HomeMy WebLinkAboutChange Order 1 with J.C. Constructors, Inc. for Black Cat Lift Station
City of Meridian
Public Works Dept.
RECEIVED
JAN 1 9 2006
City Of Meridian
City Clerk Office
Memo
To:
William Berg, Jr.; Tara Green
From: Clint Dolsby, P.E., Staff Engineer
cc:
Brad Watson, P.E., Public Works Director
Date: 01/19/2006
Re:
Proposed Agenda Items for January 24, 2006 City Council Meeting
The Public Works Department respectfully requests the following items be placed on the
January 24 City Council agenda, under consent agenda, for Council's consideration:
Budqet Amendment - South Area Treatment and Lift Station Project. We are requesting a
budget amendment, along with creation of a new line item, for the "South Area Treatment
and Lift Station Project". This amendment will allow us to work with consultants during this
budget year to complete a predesign report, site selection and acquisition of the site for the
South Area Lift Station. Following this report we plan to move on to final design of this lift
station in this budget year. We also plan on doing follow up work on the NPDES Permit
application we have submitted that includes the site selection and acquisition of the
wastewater treatment plant site. This work could also potentially include the predesign of the
south area wastewater treatment plant in this budget year.
This budget amendment is for the South Area Treatment and Lift Station Project in the
amount of $400,000.
Recommended Council Action: The Public Works Department recommends that City
Council approves the budget amendment for the South Area Treatment and Lift
Station Project in the amount of $400,000 for FY 2006.
.* Chanqe Order No.1 for the Black Cat Lift Station. Additional work is required for the
completion of the Black Cat Lift Station. This change order consists of the following work,
which is 1.65% of the original contract amount for the project:
.
Lowering the utility lines to provide cover for approaches to Black Cat Road.
Elimination of the VFD for the fan motor and reclassification of the mag meter.
Addition of empty embedded conduits for future pump control stations.
Revisions to the electrical panels and SCADA system.
.
.
.
. Page 1
.
Payment for overtime inspection.
Addition of flex couplings for the DI pipe at the NPW tank.
Fittings purchased by ACHD for the drain tile where it was in conflict with the
dewatering line.
Additional tenser layer and geofabric.
Additional hip rafter for the trusses and galvanized break metal at the double door
openings.
Landscaping and fence revisions.
.
.
.
.
.
JC Constructors, Inc. submitted a cost for this change order as summarized below:
.
JC Constructors, Inc.
$42,429.74
Recommended Council Action: The Public Works Department recommends
that City Council approves Change Order No.1 for the Black Cat Lift Station
with JC Constructors, Inc. for $42,429.74 and authorize the Mayor to sign it.
Thank you for your consideration. Please contact me if you have any questions regarding
any of these items.
. Page 2
CHANGE ORDER NO.1
No.1
DATE OF ISSUANCE
EFFECTIVE DATE
OWNER City of Meridian
CONTRACTOR JC Constructors. Inc.
Contract: Black Cat Lift Station
Project: Black Cat Lift Station
OWNER's Contract No. N/A
ENGINEER
ENGINEER's Contract No.
N/A
You are directed to make the following changes in the Contract Documents:
Description: This change order consists of the following work:
Lowering the utility lines to provide cover for approaches to Black Cat Road.
Elimination of the VFD for the fan motor and reclassification of the mag meter.
Addition of empty embedded conduits for future pump control stations.
Revisions to the electrical panels and SCADA system.
Payment for overtime inspection.
Addition of flex couplings for the 01 pipe at the NPW tank.
Fittings purchased by ACHD for the drain tile where it was in conflict with the dewatering line.
Additional tenser layer and geofabric.
Additional hip rafter for the trusses and galvanized break metal at the double door openings.
Landscaping and fence revisions.
.
.
.
.
.
.
.
.
.
.
Reason for Change Order: Miscellaneous requests for change were incorporated into this project.
Attachments: (List documents supporting change): Estimates from JC Constructors, Inc. for each of the requests for change.
RECOMMENDED:
By: ~'O~.- By:
Clint Dolsby, Staff Engineer
Date: II, q 106 Date:
Approved by City Council:
EJCOC 1910-8-B (1996 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the
Construction Specifications Institute.
