MATERIAL COSTS FOR CHANGE ORDER 0;00 EQUIPMENT Equipment Description Trackhoe Est Usage 1 Rate 95 95.00 Equipment Description Compactor Est Usage 1 Rate 45 45.00 Equipment Description Est Usage Rate 0.00 Equipment Description Est Usage Rate 0.00 Equipment Description Est Usage Rate 0.00 .EQuipment Description Est Usage Rate 0.00 TOTAl EQUIPMENT COSTS FOR CHANGE ORDER 140.00 Page 2 ~ CHANGE PROPOSAL REQUEST 1.PROJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal # MERIDIAN WWTF JC CONSTRUCTORS 148 5 IMPROVEMENTS 5.CONTRACT NO: 6.PROPOSAL DATE 21-Dec-O5 DESCRIPTION OF CHANGE Additional cost to have Custom Electric supply a new 1 flex 700, 50 HP VFD as a spare on the ASI pumps. - COST SUMMARY A. FOR CHA-NGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR 1. Direct labor wi labor fringes ( Attach supporting detail estimates with man-hours afld rates) $ - 2. Insurance and Labor Taxes $ - --- 3. Materials and Equipment Detailed quantities attached- $ - 4. Overhead & Fee @ 15% $ - $ ~ Time Extention Requested 3 workina day JC Constructors' Cost $ - - B.. For worK to be performed by subcontractoß, per proposals and detailed breakdowns 1. SUBCO~CTORNAME CATEGORY OF WORK: AMOliNT -- - n- -- --,,- m__n_- -- ..n_- -- -- -..- - ___m- -- ,,------- - -....-- - - - - - -""--..-.... ..-..-- ---..- -- Custom Electric $ 5.530.00 2- TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P): $ 5.530.00 3 COHTAACTORS COMMISSION ON. TOl'Al-SUBCONTRAC-1ORAMOUNT @ S P6RCENT: $ 276.50 CONTRACTORS BOND COST @ $.018/1000 $ 87.1'0 c. TOT AllNCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5 $ 5,893.60 JC CONSTRUCTORS. INC. tL--~ CONTRACTOR NAME Jim Cox PRINTED NAME ON PROPOSAL SJ.wAT \ 0( ~ Page 1, JCC k,~,',~"'-~-L,::',.:~2,":"~,~~~~~~::'.,~~~:::'.::-:"..,~,,-,,,.,, -.,.","....... -'-"""'-W"-"",."..---.. ,W"-",-""",_",m,...---""",.",,. " ""---n """" , "'-'--" ,"""'- ","..-"""."" ."..-'----- ---'-"""""""'.."",m, '"m.." "'-,,-,,',,-",-- ".,-"......,..._"-~~.M~,,.!..~ 2800 West, Idaho Blvd. Emmett, Idaho 83617 Phone: 2(13.365-2700 Fax: 2(13.365-2768 Custom Electric, Inc WCD 005 To: J.c. Canst From: Russell Steadman Fax: 853--5154 Date: December 20, 2005 Phone: 841-7293 Pages: 1 includng this one Re: WCD 005 cc: TIm Foley 0 Urgent 0 For Review 0 Please Comment 0 Please Reply 0 Please Recycle TIm: Here is the price for the WCD ODS. We will provide 1 Flex 700 50 H.P. VFD as a spare to the City of Meridan. It will cost $5530. If you have any questions r;jve me a ælL Thank you, Russell Steadman .. o~,' ','~" .. ~"", ,',"", "" w ". ~,- , ",~",' ,"" -" ", ",,','," ,', ., ,','~,","', ,><, "'-""'-"""',,'C,...,' -.""",','"""',-,,, .',', ',..,,",~,.",-,^, ,""'N,', -','-"",." ,I an.. L Q. LUll OM (: 'f IjflMI"fW M., -"""_.. ~ --- ~;.S4:2¡"p....,- o9-:No.. 6H I. ~.. [I . . :>---' '. ,,' ,¡.--,_.~" ,- "~ .'--- . FAX TRANSMI1T AL 702 W. Franklin Rd. Meridian. let 83842 Pfao.-fZ08)888-6131 . Ftar (208)888..&131 DATE"" 9 ~ Z Z -Qr -0 ~ g"þ' ~t71 ~1Jf;J'11W/ "",;/ AtJr AkJ!' ~. -'"",.., s7o~ / J G ~~J.r;r rt,..,.k vr C? '5;( ~ $' ~ '{¿ß. SO 7~7A"- ;t/~ O!JÆ>. ~