HomeMy WebLinkAboutZ - Project Final Acceptance Letter - Alicia Court SubdivisionMayor Robert E Simison
E IDIANCity Council Members:
Treg 8ernt Brad Hoaglun
Joe Borton Jessica Perreauit
Luke Cavener Liz Strader
March 19, 2021
Bruce Ursenbach, Manager Highmark Excavation, LLC
Tony O'Neil, Registered Agent 5730 W. Cherry Ln
Alicia Court, LLC Meridian, ID 83642
4865 E. Franklin Road, Suite 120
Nampa, ID 83687
RE: Alicia Court Subdivision — Final Acceptance
Dear Mr. Bruce Ursenbach:
Installation of this project's sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required testing in accordance with City of Meridian Standard Specifications and Drawings,
and therefore are hereby accepted by the City for ownership and normal maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the City of
Meridian's Supplemental Specifications and Drawings to the Idaho Standards for Public Works
Construction, Current Edition, the installation and materials of the sewer and domestic water
systems are to be warranted against defect by the owner for a period of two -years from the date
of this letter.
Sincerely,
4L4��_
Warren Stewart, P.E.
City Engineer
cc. City Clerk
PW - Water Division
PW - Wastewater Division
PW - Construction Division
Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642
Phone 208-898-5500. Fax 208-898-9551 . www.meridiancity.org
[Recipient]
Page 2
File