Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ACHD Comment
+ CH D Gfl�,tit�t`uoC�o �:� Right -of -Way & Development Services Planning Review Division Project/File: Shops at Victory: MAZ-08-007/ MPP-08-0061 MCUP-08-011/ MALT-08-012 This is a Preliminary Plat Application for a 29,950 sf Commercial Development Application on approximately 4.79-Acres. Lead Agency: City of Meridian Site address: 3210 S. Eagle Road Staff Approval: July 17, 2008 Owner: LDR-II/DMG, LLC 350 N. 9" Street, Ste 201 Boise, Idaho 83702 Applicantl Representative: Landmark Development Group 2462 Sunshine Dr. Boise, Idaho 83712 Staff Contact: Kristy Scovill Phone: 387-6171 E-mail: kscovillCa�achd ada id us Tech Review: July 14, 2008 Application Information: Acreage: 4.79-acres Current Zoning: RUT Commercial Lots: 3 A. Findings of Fact Existing Conditions: 1 2 1 Site Information: The site currently has one single family residence Description of Ad'acent Surrounding Area: Direction Land Use North Rural Urban Transition South Rural Urban Transition East Medium low-Densit Residential District West Medium Density Residential District RECEIVED JUL I ? 200S City ofMeridiffi City Clerk Ofci RUT RUT R-4 R-8 Shops at Victory 2 3. Existing Roauway Improvements and Right -of -Way Adjacent To and Near the Site • Eagle Road is currently improved with 2 traffic lanes, and no curb, gutter or sidewalk abutting or near the site. There is 96-feet of right-of-way existing for Eagle Road abutting the site(48-feet from centerline) • Victory Road is currently improved with 2 traffic lanes, and no curb, gutter or sidewalk across from or abutting the site. There is between 96-feet of right-of-way existing for Victory Road (48-feet from centerline abutting the site). • Falcon Drive is currently improved with 2 traffic lanes, and no curb, gutter, or sidewalk abutting the site. There is 50-feet of right-of-way existing for Falcon Drive (25-feet from centerline). 4. Existing Access: There are two defined access points to this property. The first is located at the east property line, intersecting Falcon Drive. The second access point is located approximately 107-feet from the east property line (measured property line to near edge). 5. Site History: ACHD has not previously reviewed this site. Development Impacts: 6. Trip Generation: This development is estimated to generate 1,327 additional vehicle trips per day (10 existing) based on the Institute of Transportation Engineers Trip Generation Manual. 7. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of a building permit. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 8. Traffic Impact Study: A traffic impact study was not required with this application. 9. Impacted Roadways: Roadway Frontage Functional Traffic Count Level of Speed Classification Service* Limit Eagle Road 480' Principal 15,836 south of Exceeds 55 MPH Arterial Overland Road on °E° 1 /31 /2007 Victory Road 500' Minor Arterial 7,400 east of Better 40 MPH Eagle Road on than "C" 6/1 /2006 6,166 west of Eagle Road on Falcon Drive 1/24/2007 0' Local N/A N/A 20 MPH *Acceptable level of service for a two lane minor arterial roadway is "D" (14,000 VTD *Acceptable level of service for a two lane principal arterial roadway is "E" (15,500 VTD Shops at Victory 3 10. Capital Improvements Plan/Five Year Work Program There are several projects in the CIP, road projects 40, 41 and 136, and intersection project 90. The following improvements are scheduled in the District's Five Year Work Plan. • Eagle Road from Victory Road to Ridenbaugh Canal is currently scheduled to be widened to 5-lanes with curb, gutter, sidewalk, and bike lanes within 96-feet of right-of-way between 2009 to 2013. • The intersection of Eagle Road and Victory Road is scheduled to be signalized concurrently with the road widening project. Victory Road from Eagle Road to Cloverdale Road is scheduled to be widened to 5 lanes between 2009 to 2013. B. Findings for Consideration 1. Eagle Road Right -of -Way Policy: District policy requires 96-feet of right-of-way on arterial roadways (Figure 72- F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector roadways and arterial roadways (7204.7.2). Applicant's Proposal: The applicant is proposing a 7-foot concrete sidewalk along Eagle Road Staff Comment/Recommendations: The applicant will not be required to dedicate any additional right-of-way for Eagle Road abutting the site. The applicant will be required to construct a 5-foot detached concrete sidewalk, a minimum of 41-feet from the centerline of the roadway OR, provide the District with a road trust in the amount of $9,600 for construction of the sidewalk with the District's scheduled intersection project. 