HomeMy WebLinkAboutCC - Road Groundwater CL Statement⊂璽W
⊂=lヽ/l 」 ∈三〇丁E
November 13, 2019
City of Meridian
33 E. Broadway Ave,
Meridian, lD 83642
RE: Three Corners Ranch Subdivision Roadway Centerline E看evations
To Whom lt May Concem:
i certfty that訓design street finish centerline eIevations within Three Comers Ranch Subdivision as
Shown in the plan set date stamped November 13, 2019 are set a minimum ofth「ee feet above the
highest estab=shed normaI groundwater elevation.
Respectfu=y,
剛史/〈二ノ
Corinne M. Graham, PE
Principal
921 S. ORCHARD STREET, SUI丁E 200
BOISE, ID 83705
(208) 946-3874
Cgraham@cswengineering.com