Loading...
2021-08-09 ACHD Staff Report Development Services Department AO CHD 'I 5iia­e Project/File: McFadden Property Annexation and Rezone/ MER21-0089/ H-2021-0048 This is an annexation with rezone and a development agreement with the City of Meridian for a 17.64 acre site. The site is located at the northwest corner of Cherry Lane and Meridian Road. Lead Agency: City of Meridian Site address: 104 W Cherry Ln Commission fi � +rr g-r ZqW Meeting: XXXX, 202Xa '�+ ,� Staff Approval: XXXX, 202X IL� L Applicant/ Representative: Doug Tamura 1124 E Santa Maria Dr Boise ID 83712 Owner: Kobe, LLC `"!" �`"p ;�� 1124 E Santa Maria Dr Boise, ID 83712 Staff Contact: Kelly Bruner Phone: 387-6132 E-mail: kbrunerC@achdidaho.org A. Findings of Fact 1. Description of Application: The applicant is requesting approval for an annexation of 17.64 acres into the City of Meridian, a rezone from RUT (Rural-Urban Transition)to C-G (General Retail and Service Commercial) and a development agreement with the City of Meridian. The Applicant's rezone proposal is consistent with the City of Meridian's comprehensive plan,which designates this area as Mixed Use Community. 2. Description of Adjacent Surrounding Area: Direction I Land Use Zoning North Limited Office & Medium-Low Density Residential L-O & R-4 South Old Town O-T East Community Business C-C West Limited Office & Medium Density Residential L-O & R-8 3. Site History: ACHD has not previously reviewed this site for a development application. 1 DRAFT McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 4. Transit: Transit services are not available to serve this site. 5. New Center Lane Miles: The proposed development includes 0 centerline miles of new public road. 6. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 7. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): • Fairview Avenue is listed in the 2020 CIP to be widened to 7 lanes from Meridian Road to Locust Grove Road between 2036 and 2040. 8. Roadways to Bikeways Master Plan: ACHD's Roadways to Bikeways Master Plan (BMP) was adopted by the ACHD Commission in May of 2009 and was updated in 2018. The plan seeks to implement the Planned Bicycle Network to support bicycling as a viable transportation option for Ada County residents with a wide range of ages and abilities, maintain bicycle routes in a state of good repair in order to ensure they are consistently available for use, promote awareness of existing bicycle routes and features and support encouragement programs and to facilitate coordination and cooperation among local jurisdictions in implementing the Roadways to Bikeways Plan recommendations. The BMP identifies Meridian Road as a Level 2 facility and Cherry Lane as a Level 3 facility that will be constructed as part of a future ACHD project. B. Traffic Findings for Consideration 1. Trip Generation: Below is a chart with the land use and estimated trip generation rates for the use that may be included within the site. Trip generation rates are based on the Institute of Transportation Engineers Trip Generation Manual, 101" edition. Use Avg. Daily Trips Avg. PM Peak Hour Multifamily Low-Rise 7.32 0.56 Unit General Office Building 9.74 1.15 (1,000 sf) Medical/Dental Office 34.80 3.46 1,000 sf Variety Store 63.47 6.84 (1,000 sf) Coffee/Donut Shop w/ Drive Thru 820.38 43.38 1,000 sf A traffic impact study is required for developments that are proposed to generate more than 100 PM peak hour trips consistent with District Policy 7106. Additional analysis may also be required for the access proposed with the future development application if a traffic impact study is not required. The applicant should contact ACHD to determine if a traffic impact study or additional access analysis is warranted when there is a conceptual site plan prior to the submittal of the future development application. 2. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) 2 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 Roadway Frontage Functional PM Peak Hour PM Peak Hour Level Classification Traffic Count of Service Cherry Lane 590-feet Principal Arterial 1,295 Better than "E" Meridian Road 1,280-feet Minor Arterial 1,022 Better than "E" • Acceptable level of service for a five-lane principal arterial is "E" (1,780 VPH) • Acceptable level of service for a five-lane minor arterial is "E" (1,540 VPH). 3. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD's most current traffic counts. • The average daily traffic count for Cherry Lane west of Meridian Road was 24,972 on 11/14/17. • The average daily traffic count for Meridian Road south of Ustick Road was 19,180 on 03/20/19. C. Findings for Consideration This application is for annexation and rezone only. Listed below are some findings for consideration that the District may identify when it reviews a future development application. The District may add additional findings for consideration when it reviews a specific redevelopment application. 