Loading...
HomeMy WebLinkAboutKohl's Department Store CUP-05-048 CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF ~. - LAW AND -- -,-- ---~~ - ~--- . DE-aSION & ORDER ,~A; ."t. .. ; ; ç' : 1-" . "'.. ", ~ cUe;; dl;~~ c " v U.\H() .~ "~fj..",,~_(l '-~-.. ----,.-. ~- .--_. -~--- >--__-Io,..the Matter of Conditional Use PermiCför a-96,000 sq. ft. Department Store in a C-G Zone for Kohl's by W.H. Moore Case No(s). CUP-05-048 For the Planning & Zoning Commission Hearing Date of: November 3, 2005 A. Findings of Fact 1. Hearing Facts (see attached Staff Report for the hearing date of 11/03/05 incorporated by reference) 2. Process Facts (see attached Staff Report for the hearing date of 11/03/05 incorporated by reference) 3. Application and Property Facts (see attached Staff Report for the hearing date of 11/03/05 incorporated by reference) 4. Required Findings per the Unified Development Code (see attached Staff Report for the hearing date of 11/03/05 incorporated by reference) B. Conclusions of Law 1. The City of Meridian shall exercise the powers conferred upon it by the "Local Land Use Planning Act of 1975," codified at Chapter 65, Title 67, Idaho Code (I.C. §67-6503). 2. The Meridian Planning & Zoning Commission takes judicial notice of its Unified Development Code codified at Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has, by ordinance, established the Impact Area and the Amended Comprehensive Plan ofthe City of Meridian, which was adopted August 6, 2002, Resolution No. 02-382 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A. 4. Due consideration has been given to the comment(s) received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). CUP-O5-048 - PAGE 1 of 4 5. It is found public facilities and services required by the proposed development will not impose expense upon the public if the attached conditions of approval are imposed. 6. That the City has granted an order of approval in accordance with this Decision, which shall be signed by the Commission Chair and City Clerk and then a copy served by the Clerk upon the applicant, the Planning Department, the Public Works Department and any affected party requesting notice. 7. That this approval is subject to the Legal Description, Site Plan, Building Elevations, and the Conditions of Approval all in the attached Staff Report for the hearing date of 11/03/05 incorporated by reference. The conditions are concluded to be reasonable and the applicant shall meet such requirements as a condition of approval of the application. C. Decision and Order Pursuant to the Planning & Zoning Commission's authority as provided in Meridian City Code § 11-5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's CUP Site Plan and Landscape Plan as evidenced by having submitted the plans dated 1017/05 is hereby conditionally approved; and, 2. The applicant's CUP building elevations as evidenced by having submitted the "Exterior Elevations" sheet from P&R Architects dated 9/29/05; and, 3. The following modifications to site specific conditions were made at the Planning & Zoning Commission hearing: a. Applicant shall work with Planning Department staff to modify the south and west building elevations per the staff report. In particular, the Commission supports a modification to the west elevation's roof line, wall projections, and screening since it is visible from eastbound Ustick Road traffic (an entryway corridor). 4. The site specific and standard conditions of approval are as shown in the atiached Staff Report for the hearing date of 11/03/05 incorporated by reference. D. Notice of Applicable Time Limits 1. Notice of Eighteen (18) Month Conditional Use Pennit Duration Please take notice that the conditional use pennit, when granted, shall be valid for a maximum period of eighteen (18) months unless otherwise approved by the City. During this time, the applicant shall commence the use as permitted in accord with the conditions of approval, satisfy the requirements set forth in the conditions of approval, and acquire building permits and commence construction of pennanent footings or structures on or in the ground. For conditions use permits that also require platting, the final plat must be recorded within this eighteen (18) month period. For projects with CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). CUP-O5-048 - PAGE 2 of 4 multiple phases, the eighteen (18) month deadline shall apply to the first phase. In the event that the development is made in successive contiguous segments or multiple phases, such phases shall be constructed within successive intervals of one (1) year from the original date of approval. If the successive phases are not submitted within the one (1) year interval, the conditional approval of the future phases shall be null and void. Upon written request and filed by the applicant prior to the termination of the period in accord with 11-5B-6.G.l, the Director may authorize a single extension ofthe time to commence the use not to exceed one (1) eighteen (18) month period. Additional time extensions up to eighteen (18) months as detennined and approved by the Commission may be granted. With all extensions, the Director or Commission may require the conditional use comply with the current provisions of Meridian City Code Title 11. E. Notice of Final Action and Right to Regulatory Takings Analysis 1. The Applicant is hereby notified that pursuant to Idaho Code 67-8003, a denial of a plat or conditional use pennit entitles the Owner to request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. 2. Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521 an affected person being a person who has an interest in real property which may be adversely affected by the issuance or denial of the conditional use pennit approval may within twenty-eight (28) days after the date of this decision and order seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. F. Attached: Staff Report for the hearing date of 11/03/05. CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). CUP-O5-048 - PAGE 3 of 4 By action ofthe Planning & Zoning Commission at its regular meeting held on the \lth dayof-NG"fe:m\cc/ ,2005. COMMISSIONER MICHAEL ROHM VOTED ~ COMMISSIONER DAVID MOE VOTED \ ~(l , COMMISSIONER WENDY NEWTON-HUCKABAY VOTED \ t- 0.. COMMISSIONER KEITH BORUP VOTED L'Yo.... COMMISSIONER DAVID ZAREMBA (CHAIR) VOTED IAR.Æ.... I ~\~O~~~ CHAIRMAN MVID ZAREMBA Attest: Copy served upon Applicant, The Planning Department, Public Works Department and City Attorney. B~~ 0 1f'" ity Clerk's Office Dated:Jl2}-OS CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). CUP-O5-048 - PAGE 4 of 4 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 STAFF REPORT Planning & Zoning Commission Hearing Date: 11/3/2005 ctG;Ûl~~ , 1:-',\11<," '.-' "'-:'t:_q,:;" , "'!