Loading...
HomeMy WebLinkAbout2021-01-14 Boise Project Board of Control RON PLATT CONTROL AGENCY FOR 167,000 CHAIRMAN OF THE BOARD BOISE PROJECT' BOARD OF CON TROLJ ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS BRIAN MCDEVITT VICE CHAIRMAN OF THE BOARD (FORMERLY BOISE U.S,RECLAMATION PROJECT) ROBERT D.CARTER 2465 OVERLAND ROAD PROJECT MANAGER BOISE,IDAHO 83705-3155 NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT THOMAS RITTHALER WILDER DISTRICT ASSISTANT PROJECT MANAGER NEW YORK DISTRICT BIG BEND DISTRICT APRYLGARDNER SECRETARY-TREASURER MARY SUE CHASE ASSISTANT SECRETARY- TEL:(208)344-1141 TREASURER FAX:(208)344-1437 11 January 2021 City of Meridian R-EcFTvFD City Clerk's Office JAN 4 2021 33 E. Broadway Avenue, CITY OF C>44� Meridian, Idaho 83642 CITY CLERKS OFFICE RE: Stapleton Sub No. 2 FP-2020-0014 SW Corner S Meridian Rd and W. Harris St. Boise-Kuna Irrigation District BK- 90 C Tumbler Lateral 21+10 Sec. 25, T3N, Rl W, B.M. City Cleric's Office, Sonya Allen: The United States' Tumbler Lateral lies within the boundary of the above-mentioned location. The easement for this lateral is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert this federal easement 20 feet East and 20 feet West of the lateral's centerline and 20 feet in all directions from any concrete irrigation Structures. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. The Boise Project does not approve landscaping including trees and/or shrubs (other than grass) within its easements, as this will certainly increase our cost of maintenance. All easements must remain a flat drivable surface. Any fencing/pathways, as may be required, must be constructed off of any Boise Project Easements. Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be located outside of these easements. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case no work shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Storm Drainage and/or Street Runoff must be retained on site. Local irrigation/drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement. Boise Project is also under the understanding that the Home Owners Association will own and operate any pump station that is associated with this project. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a copy of the irrigation and drainage plans. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sinc , Th mas Ritthaler Assistant Project Manager for/tr cc: Clint McCormick Watermaster, Div; 2 BPBC Lauren Boehlke Secretary-Treasurer, BKID File