Loading...
HomeMy WebLinkAboutPorky Park Sub PP PP 05-026 0 MERIDIAN PLANNING & ZONING MEETING APPLICANT V J Joint Venture July 7, 2005 ITEM NO. 21 REQUEST Public Hearing - Preliminary Plat approval of 15 commercial building lots on 34.56 acres in proposed C-G zone for Porky Park Subdivision - south of Pine Street and east of North Eagle Road AGENCY COMMENTS CITY CLERK: CITY ENGINEER: CITY PLANNING DIRECTOR: CITY ATTORNEY See attached Staff Comments CITY SEWER DEPT: CITY PARKS DEPT: No Comment \ ~~'\{IMì~ ~~oJoY <ro ctu ~J) CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: MERIDIAN SCHOOL DISTRICT: SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: See attached Comments See attached Comments SETTLERS'IRRIGATION: IDAHO POWER: INTERMOUNTAIN GAS: OTHER: Contacted: ~a~ l.ft2/'--. Emailed: Date: 7/VJ þs- Phone: f.(~ - Sf 21'/ Cf'L^-- , /. \ Staff Initials: tJ€ '-'V ~ Materials presented at public meetings shall become property of the City of Meridian. MAYOR Tammy de Weerd ~- ,,;(. .r"f'~"'" t..~' "' ~V1¡'~ olfe;;d/:;~~ ~, \ IDAHO J~ \~ v \:"" ./.f< ;:(r. 1'" "'~~Z!:/¡. "" ~,..¡",--CY -~~"Ü!f¿\Sl'n~: "J,!-~-"-. sma ---~~._~ ,"190:1 LEGAL DEPARTMENT (208) 888-4433 'Fax 887-4813 PUBLIC WORKS BUILDING DEPARTMENT (208) 898-5500 . Fax 898-9551 CITY COUNCIL MEMBERS Keith Bird William L.M. Nary Shaun Wardle Charles M. Rountree PLANNING AND ZONING DEPARTMENT (208) 884-5533 . Fax 888-6854 MEMORANDUM: Transmittal Date: July I, 2005 Hearing Date: July 7, 2005 To: Mayor, City Council and Planning & Zoning Commission - . "" " j", , ~I i' From: -~ j ¿;/6'ß- Joseph Guenther, Associate City Planner / Michael Cole, Development Services Coordinator M C .); 'I ' t, 'Ii Si-~;:~:: 8{~!~1~Ôf]~cF Re: Porky Park Subdivision . Request for Rezone of 4.5 acres £rom I-L to C-G Zone, by VJ Joint Venture (File No. RZ-O5-009). . Request for subdivision of fifteen (15) Commercial Lots on 34.56 acres in an existing I-L Zone and proposed C-G Zone by VJ Joint Ventures. (File #PP-O5-026) We have reviewed this submittal and offer the following comments, as conditions of the applicant. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATIONS SUMMARY & HISTORY The Applicants, Jacksons Food Stores, Inc.( proposed Lot 1) and VJ Joint Ventures, have requested rezone approval of 4.5 acres from I-L (Light Industrial) to C-G (General Commercial). The PP application includes fifteen commercial lots, three total C-G lots incluqing the existing J acksons food store and twelve industrial lots. The C-G rezone is proposed as the Lots 2-3. Proposed Lot 1 Block 1 is cunently approved for C-G zone by Jacksons Food Store, VJ Joint Ventures is proposing to add 4.53 acres ofC-G zoned lots to the mix-use. The remaining lots, all lying east of Lot 3 Block 1 will remain in the I-L zone. The property is located at the southeast comer of Eagle Road and Pine Ave. The Comprehensive Plan depicts the subject property as Mixed Use-Regional. Lot 1, Block 1 (2 acres) within the proposed preliminary plat is owned by Jacksons Food stores and is included with the plat as a condition of approval for the rezoning ofthepropertyto C-G. VJ Joint Ventures, which is owned and managed by Ronald W. Van Auker, owns the property east of the J acksons property. Van Auker, Inc. has not submitted a master plan on the remainder of their land. The 2 acre parcel has a legal description drafted November 29,2004, prepared by Treasure Valley Engineers and rezone and conditional approval under CUP-05-0 12, and RZ-05-004. The remainder RZ-05-009, PP-O5-026 Porky Park Subdivision Planning & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 2 of the Van Auker land holding to the east is currently vacant and requires compliance with the conditions of approval reduction in platting requirements RP-04-00 I. Staff recommends approval of the subject applications with the conditions noted in this report. LOCATION & SURROUNDING USES The subject property is located on the ease side of Eagle Road, south of Pine Ave. The following uses surround the subject property: North - Existing commercial development recently platted as Reagan Subdivision, zoned 1- L with a CUP Use Exception for Commercial uses and designated as Commercial in the Comprehensive Plan Future Land Use Map. South - Commerce Park Subdivision, zoned I-L, designated as Industrial in the Comprehensive Plan Future Land Use Map. East - Ronald W. Van Auker Property, zoned I-L, designated as Mixed Use Regional in the Comprehensive Plan Future Land Use Map. East of this site is the Meridian School District. W est ~ Undeveloped parcels, zoned 1- L, designated as Industrial in the Comprehensive Plan Future Land Use Map. Recently amended to Mixed Use Regional. OWNER OF RECORD The owners of record are Jacksons Food Stores, and VJ Joint Ventures, signed by Ronald W. Van Auker who has given consent for the applicant to submit the requested applications. STANDARDS FOR ZONING AMENDMENT The Commission and Council shall review the particular facts and circumstances of each proposed zoning amendment in terms of the following standards and shall find adequate evidence answering the following questions about the