1. Plans and Studies Fairview Avenue Access Management The Fairview Avenue Corridor Management Plan, adopted in February 2014, identified various strategies to improve safety and mobility along the Fairview Avenue Corridor, between Linder Road and Orchard Street. Identified strategies include but are not limited to: reducing the number of driveways and consolidating existing access points, adding bike and pedestrian facilities including reconstruction of driveways to meet ACHD standards, removing access conflicts at intersections including left turn medians, and street lighting. Further, the ACHD Commission directed the use of mid-block non-traversable medians occur only after efforts have been made to employ the other identified strategies and with subsequent Commission approval. The vision of this Plan is that it be implemented through development and redevelopment of the corridor and through subsequent Commission-approved ACHD projects. 2. Cherry Lane a. Existing Conditions: Cherry Lane is improved with 5-travel lanes, vertical curb, gutter, and 7- foot wide attached concrete sidewalk abutting the site to the east of the existing driveway on Cherry Lane. There is 5-foot wide attached concrete sidewalk abutting the site to the west of the driveway. There is 98-feet of right-of-way for Cherry Lane (45-feet from centerline). b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state that the standard 5-lane street section shall be 72-feet (back-of-curb to back-of-curb)within 96- 3 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 feet of right-of-way. This width typically accommodates two travel lanes in each direction, a continuous center left-turn lane, and bike lanes on a minor arterial and a safety shoulder on a principal arterial. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing streets adjacent to a proposed development may be required. These improvements are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or replacement; curb and gutter construction or replacement; replacement of unused driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement repairs; signs; traffic control devices; and other similar items. ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Cherry Lane is designated in the MSM as a Mobility Arterial with 7-lanes and on-street bike lanes, a 99-foot street section within 124- feet of right-of-way. c. Staff Comments/Recommendations: Cherry Lane is already improved with 5-lanes, curb, gutter and 7-foot wide attached concrete sidewalk on the east side of the existing driveway within 98-feet of right-of-way. Therefore, staff does not recommend any additional improvements be required with the future development application except that the applicant should be required to construct a 5-foot wide detached concrete sidewalk with a 6-foot wide parkway strip or a 7-foot wide attached concrete sidewalk to the west of the existing driveway on to Cherry Lane abutting the site. Provide a permanent right-of-way easement to 2-feet behind back of sidewalk for any sidewalk placed outside of the dedicated right-of-way. This section of Cherry Road is listed in the MSM to be widened to 7-lanes. To accommodate the future widening, the applicant should be required to dedicate additional right-of-way to total 62-feet from centerline of Cherry Lane abutting the site, as part of a future development application. 4 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 The applicant should be required to replace any deteriorated segments of curb, gutter and sidewalk on Cherry Lane abutting the site consistent with the District's Minor Improvements Policy. 3. Meridian Road a. Existing Conditions: Meridian Road is improved with 5-travel lanes, vertical curb, gutter, and 5-foot wide concrete sidewalk abutting the site. There is 96-feet of right-of-way for Meridian Road (48-feet from centerline). b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state that the standard 5-lane street section shall be 72-feet (back-of-curb to back-of-curb)within 96- feet of right-of-way. This width typically accommodates two travel lanes in each direction, a continuous center left-turn lane, and bike lanes on a minor arterial and a safety shoulder on a principal arterial. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing streets adjacent to a proposed development may be required. These improvements are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or replacement; curb and gutter construction or replacement; replacement of unused driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement repairs; signs; traffic control devices; and other similar items. 5 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Meridian Road is designated in the MSM as a Residential Arterial with 5-lanes and on-street bike lanes, a 72-foot street section within 96-feet of right-of-way. c. Staff Comments/Recommendations: ACHD widened Meridian Road to 5-lanes between Cherry Lane and Ustick Road in October of 2020 consistent with the MSM and CIP. Therefore, the applicant should not be required to make any additional improvements or right- of-way dedication on Meridian Road abutting the site with the future development application. The applicant should be required to replace any deteriorated segments of curb, gutter and sidewalk on Meridian Road abutting the site consistent with the District's Minor Improvements Policy. 