Right-of- Way & Development Department
Planning Review Division
Oo~ut;((, ~
RECEIVED
OCT 1 4 2805
October 7, 2005
City of Meridian
City Clerk Office
TO:
Ronald Van Auker
3084 East Lanark Street
Meridian, Idaho 83642
SUBJECT:
MMI-05-011
Miscellaneous application
1822 East Overland Road
In response to your request for comment, the Ada County Highway District (ACHD) staff has reviewed
the submitted application and site plan for the item referenced above. It has been determined that the
Right-of-Way and Development Services Department does not have any site specific requirements for
you at this time due to the fact that the development will:
.
Generate less than 10 additional vehicle trips per day.
If the site plan or use should change in the future, ACHD will review the site plan and may require
improvements to the transportation system at that time.
Prior to final approval you will need to submit plans to the ACHD Development Review Department.
A traffic impact fee may be assessed by ACHD and will be due prior to the issuance of a building
permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding
impact fees.
Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement
widening, driveways, culverts, etc), a permit or license agreement must be obtained from ACHD.
If you have any questions, please feel free to contact me at (208) 387-6174.
Sin~CereIY' ----- ~-----
'-~
--'--z.-:= /'
Lisa achman
Planner I
Right-of-Way and Development Services, Planning Division
Cc:
Project File, Construction Services, Meridian City
~
Development Process Checklist
II
-J
I8:ISubmit a,development'appHcation to a City or to the County
I8:IThe City or the County will transmit the development application to ACHD
I8:IThe ACHD Planning Review Division will receive the development application to revie~
I8:IThe Planning Review Division will do ~ of the following:
I8:ISend a "No Review" letter to the applicant statirig that there are no site specific
requirements at this ~ime. -
OSend a "Comply With" letter to the apphcant stating that if the development is within a'
- platted subdivision or part of a previous development apphcation and that the site specific requirements from the, .
previous development also apply to this development apphcation. '
OWrite a Staff Level report analyzing the impacts of the development on the
transportation system and evaluating the proposal for its conformance to District Policy.
OWrite a Commission Level report analyzing the impacts of the development on the
transportation system and evaluating the proposal for its conformance to Distri,ct Policy.
- Othe Planning Review Division will hold a Technical Review meeting for all Staff and Commission
Level reports.
I8:IFor ALL devblopment applications, including those receiving a "No Review" or "Comply With"
letter: .
The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review
Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then
architectural plans may be submitted for purpose~'ofimpact fee calculation.)
The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including,
but not limited to, driveway approaches, street improvements and utility cuts.
OPay Impact Fees prior to issuance of building permit~ Impact fees cannot be paid pri~r to plan review approval.
.
.
. DID YOU REMEMBER:
Construction (ZOne)
0 Driveway or Property Approach(s)
. Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic SerVices). There is a one week turnaround for this approval.
0 Working in the ACHD Right-oC-Way
. Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to
ACHDConstruction - Permits along with: '
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are
placing >600 sf of concrete or asphalt.
Cons/roction (Subdivisions)
0 Sediment & Erosion Submittal
, . At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan
Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division.
0 Idaho Power Company
. Vic Steelman at Idaho Power must have his ¡PCa approved set of subdivision utility plans prior to Pre-Con being scheduled.
0 Final Approval from Development Services
. ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con.