Loading...
HomeMy WebLinkAboutApplicant Response to Staff ReportDecember 6, 2007 Mr. Bill Parsons City of Meridian Planning Department 660 East Watertower, Suite 202 Meridian, ID 83642 Via Email: parsonsb meridiancitv.ora Re: Verona Commercial Dear Mr. Parsons: no no MEN Consulting, Inc. E°c ^ - 207 City cf Meriia* City Clerk omee We have reviewed the staff report for the above -referenced project. With the following minor revisions, the staff report is acceptable to the property owner: I. PLANNING DEPARTMENT REZONE COMMENTS/PROVISIONS 1.1.3 Add Item 4.3: The proposed commercial and office buildings shall be constructed with high quality materials, including but not limited to: textured concrete stucco, wood .... Add Item 4.4: Development of the property shall generally comply, as determined by the Planning Director, with the conceptual site plan submitted with RZ-07-017 and PP-07- 022. A minimum of 9 4 buildings with no one building exceeding 50,00 60,000 square feet shall .... 2. PUBLIC WORKS DEPARTMENT 2.15 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act �r- _u,,usi _ . u4. Thanks for your help with this project. If you have any questions, please let me know. Sincerely, QUADRANT CONSULTING, INC. Chuc Christensen Project Manager 1904 W. Overland • Boise. ID 83705 • Phone (208) 342-0091 • Fax (208) 342-0092 • Email: quadrant@quadrant.cc Civil Engineering • Surveying • Construction Management