HomeMy WebLinkAboutLyndhurst Grove Subdivision FP-05-045
BEFORE THE MERIDIAN CITY COUNCIL
IN THE MATTER OF THE
APPLICATION OF LAND PRO
DEVELOPMENT, LLC FOR FINAL
PLAT APPROVAL OF 36 SINGLE-
FAMILY RESIDENTIAL BUILDING
LOTS AND 5 COMMON AREA
LOTS ON 6.26 ACRES IN AN R-8
ZONE LOCATED EAST OF NORTH
TEN MILE ROAD AND ON THE
NORTH SIDE OF WEST PINE
STREET IN A PORTION OF THE
SW ~OFTHENW~OFT.3N.,R.
tW., SECTION 11
C/C July 26, 2005
)
)
)
)
)
)
)
)
)
)
)
)
)
CASE NO. FP-05-045
ORDER OF CONDITIONAL
APPROVAL OF FINAL PLAT
This matter coming before the City Council for Final Plat approval pursuant to
Meridian City Code § 12-3-7 on July 26, 2005, and the Council finding that the Administrative
Review is complete from Sonya Allen, Assistant City Planner for the Planning and Zoning
Department, and Michael Cole, Development Services Coordinator for the Public Works
Department, dated: Hearing Date: July 26,2005, to the Mayor and Council, and the Council having
considered the requirements of the preliminary plat the Council takes the following action:
IT IS HEREBY ORDERED THAT:
1.
The Final Plat of "PLAT SHOWING LYNDHURST GROVE SUBDIVISION
LOCATED IN A PORTION OF THE SW ~ OF THE NW ~ OF T. 3N., R. tW.,
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR LYNDHURST GROVE SUBDIVISION I (FP-O5-045)
Page 1 of 4
SECTION II, BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO 2005,
HANDWRITTEN DATE: OS/24/05, SHEET I OF 3, BAILEY ENGINEERING,
INC.", LAND PRO DEVELOPMENT, INC., Developer, is Conditionally Approved
subject to those conditions of Staff comments as set forth in the Memorandum to the
Mayor and City Council from Sonya Allen, Assistant City Planner for the Plal1l1ing
and Zoning Department and Michael Cole, Development Services Coordinator for
the Public Works Department, dated: Hearing Date: July 26,2005, listing 23 SITE
SPECIFIC REQUIREMENTS/FINAL PLAT and 12 GENERAL REQUIREMENTS,
a true and correct copy of which is attached hereto marked Exhibit "A", and
consisting of 5 pages, and by this reference incorporated herein, and the response
letter from Bailey Engineering, Inc., a true and correct copy of which is attaches
hereto marked Exhibit "B" and consisting of 1 page, and by this reference
incorporated herein, and the additional requirements from the action of the Council
taken at their July 26, 2005 meeting as follows, to-wit:
1.1
Adopt the Recommendation of the Central District Health
Department as follows:
The Central District Health requires after written approval
from the appropriate entities are submitted, they can approve
this proposal for central sewage and central water; that plans
must be submitted to and approved by the Idaho Department
of Health and Welfare, Division of Environmental Quality for
central sewage and central water; that run-off is not to create a
mosquito breeding problem; and it is suggested that the
stormwater be pretreated through a grassy swale prior to
discharge to the subsurface to prevent impact to groundwater
and surface water quality; that engineers and architects should
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR LYNDHURST GROVE SUBDIVISION / (FP-05-045)
Page 2 of 4
obtain current best management practices for stOn11water
disposal and design a stormwater management system that is
preventing groundwater and surface water degradation.
Manuals for guidance:
1.
State of Idaho Catalog of Stonnwater Best
Management Practices for Idaho Cities and
Counties. Prepared by the Idaho Division of
Environmental Quality, July 1997.
2.
Stormwater Best Management Practices
Guidebook. Prepared by City of Boise Public
Works Department, May 2000.
2.
The final plat upon which there is contained the Certification and signature of the
City Clerk and the City Engineer verifying that the plat meets the City's requirements shall
be signed only at such time as:
1.
The Plat dimensions are approved by the City Engineer; and
2.
The City Engineer has verified that all off-site improvements are completed
and/or the appropriate letter of credit or cash has been issued guaranteeing the
completion of off-site and required on-site improvements.