4. Internal Local Streets a. Existing Conditions: There are no local streets within the site. b. Policy: Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for improving all local street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way widths for all local streets shall generally not be less than 47-feet wide and that the standard street section shall be 33-feet (back-of-curb to back-of-curb). Standard Urban Local Street-33-foot Street Section and Right-of-way Policy: District Policy 7207.5.2 states that the standard street section shall be 33-feet (back-of-curb to back-of- curb)for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 47-feet of right-of-way. For the City of Kuna and City of Star: Unless otherwise approved by Kuna or Star, the standard street section shall be 36-feet (back-of-curb to back-of-curb) for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 50-feet of right-of-way. Continuation of Streets Policy: District Policy 7207.2.4 states that an existing street, or a street in an approved preliminary plat, which ends at a boundary of a proposed development shall be extended in that development. The extension shall include provisions for continuation of storm drainage facilities. Benefits of connectivity include but are not limited to the following: • Reduces vehicle miles traveled. • Increases pedestrian and bicycle connectivity. • Increases access for emergency services. • Reduces need for additional access points to the arterial street system. • Promotes the efficient delivery of services including trash, mail and deliveries. • Promotes appropriate intra-neighborhood traffic circulation to schools, parks, neighborhood commercial centers, transit stops, etc. • Promotes orderly development. Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is required on both sides of all local street, except those in rural developments with net densities of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot 6 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 frontage, in which case a sidewalk shall be constructed along one side of the street. Some local jurisdictions may require wider sidewalks. The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least 8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to provide increased safety and protection of pedestrians and to allow for the planting of trees in accordance with the District's Tree Planting Policy. If no trees are to be planted in the parkway strip, the applicant may submit a request to the District, with justification, to reduce the width of the parkway strip. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Cul-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to provide a minimum turning radius of 45-feet; in rural areas or for temporary cul-de-sacs the emergency service providers may require a greater radius. Landscape and parking islands may be constructed in turnarounds if a minimum 29-foot street section is constructed around the island. The pavement width shall be sufficient to allow the turning around of a standard AASHTO SU design vehicle without backing. The developer shall provide written approval from the appropriate fire department for this design element. The District will consider alternatives to the standard cul-de-sac turnaround on a case-by-case basis. This will be based on turning area, drainage, maintenance considerations and the written approval of the agency providing emergency fire service for the area where the development is located. Landscape Medians Policy: District policy 7207.5.16 states that landscape medians are permissible where adequate pavement width is provided on each side of the median to accommodate the travel lanes and where the following is provided: • The median is platted as right-of-way owned by ACHD. • The width of an island near an intersection is 12-feet maximum for a minimum distance of 150-feet. Beyond the 150-feet, the island may increase to a maximum width of 30-feet. • At an intersection that is signalized or is to be signalized in the future, the median width shall be reduced to accommodate the necessary turn lane storage and tapers. • The Developer or Homeowners Association shall apply for a license agreement if landscaping is to be placed within these medians. • The license agreement shall contain the District's requirements of the developer including, but not limited to, a "hold harmless" clause; requirements for maintenance by the developer; liability insurance requirements; and restrictions. • Vertical curbs are required around the perimeter of any raised median. Gutters shall slope away from the curb to prevent ponding. c. Staff Comments/Recommendations: As part of a future development application, the applicant should be required to design and construct the internal local streets to meet ACHD District policies listed above. 