HomeMy WebLinkAboutACHD CommentPPR-19-2001 THU 01:27 PM ELAM & BURKE FAX NO. 2083845844 P. 01
ELAM & BURKE
A Professional Association
ATTORNEYS AND COUNSELORS AT LAW
Estahlished in 1928
KEY FINANCIAL CENTER
TELEPHONE
702 WEST IDAHO
208-343-5454
POST OFFICE SOX 1538
BOISE, IDAHO 83701
FACSIMILE
SCOTT L. CAMPBELL
208-384-5544
FACSIMILE. TRANSMISSION
April 19, 2001
Please deliver the following pages to:
NAME: Shari Stiles, Planning and Zoning Administrator
COMPANY: CITY OF MERIDIAN
FAX #: (208) 888-6854
SENDER: Scott L. Campbell
TOTAL NUMBER OF PAGES (including this page): 3
FAXED MATERIAI, DESCRIPTION OR COMMENTS:
Scott L. Campbell's Letter of April 19, 2001, Re: Bridge Tower Subdivision
CONFIDENTIALITY NOTICE,
lire information in this facsimile is cunfidential and intended only for the use of the addressee. The data transmitted is
attorney privileged and may be exempt from disclosure. Do not copy or distribute to anyone other than the addressee.
Reliance on this data by other than the intended recipient is prohibited. Plcasc notify us immediately if you have
mcuived this communication in error. Upon notification we will arrange for return of the fax copies to Elam & Burke,
P.A. Thank you for your aysistancc.
Original documents will:
[ J follow by regular hail
[ J Follow by Federal Express
( xx ) Nut be sent unless required for processing
If you have any probJen v receiving, please call Dawn Peckham at (208) 343-5454.
Date Cumpleted: April 19, 2001
l_'' " 1C 101 LVV i __ - .— — v vv1a I——
�- RECEIVED
APR 18 2001
ADA COUNTY HIGHWAY DISTRICT CITYOFMERIDIAN
Planning and Development Division
Development Application Report
Preliminary Plat — Bridgetower Crossing/MPP01-005 Ten MileiMcMillan Road 336-lots
This application has been referred to ACHD by the City of Meridian for review and comment. Staff is
recommending approval of a preliminary plat for a 336-lot residential, commercial, and office subdivision
on 175.9 1 -acres. The 175.91-acre site is located at the southeast confer of Ten Mile Road and McMillan
Road. The applicant submitted four separate applications, and staff is only commenting on the proposed
plat at this time. This development (only the preliminary plat) is estimated to generate up to 12,118
vehicle trips per day based on the submitted traffic study.
On April 18, 2001, the ACHD Commission approved staff to release this draft report to the City
of Meridian Planning & Zoning Commission with revisions to this report as directed by the
Commission. The ACHD Commission will not make final recommendations on this plat until the
ACHD Commission and Meridian City Council have had the opportunity to discuss development
in this area.
Roads impacted by this development: Ustick Road
Ten Mile Road
McMillan Road
Linder Road
ACHD Commission Date — April 18, 2001 — 12:00 p.m.
Facts and Findings:
A. General Information
Owner — E.L. Bews, Chandos Hoaglun & Young Lands, Ltd
Applicant — Primeland Development Co., LLP
RUT & R-4 - Existing zoning
175.91- Acres
336 - Proposed building lots
259-Single family lots
59-Townhome lots
8-Office lots
10-Commercial lots
58-Proposed common lots
349,000-Square feet of office
165,000-Square feet of commercial
256 - Traffic Analysis Zone (TAZ)
Meridian - Impact Fee Service Area
West Ada - Impact Fee Assessment District
Bridgetower. cmm
Page 1
ODD 10 i FA 1 1C.10 Dore M--)
-- . - - - Sri -icy FrI12" • .j, i .
Bridgetower Crossing Subdivision
Ten Mile Road, McMillan Road, Ustick Road
E
1000 0 1000 2000 Feet bV
S
Bridgetower. cmm
Page 2
APR 18 let 16:19 pnrlp_Rl
iJ•JJ ��I 11 1V/
101CG
r-Htz.'
Ustick Road
Ustick Road is a minor arterial with bike lane designation
Traffic count on Ustick Road west of Linder Road was 5,318 on 8/16/00
Better than "C" -Existing Level of Service
"C" -Existing plus project build -out Level of Service
700-feet of frontage
50-feet existing right-of-way (25-feet from centerline)
96-feet required right-of-way (48-feet from centerline)
Ustick Road is improved with two traffic lanes with no curb, gutter or sidewalk abutting the site.
The Ustick Road intersections with Ten Mile Road and Linder Road are four-way STOP
controlled. The applicant is not proposing any new access points to Ustick Road.
Ten Mile Road
Ten Mile Road is a minor arterial with bike lane designation
Traffic count on Ten Mile Road north of Ustick was 2,168 on 5111/99
Better than "C" -Existing Level of Service
Better than "C" -Existing plus project build -out Level of Service
2,600-feet of frontage
50-feet existing right-of-way (25-feet from centerline)
96-feet required right-of-way (48-feet from centerline)
Ten Mile Road is improved with two traffic lanes with no curb, gutter or sidewalk abutting the
site. The applicant is proposing to construct one public street and three driveways to access Ten
Mile Road.
McMillan Road
McMillan Road is a minor arterial with bike lane designation
Traffic count on McMillan Road west of Linder Road was 1,133 on 9/13/00.
Better than "C" -Existing Level of Service
Better than "C" -Existing plus project build -out Level of Service
1,240-feet of frontage
50-feet existing right-of-way (25-feet from centerline)
96-feet required right-of-way (48-feet from centerline)
McMillan Road is improved with two traffic lanes with no curb, gutter or sidewalk abutting the
site. The McMillan Road/Linder Road intersection is four-way STOP controlled. The McMillan
Road/Ten Mile Road intersection is two-way STOP controlled only on the McMillan Road
approaches. The applicant is proposing to construct one public street and three driveways to access
McMillan Road.
Linder Road
Linder Road is a minor arterial with bike lane designation
Bridgetower. cmm
Page 3
APR 1R 101 15:20 pone Aa
Traffic count on Linder Road north of Ustick Road was 5,067 on 5/2/00
Better than "C" -Existing Level of Service
"C" -Existing plus project build -out Level of Service
0-feet of frontage (with this plat application)
Linder Road is improved with two traffic lanes with no curb, gutter or sidewalk abutting the site.
B. The applicant has submitted four separate applications:
1. MZA01-001 —Planned Unit Development
2. MAZO1-003 —Annexation and zoning of 371.42-acres from RUT to R-4 and C-G
3. MPPO1-005 —Preliminary plat for 336 building lots on 175.91-acres in proposed R-4 and C-G
zone
4. MCUPOI-006 — Conditional use permit for 692 single-family lot, 59 townhomes, 17 office lots
and 10 commercial lots on 370.55-acres in proposed R-4 and C-G zone (includes lots in
preliminary plat)
(The maps are labeled by application number.)
C. Staff is recommending that the Commission act only on the plat for 336 building lots on 175.91-
acres. The conditional use permit includes 778 buildable lots, and may present traffic problems that
staff is not yet ready to address. The abutting roadways can handle the additional traffic generated
by the preliminary plat alone. The remainder of the site (under the CUP application) includes 485
additional single-family lots, and an elementary school, and access to Linder Road via a public
street.
D. Staff has been receiving inquiries from developers in this northwest Meridian area. Many
developers are prepared to plat entire section -miles, and have site plans developed. The preliminary
plans generally include 700 to 900 residential lots, schools, and office/commercial lots. However,
the developers cannot submit their applications for these plans until their property has an annexation
path to the Meridian city limits.
The applicant's traffic engineer, and an engineer representing another developer in the area, realized
that the potential for development in this area is extreme, and that the traffic impact studies that each
individual developer were submitting, did not include the major surrounding developments that are
"in the works". If you were to look at each development individually, the roadway system is
adequate, but when you start adding in a second or third large-scale development, the traffic
capacities of these roadways (Ustick Road, McMillan Road, Ten Mile Road, Linder Road) reach
their 2020 planning thresholds.
Based on development patterns in this area, and the concern surrounding the abutting roadways,
staff has hired a consultant from the "on -call" list to conduct a traffic impact study of the
northwestern Meridian area from Ustick Road to Chinden Boulevard, and from Meridian Road to
one-half mile west of Black Cat Road. The study is currently in "DRAFT" form while ACHD staff,
City of Meridian staff, and COMPASS staff review the preliminary findings. From the end product
of the study, staff anticipates implementing an extra -ordinary impact fee overlay district to pay for
roadway improvements (mainly widening and traffic signals) to these surrounding roadways. Staff
estimates that it will take three to four months to determine what improvements need to be made
immediately to handle the traffic being generated by the conglomeration of these developments, and
Bridgetower, cmm
Page 4
APR 18 101 16:21 porgy QS
1V' ril IN 1 LCJul ILL 11W. ILCJQJ JVI lj.J IfIOILL rF7UL' O/ I,
to calculate an extraordinary fee to make those improvements. This current preliminary plat under
review would also be subject to any extraordinary fees that the District may impose. The developer
has orally indicated that they understand that this subdivision may be subject to any extra -ordinary
fees imposed in this area, if that necessity is identified in the future. Upon final approval, the
applicant should provide a written agreement to ACDH, acknowledging that this subdivision may be
subject to extra -ordinary impact fees.
Staff recommends that the Commission approve this 336-lot preliminary plat, and at the next
regularly scheduled meeting with the Meridian City Council and ACHD Commission, discuss the
impacts that this development and surrounding development will have on the transportation system.
E. Staff recognizes that the amount of right-of-way dedicated with this project is overwhelming, and
that ACHD may not have the funds to purchase such a large amount of right-of-way. In this
situation it is likely that impact fee offset agreements will be utilized to offset the amount of money
that ACHD will pay out-of-pocket to acquire the right-of-way.
F. The applicant hired Washington Group to perform a traffic analysis of this site. The analysis has
identified the following conclusions:
1. The preliminary plat includes 259 single-family residences, 59 senior housing units and 349,000
sq ft of general office space, and 165,000 sq ft of commercial neighborhood shopping center.
2. The residential portion of the site generates 2,652 daily vehicle trips or 277 vehicle trips during the
pm peak hour.
3. The neighborhood shopping center site generates 5,524 daily vehicle trips or 518 vehicle trips
during the pm peak hour.
4. The office sites generate 3,842 daily vehicle trips or 520 vehicle trips during the pm peak hour.
5. None of the internal local streets exceed the planning threshold values for residential streets. The
traffic volumes justify no redesign of the internal local street system.
6. None of the internal collector streets exceed the planting threshold values for collector streets. No
additional collector streets are warranted by the traffic volumes
7. The layout of the internal collector streets eliminates the potential for cut -through traffic and the
need for traffic calming. A collector street connection to McMillan Road is not justified by the
traffic volumes
8. The private driveways/roadways abutting the office components provide adequate site access. The
traffic volumes do not justify direct lot access to the arterial street system.