NOTICE OF FINAL ACTION
AND RIGHT TO REGULATORY TAKINGS ANALYSIS
The Applicant is hereby notified thatpursuantto Idaho Code 67-8003, the Owner may
request a regulatory taking analysis. Such request must be in writing, and must be filed with the City
Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A
request for a regulatory takings analysis will toll the time period within which a Petition for Judicial
Review may be filed.
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR LYNDHURST GROVE SUBDIVISION / (FP-05~045)
Page 3 of 4
Please take notice that this is a final action of the governing body of the City of
Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest
in real property which may be adversely affected by this decision may, within twenty-eight (28) days
after the date ofthis decision and order, seek a judicial review as provided by Chapter 52, Title 67,
Idaho Code.
By action of the City Council at its regular meeting held on the ---1u \h
day
of
,2005.
Attest:
By:
City Clerk's Office
Dated:
8~4{h
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR LYNDHURST GROVE SUBDIVISION / (FP-OS-04S)
Page 4 of 4
l:
MAVOR
Tammy de Weerd
".~ .,'"
cM'e;;dl;~.-~' j
~ JDAHO
'\-",
" ('
~~~ . -'( ,
'!!_~~
CITY COUNCIL MEMBERS
Keith Bird
Christine Donnell
Shaun Wardle
Charles M. Rountree
PUBLIC WORKS
BUILDING DEPARTMENT
(208) 898-5500 . Fax (208)898-9551
PLANNING AND ZONING
DEPARTMENT
(208) 884-5533 . Fax 888-6854
ST AFF REPORT:
To:
Mayor and City Council
(1-1
Sonya Allen, Assistant City Plal1l1er ()
Michael Cole, Development Services Coordinator M (.
From:
Re:
Lyndhurst Grove Subdivision
Hearing Date: July 19, 2005
Transmittal Date: July 12, 2005
Request for Final Plat approval of 36 Single-family Residential Building Lots and
5 Common Lots on 6.26 Acres in an R-8 Zone by Land Pro Development, LLC
(File No. FP-O5-045).
We have reviewed the above referenced submittals and offer the following comments as
conditions of approval. These conditions shall be considered in full, unless expressly
modified or deleted by motion of the Meridian City Council:
APPLICATION SUMMARY & LOCATION
The applicant, Land Pro Development, LLC, has applied for Final Plat approval of 36 single-
family residential building lots and 5 common lots on 6.26 acres of land for Lyndhurst Grove
Subdivision. The zoning designation for the proposed subdivision is R-8 (Medium Density
Residential). The proposed gross density of the subdivision is 5.75 dwelling units per acre. The
proposed net density is 7.86 dwelling units per acre.
Lyndhurst Grove Subdivision is located at 2820 W. Pine Street, in the NW ~ of Section 11,
T.3N., R.IW.
A Conditional Use Permit/Planned Development was approved for this subdivision that allowed
for reductions to the minimum frontage allowed for attached lots (50-ft. for non cul-de-sac lots)
and minimum lots size for attached lots (3,600 s.f.) and detached lots (4,500 s.f.).
The submitted Final Plat substantially complies with the approved Preliminary Plat.
Staff recommends approval of Lyndhurst Grove Subdivision with the comments and conditions
stated in this report.
FP-O5-045
Exhibit "A"
Lyndhurst Grove Sub FP.doc
8.
Mayor & City Council
Hearing Date: July 19, 2005
Page 2
SITE SPECIFIC COMMENTS / FINAL PLAT
1.
Applicant is to meet all tenns of the approved Annexation (AZ-05-011), Conditional Use
Pennit (CUP-05-015), and Preliminary Plat (PP-05-013) for this subdivision.
2.
Fencing must be in compliance with MCC 12-4-10 and 12-13-15-9.
3.
Revise or add the following notes on the face of the plan dated 5/24/05:
(9.)"Direct lot access to W. Pine Street is prohibited unless specifically allo'..ved by tho
Ada County Higll\vay District and City of Meridian."
(10.) Strike this note, no sewer lift station is being proposed on this lot.
4.
The landscape plan, dated 5/23/05, shall be revised as follows:
a.
Reduce the height of the fencing along the micropath on Lot I, Block 2 from 5-ft.
to 4-ft. if constructed of a solid material.
