Loading...
Request for Reconsideration,~ ~ ~ IvE .. AUG 0 9 2005 ~ o Project Management/ SiteDevelopment/Constroctbn Managemern ~ I~Y ~ F M E R ~ ~ ~ A N CI~"1' CLERK ~FF!~~ Date: August 9, 2005 To: Mayor DeWeerd and Members of the MeridianCity Council 33 E. Idaho Meridian, ID 83642 Re: Reconsideration of the Silver Oaks annexation/rezone request and the accompanying preliminary plat and detailed conditional use permit applications. Dear Mayor DeWeerd and Council, Please consider the following as a request to reconsider your 3-2 vote to deny the Silver Oaks Annexation request, and the accompanying Preliminary Plat and Detailed Conditional Use Permit for a Planned Development. We have discussed the issues brought up at the City Council meeting amongst ourselves and we feel that there are few issues that should be discussed in more detail so that thew is a greater understanding of the proposed Silver Oaks project. The Comprehensive Plan. indicates that this property should be developed as a "High Density" project upon development. We did not consider other options for development (industrial, commercial etc) because high-density housing is what we wished to develop on this property. One of the findings required for all developments in Meridian is that the project must be harmonious with and in accordance with the Comprehensive Plan (or else a Comprehensive Plan Amendment must accompany the application, MCCI 1-15-11A). The proposed project is harmonious with the adopted Comprehensive Plan. The proposed. d.eveloprnent consisted of three applications; annexation, preliminary plat and a detailed conditional use permit for a planned development. The annexation and preliminary plat applications are not complex; they consist of a simple request for annexation, and a basic two-lot subdivision, that require little else than a legal description and an exhibit showing how the land will be divided. The detailed conditional use permit application, however, is much more complex application and. requires a detailed site plan, color elevations, a traffic study, a landscape plan and amenities (clubhouse, pool, open space, pathways etc). if the site plan, elevations, landscaping and amenities are approved as submitted they are required to be built that way. A developer can deviate from the approved plan only with the City's consent. The site plan/landscaping/elevations/amenities can be added to the annexation "Development Agreement" by reference fox additional protection to the City to make sure that the project will be built as proposed. 405 S. 8th Street, Suite 290 • Boise, Idaho 83702. 208.336.5355 -Fax 208.336.2282 The proposed density of the Silver Oaks project is approximately 12.5 d.u. per acre, with a total of 308 residential units contained within 77 four-plea buildings. This density is lower than other multi-family projects recently approved within Meridian, and Silver Oaks provides greater amenities. We are willing to reduce the nur~nber of buildings by seven (28 dwelling units) to reduce the overall density to 11.5 d.u. per acre. This will reduce traffic by approximately 280 vehicle trips per day, and will increase open-space within the project by approximately 2% (including reducing the area needed for parking). Traffic circulation and traffic generation for the Silver Oaks project were of great concern when designing this project. The property has very limited access to p'ranklin Road and where it touches Franklin it has to cross the Kennedy Lateral. We hired a traffic engineer to perform a traffic study, and met with the Cherry Lane Christian Church to discuss the possibility of dross access/shared access with them. The Traffic Impact Study (TIS) came back positive that the proposed internal traffic patterns and the single access would be adequate for the proposed development. The Church also was in agreement to provide a cross access and a shared roadway. A stub street was also added to the west to improve circulation in the future. ACHD has now indicated there is a possibility of installing a traffic light at the proposed shared roadway into the church and Silver Oaks project (per ACFID's Staff Report for the Cherry Lane Christian Church Annexation). 'Che Silver Oaks project is not ,just another run of the mill four-plex project where we have tried to see how many buildings we could cram onto a parcel of land. We have included a large amount of open-space and a generous amenity package for the residents of the project. The individual units are as large as many of the homes in the area (1,100- 1,300sf), and they will be located in an area that will soon provide a large number of jobs, as well as provide quick access to I-84. We have talked with Cherry Lane Christian Church representatives and they too have voiced support for this project to be re-considered for the reason listed above, as well as sharing in the costs of utility and infrastructure improvements that would benefit both projects. For the reasons stated above we ask that you please reconsider your action to deny tlae Silver Oaks project. If you have any questions concerning this reconsideration request please contact me at 336-5355 or via a-mail at chnckinnon cr,cangergroup.corn. Sincerely ~,Ll l Dave McKinnon Land Use Planner cc: Rick O'Neal