proposed zoning amendment (11-15-11).. A. Will the new zoning be harmonious with and in accordance with the Comprehensive Plan and, if not, has there been an application for a Comprehensive plan amendment; This property is designated "Mixed Use - Regional" on the Comprehensive Plan Future Land Use Map. The Mixed Use comprehensive plan designations provides for a combination of compatible land uses that are typically developed under a master or conceptual plan. All development within this designation will occur only under the Conditional Use Permit process, except the Mixed Use-Regional (see below). Where mixed use developments are phased, a conceptual site plan for the entire mixed use area is encouraged with the development application or, depending on the scope ofthe development, prior to a formal development application being submitted. The following standards will apply to this category: RZ-OS-O09, PP-OS-026 Porky Park Subdivision RZ_PP Planning & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 3 No upper limit of non-residential use.s Over 200,000 sq. ft. of non-residential building area; CUP application would not be needed unless a project lies within 300 feet of an existing residence or school or CUP is othelwise required per ordinance; Residential density of3 to 40 units/acre. Sample uses include: All MU-N and MU-C categories, entertainment uses, major employment centers, clean industry. Meridian City Code (MCC) 11-7- 2.r. states the purpose of the C-G district is "to provide for a review of the impact of proposed commercial uses which are auto and service oriented and are located in close proximity to major highway or arterial streets; to fulfill the need of travel-related services as well as retail sales for the transient and pennanent motoring public." The following Comprehensive Plan policies also support the annexation and proposed retail/fuel service use: . "Permit new. . .commercial developments only where urban services can be reasonably provided at the time of final approval and development is contiguous to the City." (Chapter IV, pg. 26, Goal I, Obj. A, #6) Sanitary sewer, municipal water, solid waste and other services exist to this area of Meridian. . "Require all new parking lots to provide landscaping in internal islands." (Chapter V, pg. 43, Goal III, Obj. D, #3) The Site Plan submitted with the CUP application for this property shall show internal planters, as required. . "Locate new community commercial areas on arterials. . .near residential areas in such a way as to complement with adjoining residential areas." (Chapter VII, pg. 43, Goal III, Obj. D, #3) The proposed commercial uses are located closest to the intersection of a minor arterial roadway and a state highway. A 25-foot wide street buffer is shown along Pine Ave and a 35-foot wide street buffer is shown along Eagle Road SH55, designed in part to mitigate potential negative impacts upon the vehicular traffic on Eagle Road. "" . "Restrict curb cuts and access points on collectors and arterial streets." (Chapter VII, pg. 107, Goal N, Obj. D, #2) Access to Pine Ave, including rightøin/right-out and shared accesses allowing travel towards the west/Eagle Road are subject to the conditions of ACHD. A cross access agreement within the properties at the future property boundaries will be required so the cuts can be shared with adjacent development. In addition, access to Eagle Road is prohibited in compliance with lTD. Staff finds that the requested General Commercial (C-G) zoning designation is in accord with the Comprehensive Plan, the Future Land Use Map, and the Mixed Use-Regional RZ-05-009, PP-O5-026 Porky Park Subdivision RZ.PP Planning & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 4 designation. B. Is the area included in the zoning amendment intended to be re-zoned in the future; Staff finds that the proposed rezone and accompanying development plans comply with the requested zone and staff does not anticipate that the property will be rezoned in the future. The properties requesting commercial zoning meet the requirements of a commercial/retail comprehensive designation and are adjacent to an existing commercial development to the north. The industrial use development east of the commercial phase is consistent with the development of warehousing and wholesale production and sales which are located to the south of the property. A Master or Concept plan for the 27.59 acres has been submitted consistent with the development agreement for the rezone of the J acksons Food store (RZ- 05-004) to address the future of rezoning on the subject property. c. Is the area included in the zoning amendment intended to be developed in the fashion that would be allowed under the new zoning; Staff finds that the applicant has submitted detailed development plans for the mixed uses on the property. Staff further finds that the convenience store use, proposed hotel, and proposed light industrial businesses are allowed within the appropriate zoning designations in this mixed use area. D. Has there been a change in the area or adjacent areas which may dictate that the area should be rezoned; Staff finds that the immediate vicinity is a mix of undeveloped parcels that are designated for a mix of uses in the future, existing urban density residential uses (Meridian Crossroads), and property annexed and zoned as commercial and industrial property. The southwest comer of Eagle and Pine (approx. 