CHANGE IN CONTRACT PRICE:
Original Contract Price
$ 2.565.000.00
Net Increase (Decrease) from previous Change Orders
No. ~ to ~
$ 0
Contract Price prior to this Change Order:
$ 2.565.000.00
Net increase (decrease) of this Change Order:
$ 42.429.74
Contract Price with all approved Change Orders:
$ 2.607.429.74
ACCEPTED:
Contractor
CHANGE IN CONTRACT TIMES:
Original Contract Times:
Substantial Completion:
Ready for final payment:
(days or dates)
Net change from previous Change Orders No. - to
No._:
Substantial Completion:
Ready for final payment:
(days)
Contract Times prior to this Change Order:
Substantial Completion:
Ready for final payment:
(days or dates)
Net increase (decrease) this Change Order:
Substantial Completion:
Ready for final payment:
(days)
Contract Times with all approved Change Orders:
Substantial Completion:
Ready for final payment:
(days or dates)
APPROVED:
ATTEST:
By:
Tammy de Weerd, Mayor
By:
William G. Berg, Jr. City Clerk
Date:
Date:
~
CHANGE PROPOSAL REQUEST
1.PROJECT 2.CONTRACTOR 3.PROJECT NO. Change Propos;¡l #
City of Meridian Black Cat Lift 140 1
Station. JC CONSTRUCTORS
5.CONTRACT NO: 6.PROPOSAL DATE
23-Aug...(l5
DESCRIPTION O.f CHANGE
At the western limits of the property utility lines needed to be lowered to provide cover for the
approaches at Black Cat Road.
Labor by JC Constructors was for relocating the fence and providing layout to the three separate
crews that came in at different times.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
i. Direct labor wi labor fringes ( Attach supporting detail estimates with man-hours and tates) $ 560.34
2. Insurance and Labor Taxes $ . 129.45
3. Materials wi frgt and SST. Detailed quantities attached. $ -
4. Equipment Expanse $ -
5. Overhead & Fee @ 15% $ 103.47
$ -
Time Extention Requested 0 workinq days JC Constructors Proposal Cost $ 793.26
.
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
1. ." AMOUNT
SUBCONTRACTOR NAME CATEGORY OF WORK
Cable One Utility Relocation $ 1,323.05
Intermountain gas. Utility Relocation $ 759.05
Owest Utility Relocation $ 3,730.00
White Pine landscaping Landscape Repair $ 180.00
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P): $ 5,992.10
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT (!¡ 5 PERCENT: $ 299.61
CONTRACTORS BOND COST Q $,018/1000 $ 127.53
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ 7,212.50
JC CONSTRUCTORS, INC. -r:: - ~
CON77'/ACTOR NAME
Rob Guyott
PRINTED NAME ON PROPOSAL -;;GNATUREIDATE'
Page 1, JCC
/'"~
CHANGE PROPOSAL REQUEST
1.PROJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal #
City of Meridian Black Cat Lift 140 2
Station. JC CONSTRUCTORS
5.CONTRACT NO: 6.PROPOSAL DATE
23-AuQ-oS
DESC~PTIONOFCHANGE
Eliminatìòn of the VFD for the fan motor. The motor comes with a belt system that allows for
speed adjustment. The VFDs are being eliminated per the engineers request.
The additional panel capacity referenced on Custom Electrics Quote will be addressed
under a separate cover.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wi labor fringes ( Attach supporting detail estimates with man-hours and rates) $ -
2. Insurance and labor Taxes $ -
3. Materials wi frgt and SST. Detailed quantities attached. $ -
4. Equipment Expense $ -
5. Overhead & Fee @ 15% $ -
$ -
Time Exh!ntion Requested a workinQ days JC Constructors Proposal Cost $ -
8. For work to be performed by subcontractors. per proposals and detailed breakdowns
1 - AMOUNT
SUBCONTRACTOR NAME CATEGORY OF WORK
Custom Electric Electrical/Controls $ (644.00)
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. QH&P): $ (644.00)
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT @ 5 PERCENT:
CONTRACTORS BOND COST c:!i s.o1811ooo $ (11.59)
c. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ (655.59)
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rob Guyott
PRINTED NAME ON PROPOSAL S/GNATlJREIDATE
Page 1, JCC
~
CHANGE PROPOSAL REQUEST
1.PROJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal #
City of Meridian Black Cat Lift 140 3
Station. JC CONSTRUCTORS
5.CONTRACT NO: 6PROPOSAl DATE
23-Auç¡-QS
DESCRIPTION OF CHANGE
The City requested the addition of empty embedded conduits for future pump control stations
4&5
COST SUMMARY ' o.