9. The arterial street system operates at an acceptable level of service under existing conditions.
a. The four arterial streets bordering the site operate at Level of Service (LOS) of "C" or
better under existing conditions.
b. The four arterial street intersections bordering the site operate at an acceptable LOS "C" or
better under existing conditions.
10. The first phase of the project includes the build out of only the residential and office components.
Under this level of development:
a. The four arterial streets bordering the site operate at Level of Service (LOS) of "C" or
better under existing plus project conditions.
b. The McMillan Road intersections with Linder Road and ten Mile Road operate at an
acceptable LOS C or better under existing plus project conditions.
Bridgetower. corm
Page 5
APR 1R 101 1F:PP
onr_� rar_
a 1 LVVl ILI.- IlV- -�CUU/ JV! U..J.J.L �f 1l�1GC rF91zL- f, LI
c. The Ustick Road intersections with Linder Road and Ten Mile Road operate at an
unacceptable level of service under existing plus project conditions. Both intersections will
require traffic signals if the residential and office portions of this project are completed
within five years. Added left -turn lanes are needed on each intersection approach.
11. The second phase of the project includes the build out of the neighborhood shopping center on the
parcel north of McMillan Road. Under this level of development:
a. The four arterial streets bordering the site operate at Level of Service (LOS) of C or better
under existing plus project conditions.
b. The Ustick Road intersections with Linder Road and ten Mile Road will continue to
operate with an acceptable level of service.
c. The McMillan Road intersections with Linder Road and Ten Mile Road operate at an
acceptable LOS C or better under existing plus project conditions. Added left -turn lanes
are needed on each intersection approach. The McMillan/Ten Mile intersection will
require conversion to all -way STOP control.
12. The neighborhood shopping center has adequate site access through the four proposed driveways.
13. The McMillan Road intersections with Linder Road and Ten Mile Road will not require traffic
signals at the completion of the neighborhood shopping center.
14. Construct center turn lanes on Ustick Road, Linder Road and Ten Mile Road at the collector street
intersections.
15. The ACHD Policy Manual identifies a 29-foot collector street as section C2-NP. This street
section is appropriate for this project. The collector roadways will require widening to 36-feet at
intersections to allow for a center left -turn lane.
*Staff reserves the right to verify this information provided by the applicant's traffic engineer.
SITE
G. The proposed subdivision will have access to Ten Mile Road, McMillan Road and Ustick Road via
public streets; and will have access to Ten Mile Road and McMillan Road via driveways to the
office/commercial lots.
H. The applicant is proposing to construct the main entrance to the subdivision on Ten Mile Road
located approximately 1/3-mile south of McMillan Road. The proposed location conforms to
District policy. The entrance should be designed with 21-foot street sections on either side of a
center median. The median should be constructed a minimum of 4-feet wide (but no larger than 12-
feet wide) to total a minimum of a 100-square foot area. The applicant will be required to dedicate
54-feet of right-of-way plus the additional width of the median.
1. The applicant is proposing to construct the main entrance to the townhouse portion of the
subdivision on McMillan Road located approximately 900-feet east of Ten Mile Road. The
proposed location conforms to District policy. The entrance should be designed with 21-foot street
sections on either side of a center median. The median should be constructed a minimum of 4-feet
wide (but no larger than 12-feet wide) to total a minimum of a 100-square foot area. The applicant
will be required to dedicate 54-feet of right-of-way plus the additional width of the median.
J. The applicant is not proposing to connect the single-family residential portion of the subdivision
with the townhouse portion of the subdivision in an effort to prevent cut -through traffic to McMillan
Road. The applicant's traffic engineer suggests that this proposed design will eliminate
Bridgetower. cmm
Page 6
APR 1R 'Gt1
oorc M7
neighborhood cut -through. Staff recommends that the City require a pedestrian pathway between
the single-family and townhouse lots to provide pedestrian access to McMillan Road.
K. The applicant is proposing to construct Belltower Drive and Towerbridge Way through the site as
residential collectors because the anticipated traffic volumes exceed 1,000 vehicle trips per day.
Front -on housing is prohibited on residential collectors. District policy requires that these street
segments be constructed as 36-foot street sections with curb, gutter and 5-foot wide concrete
sidewalks. Unless otherwise noted, parking should be prohibited on these street segments.
Coordinate the signage plan with District staff. The access restrictions for these street segments
should be stated on the final plat.
L. The applicant should be required to provide directional signage on Belltower Drive where the
roadway diverges around the water amenity. This signage is necessary to guide motorists in the
proper direction. Coordinate the design of the signage plan with Traffic Services staff.
M. The applicant is proposing to construct two driveways off Belltower Drive to serve the
office/commercial lots. The driveways are located approximately 230-feet east of Ten Mile Road on
both the north and south side of Belltower Drive. The proposed driveway locations conform to
District policy and should be constructed as proposed.
N. The applicant is proposing to connect to two existing stub streets that were approved with the
Bridgetower Subdivision (located north of Ustick Road). The streets, Pride Crossing Drive and
Towerbridge Way, should be extended into this site as proposed.
O. The applicant is proposing to construct two stub streets to the undeveloped parcel to the southwest of
the site. District staff supports the locations of the stub streets. The stub streets, Breeze Creek Way
(to the south), and Teano Drive (to the west), should be located as proposed. The applicant is
proposing to construct turnarounds at the end of the stub streets due to their lengths. The applicant
should be required to install a sign at the termini of the stub streets stating that, "THIS ROAD
WILL BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub streets, and the
design of the turnaround with District staff.
P. The applicant is proposing to construct three stub streets to the undeveloped parcels to the northeast
and east of the site (parcels included in the entire planned unit development proposed by this
applicant). District staff supports the locations of the stub streets. The stub streets: Coppercloud
Way (to the north), Messina Street (to the east), and Verona Drive (to the east), should be located as
proposed. Due to the length of the stub street, the applicant is not proposing to construct
turnarounds, and none are required. The applicant should be required to install a sign at the termini
of the stub streets stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE".
Coordinate the sign plan for the stub streets with District staff.
Q. The applicant is not proposing to construct a stub street to the small parcel to the east of the
townhouse lots. In the future, staff will recommend that a stub street be constructed to that parcel
from the east.
Bridgetower. cmm
Page 7
APR 18 'ol 16:23
pore AR
v• �cJvi ILL 11V • CLUOJ �V I —OJJl if 1T.J1GL 1-NVL JJ 11
R. Any proposed landscape islands/medians within the public right-of-way dedicated by this plat should
be owned and maintained by a homeowners association. Notes of this should be required on the
final plat.
Unless otherwise approved, the applicant should be required to construct all public roads within the
subdivision as 36-foot street sections with curb, gutter, and 5-foot wide concrete sidewalks within
50-feet of right-of-way.
T. District policy requires streets within the subdivision to align or offset a minimum of 125-feet from
any proposed public street. It appears that the proposed streets are located in conformance with
District policy.
U. The turnarounds should be constructed to provide a minimum turning radius of 45-feet.
SIDEWALK
V. District policy requires the construction of a 5-foot wide detached concrete sidewalk on collector and
arterial roadways. All of the abutting roadways are listed as minor arterials on the functional
classification map.
W. The applicant should be required to construct a 5-foot wide concrete sidewalk on Ten Mile Road
abutting the site, located 2-feet within the right-of-way. If the applicant constructs a meandering
sidewalk, provide a sidewalk easement to the District to construct the sidewalk outside of the right-
of-way. Coordinate the location and elevation of the sidewalk with District stag.
X. The applicant should be required to construct a 5-foot wide concrete sidewalk on McMillan Road
abutting the site, located 2-feet within the right-of-way. If the applicant constructs a meandering
sidewalk, provide a sidewalk easement to the District to construct the sidewalk outside of the right-
of-way. Coordinate the location and elevation of the sidewalk with District staff.
Y. The applicant should be required to construct a 5-foot wide concrete sidewalk on Ustick Road
abutting the site, located 2-feet within the right-of-way. If the applicant constructs a meandering
sidewalk, provide a sidewalk easement to the District to construct the sidewalk outside of the right-
of-way. Coordinate the location and elevation of the sidewalk with District stag.
DRIVEWAYS
Z. District policy requires driveways on arterial roadways to be constructed 220-feet from a signalized
intersection for right-in/right-out operations; 440-feet for full access; and 315-feet for full access if
there are no intervening driveways. Policy also requires driveways to be offset a minimum of 230-
feet from any existing or proposed driveways (based on 45 MPH). All of the proposed driveways
are located in conformance with District policy, assuming future signalized intersections.
AA. Graveled driveways abutting public streets create maintenance problems due to gravel being tracked
onto the roadway. The applicant should be required to pave the driveways their full width of 24 to
30-feet, and at least 30-feet into the site beyond the edge of pavement of Ten Mile Road, McMillan
edge.
Road and Ustick Road, and install pavement tapers with 15-foot radii abutting the existing roadway
Bridgetower. cmm
Page 8
APR 1R '01 19:P4
aonp Aq
i— r— — -U.JJ1 lr.LOZC-G-rr1l7L' Lu/1I
BB. The applicant is proposing to construct a 25-foot wide driveway on the east side of Ten Mile Road
located approximately 380-feet south of McMillan Road to serve the office and commercial lots.
The proposed driveway location conforms to District policy and should be constructed as proposed.
This driveway is the only proposed driveway on Ten Mile Road south of McMillan Road.
CC. The applicant is proposing to construct a 30-foot wide driveway on the east side of Ten Mile Road
located approximately 440-feet north of McMillan Road to serve the commercial lot. The proposed
driveway location conforms to District policy and should be constructed as proposed.
DD. The applicant is proposing to construct a 30-foot wide driveway on the east side of Ten Mile Road
located approximately 20-feet south of the north property line to serve the commercial lot. The
proposed driveway location conforms to District policy and should be constructed as proposed.
EE. The applicant is proposing to construct a 30-foot wide driveway on the north side of McMillan Road
located approximately 440-feet east of Ten Mile Road to serve the commercial lot. The proposed
driveway location conforms to District policy and should be constructed as proposed.
FF. The applicant is proposing to construct a 30-foot wide driveway on the north side of McMillan Road
located approximately 50-feet west of the east property line to serve the commercial lot. The
proposed driveway location conforms to District policy and should be constructed as proposed.
GG. The applicant is proposing to construct a 25-foot wide driveway on the south side of McMillan Road
located approximately 440-feet east of Ten Mile Road to serve the office/commercial lots. The
proposed driveway location conforms to District policy and should be constructed as proposed.
CENTER TURN LANES
HH. The applicant should be required to construct a center turn lane on Ten Mile Road for the Ten Mile
Road/main entrance intersection. The turn lane should be constructed to provide a minimum of
100-feet of storage with shadow tapers for both the approach and departure directions. Coordinate
the design of the turn lane with District staff.
II. The applicant should be required to construct a center turn lane on Ten Mile Road for the Ten Mile
Road/driveway intersection located south of McMillan Road. The turn lane should be constructed
to provide a minimum of 100-feet of storage with shadow tapers for both the approach and departure
directions. Coordinate the design of the turn lane with District stag.