62 acres) was annexed and zoned C-G (General Commercial) in February 2005 as part of the Ten Mile Development planned development. Immediately south of the parcel is an industrial subdivision with warehousing/sales/various industrial uses. The widening of Pine Avenue to five lanes, the construction of the middle School east of the site, the signalization of the intersection, and the Eagle/I-84 on ramp are all indicators of a need for a mix of commercial services in the area. The proposal is consistent with adjacent uses in the City of Meridian and to the east in the City of Boise. E. Will the proposed uses be designed, constructed, operated and maintained to be harmonious and appropriate in appearance with the existing or intended character of the general vicinity and that such use will not change the essential character of the same area; Staff finds that the proposed development is designed in a manner that will be hannonious with and appropriate in appearance with the existing neighborhood. The approved retail/fuel RZ-O5-009, PP-05-026 Porky Park Subdivision RZ.PP Plmming & Zoning CmmnissioniMayor & City Council July 7,2005 (Hearing Date) Page 5 service/auto washing facilities on proposed Lot 1, Block 1 are listed uses in hmIDony with the intended uses in the C-G district mId received approval on May. The eastel11 edge of the proposed Jacksons Food Store development (Pine Ave westel11 entrance dliveway) is approximately 207 feet east of the 2-acre site, requiring a cross access agreement to be entered into. The application does not indicate potential future uses on the eastel11 remainder ofthe 27.59 acre parcel. However, any fl.lture use will be consistent with the existing zoning or only allowed through a public hearing/CUP or platting process in compliance with the Future Land Use Map. The landscaped street buffers, lighting stmIdards and building setbacks as required by the Zoning Ordinance are intended to ease impacts of these commercial and industrial uses on nearby residences. F. Will not be hazardous or disturbing to existing or future neighboring uses; Staff finds that the requested annexation and zoning to C-G should not be disturbing to existing or future neighboring uses. Any future change of use on the property that may have a significant impact on the surrounding properties will require conditional use approval under current ordinances, and adjoining property owners will have an opportunity to comment. Staff anticipates that the proposed commercial use will not be hazardous or disturbing to the neighboring uses as long as lighting and noise ordinances are adhered to. The Commission and Council should consider all public testimony, oral and written, before making this finding. G. Will be served adequately by essential public facilities and services such as highways, street, police, and fire protection, drainage structures, refuse disposal, water, sewer or that the person responsible for the establishment of proposed conditional use shall be able to provide adequately any such service; Staff finds that the proposed uses can be adequately served by all essential public services and facilities. Drainage will need to be retained on site. H. Will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the econoDÛc welfare of the community; Staff finds that the requested uses will not create excessive additional requirements at public costs for public facilities and services. Additionally, staff finds that the proposed rezone would not be detrimental to the economic welfare of the community. I. Will not involve uses, activities, processes, materials, equipment, and conditions that will be detrimental to any persons, property, or general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors; Staff finds that the proposed C-G zoning of the property does not inherently allow uses that RZ-O5-009, PP-05-026 Porky Park Subdivision RZ_PP Plmming & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 6 will generate activities, processes, materials, equipment, mId conditions that are detrimental to the general welfare of the community. Pennitted uses in the C.G zone include gas stations facilities, banks, professional offices, clinics, dry cleaning, hotels, restaurants and retail stores. However, as noted above, all future uses will require a mix of use applications consistent with the Future Land Use Map. Future uses and/or platting will allow for public testimony and site specific conditions, if necessary, to mitigate uses that may be detrimental to any persons, property or the general welfare. J. Will have vehicular approaches to the property which shall be so designed as not to create an interference with traffic on surrounding public streets; The accompanying Preliminary Plat application shows vehicular access to the property via existing curb cuts that have