HomeMy WebLinkAboutChristian Brothers AutomotiveADA COUNTY RECORDER Phil McGrane 2019-118411
BOISE IDAHO Pgs=6 HEATHER LUTHER 11/25/2019 04:12 PM
CITY OF MERIDIAN, IDAHO NO FEE
City of Meridian
WARRANTY SURETY AGREEMENT
Christian Brothers Automotive
87 East Calderwood Drive
THIS WARRANTY SURETY AGREEMENT is made and entered into this Z_5 day of
"oV -e vv\loe,r , 20Aa by and between the CITY OF MERIDIAN, a Municipal Corporation,
hereinafter referred to as CITY, and CBH Properties Meridian, LLC, hereinafter referred to as
DEVELOPER.
WITNESSETH:
WHEREAS, DEVELOPER received approval from the CITY on May 6th, 2019, of the
construction plans ("Construction Plans"), for the development known as Christian Brothers
Automotive ("Development") located in the City of Meridian, which Construction Plans include
improvements for public life, safety and health ("Required Public Improvements'), as set forth on
Exhibit "A" attached hereto and incorporated herein, and improvements for non -life, non -safety
and non -health improvements ("Required Development Improvements") (The Required Public
Improvements and Required Development Improvements may be collectively referred herein as
"Improvements"); and
WHEREAS, DEVELOPER has posted performance surety with CITY to guarantee the completion
of the Improvements; and,
WHEREAS, DEVELOPER has completed the installation of the Improvements; and
WHEREAS, the Unified Development Code of the City of Meridian Section 11-5C-3 requires
that the DEVELOPER execute and file with the CITY an agreement providing for, among other
things, a warranty surety in the amount of twenty percent of the cost of improvements for a period
of two years; and
WHEREAS, the CITY is agreeable to acceptance of the improvements and release of the
performance surety upon the execution of this Agreement and compliance by the DEVELOPER
with the provisions of the Unified Development Code of the City of Meridian.
NOW, THEREFORE, in consideration of foregoing mutual promises, covenants and agreements
of the parties, it is hereby agreed as follows:
1. The DEVELOPER agrees to correct, repair and maintain all such Required Public
Improvements from any defects, omissions or irregularities in the construction, materials
or work thereof for a period of two (2) calendar years from the date of written acceptance
of such Improvements.
WARRANTY SURETY AGREEMENT —Christian Brothers Automotive, LLC — Page I
2. Upon execution of this Agreement, the DEVELOPER shall notify the CITY of the
readiness for final inspection. Upon certification by the City Engineer that all requirements
of the CITY have been met and CITY formally accepts such Improvements in writing, the
following shall occur:
A. The DEVELOPER shall submit a written request to the CITY to release the
Performance Surety, including:
A statement from the DEVELOPER that the required Improvements are
complete and have been constructed in accordance with the City's
Requirements.
B. The DEVELOPER shall submit to the CITY a Warranty Surety in a form approved
by the CITY in the estimated sum of $2,882.40 to provide for correction of any
defective materials or workmanship in such Required Public Improvements for a
period of two (2) years after final acceptance, as defined in the City Public Works
Construction Code. The amount of such surety assurances is based upon 20% of
the contractor's itemized bid, as set forth on Exhibit "B" attached hereto and
incorporated herein, for the completion of the Required Public Improvements. At
the expiration of the two year period, DEVELOPER shall submit a written request
to the CITY to release the Warranty Surety, along with a statement from the
DEVELOPER that the Required Public Improvements continue to meet City's
Requirements at the end of the two year warranty period. After receiving such
request the CITY shall conduct an inspection of the Required Public Improvements
to determine if any defects are present. If there are no defects, CITY shall
release/return the Warranty Surety to DEVELOPER.
3. The CITY agrees to accept the Required Public Improvements and release the
performance surety upon certification by the City Engineer that all Required Public
Improvements have been constructed in accordance with the City's Requirements. Such
certification is not intended to relieve DEVELOPER or any contractor or material
supplier of their responsibility for any defects in materials or workmanship of such
Improvements.
4. In construing this Agreement, it is understood that either party may be more than one
person and if the context so requires, the singular pronoun shall be taken to mean and
include the plural, the masculine, and neuter, and that generally all grammatical changes
shall be made, assumed and implied to make the provisions hereof apply equally to a single
or several individuals.
WARRANTY SURETY AGREEMENT —Christian Brothers Automotive, LLC — Page 2
IN WITNESS WHEREOF, the parties shall cause this Development Surety Agreement to be
executed by their duly authorized officers the day and year first above written.
STATE OF TEXAS )
ss.
County of 14 r IS
CBH Properties Meridian, LLC:
By: --
Name: J —,q 7
Title:
On this 6 �' day of 20 11, before me, the undersigned, a Notary
Public in and for the State of Vepersonally appeared , known or
identified to me to be the 0 A , who &xecuted this instillment on behalf of said
(LLC), and acknowledged to me that such (LLC) executed the same.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and
year first above written.
