Loading...
HomeMy WebLinkAbout2020-03-26 Parks Pathways WE ND Parks and Recreation Reviewer: Kim Warren/ Pathways Project Manager Planner Assigned: Joseph Dodson Project Name: Lavender Heights File No: H-2020-0009 Date: 3.13.20 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL- PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to submittal of the final plat for City Engineer signature,the applicant shall submit a public access easement for a multi-use pathway outside of the irrigation district easement to extend(1) from the northernmost property corner, along the east (north) side of the Farr Lateral, to the main entry road at Lake Hazel. (2) Pathway shall transition at the entry road to the south side of the Farr Lateral, continuing on to the southeast property boundary at Lake Hazel. (3) Easement shall also be dedicated for a north-south multi-use pathway connection extending from the subdivision entry at Lake Hazel to the aforementioned canal pathway at north. Locate north/south pathway in common lots where possible to minimize pedestrian-vehicular conflicts. Submit all easement paperwork to the Planning Division for Council approval and subsequent recordation. Easements shall be a minimum of 14'wide (10' pathway+2' shoulder each side). Use standard City template for public access easement. Easement checklist must accompany all easement submittals. 3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways Master Plan Chapter 3. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. 5. 6' high open vision fencing shall be installed between pathways and(live)water irrigation canals and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other fence details per UDC 11-3A-7. 6. Project developer shall be responsible for obtaining license agreement and other permission(s) as required for constructing within irrigation district easements. 7. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district,the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall not(nor are they intended to)override those of the irrigation district having jurisdiction over the project area. Rev.oi.30.20