been authorized by ACHD. The property owner negotiated the locations and design of these ingress/ egress points to Pine Ave with ACHD and access points may change slightly through the platting. To help prevent interference with westbound Pine Ave traffic and southbound Eagle Road traffic, left turns are prohibited out of the site, unless at the designated access. The applicant has shown a public roadway connection from the south border ofthe project to connect Commerce Street with Pine Avenue. Staff supports this location mId connection in compliance with Preliminary Plat special consideration #2. The project is in compliance with ITD and the Meridian Comprehensive Policies on access to principle arterials, no direct access to Eagle Road will be allowed. Please see the ACHD and ITD reports for more information regarding vehicular approaches and traffic. K. Will not result in the destruction, loss or damage of a natural or scenic feature of major importance. Staff finds that no natural or scenic features will be lost or damaged by the project. L. Is the proposed zoning amendment in the best interest of the City; Staff finds that the proposed annexation would be in the best interest of the City by increasing the supply of land zoned for neighborhood and vehicular oriented commercial/retail uses North ofI-84. The proposed zoning complies with the Future Land Use Map, is not proposing any variances or exceptions to Meridian City Code and will allow for the commercial improvement ofland at a high visibility intersection and industrial uses consistent with existing uses away from the commercial corridor. SITE SPECIFIC COMMENTS (Annexation) RZ-O5-009, PP-05-026 Porky Park Subdivision RZ,PP Plmming & Zoning Cmmnission/Mayor & City Council July 7, 2005 (Hearing Date) Page 7 1. The legal description submitted with the application is accurate, places the property contiguous to existing city limits, and meets the requirements of the City of Meridian and Idaho State Tax Commission. The legal description ofthe C-G zone is on the plat listed as Lots 1-3 of Block 1, Porky Park Subdivision. Stamped by Todd R.Waite, PLS May 18, 2005. 2. The subject property is within the Urban Services Planning Area. PRELIMINARY PLAT FINDfNGS AND REQUIREMENTS Sections 12-3-3 J.2 and 12-3-5 D read as follows: "In determining the acceptance of a proposed subdivision, the Commission/Council shall consider the objectives of this title and at least the following: a. The conformance of the subdivision with the Comprehensive Development Plan; Staff finds that the current zoning designation is in general compliance with the effective Comprehensive Plan ('02) and the Future Land Use Map, which designates the land to be "Mixed Use Regional." Generally, the Mixed Use designation will provide for a combination of compatible land uses that are typically developed under a master or conceptual plan. Sample uses are listed as entertainment, clean industry, and major employers. The uses of Office/Retail closest to Eagle Road are similar to the sample uses listed on Page 98 Chapter VII of the Meridian City Comprehensive Plan. The uses of warehouse and wholesaling on the remaining lots are also consistent with the underlying zoning designation and mixes of uses. The proposed retail uses within the subdivision are pennissible in the requested zones of the MCC (11-8-1.) Therefore, Staff finds that the proposed subdivision is in compliance with the Comprehensive Plan and will not require further conditional approval if developed as presented. b. The availability of public services to accommodate the proposed development; Staff finds that this development will not cause excessive additional requirements at public cost. The property has existing sewer and water stubs served adequately by all essential public facilities and services in Pine Avenue. The applicant shall be required to extend water and sanitary sewer mains to and through the proposed development, thereby making them available to the adjacent properties. c. The continuity of the proposed development with the capital improvement program; Staff finds that the subdivision will not conflict with the capital improvement plan. Because the developer is installing sewer, water, utilities and irrigation, the subdivision will not require the RZ-05-009, PP-05-026 Porky Park Subdivision RZ-PP Planning & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 8 expenditure of capital improvement funds. d. The public financial capability of supporting services for the proposed development; Staff finds that the development will not require major expenditures for providing supporting services. See item b. e. The other health, safety or environmental problems that may be brought to the CoD1DÚssion's attention. Staff finds that there should not be any other health, safety or environmental problems associated with this subdivision that should be brought to the Council or Commission's attention. ACHD considers road safety issues in their analysis. No hazardous natural features have been identified on the site. SPECIAL CONSIDERATIONS-PRELIMINARY PLAT 1. The applicant shall maintain compliance with existing approvals for the conditional use approval of the J acksons food store on proposed Lot 1 Block 1, AZ-05-004, CUP-05-009 and all applicable conditions of approval for the commercial lots in a mixed use development. 