JJ. The applicant should be required to construct center turn lanes on Ten Mile Road for the Ten Mile
Road/driveway intersections north of McMillan Road that serve the commercial parcel. The turn
lanes should be constructed to provide a minimum of 100-feet of storage with shadow tapers for
both the approach and departure directions. Coordinate the design of the turn lanes with District
staff.
KK. The applicant should be required to construct a center turn lane on McMillan Road for the
McMillan Road/main entrance intersection. The turn lane should be constructed to provide a
minimum of 100-feet of storage with shadow tapers for both the approach and departure directions.
Coordinate the design of the turn lane with District staff.
Bridgetower. cmm
Page 9
APR 1R 'ni
Onf:C I P
LL. The applicant should be required to construct center turn lanes on McMillan Road for the McMillan
Road/driveway intersections located east of Ten Mile Road. The turn lanes should be constructed to
provide a minimum of 100-feet of storage with shadow tapers for both the approach and departure
directions. Coordinate the design of the turn lanes with District staff.
MM. Based on the recommendation of the traffic study, added left -turn lanes are needed on each
intersection approach at the Ustick Road/Linder Road intersection and at the Ustick Road/Ten Mile
Road intersection. The applicant should coordinate the design of these improvements with District
staff.
NN. Based on the recommendation of the traffic study, the applicant should provide a road trust deposit
for 21 % of the cost of a traffic signal at the Ustick Road/Linder intersection. The applicant should
provide a road trust in the amount of $29,400 for their proportionate share of the cost of the traffic
signal at Ustick and Linder Roads.
00. Based on the recommendation of the traffic study, the applicant should provide a road trust deposit
for 27% of the cost of a traffic signal at the Ustick Road/Ten Mile Road intersection. The applicant
should provide a road trust in the amount of 537,800 for their proportionate share of the cost of the
traffic signal at Ustick and Ten Mile Roads.
UTILITIES/IRRIGATION
PP. The preliminary plat indicates that the Settlers Canal is located on the south side of McMillan Road.
The applicant should relocate the canal outside of the new right-of-way of McMillan Road to
provide adequate space for future road widening.
QQ. All irrigation facilities should be relocated outside of the new right-of-way on McMillan Road, Ten
Mile Road and Ustick Road.
RR. All utility relocation costs associated with improving street frontages abutting the site should be
borne by the developer.
SS. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact Construction Services at 387-6280 (with file numbers) for details.
TT. Based on development patterns in this area and the resulting traffic generation, staff anticipates that
the transportation system will be adequate to accommodate additional traffic generated by this
proposed development with the requirements outlined within this report.
Special Notification to City of Meridian:
Staff recommends that the ACHD Commission approve this 336-lot preliminary plat, but delay
acting on any further development applications in this area (including the remainder of this site),
until staff has made a recommendation to the ACHD Commission for road widening and impact
fees, based on the Meridian area traffic study.
Bridgetower. cmm
Page 10
APR 18 '01 16:26
PA;F. 1 1
�vc_s iL� Div• ILVV-7 .�C��-�.�-.y �fl�l L� i nVL- i� yi
2. The applicant is not proposing to connect the single-family residential portion of the subdivision
with the townhouse portion of the subdivision in an effort to prevent cut -through traffic to McMillan
Road. The applicant's traffic engineer suggests that this proposed design will eliminate
neighborhood cut -through. Staff recommends that the City require a pedestrian pathway between
the single-family and townhouse lots to provide pedestrian access to McMillan Road.
The following Site Specific Requirements and Standard Requirements must be met or provided
for prior to ACHD approval of the final plat:
Site Specific Requirements:
Dedicate 48-feet of right-of-way from the centerline of Ten Mile Road abutting the parcel by
means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of
a building permit (or other required permits), whichever occurs first. Allow up to 30 business days
to process the right-of-way dedication after receipt of all requested material. The owner will be
paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD
right-of-way.
2. Dedicate 48-feet of right-of-way from the centerline of McMillan Road abutting the parcel by
means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of
a building permit (or other required permits), whichever occurs first. Allow up to 30 business days
to process the right-of-way dedication after receipt of all requested material. The owner will be
paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD
right-of-way.
Dedicate 48-feet of right-of-way from the centerline of Ustick Road abutting the parcel by means
of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a
building permit (or other required permits), whichever occurs first. Allow up to 30 business days
to process the right-of-way dedication after receipt of all requested material. The owner will be
paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD
right-of-way.
4. Construct the main entrance to the subdivision on Ten Mile Road located approximately 1/3-mile
south of McMillan Road, as proposed. The entrance shall be designed with 21-foot street sections
on either side of a center median, and the median shall be constructed a minimum of 4-feet wide
(but no larger than 12-feet wide) to total a minimum of a 100-square foot area. The applicant
shall be required to dedicate 54-feet of right-of-way plus the additional width of the median.
>. Construct the main entrance to the townhouse portion of the subdivision on McMillan Road
located approximately 900-feet east of Ten Mile Road, as proposed. The entrance shall be
designed with 21-foot street sections on either side of a center median and the median shall be
constructed a minimum of 4-feet wide (but no larger than 12-feet wide) to total a minimum of a
100-square foot area. The applicant shall be required to dedicate 54-feet of right-of-way plus the
additional width of the median.
Bridgetower.cmm
Page I 1
APP 1R 'MI 1F;aA
onr_c I -,
� �" i ice• ���"'- JOr '-'`'�i iF101LC - �'MVt • 1Ji 1 i
Construct Belltower Drive and Towerbridge Way through the site as residential collectors because
the anticipated traffic volumes exceed 1,000 vehicle trips per day. Front -on housing is prohibited
on residential collectors. Construct these street segments as 36-foot street sections with curb, gutter
and 5-foot wide concrete sidewalks. Parking shall be prohibited on these street segments.
Coordinate the signage plan with District staff. The access restrictions for these street segments
shall be stated on the final plat.
7. Provide directional signage on Belltower Drive where the roadway diverges around the water
amenity. This signage is necessary to guide motorists in the proper direction. Coordinate the
design of the signage plan with Traffic Services staff.
Construct two driveways off Belltower located approximately 230-feet east of Ten Mile Road on
both the north and south sides of Belltower Drive.
Connect to two existing stub streets that were approved with the Bridgetower Subdivision (located
north of Ustick Road) as proposed. The streets, Pride Crossing Drive and Towerbridge Way, shall
be extended into this site.
10. Construct two stub streets to the undeveloped parcel to the southwest of the site. The stub streets,
Breeze Creek Way (to the south), and Teano Drive (to the west), shall be located as proposed.
Construct turnarounds at the end of the stub streets and install a sign at the termini of the stub
streets stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the
sign plan for the stub streets, and the design of the turnaround with District staff.
11. Construct three stub streets to the undeveloped parcels to the northeast and east of the site (parcels
included in the entire planned unit development proposed by this applicant). Tile stub streets:
Coppercloud Way (to the north), Messina Street (to the east), and Verona Drive (to the east), shall
be located as proposed. No turnarounds are required. Install a sign at the termini of the stub
streets stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the
sign plan for the stub streets with District staff,
12. Any proposed landscape islands/medians within the public right-of-way dedicated by this plat shall
be owned and maintained by a homeowners association. Notes of this shall be required on the final
plat.
13. Unless otherwise approved, construct all public roads within the subdivision as 36-foot street
sections with curb, gutter, and 5-foot wide concrete sidewalks within 50-feet of right-of-way.
14. Streets within the subdivision shall align or offset a minimum of 125-feet from any proposed
public street.
15. Construct the turnarounds to provide a minimum turning radius of 45-feet.
16. Construct a 5-foot wide concrete sidewalk on Ten Mile Road abutting the site, located 2-feet
within the right-of-way. If the applicant constructs a meandering sidewalk, provide a sidewalk
easement to the District to construct the sidewalk outside of the right-of-way. Coordinate the
location and elevation of the sidewalk with District staff.
Bridgetower. cmm
Page 12
APR 1 A ' G11 1 r,: ]7
onrc 17
- w ♦wv, - _. Y1V1CL I nVL• 1-, 1I
17. Construct a 5-foot wide concrete sidewalk on :McMillan Road abutting the site, located 2-feet
within the right-of-way. If the applicant constructs a meandering sidewalk, provide a sidewalk
easement to the District to construct the sidewalk outside of the right-of-way. Coordinate the
location and elevation of the sidewalk with District staff.
18. Construct a 5-foot wide concrete sidewalk on Ustick Road abutting the site, located 2-feet within
the right-of-way. If the applicant constructs a meandering sidewalk, provide a sidewalk easement
to the District to construct the sidewalk outside of the right-of-way. Coordinate the location and
elevation of the sidewalk with District staff.
19. Pave the driveways their full width of 24 to 30-feet, and at least 30-feet into the site beyond the
edge of pavement of Ten Mile Road, McMillan Road and Ustick Road, and install pavement
tapers with 15-foot radii abutting the existing roadway edge.
20. Construct a 25-foot wide driveway on the east side of Ten Mile Road located approximately 380-
feet south of McMillan Road to serve the office and commercial lots, as proposed.
21. Construct a 30-foot wide driveway on the east side of Ten Mile Road located approximately 440-
feet north of McMillan Road to serve the commercial lot, as proposed.
22. Construct a 30-foot wide driveway on the east side of Ten Mile Road located approximately 20-
feet south of the north property line to serve the commercial lot, as proposed.
23. Construct a 30-foot wide driveway on the north side of McMillan Road located approximately
440-feet east of Ten Mile Road to serve the commercial lot, as proposed.
24. Construct a 30-foot wide driveway on the north side of McMillan Road located approximately 50-
feet west of the east property line to serve the commercial lot, as proposed.
25. Construct a 25-foot wide driveway on the south side of McMillan Road located approximately
440-feet east of Ten Mile Road to serve the office/commercial lots, as proposed.
26. Construct a center turn lane on Ten Mile Road for the Ten Mile Road/main entrance intersection.
The turn lane shall be constructed to provide a minimum of 100-feet of storage with shadow tapers
for both the approach and departure directions. Coordinate the design of the turn lane with District
staff.
27. Construct a center turn lane on Ten Mile Road for the Ten Mile Road/driveway intersection
located south of McMillan Road. The turn lane shall be constructed to provide'a minimum of 100-
feet of storage with shadow tapers for both the approach and departure directions. Coordinate the
design of the turn lane with District staff.
28. Construct center turn lanes on Ten Mile Road for the Ten Mile Road/driveway intersections north
of McMillan Road that serve the commercial parcel. The turn lanes shall be constructed to provide
a minimum of 100-feet of storage with shadow tapers for both the approach and departure directions. Coordinate the design of the turn lanes with District staff.
Bridgetower. cmm
Page 13
APR 1R 101 16:2R
Darc I
ILL- IIV- tL-v07 -TO i-pawl iF101CC- 7"HkzL- I�>,I
29. Construct a center turn lane on McMillan Road for the McMillan Road/main entrance intersection.
The turn lane shall be constructed to provide a minimum of 100-feet of storage with shadow tapers
for both the approach and departure directions. Coordinate the design of the turn lane with District
staff.