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wi labor fringes ( Attach supporting detail estimates with man-hours and rates) $ -
2. Insurance and labor Taxes $ -
3. Materials wi frgt and SST. Detailed quantities attached. $ -
4. Equipment Expense $ -
5. Overhead & Fee @ 15% $ -
$ -
Time Extention Requested 0 workinq days ..IC Constructors Proposal Cost $ -
8. For work to be performed by subcontTactors, per proposals and detailed breakdowns
1.
SU8CONTRACTOR NAME CATEGORY OF WORK AMOUNT
Custom Electric Electrical/controls $ 761.00
2
TOTAL SUecONTRACTORAMQUNT (INCLUDING SU8. OH&P): $ 761.00
3
CONTRACTORS COMMISSION ON TOTAL SU8CONTRACTOR AMOUNT (!! 5 PERCENT: $ 38.05
. -.
CONTRACTORS BOND COST (I¡ $.01811000 $ 14.38
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ 813.43
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rob Guyott
PRINT£[) NAME ON PROPOSAL SIGNA TORE IDA IT
Page 1, JCC
~
CHANGE PROPOSAL REQUEST
1.PROJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal #
City of Meridian Black Cat Lift 140 4
Station. JC CONSTRUCTORS
5.CONTRACT NO: 6_PROPOSAL DATE
2S-Auo-ÐS
DESCRIPTION OF CHANGE
The returned electrical submittal dated may 26, 2005. note 16470 2. requests a revision to
panel A. The costs to modify the panel are attached. Custom is holding on the modifications
pending review of the submitted costs.
COST SUMMARY -
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wi labor fringes ( Attach supporti'ng detail estfmates with man.-hol.l~ and! liates) $ -
2. Insurance and Labor Taxes $ -
3- Materials wI ftgt and SaT. Detailed quantities attached. $ -
4. Equipment Expen$a. $ -
5. Overhead & Fee @ 15% $ - -
$ -
Tíme EJrtentíon Requested 0 workínQ days JC c~ Proposal Cost $ -
B. For work to be performed by subcontractors, per proposals and detaíled breakdowns
1-
SUBCONTRACTOR NAME CA TEOORY OF WORK AMOUNT
Custom Electric Electrical/Controls $ .- 1.702.00
:i!
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P): $ 1.702.00
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT ~ 5 PERCENT: $ 85_10
CONTRACTORS BOND COST@ $.018/1000 $ 32.17
c. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ 1,819.27
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rob Guyett
PRiNTED NAME ON PROPOSAL SIGNA TURE / DA 7E
Page 1, JCC
0_____. ,
CHANGEPROPOSALREQU~ST
1 PROJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal #
City of Meridian Black Cat lift 140 S
Station. JC CONSTRUCTORS
5.CONTRACT NO: fj.PROPOSAL DATE
30-AuQ..QS
DESCRIPTION Of CHANGE
JC was billed by the City for overtime inspection. Costs for overtime inspection where not
specified for this particular project. For book keeping purposes JC will pay the City of Meridian's
invoice number 1657 for $270. This request reimburses JC Constructors for the payment of
the invoice # 1657.
COST SUMMARY
A. FOR CHANGE WORK CIRECTL Y PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wi labor fringes ( Attach supporting detail estimates with man-hours and rates) $ -
2. Insurance and labor Taxes $ -
3. Materials wi frgt and SST. Detailed quantities attached. $ -
4. Equipment Expense $ -
5. Overhead & Fee @ 15% $ -
$ -
Time Extention Requested 0 workinQ days JC Constructors Proposal Cost $ 270.00
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
1. ,
SUBCONTRACTOR NAME CATEGORY OF WORK AMOUNT
-
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P): $ -
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT @ 5 PERCENT: $ -
CONTRACTORS BOND COST@ $.018/1000
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+BS) $ 270.00
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rob Guyett
PRINTED NAME ON PROPOSAL SIGNATURE I DATE
Page 1, JCC
CHANGE PROPOSAL REQUEST
1.PROJECT
2.CONTRACTOR
3.PROJECT NO-
City of Meridian Black Cat Lift
Statìon.
140
JC CONSTRUCTORS
5.CONTRACT NO:
Chang" Proposal #
6_PROPOSAL DATE
1-Sep-O5
6
DESCRIPTION G.F CHANGE
The classification 'of the Mag meter has been modmed. The revised classification to a Class 1, Div 2'
increases the cost by $1289.75.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wi labor fringes ( Attach supporting detail estimates with man-hou~ and rates)
2. Insurance and labor Taxes
3. Materials wi frgt and SgT. Detailed quantities attacll~:-
4. Equipmant Expense
$
$
$
$
$
$
JC Constructors Proposal Cost $
- -
. .