2. Construct a north-south public road at the end of Commercial Court to intersect Pine Street. The roadway location should be approved as proposed. Construct the roadway as a 40-foot local/commercial street section with vertical curb, gutter and 5-foot wide concrete sidewalk, within 54-feet of right -of-way. PRELIMINARY / FINAL PLAT SITE SPECIFIC CONDITIONS 1. Sanitary sewer service to this site is being proposed from existing 6-inch stubs run in during the E. Pine Street road project to all lots except Lot 7, Block 1 and Lot 2 Block 2. Six inch pipe can not be used for main line purposes, therefore the aforementioned lots are not sewerable at this time and will be subject to sanitary sewer restrictions until such time as sewer is made available to them. The applicant shall be responsible to install all mains necessary to serve this project, main size and routing to be coordinated with Public Works. The applicant shall execute City of Meridian standard forms of easements for any mains necessary to provide service. 2. Water service to this site will be from main line extensions from existing water mains in Pine Avenue. The applicant will be responsible to construct water mains to and through this proposed development. Subdivision designer to coordinate main sizing and routing with the Public Works Department. Applicant shall execute City of Meridian standard forms of easements, for any mains that are required to provide service. RZ-O5-009, PP-O5-026 Porky Park Subdivision RZ.PP Plamling & Zöl1Îng Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 9 3. Per MCC 12-13 -10-4, maintain a 25- foot wide street buffer along Pine Avenue. All required street buffers shall be located beyond any future right-of-way. Show easements for all required buffers on the final plat. The Porky Park Business Owners Association shall maintain all required landscape buffers. 4. All landscape buffers shall be constructed prior to the issuance of any Certificate of Occupancy within the subdivision. 5. A perpetual vehicular cross access easement shall be provided to all lots within the subdivision. Said cross access shall be depicted on the final plat for Porky Park Subdivision. 6. A detailed fencing and landscape plan, in compliance with MCC 12-13, shall be submitted with the final plat application. 7. Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed, unless deemed unnecessary by the City Arborist per Ordinance 12-13-13. Required landscaping trees will not be considered as replacement trees for those trees that have to be removed. The applicant shall submit a tree removal/preservation plan at least 10 days prior to the City Council hearing. 8. Add the following plat note: The owner of each lot, across which passes an irrigation/drainage ditch or pipe, is responsible for the maintenance thereof, unless such responsibility has been assumed by an irrigation/drainage jurisdiction. 9. The Preliminary Plat dated 5/1912005, Sheet PP-l drawn by Todd R. Waite, Claiborn - Waite Consulting, LLC is approved with the comments and considerations contained within this report. 10. The Preliminary Site/Landscape Plan (Sheet PL-l, by G-Jenson.)is approved with the following considerations: a. The final landscape plan must match the approved landscape plan as required by CUP-05-012 for the Eagle Road and Pine Avenue intersection. b. The future public road, indicated between Blocks 1 and 2 shall include right ofway landscaping consistent with MCC 12-13. c. All future projects will be required to submit an internal landscape plan with Certificate of Zoning Compliance applications. 11. The applicant has not proposed a pressurized irrigation system. M.C.c. 12-5-2-N requires all new subdivisions to provide underground pressurized irrigation to all lots within a new RZ-O5-009, PP-O5-026 Porky Park Subdivision RZ.PP Plamling & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 10 subdivision. The City of Meridian requires that pressurized inigations systems be supplied by a year-round source of water. If a creek or well source is not available, a single-point connections to the municipal water system shall be required. If a single-point cOlmection is used, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the final plat by the Meridian City Engineer. PRELIMINARY PLAT GENERAL REQUIREMENTS 1. Submit letter from the Ada County Street Name Committee, approving the subdivision and street names. Make any conections necessary to conform. 2. Coordinate fire hydrant placement with the City of Meridian Public Works Department. 3. Assessment fees for water and sewer service are determined during the building plan review process. 4. Two-hundred-fifty-watt, high-pressure sodium streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at subdivider's expense. