HomeMy WebLinkAboutACHD Transmittal (A-2021-0031)Applicant name:JOHN DAVIS, LAYTON DAVIS ARCHITECTS Phone:
Applicant address:2005 E 2700 S, SUITE 200, SALT LAKE CITY, UT 84109 Email:john@laytondavisarchitects.com
Owner name:JOHN FINK, CENTERCAL PROPERTIES Phone:Fax:
Owner address:
140 N UNION AVENUE, STE 225,
FARMINGTON, UT 84025 Email:jfink@centercal.com
Administrative
Applicant Information
Type of Review Requested
File number:A-2021-0031
Assigned Planner:Sonya Allen
Related Files:
Subject Property Information
Location/street address:3243 E VILLAGE DR
Assessor's parcel number(s):R1343720600
Township, range, section:3N1E4
Agent name (e.g. architect, engineer, developer, representative):JOHN DAVIS
Firm name:LAYTON DAVIS ARCHITECTS Phone:Fax:
Address:2005 E 2700 S, SUITE 200 Email:john@laytondavisarchitects.com
Contact name:Phone:Fax:
Contact address:Email:
Project/Application Name:Village at Meridian Cafe Rio Drive-through - DES, CZC
Description of Work:Scope of work for this project will be the new construction of a 4 tenant retail building with a drive thru.
Project Description
Planning Division
ADMINISTRATIVE APPLICATION
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
1
APPLICATION TYPES
Alternative Compliance - ALT:UNCHECKED
Certificate of Zoning Compliance - CZC:CHECKED
Does project have prior approval?:Yes
Does your project contain new construction and/or modifications to an existing
building or the site?:
Yes
Design Review - DES:CHECKED
Private Street - PS:UNCHECKED
Vacation - VAC:UNCHECKED
ADDRESS VERIFICATION
Address Verification Permit Number:LDAV-2020-0633
TYPE OF USE PROPOSED
Residential:UNCHECKED
Office:UNCHECKED
Commercial:CHECKED
Employment:UNCHECKED
Industrial:UNCHECKED
Single-Family Detached:UNCHECKED
Single-Family Attached:UNCHECKED
Townhouse:UNCHECKED
Duplex:UNCHECKED
Multi-Family:UNCHECKED
Vertically Integrated:UNCHECKED
PUBLIC WORKS INFRASTRUCTURE
Does this project require the extension of public infrastructure?:No
I agree to upload required checklist items for review:UNCHECKED
I acknowledge deferral of the required checklist items, may require additional
review time:
UNCHECKED
I agree to upload required checklist items with the building application:UNCHECKED
PROPERTY INFORMATION
General Location:The Village At Meridian
Current Land Use:Vacant
Total Acreage:42,190 sqft
Prior Approvals (File Numbers):H-2020-0101
ZONING DISTRICT(S)
R-2:UNCHECKED
R-4:UNCHECKED
R-8:UNCHECKED
R-15:UNCHECKED
R-40:UNCHECKED
Application Information
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
3
C-N:UNCHECKED
C-C:UNCHECKED
C-G:CHECKED
L-O:UNCHECKED
M-E:UNCHECKED
H-E:UNCHECKED
I-L:UNCHECKED
I-H:UNCHECKED
O-T:UNCHECKED
TN-C:UNCHECKED
TN-R:UNCHECKED
County:UNCHECKED
PROJECT INFORMATION
In Reclaimed Water Buffer:No
QUALIFYING OPEN SPACE
Open Grassy Area (min. 50' x 100'):UNCHECKED
Community Garden:UNCHECKED
Ponds or Water Features:UNCHECKED
Plaza:UNCHECKED