30. Construct center turn lanes on McMillan Road for the McMillan Road/driveway intersections
located east of Ten Mile Road. The turn lanes shall be constructed to provide a minimum of 100-
feet of storage with shadow tapers for both the approach and departure directions. Coordinate the
design of the turn lanes with District staff.
31. Construct added left -turn lanes on each intersection approach at the Ustick Road/Linder Road
intersection and at the Ustick Road/Ten Mile Road intersection. The applicant shallcoordinate the
design of these improvements with District staff.
32. Provide a road trust deposit for 21 % of the cost of a traffic signal at the Ustick Road/Linder
intersection in the amount of $29,400 for their proportionate share of the cost of the traffic signal
at Ustick and Linder Roads.
33. Provide a road trust deposit for 27% of the cost of a traffic signal at the Ustick Road/Ten Mile
Road intersection in the amount of $37,800 for their proportionate share of the cost of the traffic
signal at Ustick and Ten Mile Roads.
34. Relocate the Settlers Canal outside of the new right-of-way of McMillan Road to provide adequate
space for future road widening.
35. All irrigation facilities shall be relocated outside of the new right-of-way on McMillan Road, Ten
Mile Road and Ustick Road.
36. All utility relocation costs associated with improving street frontages abutting the site should be
borne by the developer.
37. Utility street cuts in pavement less than five years old are not allowed unless approved in writing
by the District. Contact Construction Services at 387-6280 (with file numbers) for details.
38. Other than the access points specifically approved with this application, direct lot or parcel access
to McMillan Road, Ten Mile Road and Ustick Road is prohibited. Lot access restrictions, as
required with this application, shall be stated on the final plat.
Bridgetower. cmm
Page 14
APR 16 '01 16:29
AOI :G' 117
Standard Requirements:
A request for modification, variance or waiver of any requirement or policy outlined herein shall
be made in writing to the ACHD Planning and Development Supervisor. The request shall
specifically identify each requirement to be reconsidered and include a written explanation of why
such a requirement would result in a substantial hardship or inequity. The written request shall be
submitted to the District no later than 9:00 a.m. on the day scheduled for ACHD Commission
action. Those items shall be rescheduled for discussion with the Commission on the next available
meeting agenda.
Requests submitted to the District after 9:00 a.m. on the day scheduled for Commission action do
not provide sufficient time for District staff to remove the item from the consent agenda and report
to the Commission regarding the requested modification, variance or waiver. Those items will be
acted on by the Commission unless removed from the agenda by the Commission.
After ACHD Commission action, any request for reconsideration of the Commission's action shall
be made in writing to the Planning and Development Supervisor within six days of the action and
shall include a minimum fee of $110.00. The request for reconsideration shall specifically identifi
each requirement to be reconsidered and include written documentation of data that was not
available to the Commission at the time of its original decision The request for reconsideration
will be heard by the District Commission at the next regular meeting of the Commission. If the
Commission agrees to reconsider the action, the applicant will be notified of the date and time of
the Commission meeting at which the reconsideration will be heard.
3. Payment of applicable road impact fees are required prior to building construction in accordance
with Ordinance #193, also known as Ada County Highway District Road Impact Fee Ordinance.
4. All design and construction shall be in accordance with the Ada County Highway District Policy
Manual, ISPWC Standards and approved supplements, Construction Services procedures and all
applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the
State of Idaho shall prepare and certify all improvement plans.
5. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or
other required permits), which incorporates any required design changes.
6. Construction, use and property development shall be in conformance with all applicable
requirements of the Ada County Highway District prior to District approval for occupancy.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way.
Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to A.CHD.
The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days
prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic
Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during
any phase of construction.
Bridgetower. cmm
Page 15
APR le 101 1.6:30
PC= 1C,
- �Uui - ieL I1V- 2L)O; JQf-OJ71 9F101CG rHut- 1i/lf
8. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of the Ada County Highway District. The burden shall be upon the applicant to
obtain written confirmation of any change from the Ada County Highway District.
Any change by the applicant* the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or
other regulatory and legal restrictions in force at the time the applicant or its successors in interest
advises the Highway District of its intent to change the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at
the time the change in use is sought.
Conclusion of Law:
ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular and pedestrian transportation system within the vicinity
impacted by the proposed development.
Should you have any questions or comments, please contact the Planning and Development
Division at 387-6170.
Submitted by:
Planning and Development Staff
Commission Action:
Bridgetower. cmm
Page 16
APR 1R1 'nJ 1F:70
oar= 1 -7
cL nV• .gar-bJy1 #18122 PAGE 1/17
Ada County Highway District
318 E. 37th Street
Boise, ID 83714
(208) 387-6100 (208) 387-6391 FAX
Please Deliver to:
Planning & Zoning Commission
Fax #: 888-4218
Company:
From: Christy Richardson
Fax #: (208) 387-6391
Phone: (208) 387-6178
Pages: 17
Message:
APR 18 'Rj 1F:1R
--e
L
0
E
O o O u N CC
o ¢ Ul
tn
O y o72 cocu
Lu- E
29
>.
J-
�3-iR E nyaeovgc y
Ea'uU o"u oaiJ c y am ci
O
cv E,. co
cn
+— n'`�°^°y•�� Cam°E�,
_ o
Iu33u� U�y sc
c :a�a•a,�� 3°�•�
� O y8pyympu'Lyo�-`�-v
Qj
CL
m C U vi V
V .O b ;n C In ay. i2 c
°y�°.MC. T—c°.�c
E
}' moo.^u"a �'c�_
cu owu ��yo yn�cQ'L
� °c3J'uyE E
°
cn cu
cu
• ri'0
7
y.c
o
CD i�y�'•� c G,
c
p
lz
00 a•a � i � u o. c -d � .� u
• u
O e0`"' =gym yy y y y3x o y
c C1 'II O
3�.
�w
W
^id � fQ c ^ .y � >. � •
'� O O E •
U O N 3 i c. ° •
. yPLO
:J
v^ C z< O
o Z N '3 - " ^
.�••..1 to m, N�;Z
N •.N. ❑ R N V G •V CN
o 5 0
m °. o y ty
0
°v° r��;TCQEa ° w o -02 'E
Q� 3ro�0ovSw u .:'d g,g
N v N .S y R •>. v a �61
r. v R => -d
00og�yNLi4oO.a4aN �
N •c n, W y Eu a El u i. g a � •° cd y a+ CJ
..m a,3'00 � �, vy
v v °o a>.� 3 b Or
o y �E2 0 �•� °v° v
..- = •y t� c0 . G •0 E. r0 N
C
0
U-
cu
L
0
U.
a,E -aoclu
9 x v v oyn a~i awi ° 3 v w° y y
o"
3A ��b a.��.b o I 3 v � [ c r u H
ny I o[� v v v N> y 3 e�..='F
^J '_' E ii _ u la
xw ° �x u� v-0 ° ° [ v n 3v° i 'SV❑
� q v
o u d
v °'yea, oxv., �3N v�•�.rv:��
E"va.�u V�Os' v� enUa3oC_
°3 w v oyvnd G� 3 u w Vey yvy o CL
o v v u RX [? u y o
V i a_ ro x oa 3.a?'u en oa o N w a E
peod ueIPPOW
-nnn.u..r9
d
4Z
73
0
U : Peou iaJ �I�el9
Peou AouueaoW
vai Vic.6(UV4C�
N 4 �.. R y R R... N���y > C 7 R� 3 R ❑.�
w R [ a o v 0 u L 3 0 0
U R N V v N
(U 0 v",. c
� 33
vv °.'y" G N°Wv �H C'nuS.
c,� o C m2�p
tj uoE EN Evv
,>> u v ,OvH�QC." °a.nO>•O'Rna tq v v Ty uv R L
C �+
3dvRO�.L�' 3 •3.:
o [ y-• o N [ b '15mn
Ncu
9 w �u
c a •vim o �� �a-°� � y �.. � v� � 3•c❑y
o ° c a? C m3 o v> o v o N u [v y r1 R
0. i`" > h u R CO'JU v E C-4.0- y.v ca
cu
E c y y v u ° O
L x_ �y^mcn CEO E [ CUa C
y O _ N
° c ° cnw v
L N R O n O CL Mr.0 N
3 e0 IZ-2 a`mi$�oEnv +� n Ea to;muo
y O OD �^O T— C
p E NT n N v R E�� Eo t�Oy o f v.'-' o c -E CL v
i0 y L N .r' C O D Vyi T O R C O Y L O d N
.O w aai aZ a,w 0.2 o-6ENL•-wo c_2S �v�
C p L O L '� L� U T 1N R ❑p U �� (2.2 .O A O Y o
a00i o o R'y vN ay '" N„ ywa a E °� m.o co
err ?U« Y� N y �OL d� c o.Yt L v°i "~ EY v
O p Cc�.� °N� c aoL r- M" ��L o+::°�°'r o am ro E_
=.a O R-. E v ow y n,� c ate_ u.._, t» u N 3 n$ m
.�.oC`
to
o
Uo0,c
w���ct
>
N
.c
N M
CL a ex-O
A
d
d
�
L
yLy
L L
'f
Sc
Y
Sc Y
an d
W a
t
H
0.
(n
a
4n
o. o.
i
c
c
c c
aCL
U
O�
U
lz�
U u
n 0)
n
4 cM
y
G N r y
o
-,
o
oOle
a O C L
d
00
0)
(D
00
O O CQ7 C
tD
n
0)
N
°
`o.dw
m
N
v
tD
ins
ao
ti w
,a
C L
N
C
Y
Y
Y
Y
Y
EY
p N`
CLa
n
n
n
L Q
N
d
�v >
U
U
U
U
V
00
M
In
n
m
.N
N ui U
E � 3
C
EO �-o
L
Y
L
Y
L
L
L
L
Y
Y
Y
N
m
n
a
n
va
vn
I- a
U •� L
U
U
U
U
U
c':v j
0
N
0)
't
n
0)
��
L6
M
lD
M
N
L
�Q
R C �
tzc
v
E
v
E
EE
L
E
°
c`
(�
a�ci CLE
r a
as
g
U
U
'
�tw
o.m
a
to
J
C
a5 �oco .a o'a a"",
cya 3 O^
Rev
b
v 0 4 0 •a y R o N
E ��E�ov`°Eroa
cuc7��yvvvamo
axa>,�
•- V v Iyi L
o o c.° zj.
'2 ,x u .c A.[ 3
[' > Qoj
R
��33a[iA3a.•aa[i�v.,E
•� � � U 1.. Li N � i � it
� N R •b � b N N cd
R `J cc
332E Ss�
tiv°'v�� vo3v�ar
vq o N v ay N av,a TU N
R
c
o •d :� N � >, � b s
vvv [s.o 0 vgc
V ���c
v N
'O yv 1N v .d 7 O W •b -d v C.
U C� C •C 0o by-T5(5 o a[ioyt
w b0 X.
V aaE�„v•°�3auivbr
a3 v c
a-tl:�1.