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity are determined after power designs are completed by Idaho Power Company. The street light contractor shall obtain design and permit from the Public Works Department prior to commencing installations. 5. Underground, year-round pressurized irrigation must be provided to all landscape areas on site. Please submit hook-up and design details based on the proposed landscaping. Due to the size oflandscaped area, primary water supply connection to the City's mains will not be allowed. Applicant shall be required to utilize any existing surface or well water for the pnmary source. 6. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdiv.ided shall be tiled per City Ordinance 12-4-13. The ditches to be piped should be shown on the site plans. Plans will need to be approved by the appropriate irrigation/drainage jurisdiction, or lateral users association, with written confirmation of said approval submitted to the Public Works Department. 7. All storm and drainage water must be retained on site. A drainage plan designed by a State of Idaho licensed architect or engineer is required and shall be submitted to the City Engineer (Ord. 557, 10-1-91) for all off-street parking areas. Storm water treatment and disposal must be designed in accordance with Department of Environmental Quality 1997 publication Catalog of Storm Water Best Management Practices for Idaho Cities and Counties and City of Meridian standards and policies. Off-site disposal into surface water is prohibited unless the jurisdiction which has authority over the receiving stream provides written authorization RZ-OS-O09, PP-OS--DZ6 Porky Park Subdivision RZ_PP Planning & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 11 prior to development plan approval. The applicant is responsible for filing all necessary applications with the Idaho Department of Water Resources regarding Shallow Injection Wells. 8. Show all existing and proposed easements for irrigation/drainage facilities located within the boundaries ofthis proposed development. 9. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes such as landscape irrigation. 10. Provide five-foot-wide sidewalks throughout development in accordance with City Ordinance. 11. All construction shall conform to the requirements ofthe Americans with Disabilities Act. 12. Applicant shall be required to pay Public Warks development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat per Resolution 02-374. 13. Applicant shall be responsible for application and compliance with any NPDES Permitting that may be required by the Environmental Protection Agency. 14. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 15. The applicant's engineer shall be required to submit a signed, stamped statement certifying that all street finish centerline elevations are set a minimum of three feet above the highest established normal groundwater elevation. SPECIAL CONSIDERATIONS 1. 2. Signage: MCC 11-14-10 (Table D) allows a maximum of one, 15-foot high sign per street frontage. Also, MCC 11-14-9-D.3 requires the signs be located "as near the primary access driveway as practical." Roadway connection: The plat includes an undefined lot between blocks 1 and 2. The lot should be platted as a public right of way for future dedication and connection through to Commerce Street. FIRE DEPARTMENT 1. Acceptance of the water supply for fire protection will be by the Meridian Fire Department and water quality by the Meridian Water Department for bacteria testing. RZ-O5-009, PP-05-O26 Porky Park Subdivision RZ.PP PlatU1ing & Zóì1ing Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 12 2. Final Approval ofthe fire hydrant locations shall be by the Meridiat1 Fire Department. a. Fire Hydrants shall have the 4 W' outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works spec. d. Locations with fire hydrants shall have the curb painted red 10' to each side of the hydrant location. e. Fire Hydrants shall be placed on comers when spacing permits. f. Fire hydrants shall not have any vertical obstructions to outlets within 10'. g. Fire hydrants shall be place 18" above finish grade. h. Fire hydrants shall be provided to meet the requirements ofthe IFC Section 509.5. 3. All entrance and internal roads shall have a turning radius of 28' inside and 48' outside radius. 4. Fire lanes and streets shall have a vertical clearance of 13 '6". This includes mature landscaping. 5. Operational fire hydrants, temporary or permanent street signs and access roads with an all weather surface are required before combustible construction is brought on site. 6. The roadways shall be built to Ada County Highway Standards cross section requirements and shall have a clear driving surface, available at all times, which is 20' wide. Streets with less than a 29' street width shall have no parking. Streets with less than 33' shall have parking only on one side. These measurements shall be based on the face of curb dimension. 