5. Roadway Offsets a. Existing Conditions: There are no roadways within the site. 7 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 b. Policy: Local Street Intersection Spacing on Principal Arterials: District policy 7205.4.3 states that new local streets should not typically intersect arterials. Local streets should typically intersect collectors. If it is necessary, as determined by ACHD, for a local street to intersect an arterial, the minimum allowable offset shall be 1,320-feet as measured from all other existing roadways as identified in Table 1 b (7205.4.7). Local Street Intersection Spacing on Minor Arterials: District policy 7205.4.3 states that new local streets should not typically intersect arterials. Local streets should typically intersect collectors. If it is necessary, as determined by ACHD, for a local street to intersect an arterial, the minimum allowable offset shall be 660-feet as measured from all other existing roadways as identified in Table la (7205.4.6). Collector Offset Policy: District policy 7205.4.2 states that the optimum spacing for new signalized collector roadways intersecting minor arterials is one half-mile. District policy 7205.4.2 states that the optimum spacing for new signalized collector roadways intersecting principal arterials is one half-mile. District policy 7206.4.2 states that the optimum spacing for unsignalized collectors intersecting minor arterial roadways is 1,320-feet. District policy 7206.4.2 states that the preferred spacing for new collectors intersecting existing collectors is '/4 mile to allow for adequate signal spacing and alignment. District policy 7206.4.5, states that the preferred spacing for a new local street intersecting a collector roadway to align or offset a minimum of 330-feet from any other street (measured centerline to centerline). Local Offset Policy: District policy 7207.4.2, requires local roadways to align or provide a minimum offset of 125-feet from any other street (measured centerline to centerline). District policy 7208.4.2, requires commercial roadways intersecting other local streets (residential, industrial or commercial) to provide a minimum offset of 125-feet from any other roadway or intersection (measured centerline to centerline). District policy 7209.4.2, requires industrial roadways intersecting other local streets (residential, industrial or commercial) to provide a minimum offset of 125-feet from any other roadway or intersection (measured centerline to centerline). c. Staff Comments/Recommendations: As part of a future development application, the applicant should construct the roadway intersections to meet ACHD District policies listed above. The applicant should be required to construct the entrance streets to intersect Meridian Road, a minor arterial road, since it is a lesser classified street than Cherry Lane which is classified as a principal arterial road. 6. Driveways 6.1 Cherry Lane a. Existing Conditions: There is an existing 26-foot wide curb return type driveway from the site on to Cherry Lane located 314-feet west of Meridian Road. b. Policy: Access Points Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is 8 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. Access Policy: District policy 7205.4.7 states that direct access to principal arterials is typically prohibited. If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. If it is necessary to take access to the higher classified street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1 b under District policy 7205.4.7, unless a waiver for the access point has been approved by the District Commission. Driveways, when approved on a principal arterial shall operate as a right-in/right-out only, and the District will require the construction of a raised median to restrict the left turning movements. Driveway Location Policy: District policy 7205.4.7 requires driveways located on principal arterial roadways to be located a minimum of 355-feet from the nearest intersection for a right- in/right-out only driveway. Full-access driveways are not allowed on principal arterial roadways. Successive Driveways: District policy 7205.4.7 Table 1 b, requires driveways located on principal arterial roadways with a speed limit of 35 MPH to align or offset a minimum of 355-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or more) to a maximum width of 36-feet and low-volume driveways (less than 100 VTD) to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high- volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7205.4.8, the applicant should be required to pave the driveway its full width and at least 30- feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7205.4.8. Temporary Access Policy: District Policy 7202.4.2 identifies a temporary access as that which "is permitted for use until appropriate alternative access becomes available". Temporary access may be granted through a development agreement or similar method, and the developer shall be responsible for providing a financial guarantee for the future closure of the driveway. Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so that the driver does not need to re-enter the public street system. c. Staff Comments/Recommendations: Consistent with ACHD Access policy, access to Cherry Lane, a principal arterial roadway is prohibited and should be taken from Meridian Road, a lesser classified street, as part of a future development application. The existing access on Cherry Lane is not guaranteed to be allowed by ACHD as part of the future development application. If access is requested on Cherry Lane, an access analysis may be required to be submitted to ACHD for review prior to the submittal of the development application. 