Loading...
HomeMy WebLinkAbout2021-04-22 Parks Pathways Reviewer: Kim Warren / Pathways Project Manager Planner Assigned: Joseph Dodson Project Name: Prevail North Sub AZ,PP File No: H-2021-0021 Date: 4.22.21 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. The project developer shall design and construct a multi-use pathway consistent with the location and specifications set forth in the Meridian Pathways Master Plan (Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to final approval, the applicant shall submit a public access easement for a multi-use pathway within the landscape buffer along S. Meridian Road to the Planning Division for Council approval and subsequent recordation. The easement shall be a minimum of 14’ wide (10’ pathway + 2’ shoulder each side). Applicant shall also provide pathway/micropath connections to the neighborhood from the multi-use pathway along Meridian Road. Use standard City template for public access easement(s). Submit all easements online through Citizen’s Access Portal. 3. Prior to City Engineer signature on the final plat, the applicant shall depict a public access easement for the multi-use pathway along Meridian Road on the final plat. Dedicate easement for any 10’ multi-use pathway provided as a neighborhood amenity. 4. Construct multi-use pathway per typical paving section(s) shown in the Meridian Pathways Master Plan Chapter 3. 5. The owner (or representative association) of the property affected by the public access easement shall have an ongoing obligation to maintain the multi-use pathway. 6. If applicable, 6’ high open vision fencing shall be installed between pathways and (live) water irrigation canals and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other fence details per UDC 11-3A-7. 7. Project developer shall be responsible for obtaining license agreement and other permission(s) as required for constructing within irrigation district easements. 8. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall not (nor are they intended to override those of the irrigation district having jurisdiction over the project area. Rev. 12.18.18