2. Victory Road Right -of -Way Policy: District policy requires 96-feet of right-of-way on arterial roadways (Figure 72- F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector roadways and arterial roadways (7204.7.2). Applicant's Proposal: The applicant is proposing a 7-foot concrete sidewalk along Victory Road. Staff Comment/Recommendations: The applicant will not be required to dedicate any additional right-of-way for Victory Road abutting the site. The applicant will be required to construct a 5-foot detached concrete sidewalk, a minimum of 41-feet from the centerline of the roadway OR, provide the District with a road trust in the amount of $10,000 for construction of the sidewalk with the District's scheduled intersection project. 3. Driveways Driveway Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abuttingtang roadway edge. the existing Arterial/Collector Roadway Access Policy: District policy 7207.8 states that direct access arterials and collectors is normally restricted. The developer shall try to use combined ato crrees ss points. Shops at Victory If the developer can show that the use of a combined access point to a collector or arterial street is impractical, the District may consider direct access points. Access points for proposed developments at intersections should be located as far from the intersection as practical, and in no case closer than as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the District Commission. Signalized Access Policy: District policy 72-F4 (1) requires driveways located on arterial roadways near a signalized intersection to be located a minimum of 440-feet from the signalized intersection for a full -access driveway and a minimum of 220-feet from the signalized intersection for a right-in/right- out only driveway. Successive Driveway Policy (Victory Road): District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 40 to align or offset a minimum of 185-feet from any existing or proposed driveway. Successive Driveway Policy (Eagle Road): District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 50 to align or offset a minimum of 255-feet from any existing or proposed driveway. Commercial Driveway Width Policy: District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 36-feet. Most commercial driveways will be constructed as curb -cut type facilities if located on local streets. Curb return type driveways with 15-foot radii will be required for driveways accessing collector and arterial roadways. Applicant's Proposal: The applicant is proposing two driveway accesses to intersect Eagle Road, and two driveway accesses to intersect Victory Road. The applicant is proposing to construct the first driveway access to intersect Eagle Road is approximately 220-feet south of the northernmost property line (measured property line to near edge) and 38-feet in width. The applicant is proposing to construct the second driveway access to intersect Eagle Road is approximately 427-feet from the northernmost property line (measured property line to near edge) and 35-feet in width. The applicant is proposing to construct the first driveway access to intersect Victory Road is approximately 215-feet from the westernmost property line (measured property line to near edge) and 38-feet in width. The applicant is proposing to construct the second driveway access to intersect Victory Road is approximately 25.5-feet from the easternmost property line (measured property line to near edge) and 34.9-feet in width. Staff Comment/Recommendations: The applicant's proposal is consistent with the access points identified on the District's approved intersection project plans and meet's District policy. The access points were provided for in the right-of-way negotiations and the purchase and sale agreement for the right--of-way acquired from this parcel for the intersection project. While the access points meet District policy, upon review of this development application and specific site layout it appears an alternative may provide better access to and circulation within the site. Staff recommends that instead of one right-in/right-out driveway and one full access driveway on both Eagle and Victory Roads the applicant construct one full access driveway on Eagle Road and one on Victory Road located a minimum of 315-feet from the near edge from the new curb line (measured near edge to near edge). Reducing the number of driveways and changing the locations provides centralized access to the site and would improve circulation within the site. If the applicant chooses to move forward with the 4-driveways as proposed, then the driveway located 220-feet from north property line on Eagle Road and 215-feet from the west property line on Victory Road will be immediately restricted to right-in/right-out. The applicant will be required to install a 6-inch raised median from the intersection back 50-feet beyond the driveways to restrict the turn movements. Coordinate the design and ultimate location of the raised median with District Development Review and Traffic Services staff. The applicant. will be required to pave the driveways 4 their full widths and at least 30-feet into the site beyond the edge of pavement of the roadway and. Shops at Victory install pavement tapers