6.2 Meridian Road a. Existing Conditions: There is an existing 26-foot wide curb return type driveway from the site onto Meridian Road located 528-feet north of Cherry Lane. b. Policy: Access Points Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is 9 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. Access Policy: District policy 7205.4.6 states that direct access to minor arterials is typically prohibited. If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. If it is necessary to take access to the higher classified street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1 a under District policy 7205.4.6, unless a waiver for the access point has been approved by the District Commission. Driveway Location Policy: District policy 7205.4.5 requires driveways located on minor arterial roadways from a signalized intersection with a single left turn lane shall be located a minimum of 330-feet from the nearest intersection for a right-in/right-out only driveway and a minimum of 660-feet from the intersection for a full-movement driveway. District policy 7205.4.5 requires driveways located on minor arterial roadways from a signalized intersection with a dual left turn lane shall be located a minimum of 330-feet from the nearest intersection for a right-in/right-out only driveway and a minimum of 710-feet from the intersection for a full-movement driveway. Successive Driveways: District policy 7205.4.6 Table 1 a, requires driveways located on minor arterial roadways with a speed limit of 35 MPH to align or offset a minimum of 330-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or more) to a maximum width of 36-feet and low-volume driveways (less than 100 VTD) to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high- volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7205.4.8, the applicant should be required to pave the driveway its full width and at least 30- feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7205.4.8. Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so that the driver does not need to re-enter the public street system. c. Staff Comments/Recommendations: The future development application will be subject to the District policies listed above. 6.3 Local Streets a. Existing Conditions: There are no local streets within the site. b. Policy: Driveway Location Policy: District policy 7207.4.1 requires driveways near intersections to be located a minimum of 75-feet (measured centerline-to-centerline) from the nearest local street intersection, and 150-feet from the nearest collector or arterial street intersection. Successive Driveways: District Policy 7207.4.1 states that successive driveways away from an intersection shall have no minimum spacing requirements for access points along a local street, but the District does encourage shared access points where appropriate. 10 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 Driveway Width Policy: District policy 7207.4.3 states that where vertical curbs are required, residential driveways shall be restricted to a maximum width of 20-feet and may be constructed as curb-cut type driveways. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.4.3, the applicant should be required to pave the driveway its full width and at least 30- feet into the site beyond the edge of pavement of the roadway. c. Staff Comments/Recommendations: The future development application will be subject to the District policies listed above. 7. Private Roads a. Private Road Policy: District policy 7212.1 states that the lead land use agencies in Ada County establish the requirements for private streets. The District retains authority and will review the proposed intersection of a private and public street for compliance with District intersection policies and standards. The private road should have the following requirements: • Designed to discourage through traffic between two public streets, • Graded to drain away from the public street intersection, and • If a private road is gated, the gate or keypad (if applicable) shall be located a minimum of 50-feet from the near edge of the intersection and a turnaround shall be provided. b. Staff Comments/Recommendations: If the City of Meridian approves a private road with the future development application, the applicant shall be required to pave the private roadway its full width and at least 30-feet into the site beyond the edge of pavement of all public streets and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. If private roads are not approved by the City of Meridian, the applicant will be required to revise and resubmit the preliminary plat to provide public standard local streets in these locations. Street name and stop signs are required for the private road. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. ACHD does not make any assurances that the private road, which is a part of this application, will be accepted as a public road if such a request is made in the future. Substantial redesign and reconstruction costs may be necessary in order to qualify this road for public ownership and maintenance. The following requirements must be met if the applicant wishes to dedicate the roadway to ACHD: • Dedicate a minimum of 50-feet of right-of-way for the road. • Construct the roadway to the minimum ACHD requirements. • Construct a stub street to the surrounding parcels. 