Loading...
HomeMy WebLinkAboutACHD Comments ~ ~;;~it, "- ~ Right-of Way & Development Department Planning Review Division "..>-- "t .eo~uLtó ~u- RECEIVED OCT 1 It 2005 October 7, 2005 City of Meridian City Clerk Office TO: Lee Kallenberger 2459 East Franklin Road Meridian, Idaho 83642 SUBJECT: MTE-05-009 Time Extension Finish Line Automotive/44 Northwest 10th Street In response to your request for comment, the Ada County Highway District (ACHD) staff has reviewed the submitted application and site plan for the item referenced above. It has been determined that the Right-of-Way and Development Services Department does not have any site specific requirements for you at this time due to the fact that the development will: . Generate less than 10 additional vehicle trips per day. If the site plan or use should change in the future, ACHD will review the site plan and may require improvements to the transportation system at that time. Prior to final approval you will need to submit plans to the ACHD Development Review Department. A traffic impact fee may be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc), a permit or license agreement must be obtained from ACHD. It you have any questions, please feel tree to contact me at (208) 387-6174, Sincerely, ¿/~~ Lisa Bachman Planner I Right-at-Way and Development Services, Planning Division Cc: Project File, Construction Services, Meridian City ~ [ Development ProcessC'hecklist II -" [8]Submit adevelopinent' application to a City or to the County [8]The City or the County will transmit the development application to ACHD [8]The ACHD Planning Review Division will receive the development applicàtion to review [8]The Planning Review Division will do ~ of the following: t8JSend a "No Review" letter to the applicant statirig that there are no site specific requirements at this ~ime. ," DSend a "Comply With~' letter to the applicant stating that ¡fthe development is within a "platted subdivision or part of a previous development application and that the site specific requirements from the' previous development also apply to this development application. DWrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. DWrite a Commission Level report analyzing the impacts of the development on the transportation system and evaluatin~ the proposal for its confonnance to Distri,ct Policy. DThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. , t8,JFor ALL devblopment applications, including those receiving a "No Review" or "Comply With" letter: " . The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purpose~ of impactfee calculation.) The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. . DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. "DID YOU REMEMBER: Construction (ZOne) , 0 Driveway or Property Approach(s) " . Submit a "Driveway Approach Request" fonn to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic SerVices). There is a one week turnaround for this approval. 0 Working in the ACHD Right-or-Way . Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction - Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are ' placing >600 sf of concrete or asphalt. Construction (Subdivisions) 0 Sediment & Erosion Submittal , . At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division. 0 Idaho Power Company . Vic Steelman at Idaho Power must have his IPCü approved set of subdivision utility plans prior to Pre-Con being scheduled. 0 Final Approval from Development Services . ACHD Construction - Subdivision must have received approvaJ trom Development Services prior to scheduling a Pre-Con.