Reviewer: Kim Warren / Pathways Project Manager
Planner Assigned: Sonya Allen
Project Name: Northpoint Recovery CUP File No: H-2020- 0126 Date: 28 Jan 2021
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to final approval, the applicant shall submit a public access easement for a multi-use
pathway along the east property line from State Ave. to Pine Avenue. Submit easement
paperwork to the Planning Division for Council approval and subsequent recordation. The
easement shall be a minimum of 14’ wide (10’ pathway + 2’ shoulder each side). Provide
landscaping as required per standards in UDC 11-3B-12C. Use standard City template for public
access easement. Easement checklist must accompany all easement submittals.
3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways
Master Plan Chapter 3.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.
5. Project developer shall be responsible for obtaining license agreement and other permission(s)
as required for constructing within irrigation district easements, if applicable.
6. Should any discrepancy exist between these conditions of approval and the requirements of the
irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway
design that meets both City and irrigation district objectives. City requirements as stated shall
not (nor are they intended to) override those of the irrigation district having jurisdiction over the
project area.