HomeMy WebLinkAboutMcDonald's Site Modification CZC, DES, ALT A-2021-0018
Page 1
DATE: 3/19/2021
TO: Will Magdaleno, Core States Group
FROM: Cam Scott, Assistant Planner
208-884-5533
SUBJECT: A-2021-0018
McDonald’s Site Modification
LOCATION: 1710 E Fairview Ave.
I. PROJECT DESCRIPTION
The applicant, Will Magdaleno, requests Certificate of Zoning Compliance (CZC) and
Administrative Design Review (DES) to modify an existing drive through lane for an
exisitng McDonald’s on 0.58 acres of land in the C-G zoning district.
The site is located at 1710 E Fairview Ave.
II. DECISION
The applicant's requests for Certificate of Zoning Compliance and Design Review are approved with
the conditions listed in this report.
Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if
you need a building permit and/or inspection. If you do need a building permit, you must complete
that process before you commence the use or construction. Please contact Building Services for
additional details about building permits and inspections.
Site Specific Conditions of Approval
1. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3
Article D and receive approval for such signs.
2. The applicant shall complete all improvements related to public life, safety, and health as set forth
in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with
UDC 11-5C-3C.
CERTIFICATE OF ZONING
COMPLIANCE REPORT
COMMUNITY DEVELOPMENT DEPARTMENT
Page 2
3. Upon installation of the landscaping and prior to inspection by Planning Division staff, the
applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A.
4. The site plan prepared by Core States Group on January 26, 2021, labeled C4, is approved by the
City of Meridian Planning Division as shown in Exhibit A.
5. The landscape plan prepared by Core States Group, labeled LD-1, LD-2, TD-1, and TD-2, is
approved by the City of Meridian Planning Division as shown in Exhibit B.
NOTE: Four (4) trees, totaling forty-six (46) caliper inches, are being removed from the
buffer along E Fairview Ave. Per the approved mitigation plan three (3) of the existing trees
in this buffer area are being allowed to count towards the mitigation. Another 8 caliper
inches are being added with the addition of 4 new 2-inch caliper trees as approved by the
City Arborist.
6. The approved site plan and/or landscape plan may not be altered without prior written approval of
the City of Meridian Planning Division.
7. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
8. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant
shall submit a new site plan to the City of Meridian Planning Division for approval prior to
issuance of the building permit.
9. The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building Official
has issued a Certificate of Occupancy.
10. The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a
Warranty Surety in the amount of 20% of the total construction cost for all completed public
sewer and water infrastructure for a duration of two years. This surety amount will be verified by
a line item final cost invoicing provided by the owner to the City. The surety can be posted in the
form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to
Certificate of Occupancy. Applicant must file an application for surety, which can be found on
the Community Development Department website. Please contact Land Development Services
for more information at 208-887-2211.
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets
the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth
in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14.
2. The project is subject to all current City of Meridian ordinances and previous conditions of
approval associated with this site (Certificate of Zoning Compliance – CZC-12-058; Design
Review – DES-12-036; CZC-07-096; Conditional Use Permit for McDonald’s, 1995;
Development Agreement Inst. #95037561).
3. The issuance of this CZC does not release the applicant from any previous requirements of the
other permits issued for the site.
4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the
area.
5. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set
forth in UDC 11-3A-11.
6. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping
and constructed features within the clear vision triangle consistent with the standards in UDC 11-
3A-3.
Page 3
7. The applicant and/or assigns shall have the continuing obligation to meet the specific use
standards for the proposed use as set forth in UDC 11-4-3-11: Drive-Through Establishment.
III. CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director. All
requests for review shall be filed in writing with the Planning Division on or before April 5, 2021,
within fifteen (15) days after the written decision is issued, and contain the information listed in UDC
11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a final
decision on a land use application. You have the right to request a regulatory taking analysis under
Idaho Code 67-8003.
IV. EXPIRATION
The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not
commenced within one year of the date of issuance of the Certificate of Zoning Compliance.
In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until
March 19, 2022.
V. EXHIBITS
A. Site Plan (date: 1/26/2021)
Page 4
B. Landscape Plan (date: 3/10/2021)
Page 5