~~;.;;:.." TO: FROM: P&Z Commission Brad HawkinswClark, Principal City Planner SUBJECT: Michael Cole, Development Services Coordinator Kohl's Department Store File No. Cupw05-048 Conditional Use Pennit for a 96,000 sq. ft. Department Store in a C-G Zone for Kohl's byW.H. Moore 1. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST The applicant, Winston H. Moore, is requesting a Conditional Use Pennit (CUP) to construct a 96,090- square foot Kohl's Department Store on approximately 8.33 acres within the CentrePoint Marketplace development at the northwest comer of Us tick Road and Eagle Road/SH-55. The application states Kimco Development is a joint partner with W.H. Moore Company for the Kohl's building. This is the first detailed CUP application and would be the first building constructed within the CentrePoint Marketplace project. The 58wacre site was approved for annexation with a Development Agreement (DA) in March 2004 under the name Blue Marlin (see File No. AZ-03-025). The DA (Instrument No. 105048798) requires that any future use be approved either through a site specific CUP application or a Planned Development. A concept plan for the overall site was submitted with the application for infonnation purposes (not for fonnal approval). The Commission should note that, while the Landscape Plan shows Eagle Road landscape buffers, the legal description for the Kohl's site does not touch Eagle Road. Therefore, this CUP and staff report will not apply to the Eagle Road buffers. It also means that Kohl's must be addressed off of Us tick Road and not Eagle Road. A Variance application, submitted concurrently with this CUP application and before the City Council on November 1, 2005, proposes three new approaches to N. Eagle Road/State Highway 55, including two restricted access and one full access driveways. On September 29,2005, the Idaho Transportation Department (ITD) approved two right-inlright-out and one full access approach pennits. The Variance application pertains to the full 58 acres while the Kohl's CUP application pertains to approximately 8.33 acres at the south end of the site. The City Council has final decision authority on the Variance application while the P&Z Commission has final decision authority on the CUP application. 2. SUMMARY RECOMMENDATION Staff is recommending approval with conditions ofthe subject CUP application (CUP-05-048). We are recommending that the Commission require the applicant to revise the building's west and south elevations (facing Eagle and Ustick Roads) to comply with Section ll-3A-19 of the Unified Development Code (ODe) and to add a new 8wfoot wide walkway in the parking lot. While the Ada County Highway District (ACHD) Commission will not hold a hearing on this application until November 9, 2005, the ACHD staff report has been issued and they do not believe it is necessary for the City of Meridian to continue the CUP public hearing because all roadway improvements are being made in accordance with their standards. ACHD is requiring the applicant to close the first east-west driveway that is north of U stick in the southwest comer of the site. Staff supports this modification to the site plan. 3. APPLICATION AND PROPERTY FACTS a. Site Address/Location: Kohls-CUP CUP-05-048 PAGE I CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11103/05 NW comer of Us tick Road and Eagle Road/SH55 Township 4N, Range IE, Section 32 b. Owner Winston H. Moore 1940 Bonito Way Meridian, Idaho 83642 c. Applicant: Winston H. Moore -- 121:0 Bonito Way Meridian, Idaho 83642 d. Representative: e. Present Zoning: Jonathan Seel, W.H. Moore Company General Retail and Commercial (C~G), Meridian f. Present Comprehensive Plan Designation: Mixed Use-Regional- 2002 Comprehensive Future Land Use Map g. Description of Applicant's Request: 1. See Exhibit A (prepared by Quadrant Consulting) for a copy ofthe detailed site plan which depicts the building, parking and access locations. Exhibit B shows the proposed landscape plan. h. Applicant's Statement/Justification: The application notes that Kohl's is a family-focused, value-oriented specialty department store with 637 stores in 40 states. They employ over 100,000 people nationwide and would employ approximately 150 people in the Meridian store, generating property tax revenues of nearly $100,000 to the City. The applicant notes the ideal location for a retail department store. They also note the intersection widening improvements currently being constructed by W.H. Moore Company and Brighton Corporation at Ustick and Eagle and that a new public road along their west boundary will improve traffic movement in the area. 4. PROCESS FACTS a. The subject application will in fact constitute a conditional use permit as determined by City Ordinance. By reason of the provisions ofthe Meridian City Code Title 11, Chapter 5, Article A (Table II-SA-I), a public hearing is required before the Planning & Zoning Commission on this matter. b. Newspaper notifications published on: October 17th 2005 and October 31512005 c. Radius notices mailed to properties within 300 feet on: October 141h 2005 d. Applicant posted notice on site by: October 22nd 2005 5. LAND USE a. Existing Land Use(s): Bare land b. Description of Character of SuITounding Area: services, rapidly urbanizing Large lot residential, highway-oriented c. Adjacent Land Use and Zoning 1. North: Future pad sites within CentrePoint Marketplace, zoned C-G. 2. West: An outparcel, zoned RUT (Ada Co.); and Champion Park Subdivision, zoned R-8. (The approved Planned Development site plan for Champion Park shows an indoor Kohls-CUP CUP-05-048 PAGE 2 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11103/05 storage facility adjacent to the subject parcels.) 3. South: Three undeveloped parcels, zoned C-G with a Development Agreement. 4. East: Future pad sites within CentrePoint Marketplace, zoned C-G. d. History of Previous Actions: In July 2002, the owner and City entered into a "Consent to Annexation Agreement" where the City agreed to supply water and sewer service to the 58 acres and owner agreed to annex when contiguous to city limits. Also, File AZ-03-025, Annexation and Zoning for Blue Marlin. Same property was annexed and zoned to General Retail and Commercial (C-G) with a Development Agreement. e. Existing Constraints and Opportunities 1. Public Works Location of sewer: Location of water: Extension of mains in Ustick Road Extension of mains in Ustick Road Issues or concerns: None 2. Vegetation: Agricultural/Irrigated 3. Flood plain: N/A 4. CanalslDitches Irrigation: The Layton Lateral courses the southern part of property 5. Hazards: None identified 6. Size of Property: 8.33 acres 7. Description of Use: One, 96,090 s.f. department store (Kohl's) and associated parking and landscape improvements. f. Subdivision Plat Infonnation - NI A g. Landscaping - 1. Width of street buffer(s): Per the Future Land Use Map, both Ustick Road and Eagle Road are designated as "Entryway Corridors." As such, the UDC (Table ll-2B-3) requires a 35-foot wide street buffer adjacent to both roadways. The landscape plan (Sheet Ll.l) proposes a 35-foot wide buffer along Eagle Road. However, the legal description for the Kohl's site does not place it contiguous to Eagle Road. As such, this CUP application will not apply to Ea2le Road. If the applicant proposes to construct the Eagle Road buffer as an off-site improvement with the Kohl's CUP, the landscaping standards required in the UDC shall apply. 