Svc oa o R E o��•n E a
cn nai o.00ab 4°:c
c"" O � y�•H N'�•u � y ui7
o by y ayi hT•'v v.g
v .0 00
�> I oa�,udR�a�i
v o> R p V RL �•y
w"vo w.r7 y o 0
n p,C u�..
V'uo a"R�[o�E�av,�
u ao «... 3V�•n o.y�
aoc°. > �.9�'D CU o aT'v a 8 C A g r. v >.°o=xE
at_�o021 v� ° Nv�yymo_ oROQ,0.!2M--aFE
�vtia1+ii.=vRd'y c°7udEg[ oUao �4-U.�0.1iU•QouQrv R� A.�
uoo o v o a E- E�E•j , >E w3'.p�1=r�vty'U �„o
:v C4 c vU4 I
O v2vvHiv� �t7 O :y 00 -'0 uE
v>o�[pEru"[6
>` v v W o
^U
�GCc�
n °.� c w
M aR, "5 ,.•,� b0 [ O' Ob v ti p en N •b .+o v v O U v O
CL`` E°=Ev°v3 aauyo°au�v3aa�o3°aFe�'
c�-Juj ILL HU; (eUd) stir'-bOyl *IUIJd- HHUL: 1i1(
Ada County Highway District
318 E. 37th Street
Boise, ID 83714
(208) 387-6100 (208) 387-6391 FAX
Please Deliver to:
City Clerk
Fax #: 888-4218
Company:
From: Christy Richardson
Fax #: (208) 387-6391
Phone: (208) 387-6178
Pages: 17
Message:
Please disregard yesterday's fax regarding Bridgetower Sub
and replace it with this version. Thanks!
W:;'•1C7 Hr'K 1'.J, LUU1 ILL NO: UZU8) stir'-bby1 #1bIJ6 HHI,L: Z%1r
ADA COUNTY HIGHWAY DISTRICT
Planning and Development Division
Development Application Report
Preliminary Plat— Bridgetower Crossing/MPP01-005 Ten NiileiMcMillan Road 336-lots
This application has been referred to ACHD by the City of Meridian for review and comment. Staff is
recommending approval of a preliminary plat for a 336-lot residential, commercial, and office subdivision
on 175.9 1 -acres. The 175.91-acre site is located at the southeast corner of Ten Mile Road and McMillan
Road. The applicant submitted four separate applications, and staff is only commenting on the proposed
plat at this time. This development (only the preliminary plat) is estimated to generate up to 12,118
vehicle trips per day based on the submitted traffic study.
On April 18, 2001, the ACHD Commission approved staff to release this draft report to the City
of Meridian Planning & Zoning Commission with revisions to this report as directed by the
Commission. The ACHD Commission will not make final recommendations on this plat until the
ACHD Commission and Meridian City Council have had the opportunity to discuss development
in this area.
Roads impacted by this development: Ustick Road
Ten Mile Road
McMillan Road
Linder Road
ACHD Commission Date — April 18, 2001 — 12:00 p.m.
Facts and Findings:
A. General Information
Owner — E.L. Bews, Chandos Hoaglun & Young Lands, Ltd
Applicant — Primeland Development Co., LLP
RUT & R-4 - Existing zoning
175.91- Acres
336 - Proposed building lots
259-Single family lots
59-Townhome lots
8-Office lots
10-Commercial lots
58-Proposed common lots
349,000-Square feet of office
165,000-Square feet of commercial
256 - Traffic Analysis Zone (TAZ)
Meridian - Impact Fee Service Area
West Ada - Impact Fee Assessment District
Bridgetower.cmm
Page 1
— rn 1 1» r—UQ.1
ILL NU: �eVd) Jb(-b3yi #18138 PAVE-' 3i17
Bridgetower Crossing Subdivision
Ten Mile Roadq McMillan Road, Ustick Road
1000 0 1000 2000 Feet 6V
E
S
Bridgetower. cmm
Page 2
nDo 1 0 f 119 nc • 7^
�� irv• «`e�or .3ar—o��i 9f1E71Jt7 - t'HUt• -1�1(
Ustick Road
Ustick Road is a minor arterial with bike lane designation
Traffic count on Ustick Road west of Linder Road was 5,318 on 8/ 16/00
Better than "C" -Existing Level of Service
"C" -Existing plus project build -out Level of Service
700-feet of frontage
50-feet existing right-of-way (25-feet from centerline)
96-feet required right-of-way (48-feet from centerline)
Ustick Road is improved with two traffic lanes with no curb, gutter or sidewalk abutting the site.
The Ustick Road intersections with Ten Mile Road and Linder Road are four-way STOP
controlled. The applicant is not proposing any new access points to Ustick Road.
Ten Mile Road
Ten Mile Road is a minor arterial with bike lane designation
Traffic count on Ten Mile Road north of Ustick was 2,168 on 5111/99
Better than "C" -Existing Level of Service
Better than "C" -Existing plus project build -out Level of Service
2,600-feet of frontage
50-feet existing right-of-way (25-feet from centerline)
96-feet required right-of-way (48-feet from centerline)
Ten Mile Road is improved with two traffic lanes with no curb, gutter or sidewalk abutting the
site. The applicant is proposing to construct one public street and three driveways to access Ten
Mile Road.
McMillan Road
McMillan Road is a minor arterial with bike lane designation
Traffic count on McMillan Road west of Linder Road was 1,133 on 9/13/00.
Better than "C" -Existing Level of Service
Better than "C" -Existing plus project build -out Level of Service
1,240-feet of frontage
50-feet existing right-of-way (25-feet from centerline)
96-feet required right-of-way (48-feet from centerline)
McMillan Road is improved with two traffic lanes with no curb, gutter or sidewalk abutting the
site. The McMillan Road/Linder Road intersection is four-way STOP controlled. The McMillan
Road/Ten Mile Road intersection is two-way STOP controlled only on the McMillan Road
approaches. The applicant is proposing to construct one public street and three driveways to access
McMillan Road.
Linde_ r Road
Linder Road is a minor arterial with bike lane designation
Bridgetower. cmm
Page 3
noo 1 0 9 raI rao • �,,
i1. C_Uul ILL HU- #F18138 PAGE: 5/17
Traffic count on Linder Road north of Ustick Road was 5,067 on 5/2/00
Better than "C" -Existing Level of Service
"C" -Existing plus project build -out Level of Service
0-feet of frontage (with this plat application)
Linder Road is improved with two traffic lanes with no curb, gutter or sidewalk abutting the site.
B. The applicant has submitted four separate applications:
1. MZA01-001 — Planned Unit Development
2. M AZO 1-003 — Annexation and zoning of 371.42-acres from RUT to R-4 and C-G
3. MPPO1-005 — Preliminary plat for 336 building lots on 175.91-acres in proposed R-4 and C-G
zone
4. MCUPOI-006 — Conditional use permit for 692 single-family lot, 59 townhomes, 17 office lots
and 10 commercial lots on 370.55-acres in proposed R-4 and C-G zone (includes lots in
preliminary plat)
(The maps are labeled by application number.)
C. Staff is recommending that the Commission act only on the plat for 336 building lots on 175.91-
acres. The conditional use permit includes 778 buildable lots, and may present traffic problems that
staff is not yet ready to address. The abutting roadways can handle the additional traffic generated
by the preliminary plat alone. The remainder of the site (under the CUP application) includes 485
additional single-family lots, and an elementary school, and access to Linder Road via a public
street.
D. Staff has been receiving inquiries from developers in this northwest Meridian area. Many
developers are prepared to plat entire section -miles, and have site plans developed. The preliminary
plans generally include 700 to 900 residential lots, schools, and office/commercial lots. However,
the developers cannot submit their applications for these plans until their property has an annexation
path to the Meridian city limits.
The applicant's traffic engineer, and an engineer representing another developer in the area, realized
that the potential for development in this area is extreme, and that the traffic impact studies that each
individual developer were submitting, did not include the major surrounding developments that are
"in the works". If you were to look at each development individually, the roadway system is
adequate, but when you start adding in a second or third large-scale development, the traffic
capacities of these roadways (Ustick Road, McMillan Road, Ten Mile Road, Linder Road) reach
their 2020 planning thresholds.
Based on development patterns in this area, and the concern surrounding the abutting roadways,
staff has hired a consultant from the "on -call" list to conduct a traffic impact study of the
northwestern Meridian area from Ustick Road to Chinden Boulevard, and from Meridian Road to
one-half mile west of Black Cat Road. The study is currently in "DRAFT" form while ACHD staff,
City of Meridian staff, and COMPASS staff review the preliminary findings. From the end product
of the study, staff anticipates implementing an extra -ordinary impact fee overlay district to pay for
roadway improvements (mainly widening and traffic signals) to these surrounding roadways. Staff
estimates that it will take three to four months to determine what improvements need to be made
immediately to handle the traffic being generated by the conglomeration of these developments, and
Bridgetower. cmm
Page 4
moo , o � ra � ran • ��
418138 PAGE 6i17
to calculate an extraordinary fee to make those improvements. This current preliminary plat under
review would also be subject to any extraordinary fees that the District may impose. The developer
has orally indicated that they understand that this subdivision may be subject to any extra -ordinary
fees imposed in this area, if that necessity is identified in the future. Upon final approval, the
applicant should provide a written agreement to ACDH, acknowledging that this subdivision may be
subject to extra -ordinary impact fees.
Staff recommends that the Commission approve this 336-lot preliminary plat, and at the next
regularly scheduled meeting with the Meridian City Council and ACHD Commission, discuss the
impacts that this development and surrounding development will have on the transportation system.
E. Staff recognizes that the amount of right-of-way dedicated with this project is overwhelming, and
that ACHD may not have the funds to purchase such a large amount of right-of-way. In this
situation it is likely that impact fee offset agreements will be utilized to offset the amount of money
that ACHD will pay out-of-pocket to acquire the right-of-way.
F. The applicant hired Washington Group to perform a traffic analysis of this site. The analysis has
identified the following conclusions:
1. The preliminary plat includes 259 single-family residences, 59 senior housing units and 349,000
sq ft of general office space, and 165,000 sq fl of commercial neighborhood shopping center.
2. The residential portion of the site generates 2,652 daily vehicle trips or 277 vehicle trips during the
pm peak hour.
3. The neighborhood shopping center site generates 5,524 daily vehicle trips or 518 vehicle trips
during the pm peak hour.
4. The office sites generate 3,842 daily vehicle trips or 520 vehicle trips during the pm peak hour.
5. None of the internal local streets exceed the planning threshold values for residential streets. The
traffic volumes justify no redesign of the internal local street system.
6. None of the internal collector streets exceed the planning threshold values for collector streets. No
additional collector streets are warranted by the traffic volumes
7. The layout of the internal collector streets eliminates the potential for cut -through traffic and the
need for traffic calming. A collector street connection to McMillan Road is not justified by the
traffic volumes
8. The private driveways/roadways abutting the office components provide adequate site access. The
traffic volumes do not justify direct lot access to the arterial street system.
9. The arterial street system operates at an acceptable level of service under existing conditions.
a. The four arterial streets bordering the site operate at Level of Service (LOS) of "C" or
better under existing conditions.
b. The four arterial street intersections bordering the site operate at an acceptable LOS "C" or
better under existing conditions.
