17 March 2020
RE: McKay Farms Sub
5875 S Eagle Rd, Meridian.
Nampa Meridian Irrigation District
Farr Lateral 120+01
Sec. 32, T3N, RIE, BM.
Joe Dodson, Assigned Planner:
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
,SCr,TVtD
TEL: (208) 344-1141
FAX: (208) 344-1437
NAR 19 20
CITY'w
t . CLQ KS, 4
AZ, PP H-2020-0030
NM -1137A
The United States' Grimmett Lateral lies within the boundary of the above-mentioned
location. The easement for this lateral is held in the name of the United States through
the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat.
391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this lateral. We
assert the federal easement 20 feet west and 15 feet east of the lateral's centerline.
Whereas this area is for the operation and maintenance of our facility, no activity should
hinder our ability to do so.
The Boise Project does not approve landscaping including trees and/or shrubs (other than
grass or gravel) within its easements, as this will certainly increase our cost of
maintenance. Easements must remain a flat drivable surface.
Please note the appropriate easements on all future preliminary/final plats.
Boise Project Board of Control must also review and approve any final plats prior to
recording.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statues, Title 42-1209.
to be
project
facilities and/or easements that parallel, and are swithin
itpropertyiand/or
mustbe intended
a ed
within road right-of-ways due
Theaeasementny s of Boise Project facilities will remain the
outside of road right-of-way pp permission from Boise Project
same unless agreed upon and/ora roved with written p
Board of Control.
the non -
The construction of any roadway crossings must be conducted only during k- shall take lace
season when the late ral is dewatered. In any
have been secu ed through the
irrigationseem
within the easement before the proper crossing agreements
Bureau of Reclamation and the Boise Project Board of Control.
Utilities fanning to cross any project facility must do so in accordance with the master
P
most
policies now held between the Bureau of Reclamation
before prope� c the
case, no work shalrossings agreemeilities. In n s
I take place within the easement
secured through both the Bureau of Reclamation and the Boise Project Board
have been
of Control.
in / athways (as may be required) must be constructed just off the canal easement,
Fenc g p
to ensure public safety and prevent encroachments.
poles, signs, etc. and the placing of asphalt and/or cement
Parking lots, curbing, light p approved b Boise Project Board of Control prior
over Project facility easements must be app'cY
to construction.
Project Board of Control must approve any requests and/or relocation of delivery
Bosse �
points prior to construction.
Storm Drainage and/or Street Runoff must be retained on site.
NO DISCHARGE into any live irrigation system is permitted.
rri ation/drainage ditches that cross this propertyappinsooprder t easement neighboring
sery
Locals g
properties,, must remain unobstructed and protected by an
ld there be any small (neighborhood) irrigation distcchend athis
lowsite,
watthe
to elopers
and/Slioprotect them to
and/or landowners will be obligated to p'
downstream neighbors.
elo ment is subject to Idaho Code 31-3805, in accordance, this office is
This development
requesting a copy of the irrigation and drainage plans.
is
ant
Whereas this property lies within the Nampa Meridian irrigation
District
it possible to
When
that representatives of this development contact the N licable, the irrigation
discuss the pressure system prior to any costly design work. If app
s stem will have to be built to specific specifications as set by the District / Project.
Y
Boise Project Board of Control must receive a written response from the Nampa
Meridian Irrigation District as to who will own and operate the pressure irrigation system
prior to review and approval of an irrigation plan by Boise Project Board of Control.
Whereas this development is in its preliminary stages, Boise Project Board of Control
reserves the right to review plans and require changes when our easements and/or
facilities are affected by unknown factors.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Sincer ly,
Thomas Ritthaler
Assistant Project Manager- BPBC
Tbr/tr
cc: Clint McCormick Watermaster, Div; 2 BPBC
Greg Curtis Water Superintendent, NMID
File