2. Width ofbuffer(s) between land uses: Table 11-2B-3 requires a 25-foot wide buffer between commercial uses on C-G-zoned land and residential uses. The property to the west, Champion Park Subdivision, is zoned R-8, and becomes contiguous to the CentrePoint site approximately 460 feet north of the Ustick Road right-of~way. (There is an outparcel between Champion Park and the Kohl's site at the southwest comer of the site which was not a part of either the Blue Marlin or Champion Park annexation.) Champion Park was approved with a PD use exception and their site plan currently shows storage units along their east boundary. (Note: Staff was informed on Friday, 10/28/05, that an application to amend the Champion Park PD to remove the storage uses and construct patio homes is being submitted on October ]1'1.) 3. Percentage of site as open space: The UDC does not require open space or site amenities for single commercial uses. Kohls-CUP CUP-05-048 PAGE 3 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 1 ]/03/05 4. Other landscaping standards: The landscape buffer along Ustick Road should be constructed in accordance with UDC Chapter 3, Article B. h. Planned Development Characteristics - N/ A i. Conditional Use Information: 1. Non-residential square footage: 2. Proposed building height: 30 feet 3. Percentage of site devoted to building coverage: 4. Percentage of site devoted to landscaping: 5. Percentage of site devoted to paving: 62.9% 96,090 25.9% 11.51 % 6. Percentage of site devoted to other uses: 7. Number of Residential units: N/A j. Amenities - While no amenities are required under the UDC for single commercial uses, the applicant notes that the front of the building includes an entry plaza with landscape and hard paved surfaces. N/A k. Off-Street Parking (residential uses) - N/A 1. Proposed and Required Residential Standards - NI A ill. Proposed and Required Non-Residential Parking - One off-street parking space required for every 500 square feet of gross floor area. Also, one Type A and one Type B parking space required for the loading area (per UDC l1-3C-8). The proposed building floor area is 96,090 s.f., which requires 192 parking spaces. 412 parking spaces are proposed. There are no Type A or Type B spaces shown. n. Summary of Proposed Streets and/or Access (private, public, common drive, etc.): The applicant is proposing three new access points to Eagle Road/SHSS to serve the entire CentrePoint Marketplace project at the following locations: . Driveway #1 - 1,700 feet north of Us tick Driveway #2 (main access, aligned with Baldcypress) -] ,375 feet north of Ustick . . Driveway #3 - 700 feet north of Us tick As noted above, ITD issued right-inlright-out pernúts for Driveway #1 and #3 and a full movement access pennit for Driveway #2, until such time as median barriers are installed on Eagle Road. In addition, the recorded DA between the applicant and the City requires either a public or private street be constructed parallel to Eagle Road/SH55 that may connect to the north boundary and may also connect to Eagle Road, if allowed by lTD. In addition, the applicant is proposing three new access points to Ustick Road at the following locations: . Driveway #1 - 400 feet west of Eagle (right-inlright-out with center median) . Driveway #2 - 600 feet west of Eagle (full access) . Driveway #3 - 1,100 feet west of Eagle (full access public street with proposed traffic signal) Kohls-CUP CUP-05-048 PAGE 4 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 Ustick Road, from Leslie Drive to Ally Street (on east side of Eagle Road), including the Eagle Road intersection, has just been widened and improved to 5 lanes. The intersection was widened to include dual left turn lanes. The applicant's CUP site plan shows a new public, commercial street extending north of Ustick Road, beginning approximately ~ mile west of Eagle RoadlSHSS. The site plan (Sheet S-l) shows this roadway as a 40~foot street section, continuing as a public street along their west boundary to approximately 120 feet north ofthe Kohl's north property line. The concept plan shows the road eventually stubbing to the north property line. Their plan shows private, internal driveways connecting to this public street; such driveways run east-west and connect to Eagle RoadlSHSS. For a detailed report on both ITD's and ACHD's actions and comments, please see the letters/reports submitted with the application. 6. AGENCY COMMENTS MEETING On October 14th 200S, staff held an agency comments meeting. The agencies and departments present included: Meridian Fire Department, Meridian Meridian Public Works Department, and the Sanitary Services Company. Staff has included all comments and recommended actions as Conditions of Approval in Exhibit F. 7. COMPREHENSIVE PLAN POLICIES AND GOALS The subject site is designated 'Mixed Use-Regional' on the Future Land Use Map. In Chapter VII of the Comprehensive Plan, this designation is derIDed in part as an area that is situated in highly visible or transitioning parts of the City where innovative and flexible design opportunities are encouraged. The MU-R has no upper limit on the square footage of non-residential uses and is intended to allow a broad range of uses. Staff also fmds the following 2002 Comprehensive Plan text policies to be applicable to this application: . "Require all new parking lots to provide landscaping in internal islands." (Chapter V, Goal III, Obj. D, #3, page 43) "Eagle Road is the major north-south arterial in Ada County. The capacity of this arterial should be protected by minimizing the number and location of private driveway access connections to this important roadway. The City should recognize, adopt, and help implement the Eagle Road Access Control Study, prepared by ACHD in 1997." (Chapter VI, page 71) "The capacity of arterial. . .roadways can be greatly diminished by excessive driveway connections to the roadways. The City should cooperate with ACHD to minimize access points on arterial. . .roadways as development applications are reviewed." (Chapter VI, page 72) "Develop methods, such as cross-access agreements, :fi-ontage roads, to reduce the number of existing access points on to arterial streets." (Chapter VI, Goal II, Obj. A, #12, page 79). "Identify transitional zones to buffer commercial and residential uses, to allow uses such as offices and other low intensity uses." (Chapter VII, Goal I, Obj. B, #7, page 102) "Restrict curb cuts and access points on. . .arterial streets." (Chapter VII, Goal IV, Obj. D, #5, page 107) . . . . . 