8. Traffic Calming a. Speed Control and Traffic Calming Policy: District policy 7207.3.7 states that the design of local street systems should discourage excessive speeds by using passive design elements. If the design or layout of a development is anticipated to necessitate future traffic calming implementation by the District, or the streets extend greater than 750-feet in length, then the District will require changes to the layout and/or the addition of passive design elements such as horizontal curves, bulb-outs, chokers, etc. The District will also consider texture changes to the roadway surface (i.e. stamped concrete) as a passive design element. These alternative methods may require maintenance and/or license agreement. 11 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 b. Staff Comments/Recommendations: The future development application will be subject to the District policy listed above for public roads. 9. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 10. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 11. Other Access Cherry Lane is classified as a principal arterial roadway and Meridian Road is classified as a minor arterial roadway. Other than the access specifically approved with the future development application, direct lot access is prohibited to these roadways and should be noted on the final plat with the future development application. Access for the site will be evaluated at the time of the future development application. D. Site Specific Conditions of Approval This application is for annexation and rezone only. Site specific conditions of approval will be established as part of the future development application. 1. Payment of impact fees is due prior to issuance of a building permit. 2. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 12 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled)are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. F. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. G. Attachments 1. Vicinity Map 2. Site Plan 3. Utility Coordinating Council 4. Development Process Checklist 5. Request for Reconsideration Guidelines OR Appeal Guidelines 13 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 VICINITY MAP Sl -�- ) I•k'fir���}"r�' _.. ''� 7� _�_`� a }` � i� jl, � W WWr/r... A ,r F r,�-�••;,,d "r+� ! _.� - -_ _ i I.l,l�`,lnlirll)f r 1 )y d 4r1 >F1 Ate,{ ♦ �� SFP^ u } F�r}a ,W Criiil„•rlll �.r.• lllrndge St E[.Irnl«-I I7r _ k �. I • �� Y � .. ..- 1 � Y � � _ ter- .'. -.� � �7 I'� �5�_ 1 I1[ WjEhe[, Ln �� - - ��� - •x'"`_ - _ E Fa lrvk ev Ave - ryl I rl I� e n t a 1 m e l AF 14 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 SITE PLAN z W 4 G f k iz i �mt 4a � } s10 Da Q ' _ jM" awIwr- CIS- �K2i't-'j xl h 1p 3n � 'lK I � � jig a ❑ � 1 a e � ~III Ig GIs a , a900 srs�u s ers's'.0 w of �f2 "srrsi w srncsr' 8. FAlRYlEW AVE — H: CNEERt LN. 1l 7 15 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5)working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to:50 S. Cole Rd. Boise 83707, or Visit iducc.com for e-mail notification information. 16 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 Development Process Checklist Items Completed to Date: ®Submit a development application to a City or to Ada County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Section will receive the development application to review ®The Planning Review Section will do one of the following: ❑Send a"No Review" letter to the applicant stating that there are no site specific conditions of approval at this time. ®Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Items to be completed by Applicant: ❑For ALL development applications, including those receiving a "No Review" letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD,then architectural plans may be submitted for purposes of impact fee assessment.) • The applicant is required to get a permit from Construction Services(ACHD)for ANY work in the right-of-way, including, but not limited to,driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non-Subdivisions) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request"form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application"to ACHD Construction—Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment&Erosion Submittal • At least one week prior to setting up a Pre-Construction Meeting an Erosion &Sediment Control Narrative&Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ❑ Final Approval from Development Services is required prior to scheduling a Pre-Con. 17 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the Development Services Manager when it is alleged that the Development Services Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary and Clerk of the District, which must be filed within ten (10)working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The Development Services Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the Development Services Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 18 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048 Request for Reconsideration of Commission Action 1. Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 11:00 a.m. 2 days prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. 19 McFadden Property Annexation/Rezone M ER21-0089/ H-2021-0048