HomeMy WebLinkAboutPZ - Conditional Use Permit Modification wII�IAN=--- Planning Division
CONDITIONAL USE PERMIT MODIFICATION
Checklist
ALL APPLICATIONS MUST BE SUBMITTED ELECTRONICALLY THROUGH CITIZEN ACCESS PORTAL
UPLOAD ALL DOCUMENTS AND DRAWINGS PER THE REQUIRED CHECKLIST,
AS A SINGLE ZIP FILE WITH INDIVIDUAL PDFs
EACH CHECKLIST ITEM MUST BE NAMED ACCORDING TO THE NAMING CONVENTION LISTED BELOW
APPLICATIONS NOT CONTAINING ALL REQUIRED CHECKLIST ITEMS WILL BE DEEMED
INCOMPLETE.INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED
Description Document
Naming Convention
Narrative fully describing the proposed request Narrative
Legal description of the subject property(Lot,Block,and Subdivision name if located in Legal Description
a recorded subdivision OR a metes and bounds legal description of the property if not in a
subdivision
Recorded warranty deed for the subject property Warranty Deed
Affidavit of Legal Interest signed and notarized by the property owner(if owner Affidavit of Legal Interest
is a corporation,submit a copy of the Articles of Incorporation or other evidence to show that the person
signing is an authorized agent)
Scaled vicinity map showing the location of the subject property Vicinity Ma
Approved site plan that is proposed to be modified CUP Approved Site Plan
Scaled site plan showing proposed modification(s) Proposed Site Plan
For new public utility construction water,sewer,reclaimed water applicants are required to submit:
Submit a PDF version of conceptual engineering plans,including pipe sizes and Public Utility Plan
profiles
AutoCad version of the conceptual engineering plans in a format that complies Autocad file
with the specifications for project Drawings found here
Additional Requirements for Commission Approval
Pre-application meeting notes(All applications that require a public hearing are required to Pre-app Notes
conduct a pre-application meeting with the Planning Division
Neighborhood meeting sign-in sheet(Applicants are required to hold a neighborhood Neighborhood Mtg
meeting to provide an opportunity for public review of the proposed project prior to the submittal of
an application.)
The Director may approve or deny specified minor modifications,provided such modifications were not the subject of review during the original
public hearing and will not adversely impact adjacent properties(see UDC 11-5B-6G2).All other modifications shall be considered by the
Planning and Zoning Commission at a public hearing.
Community Development■Planning Division■33 E.Broadway Avenue,Ste. 102 Meridian,Idaho 83642
Phone:208-884-5533 www.meridiancity.org(planning
(Rev:0611812020)