November lO, 2005
Matt Munger
Munger Engineering
4090 W. State Street, Suite 29
Boise, ID 83703
"IŒ:1<P-()J:G6-6----&1'YOS:<rõ'ìPorky}TatK"SuoÕJVision Nõ8:îê3'Q;"~-------'-~~--- -_.~---~. --
Dear Matt:
After review of the Final Plat of the above-mentioned applications Settlers Irrigation District
requests the following:
1. All irrigation/drainage facilities along with their easements must be protected and
continue to function. The facility involved is the Settlers Canal (50'easement) that must
be tiled. Contact SID for additional requirements.
2. A Land Use Change Application must be on file prior to any approvals.
3. A license agreement MUST be signed and recorded prior to construction of any SID
facilities, or within its easements.
4. Any changes to the existing irrigation system such as relocation, water delivery, tiling,
and landscaping must be approved by Settlers Irrigation District's Board of Directors.
5. All storm drainage must be retained on-site.
6. The development must supply pressure irrigation access to all lots within the above-
mentioned subdivision from the current delivery point. If the developer wishes to have
SID own, operate, and maintain the pressure irrigation system an agreement must be in
place prior to the pre-construction meeting.
If you have any questions please call 343-5271.--
~
Nathan Draper, Manager
. Settlers Irrigation District
Enclosures