8. UNIFIED DEVELOPMENT CODE Kohls-CUP CUP-05-048 a. Allowed Uses in the Commercial Districts: UDC Table 11-2B-2 lists retail store uses as pennitted uses in the C-G zoning district. b. Purpose Statement of Zone: The purpose of the Commercial Districts is to provide for the retail and service needs of the community in accord with the Meridian Comprehensive Plan. Four Districts are designated which differ in the size and scale of commercial structures PAGES CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 accommodated in the district, the scale and mix of allowed commercial uses, and the location of the district in proximity to streets and highways. c. General Off-Street Parking Standards (from UDC 11 ~3C~5): . The following standards shall apply for off-street vehicle parking for nonresidential uses: In all Commercial Districts and Traditional Neighborhood Districts the requirement shall be one (1) space for every five hundred (500) square feet of gross floor area. TABLE 8-4G-3: REQUIRED LOADING SPACES BY GROSS FLOOR AREA GROSS FLOOR AREA ,IN.' " .' , ',S' UAREFIi1ET' , " 0 to 36,000 36,001 to 100,000 Each additional 75,000 or fraction thereof REQ{JþJ):t}T~ AND NUMBER , ' 'Qf1:$U: ES . Type A spaces shall be not less than twelve feet (12') in width and thirly~five feet (35') in length. Type B spaces shall be not less than fifteen feet (15') in width and sixty-five feet (65') in length. All spaces shall have fourteen feet (14') of vertical clearance. . Parking and loading areas shall be designed so vehicles shall not back out into the street. . No off-street loading space shall be located closer than fifty feet (50') to an abutting rural or residential district unless wholly enclosed within a sound attenuating structure, such as masonry block. No off-street loading space shall face an abutting residential district. . Any off-street loading space located within fifty feet (50') feet of a residential district shall not operate between the hours of 10:00 p.m. and 7:00 a.m. . All lighting provided to illuminate a parking area shall comply with the lighting standards provided in Article A STANDARD REGULATIONS IN ALL DISTRICTS of this Chapter. d. Structures Subject to Design Standards (11-3A-19.B.5): All structures on property adjacent to an entryway corridor (Ustick Road) are subject to the design standards listed in this section. e. Outdoor storage/refuse areas (11-3A-12): Outdoor utility meters, HV AC equipment, trash dumpsters, trash compaction and other service functions shall be incorporated into the overall design of buildings and landscaping so that the visual and acoustic impacts of these functions are fully contained and out of view from adjacent properties and public streets. 9. ANALYSIS 9a. Analysis of Facts Leading to Staff Recommendation The CUP application substantially complies with the Unified Development Code. However, there are several areas of clarification and some modifications required to both the site plan and building elevations in order for staffto recommend full approval ofthe application. Below are Kohls-CUP CUP-05-048 PAGE 6 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11103/05 several special considerations for the P&Z Commission to review at the public hearing: Kohls-CUP CUP-05-048 PAGE 7 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 1 ]/03/05 SPECIAL CONSIDERATIONS 1. Loading Space Parkin!!: UDC 11-3C~8 requires off-street loading spaces for commercial uses. The Certificate of Zoning Compliance (CZC) application shall clearly demonstrate that both a Type A and Type B space are available on site, located near the refuse/service area behind the building. 2. Elevations: The applicant has submitted building elevations ofthe proposed structure (see Exhibit C). The application lists the proposed building materials, including a concrete tilt- up wall, EIFS textured coating, white aluminum storefront and accent reveal lines. UDC 11-3A~19 requires all structures on property adjacent to an entryway corridor to comply with the design standards listed in this section. Staff s interpretation of the UDC is that the applicant may choose to place the "primary entrance" on an elevation other than the public street side. However, the public street elevations (U stick Road and the new road on west boundary) must still meet the other standards listed in 11-3A-19 (except for the primary entrance standards). The west and south elevations will need to be modified to comply with the following ordinance standards (staff analysis in italics): a) Facades: Facades visible from a public street shall incorporate modulations in the façade, roof line recesses, and projections along a minimum of twenty percent (20%) of the length of the facade. Modulation/Projection: The south elevation is approximately 290 feet in length. 20% of the building length is 58 feet. The elevation does currently have two main projections that are approximately 38 feet and 12 feet long respectively. There are three other column projections that are each approximately threefeet wide, for a total of ninefeet. Cumulatively, these projections meet the 20% standard. The west elevation is approximately 320feet in length. 20% of the building length is 64 feet. The elevation shows four column projections that total approximately 12feet. The wall does modulate to accommodate the dock/berth area. Staff recommends the Commission review the west elevation to determine if the dock modulation meets the intent of the ordinance. If not. additional vro;ections and/or modulations will be reQuired. Roof Line Recess: There is one proposed recess/indentation in the south elevation roof line, which occurs near the west wall at the mezzanine. In addition, the 38-foot projection extends above the main roof line, creating the effect of a roof line recess. The Commission will need to determine if the one recess and the pro;ection extension meet the intent of the UDC's standard to provide roof line recesses. There are no roof line recesses on the west elevation. This elevation must be modified to comply with UDC lJ-3A-19.C1.a. b) Roof lines: Roof design shall demonstrate two or more of the following: a) overhanging eaves, b) sloped roofs; c) two (2) or more roof planes; d) varying parapet heights; and e) cornices. The roof line along the south elevation currently shows one of the above options - two or more roof planes (c) but the west elevation does not show any. The Kohls-CUP CUP-05-048 PAGE 8 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 Kohls-CUP CUP-05-048 mezzanine roof is at a different height than the main structure roof," creating two different roof planes. The building does have a parapet that is approximately seven feet in height (I8feet to roof and 25'-8" to top of parapet}. However, the parapet height matches the roof line height variation and should not be allowed to meet the second