HomeMy WebLinkAboutNarrative rev
Stack Rock Group
404 S 8th Street #154
Boise Idaho, 83702
208.345.0500
www.stackrockgroup.com
Boise l Salt Lake City
Landscape Plan Modification Narrative
Sky Mesa Highlands
Case No(s) FP-2020-0007
Description: Planting Schedule has been adjusted – Trees & Shrubs have been removed / added
Updates: (9) Flame Amur Maple removed. (38) Deborah Maple removed. (34) Pacific Sunset Maple added. (12) Autumn Blaze Red Maple removed. (29) Shademaster Locust removed. (30) Colorado
Blue Spruce added. (1) Vanderwolf’s Pine removed. (82) Feather Reed Grass added. (18) Russian Sage added. (56) Slowmound Mugo Pine removed. (59) Ivory Halo Dogwoods added. (36) Summer
Wine Ninebark added. (70) Blue Shag White Pine added. (56) Black-eyed Susan added. Dry Land Seed Mix has been removed. Fescue Blend or approved other has been added. Trees along arterial
have been adjusted.
Description: Details revised.
Updates: Details #3 & #4 on L100 have been revised.
Description: Berm Modifications
Updates: Berm along Eagle Rd has been adjusted per roadway construction. A 4’ retaining wall has been added along a portion of the back of the residences along Eagle Rd. The berm now
extends from that retaining wall 25’ towards Eagle Rd. There is no longer a sidewalk. After the berm is the ACHD Buffer which will be sodded per field conditions up to Eagle Rd. The
plantings in the berm along Eagle Rd have been adjusted.
Description: Existing residence on site.
Updates: All landscaping (trees & shrubs) in front of existing residence along Eagle Rd will be preserved and protected. Plans no longer show sod and a sidewalk in front of existing
residence.
Description: Seepage beds / drainage structures & features were adjusted / removed / added
Updates: Lot 13 block 2 added common lot with seepage bed. Lot 49 block 1 seepage bed was adjusted. Lot 1 block 2 seepage bed was adjusted. Lot 1 block 1 seepage bed added. Lot 20 block
1 added seepage bed. Lot 29 block 1 seepage bed adjusted. Lot 11 block 1 added seepage bed.
Description: Building/Common/Street Lots were adjusted / removed / added
Updates: Lot 53 block 1 was added. Lot 52 block 1 was added. Lot 51 block 1 was added. Lot 50 block 1 was added. Lot 8 block 4 was added. Lot 7 block 4 was added. Lot 12 block 2 was
added. Lot 1 block 1 added turf and a 5’ gravel path. Lot 32 block 3 common lot was adjusted per the new lot layout which extends 4 lots to the sidewalk on S. Pioneer Way Trail. Lot
29 block 1 added access road and removed a sidewalk path. Lot 38 block 1 added 5’ gravel path & adjusted the existing path. Common area along S. Eagle Rd has been adjusted per construction
on S. Eagle Rd, sidewalk has been removed & any landscaping in front of the existing lot on S. Eagle Rd has been removed. Lot 15 block 1 common lot added fencing. Lot 8 block 1 common
lot added fencing.
Description: Street Names were adjusted / removed / added
Updates: East Mardia St was added. South Burgo Place is now South Phoebe Place. East Hyper Drive is now East Parulo Drive.
Description: Street / Common Lot Trees were adjusted / removed / added
Updates: Trees at lot frontages were reduced to (1) per every building lot per code. Lot 13 block 2 added (2) Class II trees. Lot 49 block 1 added (1) evergreen tree. Lot 1 block 2 added
(2) evergreen trees and (2) Class II trees. Lot 32 block 3 removed (1) Class I tree. Lot 20 block 1 removed (1) Class I tree. Lot 29 block 1 added (1) Class II tree. Lot 14 block 3
removed (2) Class II trees due to the sq’ being adjusted. Lot 38 block 1 added (3) trees, replaced some deciduous with evergreens. South Eagle Road removed (10) trees due to lot adjustment
due to road construction.
Note: All proposed changes conform with the approved project’s conditions of approval and all applicable requirements of the UDC.