Loading...
Letter from Engineering NW En1!ineerinll North West, LLC 423 N. Ancestor Place, Suite 180 Boise. Idaho 83704 October 24, 2005 Mayor and City Council City of Meridian 660 E. Watertower, Suite 200 Meridian, ill 83642 Re: (208) 376-5000 . Fax (208) 376-5556 T "- ,..~ . .'.::",_t :'f""V "-:;.~,'¡ , 20ll5 :,:L_:, - lee'-: .\:.,:,r::_lÙ,,::"'è -,-::'_:,,:::'- 'c'-:: -',:,":" File No. FP-05-062 Paramount Village Center I am writing on behalf of our client, Paramount Development, Inc. who has indicated to us their acceptance of the conditions of approval as outlined by staff's October 20 memo for the above referenced. Our response to the City's Site Specific Comments for this project is as follows: Site Soecific Requirements 1) All terms of the approved Preliminary Plat (pP-05-011), Conditional Use Permits (CUP-03-008 & 05-013), Annexation (AZ-03-006) and Development Agyeement (Inst. No. 103137116) will be met. The Paramount Homeowner's Association will own and maintain the pressure irrigation system within this development. Appropriate easements for the pressure irrigation will be identified on the final plat. An irrigation well will be continued for use as a secondary source as in previous phases. Agree. Sewer and water mains will be constructed through this phase of development by colUlecting to existing extensions from previous phases. Drainage for the interior lots will be developed for the entire site rather that for each individual lot. All storm drainage will be collected and disposed of via subsurface seepage trenches. Any water/sewer mains outside of a public right-of-way shall be in a 20-foot easement prior to request for plat signature. The landscape plan shall be revised as requested. Face of plat - Notes will be modified / added as outlined. The Ada County Street Name Committee Final letter will be submitted to the City of Meridian prior to signature by the City Engineer. There are no wet ponds proposed for this project. The Certificate of Owners will be completed prior to final plat signature. Agree. 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) General Requirements The developer agrees to all the general requirements contained in the staff report dated October 20, 2005. Should you have any questions or need anything else feel free to give me a call. Thank you, 1¿Þt ene P. Smith, P.E. Xc: Peter Oliver, Paramount Development 2