' ".'F ry p{ �`
U7 i Jf T Xn
Notary Public for
a��u J -20My commission Expires:
ZJ01
€pOWY f„'rt561:;
WARRANTY SURETY AGREEMENT —Christian Brothers Automotive, LLC — Page 3
STATE OF IDAHO
ss.
CITY OF MERIDIAN:
By:
Ta y de W rd, Mayor
County of Ada )
On this day of IN s �20 , before me, the undersigned, a Notary
Public in and for the State of Idaho, personally appeared Tammy de Weerd, known or identified to me to
be the Mayor of the City of Meridian, Idaho and who subscribed her name to the within instrument and
acknowledged to me that the City of Meridian executed the same.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and
year first above written.
SEAL
.• IVES•• •
'COMMISSION
• ON182077
o t �
0% .� OF �.� •
•
f••sseo
1 �
ota ublic for Idaho
commission Expires: t T
WARRANTY SURETY AGREEMENT —Christian Brothers Automotive, LLC — Page 4
LOT 8
EXHIBIT
A -
WATER EASEMENT EXISTING
PROPOSED SEWER SERVICE 7K 12
FOR NEIGHBORING LOT SEEPAGE BED #21\.
SEE WATER NOTE 3
ON SHEET C1.1
III , (SEE NOTE 101
0
4 20 .0 ----71 )
LF± /-SEE NOTE 2 --1 1 )
SEE NOTE 2-
wi
x
x
x
SEE WATER
ON SHEET C1.1
1
4" IE: 28.4±-
6" IE: 28.2%
6" IE: 28.
�21 LF± U3
W
LF± 0
I cn
R3 S5
6" ROOF IE: 29.25±
-\�ID6 4" SEWER IE: 30.3± (OR HIGHER TO PASS OVER ROOF DRAIN)
V CID
R - RD6 R -R RD6- RDS
Vc 'o
I o S3 10 LF± R3 R2 co -----------
6" ----------
6" ROOF IE: 29.09±
4" SEWER IE: 30.1± (OR HIGHER TO PASS OVER ROOF
,CRI STIANB R O
TH
DRA
IN)
H�AUToMOn�VE RSE�
T
4" IE: 31.40±
6" IE: 31.20±
R2 -(W4)
z- 6" IE: 31.60±---
R2 4" IE 3180
R
:Z -RD CR2\)-/ w
11 ��
Ex w, 6-,+ 13,
5JRX04vntfon
2866 S 1250 E
Hagerman, ID 83332
(208)308.0890
lddt_ta5lexcavation,com
Date: Tuesday, May 14, 2019
'o: Project:
:loud CM Christian Brothers Auto
Task
Descrintion
Unit Olv Unit Cost Total
0 Mobilization, Permits, Traffic control and SWPPP Install
$
- $
6,025.00
0 Excavate site to sub grade elevations per plan
- $
16 274.00
Excavate/backfill building footings and prep for slab on grade -
includes 18" over ex/Import under footings per geo tech
Fufn)sh and Install sewer services and 1500 gallon interceptor.
0
($
14,412,00`
0 footage of service line)
$
- $
4,808.00
Furnish and Install drainage system -seepage bed, roof drains,
12" drain, sand lense and 1000 gallon Interceptor (Increased
seepage bed size, 20' more 6" piping, cleanout and 12" fitting in
0 bed)
$
- $
32,964.00
o Furnish and place cross section for asphalt
$
- $
23 275.00
Place and prep base for all curbs and gutters (Updated curbing,
0 roughly same LF)
$
- $
3,519.00
0 Place and prep base for all sidewalks
$
- $
1,809.00
Furnish and place asphalt per plan (Less light asphalt and more
0 heavy asphalt - smaller total SF lot) -Stri Ing Included
$
- $
27,139.00
0 Rough grade landscape area's
$
- $
4,516.00
2' over excavation and recompaction of same soils for building
0 pad -Add if needed
$
- $
3,744.00
i' over excavation and recompaction of same soils for parking
0 area's -Add if needed
$
$
4,812.00
Over excavation and compacted Import for any unsuitable
0 area's -PER YARD YD
$
-
0 0
$
0 0
$
0 0
M$29,00
$
0 0
$0
0
$
0 0
$
0 0
$
$
0 0
$
$
0 0
$
- $
0 0
$
$
0 0
$
$
IOralteS[ , 101,UW,VV
only above mentioned line Items are Included In bid,
Signature:
EXCLUSIONS; any solid rock encountered, winter conditions, dewatering, shoring/bracing (beyond trench boxes and road plates)or boring
required -said Items will be billed on a time and material basis. No MUTUAL permitting is Included, only permits strictly for SJ and their work
Included. 5J Excavation reserves the right to charge a fuel surcharge if fuel prices raise to $4.00 or higher during the project. Any alteration or
deviation from above schedule of values, Involving extra costs, will be executed upon written change orders and will become an extra charge
over and above the estimate. Estimate valid for 30 days from date above. Licensell RCE -44729