7. Commercial and office occupancies will require a fire-flow consistent with the International Fire Code to service the proposed project. Fire hydrants shall be placed per Appendix D. 8. The 15 industrial/ commercial lots lot will have an unknown transient population and will have an unknown impact on Meridian Fire Department call vohunes. The Meridian Fire Department has experienced 2612 responses in the year 2004. According to a report completed by Fire & Emergency Services Consulting Group our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010. 9. The proposed project lies outside the five-minute response zone goal. Achievement ofthis goal is subject to budgetary constraints and is intended to enhance the probability of a favorable outcome on a request for Basic Life Support. The budget constraints are typically defined as capital outlay for facilities that are located within 1.5 miles from a given location and sufficient operational funds to staff the facilities. RZ-O5.009, PP-05-026 Porky Park Subdivision RZ.PP Planning & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 13 10. The fire department requests that any future signalization installed as the result of the development ofthis project be equipped with Opticom Sensors to ensure a safe and efficient response by fire and emergency medical service vehicles. This cost of this installation is to be borne by the developer 11. Maintain a separation of5' ITom the building to the dumpster enclosure. 12. Provide a Knoxbox entry system for the complex prior to occupancy. 13. The first digit ofthe Apartment/Office Suite shall correspond to the floor level. 14. The applicant shall work with Planning Department staffto provide an address identification plan including a pylon/monument sign at the required intersection(s). 15. All aspects of the building systems (including exiting systems), processes & storage practices shall be required to comply with the International Fire Code. 16. Provide exterior egress lighting as required by the International Building & Fire Codes. 17. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2 the distance requirement shall be 600 feet (183). a. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). b. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m). 18. All R -2 occupancies with 6 or more units or with 3 floors shall be required to be fire sprinkled. 19. There shall be a fire hydrant within 100' of all fire department connections. 20. Buildings over 30' in height are required to have access roads in accordance with Appendix D Section DI05. ACHD SITE SPECIFIC CONDITIONS OF APPROVAL RZ-05-009, PP-05-026 Porky Park Subdivision RZ,PP 9. rimming & Zoning Commission/Mayor & City Council July 7, 2005 (Hearing Date) Page 14 1. Construct a 5-foot wide detached concrete sidewalk with a minimum 5~foot wide Im1dscape strip, or construct a 7-foot wide attached concrete sidewalk, abutting the site on Pine Street. Provide a sidewalk easement for sidewalk located outside of the right.of- way. 2. No new Pine Street approaches (driveways or streets) are approved with this application, with the exception of the location for the proposed street connection to Commercial Court. Provide cross access agreements throughout the subdivision to allow multiple access points to Pine Street and the proposed public roadways. 3. Construct a north-south public road located approximately 400-feet west of the east property line as proposed 4. Construct a north-south public road at the end of Commercial Court to intersect Pine Street. The roadway location should be approved as proposed. Construct the roadway as a 40-foot local/commercial street section with vertical curb, gutter and 5-foot wide concrete sidewalk, within 54-feet of right-of-way. 5. Close the existing curb return adjacent to the proposed north-south public street with standard curb and gutter to match existing improvements. 6. Access to the proposed north-south roadways shall be located a minimum of 50-feet south of Pine Street. 7. Other than the access points specifically approved with this application, direct access to Pine Avenue is prohibited and shall be noted on the final plat. 8. Comply with requirements of ITD for the Eagle Road (SH 55) frontage. Submit to the District a letter from ITD regarding said requirements prior to District approval of the final plat or issuance of a building permit (or other required permits), whichever occurs first. Contact District III Traffic Engineer Dan Coonce at 334-8340. Comply with all Standard Conditions of Approval. ACHD Standard Conditions of Approval 1. 2. Any existing irrigation facilities shall be relocated outside of the right-of-way. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. RZ-OS-OO9, PP-OS.026 Porky Park Subdivision RZ.PP 10. 