Include fencing on the landscape plan as shown on the reduced (8.5" x II")
fencing plan submitted with the final plat application.
Provide a detail of the proposed playground equipment for the tot lot.
b.
c.
5.
The applicant has indicated that the Home Owners' Association or Nampa Meridian
Irrigation District will own and maintain the pressure irrigation system within this
development. If the system is to remain private, plans and specifications shall be
reviewed by the Public Works Department, and a draft copy of the pressurized irrigation
system Operations and Maintenance Manual shall be submitted prior to signature on the
final plat by the City of Meridian Engineer.
If the system is to be owned and maintained by Nampa and Meridian Irrigation District,
evidence of a license agreement with NMID shall be provided to Public Works prior to
scheduling of a pre-construction meeting.
6.
The City of Meridian requires that pressurized irrigation systems be supplied by a year-
round source of water. If a creek or well source is not available, a single-point col1l1ection
to the culinary water system shall be required. If a single-point col1l1ection is utilized, the
developer shall be responsible for the payment of assessments for the irrigable common
areas prior to signature on the final plat by the Meridian City Engineer.
7.
Move the graphically depicted Public Utilities, Drainage and Irrigation easement from the
north side, of the boundary between Lots 10, 11, Block 2, to the south side. The
construction plans show the irrigation main in this location.
Indicate all adjacent platted subdivision on the face of the plat; in particular the northeast
property line of this project abuts Have Cove #8.
9. Correct the domestic water service origin statement in the Certificate of Owners to
reference City of Meridian instead of United Water ofIdaho.
FP-O5-045 Exhibit "A" Lyndhurst Grove Sub FP.doe
14.
15.
16.
17.
18.
Mayor & City Council
Hearing Date: July 19, 2005
Page 3
10.
Indicate in the Certificate of Owners "The Real Point of Begil1l1ing".
11.
The bearing on the face of the plat, from the Southeast corner of the Northwest quarter,
does not match the bearing in the Certificate of Owners. Please make the necessary
corrections.
12.
Except for the Eight Mile Lateral, all irrigation ditches, laterals or canals, exclusive of
natural waterways, intersecting, crossing or lying adjacent and contiguous to the area
being subdivided shall be tiled per City Ordinance 12-4-13. Plans will need to be
approved by the appropriate irrigation/drainage district, or lateral users association (ditch
owners), with written approval or non-approval submitted to the Public Works
Department. If lateral users association approval can't be obtained, plans will be
reviewed and approved by the Meridian City Engineer prior to final plat signature.
13.
The applicant shall work with the City Parks Department to acquire the necessary
approvals through the City's Master Pathway Agreement with the Nampa Meridian
Irrigation District (NMID) for the multi-use pathway and bridge crossing of the Eight
Mile Lateral. The applicant shall confonn to the Parks Department's standards for
construction of the pathway and NMID's requirements for the pedestrian bridge crossing.
The Home Owners' Association shall be responsible for maintenance of all landscaping
adjacent to the pathway.
A Certificate of Zoning Compliance is required to be obtained from the City prior to
construction of any penn. anent structures on the proposed park lot.
Prior to signature on the final plat by the City Engineer, relocate the existing single-
family home to Lot 14, Block 2, and remove all other structures on this site, as proposed.
Any existing domestic wells and/or septic systems and appurtenances relating to the
existing residence within this project will have to be removed from their domestic service
per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non-domestic
purposes such as landscape irrigation.
The applicant shall be responsible for payment of sewer and water assessments, as well
as the actual physical col1l1ection to the municipal services for the existing home on Lot
14, Block 2.
The applicant is proposing to sewer this proposed development to the private lift station
at The Courtyards at Ten Mile, however there is currently a City sewer project being
designed that will abandon this lift station as well as the lift station at Merrywood
Subdivision.
The applicant shall install mains to and through, and coordinate with the City of Meridian
Public Works Department, main size and routing, to be in confonnance with the City's
Master Sewer Plan. The applicant shall execute standard forms of easements for any
mains that are required to provide service.
FP-O5-045 Exhibit "A"
Lyndhurst Grove Sub FP.doc
Mayor & City Council
Hearing Date: July 19, 2005
Page 4
19.