Additions to Public Park:UNCHECKED
Collector Street Buffer:UNCHECKED
Arterial Street Buffer:UNCHECKED
8' or 6' Wide Parkways:UNCHECKED
10' Parkway Along Arterials:UNCHECKED
Stormwater Detention Facility:UNCHECKED
QUALIFYING SITE AMENITIES
Clubhouse:UNCHECKED
Fitness Facilities:UNCHECKED
Enclosed Bike Storage:UNCHECKED
Public Art:UNCHECKED
Picnic Area:UNCHECKED
Additional 5% Open Space:UNCHECKED
Communication Infrastructure:UNCHECKED
Dog Owner Facilities:UNCHECKED
Neighborhood Business Center:UNCHECKED
Swimming Pool:UNCHECKED
Children's Play Structure:UNCHECKED
Sports Courts:UNCHECKED
Pedestrian or Bicycle Circulation System:UNCHECKED
Transit Stop:UNCHECKED
Park and Ride Lot:UNCHECKED
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
5
Walking Trails:UNCHECKED
APPLICATION DISCLAIMER
I have read and accept the above terms:CHECKED
Your signature:John Davis
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
7
1W W W W
W W W W W
W W W W W
8''SS8''SS8''SS8''SS8''SSIVIVIVEIVIVIVIVIVIVTETTTIVIVIVIVIVIVIVEMTRWVWVWMTRWVWVWVSSS SSUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP
UGPUGPUGPUGPUGPUGPUGPSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD 12''W12''W12''W12''W12''W12''W12''W12''W12''WSD
SDETDDMWMWMWMWMWDDDDDD1TENTANT SPACE 1 5MECH.4Room6FIRE RISER 3Room2Room PIRRPIRRPIRRPIRR
PIRR12''SD12''SD12''SD12''SDSDSD8''SD CO8''SD 8''SD 8''SD 8''SDCOFSFSFSFSFS FS FSFSFSFSFSFSCOCOG G GGGGGGGG
GSDGB1.5%1.8%2.1%2.0%1.7%1.8%2.0%1.5%2.0%
1.7%
2.
7
%1.9%1.4%2.9%1.6%3.0%2.6%1.1%1.1%1.7%2627262826272628
2627262726282628
2627 262826282628
2627
2
6
2
7
26272627262726272628262726262627
2
6
2
7
2628
TYPE I INLET PROTECTION INSTALLED DURINGTHE INSTALLATION PROCESS TO BE REMOVEDAFTER FINAL STABILIZATIONCONSTRUCTION ENTRANCETO BE INSTALLED PRIOR TOEARTHWORK OPERATIONSAND REMOVED PRIOR TOFINAL PAVING BASEINSTALLATION.25.0%25.0%STAGING AREAEQUIPMENT ANDMATERIAL STORAGE,WASTE DISPOSALAREA, AND WORKMANPARKINGTYPE I INLET PROTECTION INSTALLED PRIOR TOEARTH DISTURBING ACTIVITIES AND TO BEREMOVED AFTER FINAL STABILIZATIONTYPE I INLET PROTECTION INSTALLED PRIOR TOEARTH DISTURBING ACTIVITIES AND TO BEREMOVED AT INLET REMOVAL.TYPE I INLET PROTECTION INSTALLED DURINGTHE INSTALLATION PROCESS TO BE REMOVEDAFTER FINAL STABILIZATIONTYPE I INLET PROTECTIONINSTALLED PRIOR TO EARTHDISTURBING ACTIVITIES AND TO BEREMOVED AT INLET REMOVAL.TYPE I INLET PROTECTION INSTALLED DURINGTHE INSTALLATION PROCESS TO BE REMOVEDAFTER FINAL STABILIZATIONSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFINSTALL SILT FENCE AT BACK OF CURB PRIOR TOEARTH DISTURBING ACTIVITIES AND TO BE REMOVEDFOR NEW CURB AND ASPHALT BASE INSTALLATION.2.3%1.0%3.5%29.5%0.6%0.6%0.9%1.9%FWFWFWFW FW FW FW FW FW FW FW FWFWFWINSTALL 8" FIBER ROLLAT BACK OF SIDEWALKPRIOR TO EARTHDISTURBING ACTIVITIESAND TO BE REMOVED ATFINAL STABILIZATION.CONCRETE WASHOUTPORTABLE RESTROOMS -ANCHOR TO GROUND TOPREVENT VANDALISM1.2%1.1%0.4%
2.
