Loading...
HomeMy WebLinkAbout2020-03-17 ITD �pAhp * * Your Safety • Your Mobility IDAHO TRANSPORTATION DEPARTMENT p x P.O. Box 8028 • Boise, ID 83707-2028 Your Economic Opportunity (208)334-8300 • itd.idaho.gov A�ArRr�nK EQp March 17,2020 Joe Dodson Meridian City Clerk's Office 33 East Idaho Avenue Meridian,Idaho 83642 VIA EMAIL Development Application H-2020-0021 PREVAIL NO.2 Project Name Approximately'/2 mile south of E. Amity Road, in the SW 1/4 of the NW 1/4 of Section 31, Project Location Township 3N.,Range 1E, east of SH-69 milepost 6.64 Construct a subdivision consisting of 60 single-family residential lots and 7 common lots on Project Description 13.52 acres. Applicant Schultz Development The Idaho Transportation Department(ITD)reviewed the referenced final plat applications and has the following comments: 1. This project abuts the State highway system. 2. This project is requesting a new public road to SH-69 at the mid-mile between Amity Road and Lake Hazel Road, approximate mile point 6.64(right). The applicant's is in the process of submitting remaining documentation for ITD to review and approve before an encroachment permit can be issued. 3. ITD has received,reviewed and accepted a Traffic Impact Study(TIS) encompassing the entirety of Prevail No. 1 and Prevail No. 2 formerly known as the Percy Development.As stated in ITD's TIS acceptance letter dated September 6,2019,the TIS has shown the need for mitigation on SH-69 for traffic produced by the development. 4. Applicant shall construct a mid-mile public road to ACHD's standards with a minimum approach radius of 28ft and radii between 30ft-40ft. The public road shall be centered on the mid-mile to match the platted road on the west side of SH-69. Applicant shall construct a concrete median barrier using ITD' Type 1 Traffic Separator to limit the approach to right-in,right-out, left-in. 5. Applicant shall remove existing approach approximately 320ft north of the proposed public road. All pavement shall be removed and area regraded to match adjacent drainage features. �pAhp * * Your Safety • Your Mobility IDAHO TRANSPORTATION DEPARTMENT p x P.O. Box 8028 • Boise, ID 83707-2028 Your Economic Opportunity (208)334-8300 • itd.idaho.gov 010101 EQp 6. Applicant shall work with ACHD to install a"U-Turn" sign at the intersection of SH-69 and Amity Road for the northbound to southbound u-turn movement. 7. The City is reminded that the SH-69 corridor is already congested. This project will increase the number of vehicle trips in the corridor. As the City continues to add additional trips to the corridor through development,the congestion will worsen until the roadway system is ultimately overloaded and fails. 8. ITD District 3 has issued Memo 39-Development Proportionate Share Contribution as a means to request equitable contribution from developers to improve public facilities needed to serve new growth and development. ITD will require the developer to contribute a proportionate share cost of$33,107 for mitigation improvements to the SH-69 corridor. This contribution covers mitigation for both Prevail No. I and Prevail No. 2 Subdivisions. This contribution shall be paid directly to ITD and is required prior to issuance of the ITD encroachment permit. 9. Idaho Code 40-1910 does not allow advertising within the right-of-way of any State highway. 10. IDAPA 39.03.60 rules govern advertising along the State highway system. The applicant may contact Justin Pond,Program Manager for ITD's Headquarters Right-of-Way Section at(208) 334-8832 for more information. 11. ITD objects to the proposed application due to traffic concerns. ITD will withdraw any objection to the proposed application once above described items No. 2,4, 5, 6 and 8 have been addressed with ITD Staff. If you have any questions,you may contact Ken Couch at(208) 332-7190 or myself at(208)256-4312 extension#7. Sincerely, (f -[� 1 for Sarah Arjona Development Services Coordinator Sarah.Arj ona(&itd.idaho.gov