requirement here. Staff recommends the applicant modifY the west and south elevations to provide either overhanging eaves or create more variation in the main building's parapet height. Alternatively, this standard could be met by constructing a second projection to match the 38-:loot wide projection at the east end of the south elevation. c) Mechanical equipment: All ground-level and rooftop mechanical equipment shall be screened to the height of the unit as viewed from the property line. Given the height of the proposed parapet (approx. seven feet}, staff believes any roof-mounted mechanical equipment will be screened and this standard will be met. However, this will need to be conJìrmed at the time of CZC application. d) Color and Materials: Exterior building walls shall demonstrate the appearance of high-quality materials of stone, brick, wood or other native materials. . .Smooth.faced concrete block, tilt-up concrete panels, or prefabricated steel panels are prohibited except as accent materials. The proposed structure is tilt-up construction. The UDC does allow "textured architectural coated concrete panels" as permissible material. The west and south elevations call-out a "colored coating" material on the concrete panels, which is acceptable. However, since these elevations will be clearly visible from the Ustick entryway corridor, staff recommends an additional material and/or color which compliments the east elevation be added to the west and south elevations (e.g. porcelain tile, different EIFS color). 3. Refuse/Service Area Screen: Neither the Site Plan or Landscape Plan call-out how or if the refuse/service area on the west side of the building will be screened. UDC 11-3A-12 requires the visual and acoustic impacts of these functions are fully contained and out of view from adjacent properties and public streets. The applicant's CZC application must clearly demonstrate how this standard is met. 4. Inil!ation Pumo House: No irrigation pump station or facility is shown on the Site Plan. However, if one is proposed for the site, it must be located outside of any required street buffer. Impervious surfaces are prohibited in said buffers. 5. New Street Buffer-West Boundary: The applicant is not showing any landscaping on the west side of the new public street along the west boundary. Landscaping is shown on the east side only. Staff is recommending the applicant construct both IO-foot wide street buffers along the full length of the new street with the site improvements in order to provide for consistent plant growth patterns and to improve the aesthetics at this main entrance to the development. 6. Parking Lot Extension: The asphalt surface at the east end of the parking lot is currently shown at approximately IO feet beyond the landscape planters. This surface will need to PAGE 9 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 be extended to at least 20 feet and provide for two-way vehicular movement to the north and south parking aisles. 7. Pedestrian Walkways: UDC 11-3A-19.CA requires the following for building located adjacent to an entryway colTidor a. A continuous internal pedestrian walkway that is a minimum of eight feet (8') in width shall be provided from the perimeter sidewalk to the main building entrance. The walkway width shall be maintained clear of any outdoor sale displays, vending machines, or temporary structures. The Site Plan (Sheet S-1) will need to be mod(fied to provide an 8-100t wide pedestrian walkway from the Ustick Road sidewalk to the sidewalk at the front of the building. Staff recommends locating said walkway at the west side of the middle driveway and connecting it to the sidewalk in front of the building. b. The internal pedestrian walkway shall be distinguished from the vehicular driving surfaces through the use of pavers, colored or scored concrete, or bricks. c. Walkways at least eight feet (8') in width, shall be provided for any aisle length that is greater than one-hundred fifty (150) parking spaces or two hundred feet (200') away from the main building entrance. The parking aisles are greater than 200 feet in length from the building '.'I' main entrance. The aisles are approximately 450 feet long (from entry patio to the easternmost parking space). No walkway is currently shown. While the UDC is somewhat unclear here, the intention was to provide one 8~òot walÆvvay for every 200 feet of aisle separation so that the walkway can be accessed from multiple parking rows. The intent was not to require an 8-foot walkway in every parking row. The Site Plan must be modified to construct one. 8-foot wide walkwav in the center parkin!! row. d. The walkways shall have weather protection (including but not limited to an awning or arcade) within twenty feet (20') of all customer entrances. The east elevation (primary) does show two awnings that extend over the entry doors. It is difficult to determine the length of these awnings. Stafrs interpretation of this standard is that these awnings must be at least 20 feet wide, measured from the building face to the outer edge of the awning. The applicant shall ensure this dimension is complied with at the time of CZC application submission. 9b. Staff Recommendation: Based on the above analysis, staff finds the CUP application substantially conforms with the adopted DA, Comprehensive Plan policies and UDC standards. As noted under "Special Considerations," we recommend the south building elevation be amended to comply with the entryway colTidor standards and a pedestrian walkway be added to the Site Plan. We recommend approval of the CUP application with the conditions shown in Exhibit F. Kohls-CUP CUP-05-048 PAGE 10 CITY OF MERIDIAN PLANNING AN D ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11103105 10. EXHIBITS A. Site Plan (by Quadrant Consulting, dated 10/7/05) B. Landscape Plan (by The Land Group, dated 10/07/05) C. Building Elevations (by P&R Architects, dated 9/29105) D. Legal Description E. Required Findings from UDC (CUP) F. Conditions of Approval 1. Planning Department 2. Public Works 3. Fire Department Kohls-CUP CUP-05-048 PAGE 11 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 Exhibit A: Site Plan (Quadrant Consulting) -""-" ---"'--"'._""-.,"--'~"---.,'--'.,'-""'_._,,--,---,----"'---.,,-- -.,,--,--, -""--'----"-,, '--",---. ------,,- ~:! 1/ ~:¡ , @ r 11111 II' ù 111'1, ; r 'I ï '. ,,--, ,,' 11','11', /I II : r 1,1 I' I I Cft! -.U !IU ¡ ¡ i .: . ! I :- - .-r.- " I , ~ ~ c_---- :j I i ; :' llil / ' : ; 1m ill ,J : j W ~.- -), i ~I : ¡¡ k ti " a lir :~: C II~ : ! --..,1."" --- " :~:f' c-, b- 'I I,) ~r: "t'" ,,"," '-fu\~f! I If" I,! '" !' I i "If I t~ I" i : I I ! II!'. , :1.'" ' ¡ "'-- ~~! i ) - - -+ :=- ~ ~ :.:.-..:~~-=--- - =':'~ - ,,---, ---- '-----.",,-.--.. ..", ----,-- '-, ""-".,,.. _.---------=.:...':..::"---""-"""",--"" """ \. i B ~ , I / -i.---,. [""P~ It-:=:~[' "J pl/OPQS~H~O:r::~':::';:T STalK == uadrant ] ..... -." ..I/(JRTI/W£ST CORNeR - usncl( AND EAGLe ROA~ "ns.,' '"9. 