0
%1.2%1.
3
%
2628 2628Horizontal Scale: 020'40'1" = 20'ESC Site PlanCR / JDThe drawings, designs, ideas, arrangements and plans indicated or represented are the sole property of Layton Davis Architects and are subject to the copyright of Layton Davis Architects or its assigns. They were created, evolved and developed for use on, and in conjunction with the specified project. Any use of the drawings, designs, materials or information contained herein, including but not limited to copying or reproduction, which is not expressly authorized by Layton Davis Architects, is strictly prohibited as an infringement of its copyright and may result in liability
01.04.2021PRINTED DATECHRONOLOGYPROJECT NODWN BY/ CHK BYTITLE24X36 SHEET #3243 E VILLAGE DR
MERIDIAN, ID 83646
AJ Village at Meridian
20.036BUILDING SHELL
File Location: g:\2020\120123\cad\120123 cd c150 esc site plan.dwgLast Plotted By:roger collinsDate Plotted: Monday, January 4 2021 at 09:55 AM
CONSTRUCTION SETESC SITE PLANC1.50CR / JDThe drawings, designs, ideas, arrangements and plans indicated or represented are the sole property of Layton Davis Architects and are subject to the copyright of Layton Davis Architects or its assigns. They were created, evolved and developed for use on, and in conjunction with the specified project. Any use of the drawings, designs, materials or information contained herein, including but not limited to copying or reproduction, which is not expressly authorized by Layton Davis Architects, is strictly prohibited as an infringement of its copyright and may result in liability
01.04.2021PRINTED DATECHRONOLOGYPROJECT NODWN BY/ CHK BYTITLE24X36 SHEET #3243 E VILLAGE DR
MERIDIAN, ID 83646
AJ Village at Meridian
20.036BUILDING SHELL OWNER/ DEVELOPER: MERIDIAN CENTERCAL, LLC1600 E. FRANKLIN AVE.EL SEGUNDO, CA 90245 CONTACT: JOHN FINKPHONE: 310.563.6900CONTRACTOR: TO BE DETERMINEDCONTACTADDRESSCITY, IDAHO ZIPPHONE:ONSITE ESCCOORDINATOR: COMPANYNAMEPHONE: (CELL)PLAN PREPARER: ROGER COLLINSLICENSE NO: CON 09-00260EXPIRATION: 08-29-2021THE LAND GROUP, INC.462 E. SHORE DR., STE. 100EAGLE, IDAHO 83616PHONE: 208.939.4041 SIGNATURE: ____ DATE: 1.4.2021PROJECT ENGINEER: THE LAND GROUP, INC.462 E. SHORE DR., STE. 100EAGLE, IDAHO 83616PRIMARY CONTACT: JASON DENSMER, PEPHONE: 208.939.404126982698EXISTING GROUND CONTOUR (FIVE-FOOT INTERVAL)PROPOSED GROUND CONTOUR (ONE-FOOT INTERVAL)ESC/SWPPP Legend:APPROXIMATE LIMIT OF DISTURBANCEContact Information1. IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENTMUST BE REMOVED AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS.2. EXCEPT AS PROVIDED BELOW, STABILIZATION MEASURES MUST BE INITIATED AS SOON ASPRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVETEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAT 14 DAYS AFTER THECONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLYCEASED. IF THE DISTURBED AREA IS MORE THAN 5 ACRES, STABILIZATION MUST OCCUR WITHIN7 DAYS.2.1. WHERE STABILIZATION BY THE 14th DAY IS PRECLUDED BY SNOW COVER OR FROZENGROUND CONDITIONS, STABILIZATION MEASURES MUST BE INITIATED AS SOON ASPRACTICABLE.2.2. