Loading...
HomeMy WebLinkAboutSienna Creek Subdivision No. 2 FP-05-040 BEFORE THE MERIDIAN CITY COUNCIL IN THE MATTER OF THE APPLICATION OF SAGEWOOD DEVELOPMENT, INc. FOR FINAL PLAT APPROVAL OF 55 SINGLE- FAMILY RESIDENTIAL BUILDING LOTS AND 9 COMMON LOTS ON 11.36 ACRES IN AN R-8 ZONE LOCATED NORTH OF US TICK AND NORTH LINDER ROAD IN A PORTION OF THE NE J¡í OF THE SW J¡í OF T. 4N., R.IW., SECTION 36 C/C July 12, 2005 ) ) ) ) ) ) ) ) ) ) ) ) ) CASE NO. FP-05-040 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council for Final Plat approval pursuant to Meridian City Code § 12-3-7 on July 12, 2005, and the Council finding that the Administrative Review is complete from Sonya Allen, Assistant City Planner for the Planning and Zoning Department, and Michael Cole, Development Services Coordinator for the Public Warks Department, dated: Hearing Date: July 12, 2005, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of "PLAT SHOWING SIENNA CREEK SUBDIVISION NO.2 LOCATED IN A PORTION OF THE NE ~ OF THE SW ~ OF T. 4N., R. lW., SECTION 36, BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO 2005, ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SIENNA CREEK SUBDIVISION NO.2 / (FP-O5-040) Page 1 of 4 HANDWRITTEN DATE: OS/25/05, SHEET 1 OF 3, BAILEY ENGINEERING, INC.", SAGEWOOD DEVLOPMENT, INc., Developer, is Conditionally Approved subject to those conditions of Staff comments as set forth in the Memorandum to the Mayor and City Council from Sonya Allen, Assistant City Plmmer for the Planning and Zoning Department and Michael Cole, Development Services Coordinator for the Public Works Department, dated: Hearing Date: July 12, 2005, listing 13 SITE SPECIFIC REQUIREMENTS/FINAL PLAT and 14 GENERAL REQUIREMENTS, a true and correct copy of which is attached hereto marked Exhibit "A", and consisting of 5 pages, and by this reference incorporated herein, and the memo from Sonya Allen and Anna Borchers Canning, a true and Correct copy of which is attached hereto marked Exhibit "B" and consisting of 1 page, and by this reference incorporated herein, and the response letter from Bailey Engineering, Inc., a true and correct copy of which is attached hereto marked Exhibit "C", and by this reference incorporated herein, and the additional requirements from the action of the Council taken at their July 12, 2005 meeting as follows, to-wit: 1.1 Adopt the Recommendation of the Central District Health Department as follows: The Central District Health requires after written approval from the appropriate entities are submitted, they can approve this proposal for central sewage and central water; that plans must be submitted to and approved by the Idaho Department of Health and Welfare, Division ofEnviromnental Quality for central sewage and central water; that run-off is not to create a mosquito breeding problem; and it is suggested that the stormwater be pretreated through a grassy swale prior to ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SIENNA CREEK SUBDIVISION NO.2 / (FP-O5-040) Page 2 of 4 discharge to the subsurface to prevent impact to groundwater and surface water quality; that engineers and architects should obtain Current best management practices for stonnwater disposal and design a stormwater management system that is preventing groundwater and surface water degradation. Manuals for guidance: 1. State of Idaho Catalog of Stormwater Best Management Practices for Idaho Cities and Counties. Prepared by the Idaho Division of Enviromnental Quality, July 1997. 2. Stormwater Best Management Practices Guidebook. Prepared by City of Boise Public Works Department, May 2000. 2. The final plat upon which there is contained the Certification and signature of the City Clerk and the City Engineer verifYing that the plat meets the City's requirements shall be signed only at such time as: 1. The Plat dimensions are approved by the City Engineer; and 2. The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified thatpursuantto Idaho Code 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision conceming the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SIENNA CREEK SUBDIVISION NO.2 / (FP-05-040) Page 3 of 4 Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest in real property which may be adversely affected by this decision may, within twenty-eight (28) days after the date ofthis decision and order, seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. By action of the City Council at its regular meeting held on the _\;)."'" day of J t III ) ,2005. Attest: BY',¿~ t~ City Clerk's Office Dated: g~4 -tf; ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SIENNA CREEK SUBDIVISION NO.2 / (FP-05-040) Page 4 of 4 Memorandum J\1eridiæPlanning &ZalÎngI¥- To: Lisa Wanner-Sissler, Sagewood Development cc: A. J. Lopez. Bailey Engineering, City Clerk From: Sonya Allen, Anna Borchers Canning Date: 8/2/2005 Re: Sienna Creek Subdivision No.2 & 3 During the hearing at City Council for the final plat on Sienna Creek Subdivision No.1, there was some discussion about the fencing requirements being changed from what was approved at preliminary plat level. The following details the changes that were made at Council that applies to all phases of Sienna Creek Subdivision: Rear fencing for the lots bordering common areas may be constructed of 4' solid material with up to 2' open vision on the top, or of5' wrought iron open vision material. Furthermore, side yard fencing along Lots 2 and 7, Block 5, Lots I and 11, Block 2, and Lot 7, Block 3 may be constructed of 4' solid material with up to 2' open vision on the top, or of 5' wrought iron open vision material. Fencing within 20' of the front property lines shall comply with City Code. Please consider this a revision of the fencing requirements stated in the staff reports for phases 2 & 3. Exhibit "8" 1 ~ileY Eng i neeri ng ,I nc. CIVIL ENGINEERINGIPLANNINGICADD DATE: July 1,2005 l'O: Mayor and City Cm.ll1cil RE: Sienna Creek No.2 Dear Mayor and City ColU1eil, 1)11 behalf of our client we would like to state that Sagewood DeveJopl11cnt, Tne agrees with all Site "ìpecific Comments and Conditions set forth in the fu1al plat for Sienna Creek No.2 l"hank you for your time and consideration, '-;incerely, 4f~ Ai Lopez Representing Sagewood Development, Inc. I:!Zß'!L."""- 1500 E. Iron Eagle Drive. Eagle, Idaho 83616 . Tel.: 208-938-0013 . Fax: 208-938-0516 www.baileyengineers.com bhibi¡ "(:"