April 9, 2020
Chris Johnson
Meridian City Clerk's Office
33 East Idaho Avenue
Meridian, Idaho 83642
VIA EMAIL
Development
Application H-2020-0024 MDA, CUP, PP, RZ
Project Name TANNER CREEK SUBDIVISION
Project Location 675 West Waltman Lane, north of I-84 milepost 43.65
• Modify existing Development Agreement which allows commercial/office/hotel
uses for he purpose of replacing the agreement with a new agreement allowing a
mix of single family and multi-family residential uses
• Rezone of a total of 38.47 acres of land from the C-G to the R-8, R-15, and R-40
• Construct a subdivision consisting of 400 total residential units
Project • Conditional use permit for the multi-family development consisting of 272
Description residential units in the R-40 zoning district
Applicant Schultz Development
The Idaho Transportation Department(ITD)reviewed the referenced development agreement modification,
conditional use permit, preliminary plat, and rezone applications and has the following comments:
1. This project abuts the State Highway system.
2. I-84 is a full access controlled highway.No direct access to the State highway system is
requested with this application and none is approved.
3. The interstate fence is typically constructed one foot within ITD Right Of Way,but may vary due
to terrain and other possible issues. All measurements relative to ITD Right of Way shall be
taken from the Right of Way monuments, not from the fence. Applicant must apply for and
receive an approved Right-of-Way use permit prior to doing any work or activity within the
highway Right-of-Way. The applicant may contact Shona Tonkin at(208) 334-8341 for this
permit.
tiDAHp
Your Safety • Your Mobility IDAHO TRANSPORTATION DEPARTMENT
: P.O. Box 8028 • Boise, ID 83707-2028
ya��0 J p�r�g Your Economic Opportunity (208) 334-8300 • itd.idaho.gov
RTAr+pN o``Q
4. Noise walls will not be constructed by ITD in the I-84 Corridor in this area. Any noise walls
necessary for this development shall be constructed by the developer on private property.
5. ITD will not be requesting a revised Traffic Impact Study for Tanner Creek Subdivision.
Mitigation for this development will be covered by contributing to the construction of an
auxiliary lane eastbound and westbound between the Meridian Interchange and Eagle Road
Interchange that will reduce congestion of the I-84 corridor.
6. The estimated cost for these improvements is $14,785,782. Trip distribution from the traffic
analysis provided was used to determine 16,169 trips are added to the Meridian and Eagle
Interchanges at buildout which is approximately 0.98% of interchange traffic served by the
current interchange design. Traffic analysis provided by the applicant calculated the
proportionate share for the construction of auxiliary lanes as $144,901. The applicant's
consultant has written up an explanation of the proportionate share (see attached).
7. Idaho Code 40-1910 does not allow advertising within the right-of-way of any State Highway.
8. The Idaho Administrative Procedures Act(IDAPA) 39.03.60 governs advertising along the State
Highway system. The applicant may contact Justin Pond, Program Manager for ITD's
Headquarters Right-of-Way Section at(208) 334-8832 for more information.
9. ITD has concerns about traffic impacts to the State Highway system from this proposed
development as noted in items 5 and 6.
10. Provided the development contribute the calculated proportionate share of$144,901 for interstate
improvements prior to occupancy, ITD has no objection to the proposed application.
If you have any questions, you may contact me at(208) 334-8338 or Erika Bowen (208) 265-4312 ext 7.
Sincerely,
Sarah Arjona
Development Services Coordinator
Sarah.Arjona@itd.idaho.gov
ENGINIRING, INC.
181 East 50t" Street
Garden City, ID 83714
(208) 841-4996
MEMORANDUM
DATE: March 25,2020
TO: Erika Bowen,P.E.
Idaho Transportation Department cDl1
T
CC: Mark Schultz `
Schultz Development
FROM: Chhang Ream,P.E.,PTOE 3/.25/a20
CR Engineering, Inc.
G R
PROJECT: Tanner Creek Subdivision
Meridian,Idaho
SUBJECT: Proportionate Share Calculation—Meridian Road IC to Eagle Road IC Auxiliary Lanes
This memorandum summarizes the proportionate share calculation for Tanner Creek Subdivision on the I-84
auxiliary lane improvements between Meridian Road interchange(IC)and Eagle Road IC. Table 1 summarizes the
traffic data and proportionate share calculation. Based on the 2025 build-out year total traffic volumes, the
proportionate share of Tanner Creek Subdivision is $144,901.
Table 1—Proportionate Share Calculation Summary
2018 2025 2025 2025
Existing Traffic Back round Traffic Site Traffic Total Traffic
Ramp AM PM AM PM AM PM AM PM
Meridian IC WB Off-Ramp 960 1,901 1,065 2,110 15 50 1,080 2,160
Meridian IC EB On-Ramp 965 580 1,071 644 46 32 1,117 676
Eagle IC WB On-Ramp 6,244 1,484 6,930 1,647 2 5 6,932 1,652
Eagle IC EB Off-Ramp 1,250 1,042 1,387 1,156 5 3 1,392 1,159
Total 14,426 16,011 158 16,169
Average%Site Traffic 0.98%
ITD Improvement Costs Estimate $14,785,782
Tanner Creek Subdivision Proportionate Share $144,901
The following sections discuss the proposed development and traffic data.