10. The first phase of the project includes the build out of only the residential and office components.
Under this level of development:
a. The four arterial streets bordering the site operate at Level of Service (LOS) of "C" or
better under existing plus project conditions.
b. The McMillan Road intersections with Linder Road and ten Mile Road operate at an
acceptable LOS C or better under existing plus project conditions.
Bridgetower. cmm
Page 5
a, ni � 1 7, C UU l ILL N0: - (208) 887-6391
#18138 PHGE: 7i17
c. The Ustick Road intersections with Linder Road and Ten Mile Road operate at an
unacceptable level of service under existing plus project conditions. Both intersections will
require traffic signals if the residential and office portions of this project are completed
within five years. Added left -turn lanes are needed on each intersection approach.
11. The second phase of the project includes the build out of the neighborhood shopping center on the
parcel north of McMillan Road. Under this level of development:
a. The four arterial streets bordering the site operate at Level of Service (LOS) of C or better
under existing plus project conditions.
b. The Ustick Road intersections with Linder Road and ten Mile Road will continue to
operate with an acceptable level of service.
c. The McMillan Road intersections with Linder Road and Ten Mile Road operate at an
acceptable LOS C or better under existing plus project conditions. Added left -turn lanes
are needed on each intersection approach. The McMillan/Ten Mile intersection will
require conversion to all -way STOP control.
12. The neighborhood shopping center has adequate site access through the four proposed driveways.
13. The McMillan Road intersections with Linder Road and Ten Mile Road will not require traffic
signals at the completion of the neighborhood shopping center.
14. Construct center turn lanes on Ustick Road, Linder Road and Ten Mile Road at the collector street
intersections.
15. The ACHD Policy Manual identifies a 29-foot collector street as section C2-NP. This street
section is appropriate for this project. The collector roadways will require widening to 36-feet at
intersections to allow for a center left -turn lane.
*Staff reserves the right to verify this information provided by the applicant's traffic engineer.
SITE
G. The proposed subdivision will have access to Ten Mile Road, McMillan Road and Ustick Road via
public streets; and will have access to Ten Mile Road and McMillan Road via driveways to the
office/commercial lots.
H. The applicant is proposing to construct the main entrance to the subdivision on Ten Mile Road
located approximately 1/3-mile south of McMillan Road. The proposed location conforms to
District policy. The entrance should be designed with 21-foot street sections on either side of a
center median. The median should be constructed a minimum of 4-feet wide (but no larger than 12-
feet wide) to total a minimum of a 100-square foot area. The applicant will be required to dedicate
54-feet of right-of-way plus the additional width of the median.
I. The applicant is proposing to construct the main entrance to the townhouse portion of the
subdivision on McMillan Road located approximately 900-feet east of Ten Mile Road. The
proposed location conforms to District policy. The entrance should be designed with 21-foot street
sections on either side of a center median. The median should be constructed a
wnimum of 4-feet
ide (but no larger than 12-feet wide) to total a minimum of a 100-square foot arrea. e applicant
will be required to dedicate S4-feet of right-of-way plus the additional width of the median.
J. The applicant is not proposing to connect the single-family residential portion of the subdivision
with the townhouse portion of the subdivision in an effort to prevent cut -through traffic to McMillan
Road. The applicant's traffic engineer suggests that this proposed design will eliminate
Bridgetower. cmm
Page 6
— 'v' ce1a� aIuf-e'.»1 *F1d1.D"b d/1i
neighborhood cut -through. Staff recommends that the City require a pedestrian pathway between
the single-family and townhouse lots to provide pedestrian access to McMillan Road,
K. The applicant is proposing to construct Belltower Drive and Towerbridge Way through the site as
residential collectors because the anticipated traffic volumes exceed 1,000 vehicle trips per day.
Front -on housing is prohibited on residential collectors. District policy requires that these street
segments be constructed as 36-foot street sections with curb, gutter and 5-foot wide concrete
sidewalks. Unless otherwise noted, parking should be prohibited on these street segments.
Coordinate the signage plan with District staff. The access restrictions for these street segments
should be stated on the final plat.
L. The applicant should be required to provide directional signage on Belltower Drive where the
roadway diverges around the water amenity. This signage is necessary to guide motorists in the
proper direction. Coordinate the design of the signage plan with Traffic Services staff.
M. The applicant is proposing to construct two driveways off Belltower Drive to serve the
office/commercial lots. The driveways are located approximately 230-feet east of Ten Mile Road on
both the north and south side of Belltower Drive. The proposed driveway locations conform to
District policy and should be constructed as proposed.
N. The applicant is proposing to connect to two existing stub streets that were approved with the
Bridgetower Subdivision (located north of Ustick Road). The streets, Pride Crossing Drive and
Towerbridge Way, should be extended into this site as proposed.
O. The applicant is proposing to construct two stub streets to the undeveloped parcel to the southwest of
the site. District staff supports the locations of the stub streets. The stub streets, Breeze Creek Way
(to the south), and Teano Drive (to the west), should be located as proposed. The applicant is
proposing to construct turnarounds at the end of the stub streets due to their lengths. The applicant
should be required to install a sign at the termini of the stub streets stating that, "THIS ROAD
WILL BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub streets, and the
design of the turnaround with District staff.
P. The applicant is proposing to construct three stub streets to the undeveloped parcels to the northeast
and east of the site (parcels included in the entire planned unit development proposed by this
applicant). District staff supports the locations of the stub streets. The stub streets: Coppercloud
Way (to the north), Messina Street (to the east), and Verona Drive (to the east), should be located as
proposed. Due to the length of the stub street, the applicant is not proposing to construct
turnarounds, and none are required. The applicant should be required to install a sign at the termini
of the stub streets stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE".
Coordinate the sign plan for the stub streets with District staff.
Q. The applicant is not proposing to construct a stub street to the small parcel to the east of the
townhouse lots. in the future, staff'will recommend that a stub street be constructed to that parcel
from the east.
Bridgetower. cmm
Page 7
APR 19 'm nq:7g
��, crul ILL NU: (.jib) j8,' bjy1
#181JE3 PHGE: 9117
R. Any proposed landscape islands/medians within the public right-of-way dedicated by this plat should
be owned and maintained by a homeowners association. Notes of this should be required on the
final plat.
S. Unless otherwise approved, the applicant should be required to construct all public roads within the
subdivision as 36-foot street sections with curb, gutter, and 5-foot wide concrete sidewalks within
50-feet of right-of-way.
T. District policy requires streets within the subdivision to align or offset a minimum of 125-feet from
any proposed public street. It appears that the proposed streets are located in conformance with
District policy.
U. The turnarounds should be constructed to provide a minimum turning radius of 45-feet.
SIDEWALK
V. District policy requires the construction of a 5-foot wide detached concrete sidewalk on collector and
arterial roadways. All of the abutting roadways are listed as minor arterials on the functional
classification map.
W. The applicant should be required to construct a 5-foot wide concrete sidewalk on Ten Mile Road
abutting the site, located 2-feet within the right-of-way. If the applicant constructs a meandering
sidewalk, provide a sidewalk easement to the District to construct the sidewalk outside of the right-
of-way. Coordinate the location and elevation of the sidewalk with District staff.
X. The applicant should be required to construct a 5-foot wide concrete sidewalk on McMillan Road
abutting the site, located 2-feet within the right-of-way. If the applicant constructs a meandering
sidewalk, provide a sidewalk easement to the District to construct the sidewalk outside of the right-
of-way. Coordinate the location and elevation of the sidewalk with District stag.
Y. The applicant should be required to construct a 5-foot wide concrete sidewalk on Ustick Road
abutting the site, located 2-feet within the right-of-way. If the applicant constructs a meandering
sidewalk, provide a sidewalk easement to the District to construct the sidewalk outside of the right-
of-way. Coordinate the location and elevation of the sidewalk with District staff.
DRIVEWAYS -
Z. District policy requires driveways on arterial roadways to be constructed 220-feet from a signalized
intersection for right-in/right-out operations; 440-feet for full access; and 315-feet for full access if
there are no intervening driveways. Policy also requires driveways to be offset a minimum of 230-
feet from any existing or proposed driveways (based on 45 MPH). All of the proposed driveways
are located in conformance with District policy, assuming future signalized intersections.
AA. Graveled driveways abutting public streets create maintenance problems due to gravel being tracked
onto the roadway. The applicant should be required to pave the driveways their full width of 24 to
30-feet, and at least 30-feet into the site beyond the edge of pavement of Ten Mile Road, McMillan
Road and Ustick Road, and install pavement tapers with 15-foot radii abutting the existing roadway
edge.
Bridgetower. cmm
Page 8
— r, � i-, CUU.L ILL NO: (288) :j87-63y1
#18138 -PAGE: 11�i17
BB. The applicant is proposing to construct a 25-foot wide driveway on the east side of Ten Mile Road
located approximately 380-feet south of McMillan Road to serve the office and commercial lots.
The proposed driveway location conforms to District policy and should be constructed as proposed.
This driveway is the only proposed driveway on Ten Mile Road south of McMillan Road.
CC. The applicant is proposing to construct a 30-foot wide driveway on the east side of Ten Mile Road
located approximately 440-feet north of McMillan Road to serve the commercial lot. The proposed
driveway location conforms to District policy and should be constructed as proposed.
DD. The applicant is proposing to construct a 30-foot wide driveway on the east side of Ten Mile Road
located approximately 20-feet south of the north property line to serve the commercial lot. The
proposed driveway location conforms to District policy and should be constructed as proposed.
EE. The applicant is proposing to construct a 30-foot wide driveway on the north side of McMillan Road
located approximately 440-feet east of Ten Mile Road to serve the commercial lot. The proposed
driveway location conforms to District policy and should be constructed as proposed.
FF. The applicant is proposing to construct a 30-foot wide driveway on the north side of McMillan Road
located approximately 50-feet west of the east property line to serve the commercial lot. The
proposed driveway location conforms to District policy and should be constructed as proposed.
GG. The applicant is proposing to construct a 25-foot wide driveway on the south side of McMillan Road
located approximately 440-feet east of Ten Mile Road to serve the office/commercial lots. The
proposed driveway location conforms to District policy and should be constructed as proposed.
CENTER TURN LANES
HH. The applicant should be required to construct a center turn lane on Ten Mile Road for the Ten Mile
Road/main entrance intersection. The turn lane should be constructed to provide a minimum of
100-feet of storage with shadow tapers for both the approach and departure directions. Coordinate
the design of the turn lane with District staff.
II. The applicant should be required to construct a center turn lane on Ten Mile Road for the Ten Mile
Road/driveway intersection located south of McMillan Road. The turn lane should be constructed
to provide a minimum of 100-feet of storage with shadow tapers for both the approach and departure
directions. Coordinate the design of the turn lane with District staff.
JJ. The applicant should be required to construct center turn lanes on Ten Mile Road for the Ten Mile
Road/driveway intersections north of McMillan Road that serve the commercial parcel. The turn
lanes should be constructed to provide a minimum of 100-feet of storage with shadow tapers for
both the approach and departure directions. Coordinate the design of the turn lanes with District
staff.