with 15-foot radii abutting the existing roadway edge. Commercial driveways are restricted to a width of 36-feet. 4. Tree Planters Tree Planter Policy: The District's Tree Planter Width Interim Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 5. Other Access Eagle Road is classified as a principal arterial roadway. Other than the access specifically approved with this application, direct lot access is prohibited to this roadway. Victory Road is classified as minor arterial roadway. Other than the access specifically approved with this application, direct lot access is prohibited to this roadway. C. Site Specific Conditions of Approval 1) The applicant is required to construct one of the following along Eagle Road abutting the site: a) Construct a 5-foot detached concrete sidewalk, a minimum of 41-feet from the centerline of the roadway; Or b) Provide the District with a road trust in the amount of $9,600 for construction of the sidewalk with the District's scheduled intersection project. 2) The applicant is required to construct one of the following along Victory Road abutting the site: a) Construct a 5-foot detached concrete sidewalk, a minimum of 41-feet from the centerline of the roadway; Or b) Provide the District with a road trust in the amount of $10,000 for construction of the sidewalk with the District's scheduled intersection project 3) Construct one of the following: • Construct one full access driveway on Eagle Road located a minimum of 315-feet from the near edge from the new curb line (measured near edge to near edge); AND • Construct one full access driveway on Victory Road located a minimum of 315-feet from the near edge from the new curb line (measured near edge to near edge). OR • Construct one right-in/right-out access driveway 220-feet from the north property line on Eagle Road; AND • Construct one right-in/right-out access driveway 215-feet from the west property line on Victory Road; AND • Install a 6-inch raised median from the intersection back 50-feet beyond the driveways to restrict the turn movements. Coordinate the design and ultimate location of the raised median with District Development Review and Traffic Services staff. • Construct one full access driveway on Eagle Road located 427-feet from the northernmost property line (measured property line to near edge); AND • Construct one full access driveway on Victory Road located 25.5-feet from the easternmost property line (measured property line to near edge); AND 4) Pave the driveways their full widths and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. 5 Shops at Victory 5) Commercial driveways are restricted to a width of 36-feet. 6) Other than the access specifically approved with this application, direct lot access is prohibited to Eagle Road and Victory Road. 7) Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. application, shall require the applicant to comply with all rules, regulations, ordi 11. Any change by the applicant in the planned use of the property which is the subject of this nances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. 0 Shops at Victory E. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Appeal Guidelines 7 Shops at Victory t rJ i! 1.1 $AGA I 1g4%sot I� a©o©� I MIII pg. a off x Conditional Use S.E.C. Site Plan Victory/Eagle '40 Shops at Victory N Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. Shops at Victory Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ❑Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. ❑Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ®Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ❑Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ❑For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑ Working in the ACHD Right -of -Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction — Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment & Erosion Submittal • At least one week prior to setting up a Pre -Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by the ACHD Drainage Division. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO ap proved set of subdivision utility plans prior to Pre -Con being scheduled. ❑ Final Approval from Development Services • ACHD Construction — Subdivision must have received approval from Development Services prior to scheduling a Pre -Con. 10 Shops at Victory AZ 08-007, LDR-II/DMG,LLC, AP 08-002 Boise Food Service, AZ 08-006 Denise Alter Page 1 of 1 Machelle Hill From: Larry Strough [Larry.Strough@itd.idaho.gov] ,y Sent: Tuesday, May 20, 2008 8:59 AM To: Barbara Shiffer; Machelle Hill Cc: Phil Choate Subject: AZ 08-007, LDR-II/DMG,LLC, AP 08-002 Boise Food Service, AZ 08-006 Denise Alter Attachments: SKMBT_C25008052008342.pdf; SKMBT_C25008052008341.pdf; SKMBT C25008052008340.pdf We have no comment on the encolsed applications Thank You <<SKMBT_C25008052008342.pdf>> <<SKMBT_C:25008052008341.pdf>> <<SKMBT_C25008052008340.pdf>> RECEIVET) MAY 2 0 2008 CITY OF MERIDIAN CITY CI__FRK OFFlrF 5/20/2008