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED,AND EARTH DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARYSTABILIZATION MEASURES DO NOT HAVE TO INITIATED ON THAT PORTION OF THE SITE.THE FOLLOWING TEMPORARY SOIL STABILIZATION PRACTICES SHALL BE IMPLEMENTED ON ALLDISTURBED AREAS AND/OR WHERE SHOWN ON PLAN, UNLESS CONDITIONS AS LISTED ABOVEDICTATE OTHERWISE:MULCHING (BMP 15) - APPLY STRAW, GRASS, COMPOST, WOOD CHIPS OR WOOD FIBERS TODISTURBED AREAS TO PREVENT EROSION. SEE THE APPENDIX OF THE ESC/SWPPP NARRATIVE FOR ACOMPLETE DESCRIPTION, :3. GEOTEXTILE (BMP 17) - APPLY NONBIODEGRADABLE SYNTHETIC FABRIC TO DISTURBED AREASTO PREVENT EROSION. SEE THE APPENDIX OF THE ESC/SWPPP NARRATIVE FOR A COMPLETEDESCRIPTION, :4. MATTING (BMP 18) - APPLY BIODEGRADABLE WOVEN OR JUTE FIBER MAT TO DISTURBED AREASTO PREVENT EROSION. SEE THE APPENDIX OF THE ESC/SWPPP NARRATIVE FOR A COMPLETEDESCRIPTION.Soil Stabilization1. ALL STORM WATER WILL BE CONTAINED ON SITE.2. ALL BMP'S SHALL BE INSPECTED AT A MINIMUM ONCE EVERY 14 DAYS AND WITHIN 24 HOURS OF ASTORM EVENT PRODUCING 0.25 INCHES OR GREATER - OR - ONCE EVERY SEVEN DAYS.INSPECTION FREQUENCY MAY BE REDUCED TO ONCE EVERY MONTH IF:A. THE ENTIRE SITE IS TEMPORARILY STABILIZED, ORB. RUNOFF IS UNLIKELY DUE TO WINTER CONDITIONS, ORC. CONSTRUCTION IS OCCURRING DURING SEASONAL ARID PERIODS (MAY THROUGHSEPTEMBER) IN ARID AREAS AND SEMI-ARID AREAS.3. DEWATERING IS NOT EXPECTED FOR THIS SITE . ONSITE ESC CONTRACTOR IS RESPONSIBLE FORALL NON-STORMWATER MANAGEMENT.4. STREET SWEEPING WILL BE IMPLEMENTED ON AN AS-NEEDED BASIS AS DETERMINED BY THE SWPPPRESPONSIBLE PERSON.5. PROVIDE WASTE CONTAINERS FOR BUILDING MATERIALS IN WASTE STORAGE CONTAINMENT AREA.WASTE DISPOSAL DUMPSTERS MUST HAVE LIDS, OR PROVIDE COVER OR A SIMILARLY EFFECTIVEMEANS TO MINIMIZE THE DISCHARGE OF POLLUTANTS. KEEP WASTE CONTAINER LIDS CLOSED WHENNOT IN USE AND AT THE END OF THE BUSINESS DAY. DISPOSE AT A FREQUENCY ACCORDING TOCONTAINER SIZE.6. WORKMAN SHALL PARK ON THE AREA DESIGNATED AS WORKMAN PARKING OR AN OFF-SITELOCATION IF PRE-APPROVED.7. ALL DROP INLETS, CATCH BASINS, AND CURB INLETS NOTED ON PLAN SHALL HAVE INLETPROTECTION PROVIDED. SEE THE SWPPP PLAN DETAILS ON SHEET C1.55 AND MANUFACTURESGUIDELINES FOR INSTALLATION INSTRUCTIONS.8. LOCATE ALL PORTABLE RESTROOMS AS FAR FROM PUBLIC AND PRIVATE STORM DRAIN SYSTEMS ASPOSSIBLE. ANCHOR TO PREVENT VANDALISM.11. SLURRY AND CUTTINGS FROM