HomeMy WebLinkAboutCommentsJanuary 22, 2004 FP 03-072
MERIDIAN CITY COUNCIL MEETING January 27, 2004
APPLICANT Primeland Development, LLP ITEM NO.
REQUEST Request for Final Plat approval of 45 building lots and 5 other lots on 21.24 acres in an
R-4 (PD) zone for Bridgetower Crossing No. 5 -- east of North Ten Mile Road and south of West
McMillan Road
AGENCY
CITY CLERK:
CITY ENGINEER:
CITY PLANNING DIRECTOR:
CITY ATTORNEY
CITY POLICE DEPT:
CITY FIRE DEPT:
CITY BUILDING DEPT:
CITY WATER DEPT:
CITY SEWER DEPT:
CITY PARKS DEPT:
MERIDIAN SCHOOL DISTRICT:
ADA COUNTY HIGHWAY DISTRICT:
SANITARY SERVICE COMPANY
CENTRAL DISTRICT HEALTH:
NAMPA MERIDIAN IRRIGATION:
SETTLERS IRRIGATION:
IDAHO POWER:
US WEST:
INTERMOUNTAIN GAS:
MERIDIAN POST OFFICE:
OTHER:
Contacted: , i c) I ' ;) & Date: — it Phone: _
Emailed: ttaff Initials:
Materials presented at public meetings shall become property of the City of Meridian.
COMMENTS
See attached Staff Comments
No Comment
No Comment
r \�
,
Of (Try CIF �;<� �'� >•
ON4
�Y1G�l�y1�
R IDAHO
g.
cF
ryTERo h` TREASURE V:�Y
SINCE
iss3
MAYOR
Tammy de Weerd
CITY COUNCIL MEMBERS
Keith Bird
Christine Donnell
Charles M. Rountree
Shaun Wardle
CITY DEPARTMENTS
Fire
540 E. Franklin Road
888-1234 / fax 895-0390
Parks & Recreation
11 W. Bower Street
888-3579 / fax 898-5501
Planning
660 E. Watertower Lane
Suite 202
884-5533 / fax 888-6844
Police
1401 E. Watertower Lane
888-6678 / 846-7366
Public Works
660 E. Watertower Lane
Suite 200
898-5500 / fax 898-9551
- Building
660 E. Watertower Lane
Suite 150
887-2211 / fax 887-1297
- Wastewater
3401 N. Ten Mile Road
888-2191 / fax 884-0744
- Water
2235 N.W. 8th Street
888-5242 / fax 884-1159
June 17, 2005
`-011
RECEIVED
JUN 21 2005
City of Meridian
City Cleric Office.
Primeland Development Co
660 E Franklin Ste 110
Meridian ID 83642
RE: BRIDGETOWER CROSSING #5
Sewer & Water Construction
Dear Sirs
Installation of this project's sanitary sewer and/or domestic water
systems has been satisfactorily completed in accordance with the
approved plans. These systems have passed the required tests, in
accordance with City of Meridian Standard Specifications and
Drawings, and are hereby accepted by the City for ownership and
maintenance.
Record drawings submitted to us for this project are also accepted
and are being forwarded to the Idaho Department of Environmental
Quality. The engineer of record is responsible for certification of the
record drawings as to horizontal and vertical location of all public
water and sewer facilities installed. The City of Meridian hereby
certifies that materials used and construction methods were in
accordance with City of Meridian specifications.
In accordance with City of Meridian Standard Specifications and
Drawings, the installation and materials of the sewer and domestic
water systems are to be warranted against defect by the contractor
for a period of one year from the date of this letter
4el avj
Lenard Grady, P.E.
Acting City Engineer, Public Works
cc. City Clerk, Water Division, Wastewater Division, File
Engineering Solutions
DEQ
CITY HALL 33 EAST IDAHO AVENUE MERIDIAN, IDAHO 83642 (208) 888-4433
CITY CLERK — FAX 888-4218 CITY ATTORNEY / HR — FAX 884-8723 FINANCE & UTILITY BILLING — FAX 887-4813 MAYOR'S OFFICE — FAX 884-8119
Printed on recycled paper
21 January, 2004
William G. Berg Jr.