11. Planning & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 15 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in confonnance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of- way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative ofthe Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. Any change by the applicant in the planned use ofthe property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. RZ-05-009, PP-O5-026 Porky Park Subdivision RZ.PP Planning & Zoning Commission/Mayor & City Council July 7,2005 (Hearing Date) Page 16 Sanitarv Services Comment: 1. Please contact Bill Gregory at SSC (888-3999) for detailed review of your proposal and submit stamped (approved) plans with your certificate of zoning compliance application. Police Department Comment: 1. The Police Department has no concerns related to the site design submitted with the application. Parks Department Comment: I. Standard for Mitigation oftrees: The standard established in the City of Meridian Landscape Ordinance (MCC 12-13-13-6) will be followed. RECOMMENDATION Upon resolution of the issues raised in this report, staff recommends approval of this application with the aforementioned conditions of approval. RZ-O5-009, PP-05-026 Porky Park Subdivision RZ.PP ~ & ~ 1~ Z)i4tUd 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 RE(jEIVED 22 June 21, 2005 JUN '3 C 2005 phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 William G. Berg Jr., City Clerk City of Meridian - 3 3 East TdãIíò-Ave.' -~-- - " Meridian, ID 83642 ':::;ity Of Meridian (:Jity Clerk Office .. --..c.. --~"-- _n -nn" - --n ---- --,-, " ~-~"_n- -"" RE: PP 05-026 & RZ 05-009/Porky Park Subdivision Dear Will: Nampa & Meridian Irrigation District has no comment on the above referenced application for Rezoning. Preliminary Plat: Ifall storm drainage is retained on-site there will be no impact on Nampa & Meridian Irrigation District and no further review will be required. However, if any surface drainage leaves the site, the Nampa & Meridian Irrigation District requires that a Land Use Change Application is filed for review prior to final platting. Please contact Donna Moore at 466-7861 for further information. All laterals and waste ways must be protected. The developer must comply with Idaho Code 31- 3805. It is recommended that irrigation water be made available.to all developments within the Nampa & Meridian Irrigation District. Sincerely, 13# {/~ Bill Henson Asst. Water Superintendent Nampa & Meridian lITigation District BH/dbg , c: A. Damberger .. File - Office/Shop APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS, 40,000 ~ & ~ ~o~Jia 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 22 June 2005 phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 Matt Munger Munger Engineering, Inc. 4090 W. State Street, Suite 29 Boise, ID 83703 ----'~-~---""~----~--~----"~"-"-~--"-~--' ---'-'-----'-~-~-"--"----~-_.-_"'-'--~-".",, .. -~--,-. --"=~-- ----'------- """-------~-~----" RE: Land Use Change Application - Porky Park Subdivision Please note the District now reQuires t~s of P!!.D.! Dear Mr. Munger: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above-referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with John P. Anderson, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office, or John P. Anderson, at the District's shop. Sincerely, -- .,. ~-. it - -~. ~. ~. ~lore, A t. SecretarylTreasurer NAMPA & MERIOI N IRRIGATION DISTRICT ONM/smc cc: File Water Superintendent Will Berg, City Clerk, Meridian City Ronald w. VanAuker, VJ Joint Venture & Jacksons Food Stores, Inc., 3084 E. Lanark, Meridian, 10 83642 enc. APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 SETTLERS'IRRIGATION PO BOX 7571 PHONE, 344-247 DISTRICT. CORY BOISE. IDAHO B3707-1571 FAX: 343-]642 ,,--" June 16, 2005 RECEIVED JUN 2 0 2005 Matt Munger Munger Engineering 4090 W. State Street, Suite 29 Boise, ID 83703 City of Meridian City Clerk Office Re: PP 05-026 Porky Park Subdivision ~"---"""",,~----,,-,c.- - ---" c- -,-c-- -,,------"-----~--c-:-- "--,,--c-" c- -,_--~-" --o,-,I=-------_--------------""_-~_"",, -" ..-" _-._-'----,-~-_.. .~-----' -"- - 0 ------:-----..---'---.-" ---'-- -~---,,'--" ---~------- ---",- Dear Matt: After review of the Preliminary Plat ofthe above-mentioned application Settlers Irrigation District requests the following: 1. All irrigation/drainage facilities along with their easements must be protected and continue to function. The facilities involved are the Settlers Canal (50' easement), the O'Brien Lateral (20'easement) and the Dobaron Lateral (20'easement). 2. A Land Use Change Application must be on file prior to any approvals. 3. A license" agreement MUST be signed and recorded prior to -- construction of any S .LD. facilities, or within its easements. -- 4. Any changes to the existing irrigation system such as relocation, water delivery, tiling, and landscaping must be approved by Settlers Irrigation District's Board --of Directors. 5. All storm drainage must be retained on-site. 6. The development must supply irrigation access to all lots within the above-mentioned subdivision from the current delivery point. If the developer wishes to have Settlers Irrigation District own, operate, and maintain the pressure irrigation system an agreement needs to be in place prior to the pre-construction meèting. If you have any questions please call 343-5271. ~~ Nathan Draper, Manager , Settlers Irrigation District Enclosures Cc: Will Berg, City of Meridian (w/o enclosures) Bruce Freckleton (w/o enclosures) Scott Campbell (w/o enclosures) CITY OF MERIDIAN PUBLIC HEARING SIGN-UP SHEET July 7,2005 ITEM # 21 DATE PROJECT NUMBER PP 05-026 Porky Park Subdivision PROJECT NAME NAME (PLEASE PRINT) FOR AGAINST NEUTRAL