KK. The applicant should be required to construct a center turn lane on McMillan Road for the
McMillan Road/main entrance intersection. The turn lane should be constructed to provide a
minimum of 100-feet of storage with shadow tapers for both the approach and departure directions.
Coordinate the design of the turn lane with District staff.
Bridgetower. cmm
Page 9
�� .�..- _t z�� ,��r �.��� �r1LJ1.JV i nvc.•
11� 11
LL. The applicant should be required to construct center turn lanes on McMillan Road for the McMillan
Road/driveway intersections located east of Ten Mile Road. The turn lanes should be constructed to
provide a minimum of 100-feet of storage with shadow tapers for both the approach and departure
directions. Coordinate the design of the turn lanes with District staff.
MM. Based on the recommendation of the traffic study, added left -turn lanes are needed on each
intersection approach at the Ustick Road/Linder Road intersection and at the Ustick Road/Ten Mile
Road intersection. The applicant should coordinate the design of these improvements with District
staff.
NN. Based on the recommendation of the traffic study, the applicant should provide a road trust deposit
for 21 % of the cost of a traffic signal at the Ustick Road/Linder intersection. The applicant should
provide a road trust in the amount of $29,400 for their proportionate share of the cost of the traffic
signal at Ustick and Linder Roads.
00. Based on the recommendation of the traffic study, the applicant should provide a road trust deposit
for 27% of the cost of a traffic signal at the Ustick Road/Ten Mile Road intersection. The applicant
should provide a road trust in the amount of S37,800 for their proportionate share of the cost of the
traffic signal at Ustick and Ten Mile Roads.
UTILITIES/IRRIGATION
PP. The preliminary plat indicates that the Settlers Canal is located on the south side of McMillan Road.
The applicant should relocate the canal outside of the new right-of-way of McMillan Road to
provide adequate space for future road widening.
QQ. All irrigation facilities should be relocated outside of the new right-of-way on McMillan Road, Ten
Mile Road and Ustick Road.
RR. All utility relocation costs associated with improving street frontages abutting the site should be
borne by the developer.
SS. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact Construction Services at 387-6280 (with file numbers) for details.
TT. Based on development patterns in this area and the resulting traffic generation, staff anticipates that
the transportation system will be adequate to accommodate additional traffic generated by this
proposed development with the requirements outlined within this report.
Special Notification to City of Meridian:
1 • The applicant is not proposing to connect the single-family residential portion of the subdivision
with the townhouse portion of the subdivision in an effort to prevent cut -through traffic to McMillan
Road. The applicant's traffic engineer suggests that this proposed design will eliminate
neighborhood cut -through. Staff recommends that the City require a pedestrian pathway between
the single-family and townhouse lots to provide pedestrian access to McMillan Road.
Bridgetower. cmm
Page 10
Opp 1q 'MI nq:Zq
w - zc-t�,_, .L,I LI--i 7r Lor 70 rn VL. 1L, 1 I
The following Site Specific Requirements and Standard Requirements must be met or provided
for prior to ACHD approval of the final plat:
Site Specific Requirements:
Dedicate 48-feet of right-of-way from the centerline of Ten Mile Road abutting the parcel by
means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of
a building permit (or other required permits), whichever occurs first. Allow up to 30 business days
to process the right-of-way dedication after receipt of all requested material. The owner will be
paid the fair market value of the right-of-way dedicated which is an addition to exist
ng ACHD
Dedicate 48-feet of right-of-way from the centerline of McMillan Road abutting the parcel by
means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of
a building permit (or other required permits), whichever occurs first. Allow up to 30 business days
to process the right-of-way dedication after receipt of all requested material. The owner will be
paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD
right-of-way.
3. Dedicate 48-feet of right-of-way from the centerline of Ustick Road abutting the parcel by means
of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a
building permit (or other required permits), whichever occurs first. Allow up to 30 business days
to process the right-of-way dedication after receipt of all requested material. The owner will be
paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD
right-of-way.
4. Construct the main entrance to the subdivision on Ten Mile Road located approximately 1/3-mile
south of McMillan Road, as proposed. The entrance shall be designed with 21-foot street sections
on either side of a center median, and the median shall be constructed a minimum of 4-feet wide
(but no larger than 12-feet wide) to total a minimum of a 100-square foot area. The applicant
shall be required to dedicate 54-feet of right-of-way plus the additional width of the median.
5. Construct the main entrance to the townhouse portion of the subdivision on McMillan Road
located approximately 900-feet east of Ten Mile Road, as proposed. The entrance shall be
designed with 21-foot street sections on either side of a center median and the median shall be
constructed a minimum of 4-feet wide (but no larger than 12-feet wide) to total a minimum of a
100-square foot area. The applicant shall be required to dedicate 54-feet of right-of-way plus the
additional width of the median.
Construct Belltower Drive and Towerbridge Way through the site as residential collectors because
the anticipated traffic volumes exceed 1,000 vehicle trips per day. Front -on housing is prohibited
on residential collectors. Construct these street segments as 36-foot street sections with curb, gutter
and 5-foot wide concrete sidewalks. Parking shall be prohibited on these street segments.
Coordinate the signage plan with District staff. The access restrictions for these street segments
shall be stated on the final plat.
Bridgetower. cmm
Page 11
noo in O n j fan . 7n
1� MFM 1" caul TEL NO: (208) 397-6391
#18138 PAGE 13/17
7. Provide directional signage on Belltower Drive where the roadway diverges around the water
amenity. This signage is necessary to guide motorists in the proper direction. Coordinate the
design of the signage plan with Traffic Services staff.
8. Construct two driveways off Belltower located approximately 230-feet east of Ten Mile Road on
both the north and south sides of Belltower Drive.
Connect to two existing stub streets that were approved with the Bridgetower Subdivision (located
north of Ustick Road) as proposed. The streets, Pride Crossing Drive and Towerbridge Way, shall
be extended into this site.
10. Construct two stub streets to the undeveloped parcel to the southwest of the site. The stub streets,
Breeze Creek Way (to the south), and Teano Drive (to the west), shall be located as proposed.
Construct turnarounds at the end of the stub streets and install a sign at the termini of the stub
streets stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the
sign plan for the stub streets, and the design of the turnaround with District staff.
IL Construct three stub streets to the undeveloped parcels to the northeast and east of the site (parcels
included in the entire planned unit development proposed by this applicant). The stub streets:
Coppercloud Way (to the north), Messina Street (to the east), and Verona Drive (to the east), shall
be located as proposed. No turnarounds are required. Install a sign at the termini of the stub
streets stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the
sign plan for the stub streets with District staff.
12. Any proposed landscape islands/medians within the public right-of-way dedicated by this plat shall
be owned and maintained by a homeowners association. Notes of this shall be required on the final
plat.
13. Unless otherwise approved, construct all public roads within the subdivision as 36-foot street
sections with curb, gutter, and 5-foot wide concrete sidewalks within 50-feet of right-of-way.
14. Streets within the subdivision shall align or offset a minimum of 125-feet from any proposed
public street.
15. Construct the turnarounds to provide a minimum turning radius of 45-feet.
16. Construct a 5-foot wide concrete sidewalk on Ten Mile Road abutting the site, located 2-feet
within the right-of-way. If the applicant constructs a meandering sidewalk, provide a sidewalk
easement to the District to construct the sidewalk outside of the right-of-way. Coordinate the
location and elevation of the sidewalk with District staff.
17. Construct a 5-foot wide concrete sidewalk on McMillan Road abutting the site, located 2-feet
within the right-of-way. If the applicant constructs a meandering sidewalk, provide a sidewalk
easement to the District to construct the sidewalk outside of the right-of-way. Coordinate the
location and elevation of the sidewalk with District staff.
Bridgetower. cmm
Page 12
ILL I1V- LawoJ JVI-o.:7Jl
jF171,70 rNUC • 1,1i 1 f
18. Construct a 5-foot wide concrete sidewalk on Ustick Road abutting the site, located 2-feet within
the right-of-way. If the applicant constructs a meandering sidewalk, provide a sidewalk easement
to the District to construct the sidewalk outside of the right-of-way. Coordinate the location and
elevation of the sidewalk with District staff.
19. Pave the driveways their full width of 24 to 30-feet, and at least 30-feet into the site beyond the
edge of pavement of Ten Mile Road, McMillan Road and Ustick Road, and install pavement
tapers with 15-foot radii abutting the existing roadway edge.
20. Construct a 25-foot wide driveway on the east side of Ten Mile Road located approximately 380-
feet south of McMillan Road to serve the office and commercial lots, as proposed.
21. Construct a 30-foot wide driveway on the east side of Ten Mile Road located approximately 440-
feet north of McMillan Road to serve the commercial lot, as proposed.
22. Construct a 30-foot wide driveway on the east side of Ten Mile Road located approximately 20-
feet south of the north property line to serve the commercial lot, as proposed.
23. Construct a 30-foot wide driveway on the north side of McMillan Road located approximately
440-feet east of Ten Mile Road to serve the commercial lot, as proposed.
24. Construct a 30-foot wide driveway on the north side of McMillan Road located approximately 50-
feet west of the east property line to serve the commercial lot, as proposed.
25. Construct a 25-foot wide driveway on the south side of McMillan Road located approximately
440-feet east of Ten Mile Road to serve the office/commercial lots, as proposed.
26. Construct a center turn lane on Ten Mile Road for the Ten Mile Road/main entrance intersection.
The turn lane shall be constructed to provide a minimum of 100-feet of storage with shadow tapers
for both the approach and departure directions. Coordinate the design of the turn lane with District
staff
27. Construct a center turn lane on Ten Mile Road for the Ten Mile Road/driveway intersection
located south of McMillan Road. The turn lane shall be constructed to provide a minimum of 100-
feet of storage with shadow tapers for both the approach and departure directions. Coordinate the
design of the turn lane with District staff.
28. Construct center turn lanes on Ten Mile Road for the Ten Mile Road/driveway intersections north
Of McMillan Road that serve the commercial parcel. The turn lanes shall be constructed to provide
a minimum of 100-feet of storage with shadow tapers for both the approach and departure
directions. Coordinate the design of the turn lanes with District staff.
29. Construct a center turn lane on McMillan Road for the McMillan Road/main entrance intersection.
The turn lane shall be constructed to provide a minimum of 100-feet of storage with shadow tapers
for both the approach and departure directions. Coordinate the design of the turn lane with District
staff
Bridgetower. cmm
Page 13
noo 10 on, M,. nra
1 C_Uu1 ILL NO: (208) 387-6391
418138 PAGE: 15i17
30. Construct center turn lanes on McMillan Road for the McMillan Road/driveway intersections
located east of Ten Mile Road. The turn lanes shall be constructed to provide a minimum of 100-
feet of storage with shadow tapers for both the approach and departure directions. Coordinate the
design of the turn lanes with District staff.
31. Construct added left -turn lanes on each intersection approach at the Ustick Road/Linder Road
intersection and at the Ustick Road/Ten Mile Road intersection. The applicant shallcoordinate the
design of these improvements with District staff.