--..
5. Overhead & Fee @ 15%
TIme Extention Requested
0 workina davs
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
,.
SUBCONTRACTOR NAMI:
CATEGoRY OF WORK
Z
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P):
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT C!I 5 PERCI:NT;
CONTRACTORS BOND COST @ $.0181'000
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AS+B5)
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rob Guyott
PRINTED NAME ON PROPOSAt
SleNATUR£/DATE
Page 1, JCC
AMOUNT
$
$
$
$
-
-
1,289.75
-
193A6
-
1,483.21
-
-
26.70
1,509_91
CHANGE PROPOSAL REQUEST
l_PROJECT 2.CONTRACTOR 3.PROJECT NO. Chang.. Proposal #
City of Meridian Black Cat Lift '" 140 7
Station. JC CONSTRUCTORS
5_CONTRACT NO: 6_PROPOSAL DATE
9-Sep-O5
DESCRIPTION OF CHANGE
The city has requested a change to the programming of the control system to allow communication
directly with the '!lain plant. The associated costs from Custom Electric includes antennae, modem,
and labor' to program for the new system. A deduct has been added for the elimination of the original
output cards.
See Custom Electrics breakdown of costs for a more detailed description.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
~
1 - Direct labor wi labor fringes ( Attach S<.Jpporting detail "",timates with man-hours and rates) :5 -
2- Insurance and Labor Taxes :5 -
3. Materials WI frgt and SST- Detailed quantities attached. :5 -
4- EquipmMt Expen= :5 -
'"'
---"---_U-___n__..__..-------,.- ------------------- -.. - -- n - _n.. :5
5- OvEirhe:ãër;ÇF'ee @-i5°Æ, -
:5 -
Time Extention Requested 0 worklnq days JC Constructors Proposal Cost :5 -
B. For work to be performed by subcontr¡¡ctors. per propos¡¡ls and detailed breakdowns
, AMOUNT
SUBCONTRACTOR ,~AME CATEGORY OF WORK
Custom Electric Electrical/Controls :5 3,62062
I
:¡
,O~ ~L St.:6C:èNTRACTOR ~MOl1~T- ,NCLUO'NG SUB CH,:'.P. ~ 3.62062
>
CO~ITRACTORS CCMMISSION CN TOTAL SüSC~NTRACTQR AMClJOi, <II õ ?E.Qcan :5 181_03
CONTRACTORS BONO Ç:JST @ S 01811000 :5 68.43
C. TOTAL iNCREASE OR DECREASE OF CONTRACT PRICE. (AS+B5) S 3,870,08
JC CONSTRUCTORS, INC.
::ONTRAÇ;"OR NAME
Rob Guyott
?<?INÆD NAME ON P90PQSAL SIGNA TI.;RE I OA Æ
Page 1, JCC
~
CHANGE PROPOSAL REQUEST
1.PROJECT 2.CONTRACTOR 3.PROJECT NO. Chang" Propo....1 #
City of Meridian Black Cat Lift 140 8
Station. JC CONSTRUCTORS
S.CONTRACT NO: 6.PROPOSAL DATE
28-Sep-Û5
DESCRIPTION Of C~ANGE
The City of Meridian requested the addition of three flex couplings for the 01 pipe at the
NPW tank to provide flexibility. The attached costs are for the purchase and installation of the
fittings.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wi labor fringes ( Atta<:h supporting detail estimates with man-hou~ and rates) $ 95.73
2. Insurance and Labor Taxes $ 25.44
3. Materials wi frgt and SST. Detailed quantities attached. $ 464.40
4. Equipment ExpenS(! $ -
5. Overhead & Fee @ 15% $ 87.84
$ -
Time Eoctention Requested 0 workino days JC Constructors. Proposal Cost $ 673.40
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
1. AMOUNT
SU8CONTRACTOR NAME CATEGORY OF WORK
2
TOTAL SU8CONTRACTOR AMOUNT (INClUOING SUB. OH&P); $ -
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT a¡ 5 PERCENT: $ -
CONTRACTORS BOND COST (!j5.018/1000 $ 12.12
c. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ 685.53
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rob Guyott
PRINTF:a NAME ON PROPOSAL SIGNATURE/DATE
Page 1, JCC
c. --,
;;.~.
