Loading...
HomeMy WebLinkAbout2020-3-19 Boise Project Board of ControlRON PLATT CHAIRMAN OF THE BOARD BRIAN MCDEVITT VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER BOISE PROJECT BOARD City Cleric's Office 33 E Broadway Avenue Meridian ID, 83642 (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-3155 17 March 2020 RE: McKay Farms Sub 5875 S Eagle Rd, Meridian. Nampa Meridian Irrigation District Farr Lateral 120+01 Sec. 32, T3N, RIE, BM. Joe Dodson, Assigned Planner: OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT ,SCr,TVtD TEL: (208) 344-1141 FAX: (208) 344-1437 NAR 19 20 CITY'w t . CLQ KS, 4 AZ, PP H-2020-0030 NM -1137A The United States' Grimmett Lateral lies within the boundary of the above-mentioned location. The easement for this lateral is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert the federal easement 20 feet west and 15 feet east of the lateral's centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. The Boise Project does not approve landscaping including trees and/or shrubs (other than grass or gravel) within its easements, as this will certainly increase our cost of maintenance. Easements must remain a flat drivable surface. Please note the appropriate easements on all future preliminary/final plats. Boise Project Board of Control must also review and approve any final plats prior to recording. Wording on the preliminary and final recorded plat needs to state that any proposed and/or future usage of the Boise Project Board of Control facilities are subject to Idaho Statues, Title 42-1209. to be project facilities and/or easements that parallel, and are swithin itpropertyiand/or mustbe intended a ed within road right-of-ways due Theaeasementny s of Boise Project facilities will remain the outside of road right-of-way pp permission from Boise Project same unless agreed upon and/ora roved with written p Board of Control. the non - The construction of any roadway crossings must be conducted only during k- shall take lace season when the late ral is dewatered. In any have been secu ed through the irrigationseem within the easement before the proper crossing agreements Bureau of Reclamation and the Boise Project Board of Control. Utilities fanning to cross any project facility must do so in accordance with the master P most policies now held between the Bureau of Reclamation before prope� c the case, no work shalrossings agreemeilities. In n s I take place within the easement secured through both the Bureau of Reclamation and the Boise Project Board have been of Control. in / athways (as may be required) must be constructed just off the canal easement, Fenc g p to ensure public safety and prevent encroachments. poles, signs, etc. and the placing of asphalt and/or cement Parking lots, curbing, light p approved b Boise Project Board of Control prior over Project facility easements must be app'cY to construction. Project Board of Control must approve any requests and/or relocation of delivery Bosse � points prior to construction. Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into any live irrigation system is permitted. rri ation/drainage ditches that cross this propertyappinsooprder t easement neighboring sery Locals g properties,, must remain unobstructed and protected by an ld there be any small (neighborhood) irrigation distcchend athis lowsite, watthe to elopers and/Slioprotect them to and/or landowners will be obligated to p' downstream neighbors. elo ment is subject to Idaho Code 31-3805, in accordance, this office is This development requesting a copy of the irrigation and drainage plans. is ant Whereas this property lies within the Nampa Meridian irrigation District it possible to When that representatives of this development contact the N licable, the irrigation discuss the pressure system prior to any costly design work. If app s stem will have to be built to specific specifications as set by the District / Project. Y Boise Project Board of Control must receive a written response from the Nampa Meridian Irrigation District as to who will own and operate the pressure irrigation system prior to review and approval of an irrigation plan by Boise Project Board of Control. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to review plans and require changes when our easements and/or facilities are affected by unknown factors. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sincer ly, Thomas Ritthaler Assistant Project Manager- BPBC Tbr/tr cc: Clint McCormick Watermaster, Div; 2 BPBC Greg Curtis Water Superintendent, NMID File