Loading...
HomeMy WebLinkAboutSettler's Irrigation Comments 8 SETTLERS' -, ""_/ II~ RIGA TI 0 N DISTRICT COpy ",'" PO BOX 757] j=>HONE. 344-247 BOISE, IDAHO 83707-] 571 FAX: 343- 642 . . , .. November lO, 2005 Matt Munger Munger Engineering 4090 W. State Street, Suite 29 Boise, ID 83703 "IŒ:1<P-()J:G6-6----&1'YOS:<rõ'ìPorky}TatK"SuoÕJVision Nõ8:îê3'Q;"~-------'-~~--- -_.~---~. -- Dear Matt: After review of the Final Plat of the above-mentioned applications Settlers Irrigation District requests the following: 1. All irrigation/drainage facilities along with their easements must be protected and continue to function. The facility involved is the Settlers Canal (50'easement) that must be tiled. Contact SID for additional requirements. 2. A Land Use Change Application must be on file prior to any approvals. 3. A license agreement MUST be signed and recorded prior to construction of any SID facilities, or within its easements. 4. Any changes to the existing irrigation system such as relocation, water delivery, tiling, and landscaping must be approved by Settlers Irrigation District's Board of Directors. 5. All storm drainage must be retained on-site. 6. The development must supply pressure irrigation access to all lots within the above- mentioned subdivision from the current delivery point. If the developer wishes to have SID own, operate, and maintain the pressure irrigation system an agreement must be in place prior to the pre-construction meeting. If you have any questions please call 343-5271.-- ~ Nathan Draper, Manager . Settlers Irrigation District Enclosures Cc: City of Meridian Planning Department (w/o enclosures)