City Clerk
City of Meridian
33 East Idaho Ave.
Meridian, ID 83642
RE: FP 03-072 Bridgetower Crossing No. 5
Dear Will.
,#..W RECEIVED
City of Meridian
City Qk-x°k f?ffie.<
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
Nampa & Meridian Irrigation District has no comment on the above referenced
application for Final Plat approval for Bridgetower Crossing No. 5 as it will not impact the
District.
Thank you,
Bill Henson
Asst. Water Superintendent
Nampa & Meridian Irrigation District
BH/dbg
C: Water Superintendent
File - Office/Shop
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
CENTRAL
*0 TDISTRICT
EALTH
DEPARTMENT
MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE, ID 83704-0825 • (1208) 375-5211 • FAX 327-8500
To prevent mid treat disease mid disability; to promote healthy lifestyles; and to protect mid promote the health mid quality of our eimironmetit.
04-0365
May 12, 2004
David Navarro
Ada County Recorder
200 West Front Street
Boise, ID 83702
RE: Bridgetower Crossing #5 Subdivision
Dear Mr. Navarro:
RECEIVED
MAY 17 2004
City of Meridian
City Clerk Office
Central District Health Department, Environmental Health Division, has reviewed and does
approve the final plat on this subdivision for central water and central sewer facilities. Final
approval was given May 12, 2004.
If you have any questions, please call 327-8537.
Sincerely,
Malcohm McGregor
Environmental Health Specialist
cc: Department of Housing and Urban Development
Ada County Development Services
City of Meridian
Primeland Development Company, LLP
Engineering Solutions, LLP
MM:bm
Ada i Boise County Office
707 N. Armstrong Pi.
Boise, ID E3704
Ervin. Health: 327-7499
FanJ!\, Planninc: 327-7400
Immunizations: 327-7450
Senior Nutrition: 327-7460
WIC: 327-7488
FP,X: 327-850^
Serving Valley, Elmore, Boise, and Ada Counties
Elmore Countv Office
520 E. 8th St, North
Mountain Home, ID 83647
Envirc. Health: 587-9225
Family Health: 587-4407
WIC: 587-4409
FAX: 587-3521
Valley County Office
703 N. 1st Si.
P.O. Box 144E
McCall, ID 8363E
Ph. 634-719
FAX: 634-2174,
(c7mCENTRAL
g-lat
D1 DISTRICT CENTR,,,�, DISTRICT HEALTH DEPr�TMENT
HEALTH Environmental Health DivisionRECETVED
DEPARTMENT
Rezone #
Conditional Use #
of
Return to:
❑ Boise
❑ Eagle
❑ Garden City
�leridian
Preliminary / Final / Short Plat FP 03 —6172- ❑ Kuna
❑ ACZ
__ _o . .. _ . _ __ .-- ❑ Star
❑ 1. We have No Objections to this Proposal.
❑ 2. We recommend Denial of this Proposal.
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ or bedrock from original grade ❑ other
❑ 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
4,8. After written approval from appropriate entities are submitted, we can approve this proposal for:
4w entral sewage ❑ community sewage system ❑ community water well
❑ interim sewage -central water
❑ individual sewage ❑ individual water
The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare,
Division of E vironmental Quality:
( =ral sewage ❑ community sewage system ❑ community water
❑ sewage dry lines )4-eentral water
Run-off is not to create a mosquito breeding problem.
❑ 11. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
❑ 13. We will require plans be submitted for a plan review for any:
❑ food establishment ❑ swimming pools or spas ❑ child care center
❑ beverage establishment ❑ grocery store
. Please see attached stormwater management recommendatations
❑ 15.