'ne. -==-----~.- '-- '.' ..'- "-"""'""""m""",<O",'~'" ~ ,...-::s:.:S,:...."u -~, Kohl's CUP Application Exhibit A Page 1 CITY OF MERIDIAN PLANNING AN 0 ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11103/05 Exhibit B: Landscape Plan (The Land Group) , ...-'..~, ".- '.",,', ,,- ,"" ".-" -, """ ""...'" "." '..", ,"" II II; H¡: !Iii I~ !¡II!!!!ILII :~ ; ,- ! . ig I' ¡¡ :2 'I'¡'J ¡r- ';'!',! ~ ~~¡¡ ~ '" ,," ~""'~~ 0 .-- Q Kohl's CUP Application Exhibit B Page 1 \ ¡¡~~('~' "c8C1:l:.~CI7{7""~;ý"i<'~..r i ,'-", I -r- - , ," i~i~ ,-,-,i'()~IN i :/ ,~ J1 ' Bf:- :~ l ' J / . I\~ iii:!,u¡ ~ j.._~~,.-~-t $ --!~ fQ~~~~:t: / " f~, ~ ~~~!I ~-¡---- ----[;---- !I ,~~I > "wf ~ ~l~~. J~-/~J~' f è Iff: i -" "" ~ ~~ ;':,",>~ " . ~ ~ ~ iffl ~;:;,¿ ,.- 1 Hl ~!:" ~ ~ =F- c+= Ij=: ~jë' ; ¡ f ~ ~~"i. ~ ~ i ~:, c~ ,,--- ! :J ~ ~:ii am t ), (-,,~:I~'~ I" ~"~I~rê~ ~ m ~ ,~ I'J I i ij , : :)-cjJ=II_- ~l ~~~~)~ ,- !~-.f--, ---, ---==j 0 IfIHF1~fl¡lrt) ; If,;; -"r~,' ~ I ~ I'rn~'" '~~ -'r;;t ,,'\' i- I¡I,II ¡'If ,1 I" 'I J£ !!! '\~.-'II'El~lmTi":" ¡'g ill' _~L¡jl~~:}~:~~;1 ~m~rf!t":~!': T! 1m .- ""."m.....""" """ , ,¡-K, -...., , ---"'-"'-", ", í I'; , 1\01 1"""'-- '--,,", ,-------", , m_--, ---, -------" ,-" --", .j I I II ': '~ 'lilt! dI¡¡¡I~~," ..---------,,----.,,-----, KOHL'S Moridi3l1, Idah" lief ---------- --, CITY OF MERIDlAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARlNG DATE OF 11/03/05 Exhibit B: Landscape Plan (The Land Group) ",,',"-,-- - '",-, "" ".., ,,"- """"'..-- ",," ", ., ", ",'" """ "", r"---""':::::-~:, -------, ", j ,¡ , i~;¡¡ Iii Uli !IIi rc-.,~ Ii¡ lid Ihi ;~ I~ II'" ..' ,Þ-< .- i :15 I~ ?AD4 p2AL I ~" ~- - ,t p; E I'" ---~'-- 1ri_-~-,,~ I-:~! '....., I '--~ ~AD 1, ';,I ~, 6AC, iil I Ii I ?'< --, - ---\J [JI: I' lAD 21, ~'~: D7 AC. / II 124 '~1i l' " -- --- iT-I" ~-- I ..,..., 3 I C- ! 1 ¡"';;-:~POSfO "" I - n:NANT - . ',;:CNW/ '\ I '5 <'MJfL ,I, -- 12<0' c",'....;~ i -- '--~- - -l'ib:;J;~ ---" "IA 'O"uNE MA1C;HlINE ?AD 5 ,12AC, I tAD 6 r9AC. --',,~"""MU" """"',1 ~J!'II " ,'-t' , In " ' 1~'Lh, ':\Wi~ , 11m If '" I i '-----"'-"~'--'--"--,, ,-", ",-----" !I! /¡¡II'~' , ,)1.1 ,,' , ~~~I I 'm Ii 'Ii ¡I: I¡! 1i ¡Ii¡¡I,¡:rlìWi¡'!II'l!j'j",Hllllil!jilmr¡jFi!¡¡¡¡ I," I ¡j Ii; !I ! J,¡IIII/Ili !i I!, II ./J I ' ;¡II/:¡, II¡I!¡I/!I ~ ',I¡¡'NI'II','/ H!!'I!,IIIU¡!' '¡ ¡¡IIIIlI!!'¡I~ "¡i I ¡It lid '1 '!'IIII¡',ì;II; ~ I' I I I, I, 'I 1'1 '1i11,r !i!ij i1i¡i~l iii¡¡I!li!!illi~ ',. :11 1'1! !III ,! ¡il I! hi 1 pi ..",'"--, "'----"'---""------'" KOHL'S Meridian. Idaho ;'!J¡ 1:6)1 11";. C', , ';Ii ¥: Kohl's CUP Application Exhibit B Page 2 CITY OF MERlDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 Exhibit C: Building Elevations (P&R Architects) m X -I m JJ 0 JJ m r m < » -I !:.--.~ !::i~ 1 '81~ ~1 0 Z (f) ,.j: "'.¡ mi¡ ¡~¡i' ;j,!1 Kohl's CUP Application Exhibit C Page 1 1ft!!;: w fP' ! . "; Ii cO:: >'" :r": 00 ;0. "" m Z"O ~~fIU -~;;~ "11~ n if' f ~~~ °,-- Wi 4 ~~ In r J ~~ OJ : -1 .f - '. "'" :1 .., .:1:._, ,> : r. f -,...:¡: r ..:",¡ --- :~ "..J ,- , ;' I __-¡iL.. .!, -, g ¡ ;;; ill' Hlii= >of' I z i~.dld ~H§:'" -1! ".j; "J ;¡~tV ... ! I, ~ "" ""'" . , . j ~""'~~ CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 Exhibit D: Legal Description Date: October 7, 2005 Page: lof2 EXIDBIT "A" A parcel ofland being a portion ofth~ tract ofland as described in Warranty Deed Instrument Ko. 99021196 and a portion of a tmct of land as described in Warranty Deed Instrument No. 104134508, Ada county records, said parcel being situated in the Southeast Y. of the Southeast :1., of Section 32, Township 4 North, Range 1 East, Boise Meridian, Ada County, Idaho, is more particulady described as follows: Commencing at the Southeast come¡- of said Section 32, thence along the South line of said Section North 89"44'39" West 1,118.13 feet; thence leaving said South line North O(nS'21" East 59.96 feet to the north right-of-way line of East Ustick Road being the POINT OF BEGINNING; thence North 00"15'21" East 512.46 feet; thence, South 89"59'26" East 105.26 feet; thence, South 00"00'08" West 137.66 feet; thence, North 89"59'56" East 289.65 fee; thence, North 00"00'04" West 65.17 feet; thence, South 89"59'53" East 205.85 feet; thence, South 00"00'04" East 28.58 feet; thence, South 46"31 '46" East 100.17 feet; thence, North 89"59'56" Ea.~t 184.69 feet; thence, South 00"00'52" West 362.26 feet to II point on said north right-of-way line being 44.00 feet north of the South line of said Section 32; thence, &Jong said north right-or-way line the following four courses: North 89"44'39" West 83.38 feet; thence, South 89"18'14" West 361.19 feet to a point being 38.00 feet North of the South line of said Section 32; thence North 89"44'39" Wcst395.41 feet; thence North 42"46'09" West 30.04 feet to the POINT OF BEGINNNING, Said parcel contains 363,017 square feet Of 8.33 acres more Of less. Kohl's CUP Application Exhibit D Page 1 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 '-"-'--'--, ~ ~ ill. ",.1 ~ 1=11: ~ ã~<A~oR ;;¡~,.O\ ,.6 _J: .¡:;¡¡;~ j!~e:I:ãi I-'~ iU~=¡ ~ f-I..2gaJ ~ I Hi'" ~ , ~" == !!J '" ~ '44' ~ ~ I )00 iii ¡; :;j % ","I !8 '" ~ 9!~ ~~ ~ i AI ~t: PI ~ ~ ~ I . ~ SOO'OO'S2.W 0 I ~. -$' ~ 1:¡~1~1 j" I i r . ~ Z ~ [' IIJp ~ I "h ~I-a ' ¡ ~ 3. " ~ RJw-------_.~ R/ RjW ~ ~ ---..,¡- OVO~ ]1~V3 HlIjON - --,,- --- - - - ¡r it ;¡ LLJ I I r ¡~; I J :: 38' t ~, ;oj ~ lJO ;þ-("J ~ö (I¡ "'SJ ~;-.J "'", 0 0 '" NOO1S'21"( 512.%' Iß ¡ 80/- ri'" SOO'OO' "vi PI 137.6&' I I " Q % .... !õ\ '" ,., !iJ z z Z '" "tI 2: ~ z ~~ '" "' ...."" .ØI PI ) ;;0; (.00 :b~~ t=9 <Ii )o.""~ ~~~ ;¡~ -I rn ~ '" / 111 !!2 ;; ~ ;:0 >- z ~ 0 '" '" 0 <0 <0 0 ~ ~I ~I: PI c: " ,., ::;;~~¡:;¡:; - ~c: ~I\J¡6~¡3:~~ ~ln~~"'1 --._"""-"",--"", tOO/HOil! XVd g '01 nu ÇOO~¡lO/l Kohl's CUP Application Exhibit D Page 2 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11103/05 Exhibit E: Required Findings from UDC (Conditional Use Permit) The Commission shall review the particularfacts and circumstances of each proposed conditional use in terms of the following, and may approve a conditional use permit if they shall find evidence presented at the hearing(s) is adequate to establish: 1. That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. The Commission finds that the site is 8.33 acres and is large enough to accommodate all required parking, landscaping, loading and other standard regulations required by the UDC. 2. That the proposed use will be harmonious with the Meridian Comprehensive Plan and in accord with the requirements of this Title. The Commission finds that the proposed Kohl's Department Store meets the objectives ofthe Comprehensive Plan as listed in Section 7 of this report. Some of the standards of the UDC are not currently being met by the applicant's site plan and building elevations. Specifically, the site plan needs to reflect new pedestrian walkways and the south building elevation needs to be amended to