32. Provide a road trust deposit for 21 % of the cost of a traffic signal at the Ustick Road/Linder
intersection in the amount of $29,400 for their proportionate share of the cost of the traffic signal
at Ustick and Linder Roads.
33. Provide a road trust deposit for 27% of the cost of a traffic signal at the Ustick Road/Ten Mile
Road intersection in the amount of $37,800 for their proportionate share of the cost of the traffic
signal at Ustick and Ten Mile Roads.
34. Relocate the Settlers Canal outside of the new right -of --way of McMillan Road to provide adequate
space for future road widening.
35. All irrigation facilities shall be relocated outside of the new right-of-way on McMillan Road, Ten
Mile Road and Ustick Road.
36. All utility relocation costs associated with improving street frontages abutting the site should be
borne by the developer.
37. Utility street cuts in pavement less than five years old are not allowed unless approved in writing
by the District. Contact Construction Services at 387-6280 (with file numbers) for details.
38. Other than the access points specifically approved with this application, direct lot or parcel access
to McMillan Road, Ten Mile Road and Ustick Road is prohibited. Lot access restrictions, as
required with this application, shall be stated on the final plat.
Standard Requirements:
A request for modification, variance or waiver of any requirement or policy outlined herein shall
be made in writing to the ACHD Planning and Development Supervisor. The re uest shall
s ecifically identify each re uirement to be reconsidered and include a written a lanation of why
such a re uirement would result in a substantial hardshi or ine uit .The written re uest shall be
submitted to the District no later than 9:00 a.m. on the da scheduled for All Commission
action. Those items shall be rescheduled for discussion with meeting agenda. the Commission on the next available
Requests submitted to the District after 9:00 a.m. on the day scheduled for Commission action do
not provide sufficient time for District staff to remove the item from the consent agenda and report
Bridgetower. cmm
Page 14
"+ ILL NO: (308) 387-6391 #16138 PAGE: 16/17
to the Commission regarding the requested modification, variance or waiver. Those items will be
acted on by the Commission unless removed from the agenda by the Commission.
2• After ACHD Commission action, any request for reconsideration of the Commission's action shall
be made in writing to the Planning and Development Supervisor within six days of the action and
shall include a minimum fee of $110.00. The request for reconsideration shall mspecifically identify
each requireent to be reconsidered and include written documentation of data that was not
available to the Commission at the time of its original decision. The request for reconsideration
will be heard by the District Commission at the next regular meeting of the Commission. If the
Commission agrees to reconsider the action, the applicant will be notified of the date and time of
the Commission meeting at which the reconsideration will be heard.
3. Payment of applicable road impact fees are required prior to building construction in accordance
with Ordinance # 193, also known as Ada County Highway District Road Impact Fee Ordinance.
4. All design and construction shall be in accordance with the Ada County Highway District Policv
Manual, ISPWC Standards and approved supplements, Construction Services procedures and all
applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the
State of Idaho shall prepare and certify all improvement plans.
5. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or
other required permits), which incorporates any required design changes.
6. Construction, use and property development shall be in conformance with all applicable
requirements of the Ada County Highway District prior to District approval for occupancy.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way.
Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD.
The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days
prior to breaking ground within ACHD right-of-way. The applicant shall t contacACHD Traffic
Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during
any phase of construction.
Bridgetower. cmm
Page 15
ILL NV-- lCbti) dbt 1-6:jy1
#18138 PRGE: 17i17
8. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of the Ada County Highway District. The burden shall be upon the applicant to
obtain written confirmation of any change from the Ada County Highway District.
9. Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or
other regulatory and legal restrictions in force at the time the applicant or its successors in interest
advises the Highway District of its intent to change the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at
the time the change in use is sought.
Conclusion of Law:
undue burden on the existing vehicular and pedestrian transportation
ACHD requirements are intended to assure that the proposed use/development tivill not place an
impacted by the proposed development. system within the vicinity
Should you have any questions or comments, please contact the Division at 387-6170. Planning and Development
Submitted by.
Planning and Develo ment Staff
Commission Action:
Bridgetower. cmm
Page 16
City of Meridian
Planning & Zoning
RECETVE4 D
Me m o MAY 15 2001
City of Meridian
City Clerk Office
To: P&Z Commission
Frown Brad Hawkins -Clark
CC: Bruce Freckleton, Becky Bowcutt, Project File
Date: 5/15/01
Re: Bridgetower Crossing Subdivision (File Nos. PP-01-005 and CUP-01-006)
Dear Commissioners,
The subject applications are on your 5-17-01 meeting agenda, continued from the 4-19-01
meeting. The Commission recommended approval of the Annexation application associated
with this project and passed it on to City Council. However, the public hearings for the
Preliminary Plat and CUP applications were continued and left open in order to receive new
information only. This memo summarizes a few of the outstanding issues pertaining to these
two open application hearings.
ACHD Action: The City has received a final ACHD staff report on the Preliminary Plat
application with detailed conditions. On 4-18-01, the ACHD Commission conducted a public
hearing on the Preliminary Plat application. However, ACHD has not taken any final action on
this or the other two Bridgetower Crossing applications to date and none are scheduled.
ACHD delayed any final decision on the Preliminary Plat application until after a joint meeting
between Meridian City Council, Ada County Commissioners, Meridian School District and
representatives of the development community. This meeting is scheduled for Monday, 5-21-
01. The purpose of that meeting will be to review the overall growth demands occurring in
Meridian's north corridor between Black Cat and Meridian Road and between Ustick and
Chinden. ACHD has not set a new date for final action on the Bridgetower Crossing
applications.
Staff is in general agreement with the ACHD conditions on the Preliminary Plat application.
However, since no ACHD report has been prepared for the CUP application, we cannot
comment on the larger traffic and street design issues that ACHD may have. Of primary
concern to Staff is whether or not ACHD will require a vehicular connection to McMillan Road
between Desertbreeze Avenue and the proposed elementary school site. The Applicant and
Staff have not come to any resolution or agreement on this issue.
0 Page 1
Issues Raised in 4-19 English Letter: The Commission received a letter from Brian and
Margaretha English, residents 4650 N. Linder Road adjacent to this project, the same date of
the last Commission hearing (4-19-01). Neither the Commission or Staff had adequate time
to review this letter at that time. Below are Staffs responses to some of the issues raised in
the English letter:
Traffic Concems (Item #1-4 pa 2) — The requirement for a detailed traffic study is
a requirement of ACHD, not the City. It is ACHD's ordinance that requires a traffic
study and it is ACHD staff who review and comment on the findings of the study.
While Staff believes the English letter raises some valid concerns, the City does
not employ any traffic engineers and we do not have the authority to require a
revised study — although this is certainly within the parameters of the Commission
to require if you deem it necessary. If so, Staff recommends coordination with
ACHD pdor to requiring a revised study since they would have to review the
revised study and provide feedback to the City.
2. Mitigate Street Light Glare (Item #5 pg 3) — To Staffs knowledge, the City of
Meridian has not been involved with the design of intersection street lights. This
design is done in tandem with the design and location of future traffic signals and
is under ACHD's jurisdiction. In addition, there are certain public safety codes that
must be met at these intersections for both pedestrian and vehicular visibility.
3. Mitigate Headlight Glare (Item #6 pg. 3) — Meridian's Zoning and Subdivision
Ordinances only address light glare in relation to parking lots and
commercialfindustrial uses; the ordinances do not contain any development
standards relating to glare within residential subdivisions. However, as a
CUP/PUD, the City may require such mitigation. Options to consider may be to
require a slight relocation of Coppercloud Way to either the north or south so
exiting traffic does not face directly in the English's property or require the
developer to construct a screening fence on the English property.
4. Development Schedule (pg. 4) — My estimate of Bridgetower Crossing build -out in
ten (10) years was provided by the Applicant and was simply a loose projection.
Actual subdivision build -out timeframes are heavily dependent upon market
demand. That being said, the Applicant will be required to submit Final Plat
applications for each phase of the overall development in maximum of one (1)
year increments (City Ord. 12-3-6), assuming no time extensions are requested.
The proposed Preliminary Plat shows a total of nine (9) phases, which allows the
Applicant nine (9) years to build -out the subject plat's 175 acres, starting from the
date of City Council approval of the Preliminary Plat. The City may choose to
stipulate more speck timeframes as part of the Development Agreement.
5. Public Notice and Process Concerns (pg. 4) — The City Clerk's Office is well
aware of the public notice problem with this application and has had numerous
discussions with the English's. The City Clerk will need to address the request to
send a direct mailing to the English's for future applications within the 2-3 mile
area.
• Page 2
On the last issue about zoning rules not yet being in effect, Staffs report dated 3-
12-01 (item #4, pg. 5) does specify which portions of the project would not be in
compliance under the existing zoning regulations and stipulates when lots may be
annexed and when building permits could be issued.
Settlers Canal Easement Another unresolved issue was the location and width of the
Settlers Canal along the south side of McMillan Road (see #2 on pg. 11 of the 3-12-01 staff
report). The Applicant met with the Settlers Irrigation District Board but, as of this date, the
District still has not provided an exact easement width. Given the ample depth of the
residential lots adjacent to the south side of this canal and considering the average easement
width provided for other canals of similar size, the Applicant has made assurances to the
Commission that the lots abutting the canal will not be sign icantly impacted. Staff agree and,
while we feel this easement width must still be determined and shown on the Preliminary
Plat, we feel this issue could be determined prior to the City Council hearing rather than
holding up approval at the P8Z Commission level. The Commission could attach a condition
that the Preliminary Plat must be remanded back for the Commission's review if the Settlers
Canal easement width results in the elimination of any lots currently shown on the plat.
Design of White Drain: Another pending matter was the design of the White Drain and
whether or not it will be piped. Settlers Irrigation District has required that the drain either be
piped (their preference) or the City take on liability. Settlers also will not allow any subdivision
drainage water into the White Drain. The Applicant has prepared a conceptual drainage plan
for the site and is prepared to discuss their options at the meeting. The Applicant told Staff
that regardless of whether or not the White Drain is piped, they will provide a water amenity
as shown on the CUP Plan.
Other Considerations: Historically, the P&Z Commission has chosen to only forward
applications to City Council once all major issues are resolved and all applications can be
forwarded to Council as a single package. Although the Annexation application was approved
separately, the Preliminary Plat and CUP applications must be kept together and cannot be
separated (i.e. open space allowances, office uses, townhouse uses).
The Commission has also typically delayed approval until final ACHD action has been taken.
As stated above, ACHD has delayed action until after their 5-21-01 meeting with the City
Council. Even if ACHD acts on the Preliminary Plat, the City has no estimate of when ACHD
will act on the CUP application and if significant street system changes will need to be made
to the CUP Plan as a result of ACHD's conditions.
A significant difference with this application from previous applications is the White Drain
Sewer Trunk extension. To date, the Applicant has not granted the City a sanitary sewer
easement to extend the new trunk line from Ten Mile to the east. However, the Applicant has
stated that this easement may be granted once they have initial assurances that Bridgetower
Crossing will be approved.
0 Page 3