Reviewed By:
Date: /Zy/ pe/
-< --4, G�eyJ
CDHD9/00lkc Review Sheet
CENTRAL
5�* DISTRICT
HEALTH
DEPARTMENT
MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE, ID 83704-0825 • (208) 375-5211 • FAX 327-8500
To prevent and treat disease and disability; to promote health}, lifes4,les; and to protect and promote the health and quality of our environment.
land.12 rev 0303
STORM WATER MANAGEMENT RECOMMENDATIONS
It is recommended that storm water be pre-treated prior to discharge to the
subsurface to prevent impact to ground water and surface water quality. The
engineers and architects involved with the design of this project should obtain
current best management practices for storm water disposal and design a
storm water management system that is preventing groundwater and surface
water degradation. Manuals that could be used for guidance are:
State of Idaho Catalog of Stormwater Best Management Practices For
Idaho Cities and Counties.
Prepared by the Idaho Department of Environmental Quality, July
1997.
Stormwater Best Management Practices Guidebook.
Prepared by City of Boise Public Works Department, May 2000.
Ada ,' Ecise County
707 N. Armstrong Pi.
Boise, ID 83704
Enwo. Health: 327-7499
Family Planning: 327-7400
Immunizations: 327 -74 50
Senior Nutrition: 327-7460
W": 727-74FE
Serninp Fallen Elmore. Boise, and Ada Counties
Offict > i17,Cr� dLl..
520 E. 8th St. Nora
Mountain Home, ID 83647
Enviro. Health: 587-9225
ramiiv Health: 587-44C7
Will: 587-440_
FAX 58- 352
,'Elie '_cum 011ict
0 ; N. 1st St.
r'C. Box 144E
McCall, ID 8363E
Ph. 634-7 194
FAX: 634-2174
NGINEERING
planning and engineering communities for the future
aOLUTIONSLLP
January 27, 2004
Mayor and City Council
City of Meridian
33 East Idaho Avenue
Meridian, ID 83642
Re: Bridgetower Crossing Subdivision No. 5 (Final Plat)
File No. FP-03-072
Dear Mayor and Council:
150 East Aikens Street, Suite B
Eagle, ID 83616
Phone: (208) 938-0980
Fax: (208) 938-0941
E-mail: es-beckym@gwest.net
RECEIVEL
JAN 2 7 2004
City Of Meridian
City Clerk Office
We have reviewed staff comments dated January 27, 2004, and have the following responses:
SITE SPECIFIC REQUIREMENTS
1. The applicant will meet all terms of the approved preliminary plat (PP-01-005),
conditional use permit (CUP-01-006) and development agreement (Inst. No. 101117652).
2. The applicant will comply.
3. The applicant will comply.
4. The applicant will comply.
5. The applicant will comply.
6. The applicant will comply.
7. The applicant will comply.
S. The applicant will comply.
9. The plat notes will be revised as requested.
C\Documents and Settings\greent.MERIDIANCITY\Local Settings\Temporary Internet Fi1es\0LK14B\RecsResponse.doc
Mayor and City Council v v
January 27, 2004
Page 2
10. A mosquito abatement plan is not necessary since we have no wet ponds in this
phase.
11. The applicant will comply.
12. The applicant will comply.
13. The easement width will be increased as requested.
14. The applicant will comply.
15. Noted.
GENERAL REQUIREMENTS
1. The Creason Lateral was piped last year.
2. The applicant will comply.
3. The applicant will comply.
4. The applicant will comply.
5. The applicant will comply.
6. The applicant will comply.
7. The applicant will comply.
8. The applicant will comply.
We believe this letter addresses all of your concerns. Please feel free to call me if you have
additional comments or questions.
Sincerely,
Engineering Solutions, LLP
Becky McKay
Partner
BM:ss
cc: Mr. Frank Varriale
CADocuments and Settings\greens. ME RID IANCITY\Local Settings\Ternporary Internet Files\OLKl4B\RecsResponse.doc