S:Iprojects120-21 Tanner Creek Subdivision WoclTanner Creek Proportionate Share.docx Page 1 of 4
CR
ENGIIVERING,INC.
Proposed Development & Site Traffic
Tanner Creek Subdivision is an approved residential development located on Waltman Lane in the northwest corner
of the Meridian Road interchange in Meridian, Idaho. A traffic impact study was completed for the project on
November 8, 2017. Figure 1 shows the current development site plan. The current site plan contains 128 single-
family units and 272 apartment units with an expected 2025 build-out year.
The development will have access to the transportation system via a connection to Ruddy Drive at the western site
boundary,a connection to Corporate Drive to the north, and via Waltman Lane to the east.
Figure 1—Site Plan
Waltman Ln _
i
� .. N
TS
d.RROViNTRO07 DR [II.HHC:SF"fI..A .e�
r - T ...
• 4 'YI.PIC-•iY 0R N"E ''xsK..xi
1 i --R�lg 10'PE VESiRIL,N 6RIDGE
I r r - h111'�I
-- V' --- PL C.R]lJNOA4 EA
I _ I
}
a JAiI:SE•v fiN:V[ � Ei.STING&5 S'N
H RM AN f,'"MALL
1-84 EB
S:Iprojects120-21 Tanner Creek Subdivision WoclTanner Creek Proportionate Share.docx Page 2 of 4
�NGINE�RING,INC.
Table 2 summarizes the build-out site trip generation based on the 10'Edition of the ITE Trip Generation Manual
and proposed land uses. Tanner Creek Subdivision is estimated to generate 2,786 trips per day, 187 AM peak hour
trips, and 245 PM peak hour trips.
Site traffic was distributed and assigned to the transportation system similar to the original study. The Linder Road
overpass is not expected to be constructed by the build-out year of this development and was not considered in the
site traffic distribution patterns.Approximately 10%of the site traffic expected to have origins/destinations west of
the site and use the Ruddy Drive connection. Approximately 18% of the site traffic is expected to travel on the
Corporate Drive connection to the north,and approximately 72%of the site traffic is expected to travel through the
Waltman Lane and Meridian Road intersection.Approximately 53%of the site traffic is expected to travel through
the Meridian Road interchange.Figure 2 summarizes the estimated site distribution patterns and peak hour volumes
at the Waltman Lane and Meridian Road intersection and Meridian Road interchange.
Table 2—Build-Out Trip Generation Summary
ITE Total Primary Trips
Land Use Code Size Unit Trips Entering Exiting
Weekday Daily(vpd)
Single-Family Detached Housing 210 128 DU 1,305 50% 652 50% 653
Multifamily Housing (Mid-Rise) 221 272 DU 1,481 50% 741 50% 740
Weekday Daily Total Trips 2,786 1,393 1,393
Weekday AM Peak Hour(vph)
Single-Family Detached Housing 210 128 DU 96 25% 24 75% 72
Multifamily Housing (Mid-Rise) 221 272 DU 91 26% 23 74% 68
Weekday AM Peak Hour Total Trips 187 47 140
Weekday PM Peak Hour(vph)
Single-Family Detached Housing 210 128 DU 129 63% 81 37% 48
Multifamily Housing(Mid-Rise) 221 272 DU 116 61% 71 39% 45
Weekday PM Peak Hour Total Trips 245 152 93
2025 Build-Out Year Traffic & Improvements Costs
No new traffic counts were collected for this analysis. 2018 existing counts at the Meridian Road and Eagle Road
interchanges were provided by ITD. The cost estimate for the 1-84 auxiliary lane improvements was also
provided by ITD.
To obtain 2025 background traffic,the existing counts were extrapolated with a 1.5% annual growth rate. This
growth rate is consistent with the COMPASS forecasts.
S:Iprojects120-21 Tanner Creek Subdivision ldoclTanner Creek Proportionate Share.docx Page 3 of 4
"NGINRING,INC.
Figure 1—Estimated Site Traffic Distribution Patterns & Peak Hour Site Traffic
° fI+ Corporate or I
10.
% NTS
Waltma Ln 72% , ',:J,. �,:'.
531
if
r'`LLLA�0.IJL �� a % ,
X. o
_
Jt _ R
1 Waltman Lane&Meridian Road 2 Meridian Rd Interchange
5 0 0 14 14 46
14J � 0 5J � 15
13 4 0-11. 0
74� � 0 0� � 0
1 t
25 0 0 AM 1 0 5 0 AM
1 Waltman Lane&Meridian Road 2 Meridian Rd Interchange
15 0 0 9 9 32
9 0 15J � 50
8 — 14 0---b- 0
50 � r0 0� � 0
t t
80 0 0 PM 1 0 15 0 PM
S:Iprojects120-21 Tanner Creek Subdivision WoclTanner Creek Proportionate Share.docx Page 4 of 4