Water service to this proposed development is being proposed via extensions of an
existing main in West Pine Street. The applicant shall install water mains to and through
this proposed development, and coordinate main size and routing with the Public Works
Department. The applicant shall execute City of Meridian standard forms of easements
for any mains that are required to provide service.
20.
Please submit a copy of the Ada County Street Name Committee's "Final" letter for the
street names and lot & block numbering. Make all corrections necessary to comply.
21.
All areas being counted toward the 5% open space requirement shall be ITee of "wet
ponds" or other such nuisances. All stormwater detention facilities incorporated into the
required open space are subject to Ordinance 12-13-14 and shall be fully vegetated with
grass and trees, as depicted on the submitted landscape plans.
22.
Any drainage areas (detention/retention basins) must be designed to ensure that water
will percolate or discharge within a period of time not to exceed 24 hours for all storms
up to and including a 100-year stonn event. All storm drainage must be in compliance
with MCC 12-13-14, Stormwater Integration.
23.
Staffs failure to cite specific ordinance provisions, or terms of the approved Annexation,
Conditional Use Permit/Planned Development, or Preliminary Plat does not relieve the
Applicant of responsibility for compliance.
GENERAL REQUIREMENTS
2.
3.
4.
1.
Any tree over 4" in caliper that is removed ITom the property shall be replaced by
installing additional trees, being the equivalent number of caliper inches of trees that
were removed. Required landscaping trees will not be considered as replacement trees for
those trees that have to be removed.
Street signs are to be in place, water system shall be approved and activated, fencing
installed, drainage lots constructed, road base approved by the Ada County Highway
District and the Final Plat for this subdivision shall be recorded, prior to applying for
building permits.
Applicant shall be required to pay Public Works development plan review, and
construction inspection fees, as determined during the plan review process, prior to
signature on the final plat per Resolution 02-374.
All development improvements, including sewer, fencing, micro-paths, pressurized
irrigation and landscaping shall be installed and approved prior to obtaining certificates
of occupancy.
FP-O5-045
Exhibit "A"
Lyndhurst Grove Sub FP.doç
Mayor & City Council
Hearing Date: July 19, 2005
Page 5
5.
A letter of credit or cash surety in the amount of 110% will be required for all fencing,
landscaping, amenities, pressurized irrigation, sanitary sewer, water, etc., prior to
signature on the final plat.
6.
One-hundred-watt, high-pressure sodium streetlights will be required at locations
designated by the Public Works Department. All streetlights shall be installed at
subdivider's expense. Typical locations are at street intersections and/or fire hydrants.
Final design locations and quantity are determined after power designs are completed by
Idaho Power Company. The street light contractor shall obtain design and permit ITom
the Public Works Department prior commencing installations.
7.
Compaction test results must be submitted to the Meridian Building Department for all
building pads receiving engineered backfill, where footing would sit atop fill material.
8.
Applicant's engineer will be required to submit a signed, stamped statement certifying
that all street finish centerline elevations are set a minimum of three feet above the
highest established normal groundwater elevation.
9.
Applicant shall be responsible for application and compliance with any Section 404
Pennitting that may be required by the Anny Corps of Engineers.
10.
Applicant shall be responsible for application and compliance with and NPDES
Permitting that may be required by the Environmental Protection Agency.
11.
Coordinate fire hydrant placement with the City of Meridian Public Works Department.
12.
Developer shall coordinate mailbox locations with the Meridian Post Office.
STAFF RECOMMENDATION
Staff recommends approval of the final plat with the above stated comments and conditions.
FP-O5-045
Exhibit "A"
Lyndhurst Grove Sub FP.doc
æiley Eng i neeri ng, Inc.
CIVIL ENGINEERINGIPLANNINGICADD
DATE:
July 26, 2005
TO:
Mayor and City Council
RE:
Lyndhurst Subdivision
Dear Mayor and City COLillcil,
On behalf of our client we would like to state that Land Pro Development, Inc. agrees with all Site
Specific Comments and Conditions set forth in the [mal plat for Lyndhurst Subdivision.
Thank YOll for your time and consideration,
Sincerely,
4Jr~
Aj Lopez
1500 E. Iron Eagle Drive + Eagle, Idaho 83616 . Tel.: 208-938-0013 . Fax: 208~938~O516
www.baileyengineers.com
E~hjbll "Ii"