Loading...
HomeMy WebLinkAbout2021-02-01 Meridian Parks and Pathways (AWE IDIAN:--- Parks and Recreation Reviewer: Kim Warren/Pathways Project Manager Planner Assigned: Sonya Allen Project Name: Shafer View Terrace AZ, PP File No: H-2020-0117 Date: 29 Jan 2021 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL- PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to final approval, the applicant shall submit a public access easement for a multi-use pathway within the landscape buffer parallel to S. Meridian Road. Submit easement forms to the Planning Division for Council approval and subsequent recordation. The easement shall be a minimum of 14' wide (10' pathway+ 2' shoulder each side). Use standard City template for public access easement. Easement checklist must accompany all easement submittals. 3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways Master Plan Chapter 3. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. 5. Project developer shall be responsible for obtaining license agreement and other permission(s) as required for constructing within irrigation district easements. 6. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district,the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall not(nor are they intended to)override those of the irrigation district having jurisdiction over the project area. Rev.oi.30.20