HomeMy WebLinkAboutSienna Creek Subdivision No. 2 FP-05-040
BEFORE THE MERIDIAN CITY COUNCIL
IN THE MATTER OF THE
APPLICATION OF SAGEWOOD
DEVELOPMENT, INc. FOR FINAL
PLAT APPROVAL OF 55 SINGLE-
FAMILY RESIDENTIAL BUILDING
LOTS AND 9 COMMON LOTS ON
11.36 ACRES IN AN R-8 ZONE
LOCATED NORTH OF US TICK
AND NORTH LINDER ROAD IN A
PORTION OF THE NE J¡í OF THE
SW J¡í OF T. 4N., R.IW., SECTION
36
C/C July 12, 2005
)
)
)
)
)
)
)
)
)
)
)
)
)
CASE NO. FP-05-040
ORDER OF CONDITIONAL
APPROVAL OF FINAL PLAT
This matter coming before the City Council for Final Plat approval pursuant to
Meridian City Code § 12-3-7 on July 12, 2005, and the Council finding that the Administrative
Review is complete from Sonya Allen, Assistant City Planner for the Planning and Zoning
Department, and Michael Cole, Development Services Coordinator for the Public Warks
Department, dated: Hearing Date: July 12, 2005, to the Mayor and Council, and the Council having
considered the requirements of the preliminary plat the Council takes the following action:
IT IS HEREBY ORDERED THAT:
1.
The Final Plat of "PLAT SHOWING SIENNA CREEK SUBDIVISION NO.2
LOCATED IN A PORTION OF THE NE ~ OF THE SW ~ OF T. 4N., R. lW.,
SECTION 36, BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO 2005,
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR SIENNA CREEK SUBDIVISION NO.2 / (FP-O5-040)
Page 1 of 4
HANDWRITTEN DATE: OS/25/05, SHEET 1 OF 3, BAILEY ENGINEERING,
INC.", SAGEWOOD DEVLOPMENT, INc., Developer, is Conditionally Approved
subject to those conditions of Staff comments as set forth in the Memorandum to the
Mayor and City Council from Sonya Allen, Assistant City Plmmer for the Planning
and Zoning Department and Michael Cole, Development Services Coordinator for
the Public Works Department, dated: Hearing Date: July 12, 2005, listing 13 SITE
SPECIFIC REQUIREMENTS/FINAL PLAT and 14 GENERAL REQUIREMENTS,
a true and correct copy of which is attached hereto marked Exhibit "A", and
consisting of 5 pages, and by this reference incorporated herein, and the memo from
Sonya Allen and Anna Borchers Canning, a true and Correct copy of which is
attached hereto marked Exhibit "B" and consisting of 1 page, and by this reference
incorporated herein, and the response letter from Bailey Engineering, Inc., a true and
correct copy of which is attached hereto marked Exhibit "C", and by this reference
incorporated herein, and the additional requirements from the action of the Council
taken at their July 12, 2005 meeting as follows, to-wit:
1.1
Adopt the Recommendation of the Central District Health
Department as follows:
The Central District Health requires after written approval
from the appropriate entities are submitted, they can approve
this proposal for central sewage and central water; that plans
must be submitted to and approved by the Idaho Department
of Health and Welfare, Division ofEnviromnental Quality for
central sewage and central water; that run-off is not to create a
mosquito breeding problem; and it is suggested that the
stormwater be pretreated through a grassy swale prior to
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR SIENNA CREEK SUBDIVISION NO.2 / (FP-O5-040)
Page 2 of 4
discharge to the subsurface to prevent impact to groundwater
and surface water quality; that engineers and architects should
obtain Current best management practices for stonnwater
disposal and design a stormwater management system that is
preventing groundwater and surface water degradation.
Manuals for guidance:
1.
State of Idaho Catalog of Stormwater Best
Management Practices for Idaho Cities and
Counties. Prepared by the Idaho Division of
Enviromnental Quality, July 1997.
2.
Stormwater Best Management Practices
Guidebook. Prepared by City of Boise Public
Works Department, May 2000.
2.
The final plat upon which there is contained the Certification and signature of the
City Clerk and the City Engineer verifYing that the plat meets the City's requirements shall
be signed only at such time as:
1.
The Plat dimensions are approved by the City Engineer; and
2.
The City Engineer has verified that all off-site improvements are completed
and/or the appropriate letter of credit or cash has been issued guaranteeing the
completion of off-site and required on-site improvements.
NOTICE OF FINAL ACTION
AND RIGHT TO REGULATORY TAKINGS ANALYSIS
The Applicant is hereby notified thatpursuantto Idaho Code 67-8003, the Owner may
request a regulatory taking analysis. Such request must be in writing, and must be filed with the City
Clerk not more than twenty-eight (28) days after the final decision conceming the matter at issue. A
request for a regulatory takings analysis will toll the time period within which a Petition for Judicial
Review may be filed.
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR SIENNA CREEK SUBDIVISION NO.2 / (FP-05-040)
Page 3 of 4
Please take notice that this is a final action of the governing body of the City of
Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest
in real property which may be adversely affected by this decision may, within twenty-eight (28) days
after the date ofthis decision and order, seek a judicial review as provided by Chapter 52, Title 67,
Idaho Code.
By action of the City Council at its regular meeting held on the _\;)."'"
day
of J t III
)
,2005.
Attest:
BY',¿~ t~
City Clerk's Office
Dated:
g~4 -tf;
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR SIENNA CREEK SUBDIVISION NO.2 / (FP-05-040)
Page 4 of 4
Memorandum
J\1eridiæPlanning &ZalÎngI¥-
To:
Lisa Wanner-Sissler, Sagewood Development
cc:
A. J. Lopez. Bailey Engineering, City Clerk
From:
Sonya Allen, Anna Borchers Canning
Date:
8/2/2005
Re:
Sienna Creek Subdivision No.2 & 3
During the hearing at City Council for the final plat on Sienna Creek Subdivision No.1, there was
some discussion about the fencing requirements being changed from what was approved at
preliminary plat level. The following details the changes that were made at Council that applies to all
phases of Sienna Creek Subdivision:
Rear fencing for the lots bordering common areas may be constructed of 4' solid material with
up to 2' open vision on the top, or of5' wrought iron open vision material. Furthermore, side
yard fencing along Lots 2 and 7, Block 5, Lots I and 11, Block 2, and Lot 7, Block 3 may be
constructed of 4' solid material with up to 2' open vision on the top, or of 5' wrought iron
open vision material. Fencing within 20' of the front property lines shall comply with City
Code.
Please consider this a revision of the fencing requirements stated in the staff reports for phases 2 & 3.
Exhibit "8"
1
~ileY Eng i neeri ng ,I nc.
CIVIL ENGINEERINGIPLANNINGICADD
DATE:
July 1,2005
l'O:
Mayor and City Cm.ll1cil
RE:
Sienna Creek No.2
Dear Mayor and City ColU1eil,
1)11 behalf of our client we would like to state that Sagewood DeveJopl11cnt, Tne agrees with all Site
"ìpecific Comments and Conditions set forth in the fu1al plat for Sienna Creek No.2
l"hank you for your time and consideration,
'-;incerely,
4f~
Ai Lopez
Representing Sagewood Development, Inc.
I:!Zß'!L."""-
1500 E. Iron Eagle Drive. Eagle, Idaho 83616 . Tel.: 208-938-0013 . Fax: 208-938-0516
www.baileyengineers.com
bhibi¡ "(:"