En1!ineerinf( North West, LLC
423 N. Ancestor Place, Suite 180 Boise. Idaho 83704
July 6, 2005
(208) 376v5000 . Fax (208) 376-5556
RECEIVED
JUL 0 7 2005
Mayor and City Council
City of Meridian
660 E. Watertower, Suite 200
Meridian, ill 83642
Re:
City Of Meridian
City Clerk Office
File No. FP-05-042 Settlement Bridge No.3
I am writing on behalf of our client, Capital Development, who have indicated to us their
acceptance of the conditions of approval as outlined by staff for the above referenced.
Our response to the City's Site Specific Comments for this project is as follows:
CitY of Meridian - Conditions of Approval
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
24)
1)
All tenns of the approved Preliminary Plat (pP-03-041), Conditional Use Pennit
(CUP-03-065) and Development Agreement (Inst. No. 104061807) have been
met.
The Settlement Bridge Homeowner's Association will own and maintain the
pressure irrigation system within this development. An irrigation well will be
continued for use as a secondary source as in Phases 1 & 2.
Sewer and water mains will be constructed through this phase of development.
Agree.
Agree.
Agree.
Face of plat - Notes
Note 1 covers both the '" and note (1). Notes 2, 10 & 12 have been revised.
There are no known wells or septic systems within this phase.
Streetlights will be installed at subdivider's expense per City of Meridian
requirements.
No engineered backfill is required on this phase of the project.
Please see attached letter regarding depth of groundwater.
No basins are being used in this phase.
There are no 404 issues with this phase of the development.
Agree.
Fire hydrant locations have been coordinated and approved with the City of
Meridian Public Works Superintendent.
Agree.
Note added regarding cross-access.
Agree.
Agree.
Agree.
Agree.
Agree.
Agree.
An Ada County Street Name Committee Final letter will be submitted to the City
prior to signature by the City Engineer. .
2)
3)
4)
5)
6)
7)
8)
9)
25)
26)
27)
A letter of credit will be submitted for those items not already installed or
constructed.
Not applicable for this phase of development.
Agree.
Should you have any questions or need anything else feel free to give me a call.
~~
Xc:
Dave Yorgason, Capital Development
2
Enf(ineerinl! North West, LLC
423 N. Ancestor Place, Suite 180 Boise. Idaho 83704
(208) 376-5000 . Fax (208) 376-5556
July 6,2005
RECEIVED
JUL 07 2005
Mr. Brad Watson, P.E.
City of Meridian - Public Works Department
660 E. Watertower, Suite 202
Meridian, ill 83642
City Of Meridian
City Clerk Office
Re:
Settlement Bridge Subdivision No.3
Dear Brad:
According to the initial test pit investigations and subsequent monitoring, the ground
water within this project was not encountered within depth of3 feet of the existing
ground.
Based on the above information, it is safe to assume that ground water would be greater
than 36 inches below finished street centerline elevations throughout the project.
Should you need further information, please advise.