Letter from Engineering NW
En1!ineerinll North West, LLC
423 N. Ancestor Place, Suite 180 Boise. Idaho 83704
October 24, 2005
Mayor and City Council
City of Meridian
660 E. Watertower, Suite 200
Meridian, ill 83642
Re:
(208) 376-5000 . Fax (208) 376-5556
T "-
,..~ . .'.::",_t :'f""V "-:;.~,'¡ ,
20ll5
:,:L_:, - lee'-: .\:.,:,r::_lÙ,,::"'è
-,-::'_:,,:::'- 'c'-:: -',:,":"
File No. FP-05-062 Paramount Village Center
I am writing on behalf of our client, Paramount Development, Inc. who has indicated to us their
acceptance of the conditions of approval as outlined by staff's October 20 memo for the above
referenced.
Our response to the City's Site Specific Comments for this project is as follows:
Site Soecific Requirements
1)
All terms of the approved Preliminary Plat (pP-05-011), Conditional Use Permits
(CUP-03-008 & 05-013), Annexation (AZ-03-006) and Development Agyeement
(Inst. No. 103137116) will be met.
The Paramount Homeowner's Association will own and maintain the pressure
irrigation system within this development.
Appropriate easements for the pressure irrigation will be identified on the final
plat.
An irrigation well will be continued for use as a secondary source as in previous
phases.
Agree.
Sewer and water mains will be constructed through this phase of development by
colUlecting to existing extensions from previous phases.
Drainage for the interior lots will be developed for the entire site rather that for
each individual lot. All storm drainage will be collected and disposed of via
subsurface seepage trenches.
Any water/sewer mains outside of a public right-of-way shall be in a 20-foot
easement prior to request for plat signature.
The landscape plan shall be revised as requested.
Face of plat - Notes will be modified / added as outlined.
The Ada County Street Name Committee Final letter will be submitted to the City
of Meridian prior to signature by the City Engineer.
There are no wet ponds proposed for this project.
The Certificate of Owners will be completed prior to final plat signature.
Agree.
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
General Requirements
The developer agrees to all the general requirements contained in the staff report dated
October 20, 2005.
Should you have any questions or need anything else feel free to give me a call.
Thank you,
1¿Þt
ene P. Smith, P.E.
Xc:
Peter Oliver, Paramount Development
2