SAWCUTTING OF CONCRETE OR ASPHALT SHALL BE VACUUMEDDURING CUTTING AND SURFACING OPERATIONS. SLURRY AND CUTTINGS SHALL NOT REMAIN ONPERMANENT CONCRETE OR ASPHALT PAVEMENT OVERNIGHT. SLURRY AND CUTTINGS SHALL NOTDRAIN TO ANY NATURAL OR CONSTRUCTED DRAINAGE CONVEYANCE. COLLECTED SLURRY ANDCUTTINGS SHALL BE DISPOSED OF IN A MANNER THAT DOES NOT VIOLATE GROUNDWATER ORSURFACE WATER QUALITY STANDARDS.12. SEE LANDSCAPE AND MATERIALS PLANS FOR INFORMATION CONCERNING FINAL SOIL STABILIZATIONMEASURES.13. ALL EXCESS MATERIALS SHALL BE HAULED OFF SITE AND DISPOSED OF AT AN APPROVED LOCATION.EXCESS MATERIAL MAY BE TEMPORARILY STORED ON SITE (IF APPROVED BY THE OWNER) AT APRE-APPROVED LOCATION. IF MATERIAL IS STOCKPILED FOR MORE THAN 14 DAYS STOCKPILE IS TOBE STABILIZED PER BMP #9,14. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE ISPWC.15. ANY MODIFICATIONS TO THIS PLAN REQUIRE APPROVAL OF THE DESIGNER OR THE ONSITERESPONSIBLE PERSON.16. TOTAL DISTURBED AREA IS APPROXIMATELY 1.29± ACRES.17. UPON CONTRACT APPROVAL BY THE CONTRACTOR, IT IS RECOGNIZED THAT THE CONTRACTOR HASREVIEWED THE PLAN DRAWINGS AND THE CONTRACTOR AGREES TO ABIDE BY THE REQUIREMENTSAND CONDITIONS CONTAINED HEREIN.ESC General Notes:SFSFSILT FENCE PER STATE OF IDAHO CATALOG OF STORM WATER BESTMANAGEMENT PRACTICES BMP #65. SEE DETAIL ON SHEET C155.FWFIBER ROLL PER STATE OF IDAHO CATALOG OF STORM WATER BESTMANAGEMENT PRACTICES BMP #64. SEE DETAILS ON SHEET C1.55.CONCRETE WASHOUT PER THE STATE OF IDAHO CATALOG OF STORMWATER BEST MANAGEMENT PRACTICES BMP #49 AND DETAIL ON SHEETC155.PORTABLE RESTROOM PER THE STATE OF IDAHO CATALOG OF STORMWATER BEST MANAGEMENT PRACTICES BMP #50.DROP INLET PROTECTION PER BMP #13, SEE SHEET C1.55 FOR DETAILS.MATERIALS STORAGE AND PARKING AREAS PER THE STATE OF IDAHOCATALOG OF STORM WATER BEST MANAGEMENT PRACTICES BMP #37.PROVIDE STABILIZED ENTRANCE PER THE STATE OF IDAHO CATALOG OFSTORM WATER BEST MANAGEMENT PRACTICES BMP #40. THIS SHALL BEMAINTAINED THROUGHOUT CONSTRUCTION UNTIL ASPHALT BASEMATERIAL IS INSTALLED. PROVIDE SWEEPING DAILY OR AS NEEDED TOREMOVE ANY TRACKING OF MUD AND/OR DIRT ONTO EXISTING ASPHALT.SEE SHEET C1.55 FOR DETAILS.LANDSCAPE STABILIZATION AREAS (PLANTINGS AND ROCK MULCH) PERTHE STATE OF IDAHO CATALOG OF STORM WATER BEST MANAGEMENTPRACTICES BMP #32, COORDINATE WITH LANDSCAPE SHEETS.AREA TO BE STABILIZED WITH ASPHALT SEE MATERIALS PLAN SHEETC2.00 FOR MATERIALS AND DETAILS.Note: This project meets the requirements for aLow Erosivity Waiver for Small ConstructionProjects:·Disturbed Area is less than 5.0 ac·The Erosivity Index is 2.24 which is belowthe threshold of 5.0The above is based on a start date of 2.15.2021and an end date of 7.1.2021 - if theconstruction time increases, a new calculationwill need to be completed.