comply with entryway corridor design standards. If the applicant makes these changes, this finding will be met. 3. That the design, construction, operation and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. The Commission finds that the proposed retail use complies with the uses pennitted in the C-G zone and those uses allowed under the Development Agreement. The building height, parking layout, landscape buffer widths and other dimensional standards shown in the application comply with the UDC. The property adjacent to Kohl's west boundary (beginning approximately 450 feet north of Us tick Road) is zoned R-8 and is proposed as medium density residential uses. In the future, the applicant will need to construct a buffer between land uses to address this less intensive use. 4. That the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity. The Commission finds that the proposed development will not adversely affect other property in the vicinity if the applicant complies with all CUP conditions and constructs all improvements and operates the use in accordance with the UDC standards. Traffic volumes will significantly increase. However, both ACHD and ITD have approved the application and placed special conditions on the applicant. These standards include lighting, screening, landscaping and other areas intended to mitigate potentially hannful effects. 5. That the proposed use will be served adequately by essential public facilities and services such as highways, streets, schools, parks, police and fire protection, drainage structures, refuse disposal, water, and sewer. Kohl's CUP Application Exhibit E Pagc 1 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 The Commission finds that sanitary sewer, domestic water and irrigation are available to the subject property. The applicant recently completed a public~private partnership to improve Ustick Road to five lanes and ACHD is planning to install a traffic signal at the west boundary of the site. The commercial land use should not have any impact on the school system. Please refer to other comments prepared by the Meridian Fire Department. 6. That the proposed use will not create excessive additional costs for public facilities aud services and will not be detrimental to the economic welfare of the community. The Commission finds that the applicant will pay to extend the sanitary sewer and water mains into the site. No additional capital facility costs are expected from the City. An estimated 150 local jobs are anticipated to be created by Kohl's Department Store. The additional commercial structures will improve the tax base for the City of Meridian. The applicant and/or future property owners will be required to pay highway impact fees. 7. That the proposed use will not involve activities or processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors. The Commission finds that the proposed development will not involve uses that will create nuisances that would be detrimental to the general welfare of the sUlTounding area. The Commission recognizes the fact that traffic and noise will increase with the approval of this subdivision; however, we do not believe that the amount generated will be detrimental to the general welfare of the public. The Commission finds the future buffer between land uses along the west boundary and the Ustick Road street buffer will help to mitigate noise, fumes and glare created by the additional traffic. 8. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. The Commission finds that the Layton Lateral is a significant irrigation water source which courses just north of the proposed Kohl's site. The applicant will be required to comply with all state and local ordinances regarding conveyance of water and maintaining historic points of access. The Ada County Historic Preservation Council's Site Inventory does not show any structures or places listed for the subject property. We are unaware of any other scenic or historic features. Kohl's COP Application Exhibit E Page 2 1.7 1.6 1.7 1.8 1.9 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 EXHmIT F: Conditions of Approval 1. Planning Department 1.1 SITE SPECIFIC REQUIREMENTS-CONDITIONAL USE PERMIT (CUP-O5-048) 1.2 The site plan prepared by Quadrant Consulting (Sheet S-l), dated October 7,2005, is approved, with the conditions listed herein. Applicant shall meet all of the requirements of the Annexation and Zoning (AZ-03-025) and Development Agreement recorded for the subject property. 1.3 UDC 11-3C-8 requires off-street loading spaces for commercial uses. The Certificate of Zoning Compliance (CZC) application for this project shall clearly demonstrate that both a Type A and Type B space are available on site, located near the refuse/service area behind the building. As long as the two spaces are dedicated, striping of the spaces is not required. 1.4 The applicant shall modify the west and south elevations to provide either overhanging eaves or create additional variation along the main building's parapet height. This standard may be met by constructing a second projection on each elevation to match/compliment the approximately 38- foot wide projection at the east end of the south elevation. The applicant shall coordinate the elevation modifications with the Plannim!: Department staff. 1.5 Any roof-mounted mechanical equipment will be screened from view from any public right-of- way. The applicant shall submit drawings at the time of CZC submission that demonstrate this condition is complied with. 1.6 The KoW' s building construction shall substantially comply with the elevations and materials on the drawing sheet by P&R Architects, dated 09-27-05 (revised 10-03-05), including the amendments required by this CUP. Construction materials used on the structures shall be approved by the City of Meridian Building Department and in accordance with the most recent Building Code. An additional material and/or band color which compliments the east elevation shall be added along the full south and west elevations (e.g. porcelain tile, an additional EIFS color, etc.). Provide an 8-foot wide pedestrian walkway from the Ustick Road sidewalk to the sidewalk at the front of the building. The walkway shall be distinguished from the vehicular driving surfaces through the use of pavers, colored or scored concrete, or bricks. Locate the walkway beginning at the west side of the middle driveway and connect it to the sidewalk in front of the building. The applicant shall comply with the outdoor lighting standards shown in UDC I 1-3A-I 1. Provide a walkway at least eight feet (8') in width for pedestrian movement away from the main building entrance to the parking lot. The Site Plan must be modified to construct at least one, 8- foot wide walkway in the center parking row in front of the building. The two awnings on the east elevation shall extend at least 20 feet beyond the entry doors, measured from the building face to the outer edge of the awning. The applicant shall submit a drawing at the time of CZC application submission to demonstrate compliance with this condition. Kohl's CUP Application Exhibit F Page 1 1.15 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 1.10 Construct 1 O~foot wide street buffers adjacent to the east and west sides of the new street along the west boundary with the overall site improvements. Complete prior to issuance of Certificate of Occupancy. 