City Clerk's Office
33 E Broadway Avenue
Meridian ID, 83642
BOISE PROJECT BOARD OF CONTROL
RE: Poiema Subdivision
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
3727 E Lake Hazel Rd. Meridian
New York Irrigation District
Hess Lateral 04+10 B
Sec. 33, T3N, R1E, BM.
Joe Dodson, Assigned Planner:
2465 OVERLAND ROAD
BOISE, IDAHO 83705-3155
5 July 2021
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
FP-2021-003d
NY-315-001-02, 315-001-04
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
TEL:(208)344-1141
FAX:(208)344-1437
RECEIVED
JUL 0 8 2021
G I i Y U F GKMVDm;N,-
C I Y CLERKS OFFICE
There are no Boise Project facilities located on the above -mentioned property, however it does in
fact possess a valid water right.
The Ten Mile Drain/Creek borders this property and the Army Corp of Engineers has jurisdiction
over this facility any changes to the channel and easements must be approved by them.
Local irrigation/drainage ditches that cross this property, in order to serve neighboring properties,
must remain unobstructed and protected by an appropriate easement.
This oronerty lies within the New York Irrigation District. It is important that
representatives of this development contact the NYID office as soon as possible to discuss the
pressure system prior to any costly design work. If applicable, the irrigation system will
have to be built to specific specifications as set by the District / Project.
Boise Project Board of Control must receive a written response from the New York
Irrigation District as to who will own and operate the pressure irrigation system prior to
review and approval of an irrigation plan by Boise Project Board of Control.
Storm Drainage and/or Street Runoff must be retained on site.
Whereas this development is in its preliminary stages, Boise Project Board of Control reserves
the right to review plans and require changes when our easements and/or facilities are affected
by unknown factors.
This development is subiect to Idaho Code 31-3805, in accordance, this office is requesting
any hard copies of the irrigation and drainage plans.
If you have any further questions or comments regarding this matter, please do not hesitate to
contact me at (208) 344-1141.
Y�
Thomas Ritthaler
Assistant Project Manager, BPBC