CHANGE PROPOSAL REQUEST
1_PROJECT 2_CONTRACTOR 3.PROJECT NO- Chang", Prop<>sal #
City of Meridian Black Cat Lift 140 9
Statíon. JC CONSTRUCTORS
5.CONTRACT NO: 6.PROPOSAL DATE
3-0ct-O5
DESCRIPTION OF CHANGE
During the installation of ACHD drain tile at the west edge of the project the tile was in
conflict with the dewatering line. To expedite the installation ACHD purchased 45 deg., Fittings
to go up and over the dewatering pipe. ACHD installed at no cost.
The attached cost is for material purchase on our account only.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wi labor fringes ( Attach supporting detail estimates with man-hours and rates) $ -
2. Insurance and labor Taxes $ -
3. Materials wi frgt and SST. Detailed quantities attached- $ 263.00
4- Equipment ExpGnSG $ -
5- Overhead & Fee @ 15% $ 3945
$ -
Time Extention Requested 0 workinQ days JC Constructors Proposal Cost $ 302.45
8- For work to be performed by subcontractors, per proposals and detailed breakdowns
" ... AMOUNT
SUBCONTRACTOR NAME CATEGQRYOFWCRK
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB- OH&P); $ -
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT CI 5 PERCENT: $ -
CONTRACTORS BONO COST@ $.018/1000 $ 5.44
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+85) $ 307_89
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rob Guyott
PRINTËD NAME ON PROPOSAL SIGNA TUREI[)A Œ
Page 1, JCC
~~
.-----
CHANGE PROPOSAL REQUEST
LPROJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal #
City of Meridian Black Cat Lift 140 10
Station. JC CONSTRUCTORS
5.CONTRACT NO: 6.PROPOSAL DATE
3-0ct-O5
DESCRIPTION OF CHANGE
During thè installation coordination meeting with the manufacturers representative he commented
that the standard detail in the plans was not adequate. An additional layer of tenzar was required
at the bottom layer and the geo fabric was inreased from a 4 oz to a 7 oz product.
JC purchased the additional material to maintain the suppliers warranty.
COST SUMMARY
A. FOR CHANGE WORK DJRECTL Y PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wI labor fringes ( Attach supporting detail estimates with man-hours and rates) $ 29.07
2. Insurance and Labor Taxes $ 6.58
3. Materials wI frgt and SST. Debiled quantities attached. $ 1,479.41
4. Equipmønt Expense $ -
5. Overhead & Fee @ 15% $ 227.26
$ ~
Time E¡rterrtign Requested 0 workina daYs JC Cgn>nn.ictgrs Prgpgsal cQst $ 1,742.32
B. Fgr wgrk tg be perfgrmed by subcgrrtmctgrs, per prgþgsals and detailed breakdgwns
1.
SUBCONTRACTOR NAME CATEGORY OF WORK AMOUNT
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHap): $ -
3
CONTRACTORS COMMISSION ON TOTAL SU BCONTRACTOR AMOUNT Q. 5 PERCENT: $ -
CONTRACTORS BOND COST@5.018/1000 $ 31.36
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ 1,773.68
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rgb Guyett
PRINTED NAME ON PROPOSAL SIGNATURE/DATE
Page 1, JCC
... ..
CHANGE PROPOSAL REQUEST
11.PROJ£CT 2.CONTRACTOR 3.P~ECT No. Chango Ptopou¡ ..
City of Meridian Black Cat lift 140 11
Station. JC CONSTRUCTORS
5..CQNTRAcT NO'. 6.PRQf'OSAl. CATE
5..Qçt-O5
DESCRIPTION OF CHANGE
The hip truss was changed from a 1 ply to a 2 ply to provide a more secure nailìng surface.
COST SUMMARY
A. FOR. CHANGe VVORK OItœCTL. Y P=RFOR.MeD BY TJ.IE UNDERSIGNED CONTAACTOR
1. Din¡lC;t labor wllllbor frÎflgcs ( AttIIcI1 SLlppotbng clulDii estitMlø& with It1IUI-hOtIrs and rete:';) $ -
2. Insurance anc;llabot T""Ie$ $ -
3. Matari...b wI frg\: and SST, Detailed quólntitie& attached. $ L100.00
.4. £<I.Ji"mGnt ~ $ -
5. Overf'lMd & FOG C7l15% $ 165.00
$ -
TI""'8 Ðlœl1tian Requc:;t0ld 0 workinQ days JC CQnstruo¡'(QnI Propoo;oul cQOt $ "1,265.00
'.