1.11 Comply with UDC 11-3A-12 regarding a screen for the refuse/service area. 1.12 No in-igation pump station or facility is shown on the Site Plan. However, if one is proposed for the site, it must be located outside of any required street buffer. Impervious surfaces are prohibited in said butTers. 1.13 The asphalt surface shall be extended a minimum of 20 feet east of the landscape planters shown at the east end of the parking lot and provide for two-way vehicular movement to the north and south parking aisles. 1.14 The legal description for the Kohl's site does not place it contiguous to Eagle Road. As such, this pennit does not approve nor apply to the Eagle Road landscape buffers. If the applicant proposes to construct the Eagle Road buffer as an off-site improvement with the Kohl's CuP, the landscaping standards required in the UDC shall apply. The applicant shall comply with all ACHD site specific conditions, including closure of the driveway in the southwest comer of the site that connects to the new north~south public street. 2.1 2. Public Works Department 2.2 2.3 2.4 2.5 2.6 The applicant is proposing to sewer service to this site via extensions of mains located in Ustick Road. The applicant shall install mains to and through this development; applicant shall coordinate main size and routing with the Public Works Department, and execute standard founs of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in confonnance of City of Meridian Public Works Departments Standard Specifications. Water service to this site is being proposed via extension of mains in U stick Road. The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. Provide a 20' easement for all public waterlsewer main outside of public right of way (include all water services and hydrants). The description shall be consistent with the graphically depicted easements on the plat. Submit an executed easement (supplied by Public Works), a legal description, which must include the area of the easement (marked EXHIBIT A) and an 8112" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. The submitted site plan shows no new hydrants being installed, coordinate with Rich Greene for the location of required hydrants. Any existing domestic wells and/or septic systems within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non- domestic purposes such as landscape in-igation. All development improvements, including but not limited to sewer, fencing, micro-paths, pressurized inigation and landscaping shall be installed and approved prior to obtaining Kohl's CUP Application Exhibit F Page 2 3.2 3.3 3.4 3.5 3.6 3.7 3.8 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 certificates of occupancy. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat per Resolution 02-374. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. 2.10 Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. Developer shall coordinate mailbox locations with the Meridian Post Office. 2.12 Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 2.13 The engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. 3. Meridian Fire Department 2.7 2.8 2.9 2.11 3.1 Acceptance of the water supply for fire protection will be by the Meridian Fire Department and water quality by the Meridian Water Department for bacteria testing. Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4 W' outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works spec. d. Locations with fire hydrants shall have the curb painted red 10' to each side of the hydrant location. e. Fire Hydrants shall be placed on comers when spacing permits. f. Fire hydrants shall not have any vertical obstructions to outlets within 10'. g. Fire hydrants shall be place 18" above finish grade. h. Fire hydrants shall be provided to meet the requirements ofthe IFC Section 509.5. All entrance and internal roads shall have a turning radius of28' inside and 48' outside radius. Provide at least a 20' wide Fire Lane for all internal roadways all roadways shall be marked in accordance with Appendix D Section D1O3.6 Signs. Fire lanes and streets shall have a vertical clearance of 13 '6". This includes mature landscaping. Operational fire hydrants, temporary or pennanent street signs and access roads with an all weather surface are required before combustible construction is brought on site. Commercial and office occupancies will require a tire-flow consistent with the International Fire Code to service the proposed project. Fire hydrants shall be placed per Appendix D. The new commercial lot will have an unknown impact on Meridian Fire Department call volumes. The Meridian Fire Department has experienced 2612 responses in the year 2004. According to a Kohl's CUP Application Exhibit F Page 3 3.14 3.15 3.16 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 11/03/05 report completed by Fire & Emergency Services Consulting Group our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010. 3.9 The fire department requests that any future signalization installed as the result of the development of this project be equipped with Opticom Sensors to ensure a safe and efficient response by fire and emergency medical service vehicles. This cost of this installation is to be borne by the developer. 3.10 Maintain a separation of 5' from the building to the trash dumpster enclosure. 3.11 Provide a Knoxbox entry system for the complex prior to occupancy. 3.12 The applicant shall work with Planning Department staff to provide an address identification plan and a sign which meets the requirements of the City of Meridian sign ordinance at the required intersection(s ). 3.13 The Fire Dept. has concerns about the ability to address the project and have the addresses visible from the street which the project is addressed off of. Please contact Vicki Heugly (898-5500) to address this concern prior to the public hearing. Provide exterior egress lighting as required by the International Building & Fire Codes. There shall be a fITe hydrant within 100' of all fire department connections. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2 the distance requirement shall be 600 feet (183). For Group R~3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m). 4. Sanitary Service Company 4.1 Please contact Bill Gregory at SSC (888-3999) for detailed review of your proposal and submit stamped (approved) plans with your certificate of zoning compliance application. Kohl's CUP Application Exhibit F Page 4