HomeMy WebLinkAboutACHD Comments
"
Ada Count
Sherry R. Huber, President 318 East 37th Street
Judy Peavey.Derr, Vice President Garden City, Idaho 83714-6499
Marlyss Meyer Routson, Secretary Phone (208) 387.6280
Dave Bivens, Commissioner Fax (208) 387-6289
Susan S. Eastlake, Commissioner e-mail: tellus@achd.ada.id.us
June 18, 1999
J Q;--- -
VoannaWs(d -------"-=-----,,-"--
924 E 4th Street
Meridian, 1083642
-,
FROM:
Steve Arnold, Development Analyst
Planning & Development Division
SUBJECT: MCUP99-0014
924 E 4th Street
Distri
JUN 251999
CITY C' -c:; '::.i/!T lilD IAN
PLANNî~,~,~"~< ~~:O:";L--;(è
!p-c.eív ¿d..J
1- (i-tit!
Clc Ihltj.
){ ~ff'
..
Daycare
Your appeal for the above referenced project was granted by the Commissioners of the Ada County
Highway District on June 16, 1999. The attached staff report lists conditions of approval and street
improvements which are required.
If you have any questions, please feel free to call me at 387-6170.
SA
cc: Plan & Dev Svcs. chron/file
John Edney
Chuck Rinaldi
City of Meridian
Ada Count
District
" Sherry R. Huber, President 318 East 37th Street
Judy Peavey-Derr, Vice President Garden City, Idaho 83714-6499
Marlyss Meyer Routson, Secretary Phone (208) 387.6280
Dave Bivens, Commissioner Fax (208) 387-6289
Susan S. Eastlake, Commissioner e-mail: tellus@achd.ada.id.us
June 18, 1999
Voanna Ward
924 E. 4th Street
Meridian, ill 83642
Re: Staff Level Approval
'-- ----- - ---, -.. --MCUP99-00-14-"-'--~-_u-924-E.. 4th-Street- n=-.. -- ---'--Daycare- -" - ..,
Facts and Findings:
-' --"-..
A.
B,
c.
The Ada County Highway District (ACHD) staff has received the above referenced
application requesting conditional use approval to operate a daycare for up to 12 children in
an existing residence, The site is located on the east side of 4th Street approximately 250-
feet north of Pine Street. This development is estimated to generate less than 30 additional
(10 existing) vehicle trips per day based on the Institute of Transportation Engineers Trip
Generation manual.
The application and site plan stamped as received by the City of Meridian on April 28, 1999,
and submitted to the District on May 28, 1999, have been reviewed by the ACHD Planning
and Development staff and conforms to applicable District standards/policy, or can be made
to conform with the change(s) to the plan described in the requirements stated below.
This is a stafflevel approval and will not be heard by the ACHD Commission lmless the site
plan is changed in such a manner as to not conform with District standards/policy or an
appeal of the Planning and Development staff decision is submitted as described within the
Standard Requirements outlined below,
4th Street is improved with 52-feet of pavement, with asphalt curb and gutter abutting the
site, but no sidewalk The alley adjacent to the south of the site is not paved.
The following requirements are provided as conditions for approval:
Site Specific Requirements:
1.
Proceed as proposed with your development.
Standard Requirements:
1.
This decision of the Planning and Development Supervisor may be appealed to the Ada
County Highway District Commission by the applicant or by another party within 15
MCUP9914.SLA
Page 1
2,
- ----. --, ..,--- ""
3,
4,
5, -
6,
7.
8.
8 8'
calendar days from the date of this report. The request shall specifically identify each
requirement to he reconsidered and include a written explanation of why such a re~~~ir;~~~~
would result in a suhstantial hardship or inequity- The request will be heard by the District
Commission at an evening meeting within 20 calendar days of the District's receipt of the
appeal letter, The appellant will be notified of the date and time ofthe Commission meeting.
After ACHD Commission action, any request for reconsideration of the Commission's action
shall be made in writing to the Planning and Development Supervisor within two days of the
action and shall include a minimmn fee of $110,00, The request for rec~~~~~:~:t:;~~
~e;~~ac:~~ ~:~~~ :~~l:~~~¡;~~he;~~;:~~~:;¡~e~ :~e¡~~::~: =:~~] 'd~~i;;;~ ;he
request for reconsideration will be heard by the District Commission at the next regular
meeting of the Commission. Ifthe Commission agrees to reconsider the action, the applicant
will be notified of the date and time of the Commission meeting at which the reconsideration
. ---'-will-be hear-d;-~-."--- --~-_..- --,,-- ---'-"-'----------"--'----~"~-""-' ..~.._""--'---~---- - -..-.. '. - ---~ --""..---..
Payment of applicable road impact fees are required prior to building constmction in
accordance with Ordinance #188, also known as Ada County Highway District Road Impact
Fee Ordinance.
All design and constmction shall be in accordance with the Ada County Highway District
Policy Manual, ISPWC Standards and approved supplements, Constmction Services
procedures and all applicable ACHD Ordinances unless specifically waived herein. An
engineer registered in the State of Idaho shall prepare and certify all improvement plans,
The applicant shall submit revised plans for staff approval, prior to issuance of building
permit (or other required permits), which incorporates any required design changes.
Constmction, use and property development shall be in conformance with all applicable
requirements ofthe Ada County Highway District prior to District approval for occupancy,
Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all nIles, regulations, ordinances,
plans, or other regulatory and legal restrictions in force at the time the applicant or its
successors in interest advises the Highway District of its intent to change the planned use of
the subject property unless a waiver/variance of said requirements or other legal relief is
granted pursuant to the law in effect at the time the change in use is sought.
No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant's authorized representative and an
authorized representative of the Ada County Highway District. The burden shall be upon
the applicant to obtain written confirmation of any change from the Ada County Highway
District.
MCUP9914,SLA
Page 2
*
8
8
Conclusion of Law:
1.
ACHD requirements are intended to assure that the proposed use/development will not place
an undue burden on the existing vehicular and pedestrian transportation system within the
vicinity impacted by the proposed development.
Should you have any questions or comments, please contact the ACHD Planning and Development staff
at 387-6170,
'.-- .-. -""-'----'-'-'-~~c.,...__.._-.._---~--~-"------"-_._----'-'---"--'--~._~-_.---- "'-"'--'-'---'-'--'--"'--'-""
cc:
Project file
Lead agency
MCUP9914.SLA
Page 3