S. pO/' wo~k to be pet1brmed by $Ubcontractoo<, per pro.........~s and o:I"'Itailotd bt'e«kdowns
1. AMOUNT
I>UBCONTRACTOR NAME CA TEGOR'I' OF WOR~
~
I"
TOTA~ SUBCONTAAcTOR AMOI.INT (II\ICLUDINQ euB. o..lIoP): $ -
"
CONT¡;¡ACTORS C"..oMMISoS!ON ON T011,l SUBC~OR ANlOUNT C ~~: S -
r:ONl'RACTORS eololD CO$" (II S.O1t\11Qoo $ 22.77
C. TOTAl. INCREAsE OR DeCREASE OF CONTRACT PRlCIi! - (A&ooBG) $ 1.287.77
JC CON$~UCTOR$, INC.
COJYTRACTOR NAMe.
Rob Guyott
f'RINTE:J;J /'tAM!: ON PROPOSAL !SIGNA T!JRE I (JA 'rE
Page 1, JCC
2'd
88L5-S58-802
s.Jo':l.on.J':I.suo:) :Jr
~
CHANGE PROPOSAL REQUEST
1.PROJECT 2.CONTRACTOR 3.PROJECT NO. Chango Propos:;¡l #
City of Meridian Black Cat Lift .140 12
. Station. JC CONSTRUCTORS
5.CONTRACT NO: 6.PROPQ8AL DATE
1-Nov-O5
DESCRIPTION OF CHANGE
Add galvanized break metal at double door openings
-
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wI labor fringes ( Attach supporting detail estimates with man-hours and rates) $ 118.86
2. Insurance and labor Taxes $ 27.46
3. Materials wI frgt and S8T. Detailed quantities attached. $ 389_22
4. Equipment ExpønSÐ $ -
5. Overhead & Fee @ 15% $ 80.33
$ -
Time Extention Requ~ted 0 workínQ daYs JC Con>rtructors Proposal Cost $ 615.87
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
1- AMOUNT
SUBCONTRACTOR NAME CATEGORY OF WORK
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB- OH&P): $ -
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT (!¡ 5 PERCENT: $ -
CONTRACTORS BOND COST @ $.018/1000 $ 11.09
C. TOTAL INCREAS& OR C&CRIiASE OF CONTRACT PRIC& . (AQ+B5) $ 626.96
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rob Guyott
PRINTED NAME ON PROPOSAL SIGNATURE/DATE
Page 1, JCC
~
~',
CHANGE PROPOSAL REQUEST
1.PROJECT 2.CONTRACTOR 3.PROJECT NO. Chang.. Proposal #
City of Meridian Black Cat Lift 140 13
Station. JC CONSTRUCTORS
5.CONTRACT NO: 6.PROPOSAL DATE
2Q-Dec-O5
DESCRIPTION Of CtfANGE
Add landscaping, shape berm, and revise fence type and layout. Scope of work includes cutting and
reshaping berm by JC Constructors. Addition of sod, irrigation, and trees to match the existing berm
at Black Cat Road by New West Landscaping. Fence modifications includ replacing chain link fence
with vinyl fence to match existing neighborhood fence type and revising the lay-out. Fence
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1, Direct labor w/labor fringes ( Attach supporting detail estimates with man-hours and rQtes) $ 849.00
2. Insurance and, Labor Taxes $ . 196.14
3. Materials wi frgt and SgT. Detailed quantitie5 attached. $ -
4. Equipmant Exp<>nSQ $ -
5. Overhead & Fee @ 15% $ 156.77
$ -
Time Extention Requested 0 workino days JC Constructors Proposal Cost $ 1,201.92
8. For work to be performed by subcontractors, per proposals and detailed breakdowns
" AMOUNT
SUBCONTRACTOR NAME CATEGORY OF WORK
New West Landscaping $ 15,102,00
Anvil fence Fencing $ 5,185.00
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P¡: $ 20,287.00
3
CONTRACTORS COMMISSION ON TOTAL SUecONTRACTOR AMOUNT @ 5 PERCENT $ 1.014,35
CONTRACTORS BOND COST @ 5.018/1000 $ 405,06
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5) $ 22,908,32
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Rob Guyott
PRINTED NAME ON PROPOSAl SIGNATURE/DATE
Page 1, JCC