Drainage Report
Rackham Subdivision Common
and Public Improvements
1330 S. Silverstone Way
Meridian, Idaho
HE Project No.: ID -1836-1808
October 28, 2019
Rob Sunderlage PE
Horrocks Engineers
Horrocks Engineers
Introduction
This project consists of constructing ±3,715 If of new roadway as well as associated water,
sanitary sewer, and drainage improvements to support the proposed ±52.71 ac development
within the Rackham Subdivision. The project is located southeast of the intersection of
Interstate 84 and Eagle Road in Meridian Idaho. It is served on the southwest corner by S.
Rackham Way and on the south by S. Silverstone Way. The project has three main roads
referred to as "Road A", "Road B" and "Road C' in both this report and the Public Improvement
Plans. Each road is served with its own storm drain system, sand and grease trap, and
infiltration bed.
Storm eater Inputs
The storm design for the site was completed using the "ACRD Calculation Sheet for Finding
Peak Discharge/Volume — Rational Method" & the "ACHD Calculation Sheet for Sizing Seepage
Bed with Optional Chambers" calculation sheets. Weighted C values were calculated for each
drainage area using a C value of 0.95 for paved areas and 0.30 for landscape areas. Since the
drainage areas are relatively small the default time of concentration of 10 minutes was used.
An infiltration rate of 2.40 in/hr was assumed per the geotechnical report published on
December 18th 2018 by MTI (b181762g). Each infiltration bed drains within the required time at
this infiltration rate with the slowest draining bed draining in just under 14 hours.
Drainage Area OFS-1 (see appendix) is included in the ICCU Building drainage system. Please
reference the drainage report prepared as part of the ICCU project for more information on
this. The ACHD roundabout has its own drainage system and infiltration bed. Please reference
the drainage report for prepared for the roundabout for any information pertaining to it. As
part of this project three infiltration swales will be installed along the western property line.
These are not needed to handle the runoff from the proposed roadways; however, they are
being installed for future connection when the site is developed. A drainage report will be
prepared for each one of these with each development that utilizes the capacity in these
swales.
Storm Water Design Results
Refer to Appendix A for Drainage Area Map and Appendix B for Drainage Calculations and
design results.
Hc)rroc-hs Engineers
Appendix A:
Drainage Area Map
Horrocks Engineers
Appendix B:
Drainage Calculations
Horrocks Engineers
ACRD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These
calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
calculate Post -Development Flows {for pre-developmentflows, Increase number of storage facilities to create new tab)
User Input in yellow cells,
1 Project Name Seepage Bed Al
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100
4 Enter number of storage facilities (25 max)
5 Area of Drainage Subbasin (SF or Acres) Acres
Acres
6 Determine the Weighted Runoff Coefficient (C)
C=((C1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg
Click to Show More Subbasins ❑
Subbasin
Type of Surface_
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
1
Subbasin 2
3
4
5
6
7
8
9
10
1.00
Light areas
0.80
Heavy areas
0.90
Parks, Cemeteries
0.10-0.25
Playgrounds
0.20-0.35
Railroad yard areas
1.00
Unimproved areas
0.10-0.30
Streets
Asphalt
0.95
Concrete
0.95
Brick
0.80
Roofs
0.95
Gravel
0.75
Fields: Sandy soil
Soil Type
Slope
A B C D
Flat: 0.291
0.80
Average: 2.65.
0.09 0.12 0.15 0.
Stee :>69�
0.13 0.18 0.23 0.
Adapted from ASCE
7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default User Calmate
10 min [10 Mkt. J ,
Estimated Runoff Coefficients for Various Surfac-
Type of Surface_
Runoff Coefficients 'Y
Business
Downtown areas
0.70-0.95
Urban nelghborhoods
0.50-0.70
Residential
Single Family
0.35-0.50
Multi -family
0.60-0.75
Residential (rural)
0.25-0.40
Apartment Dwelling Areas
0.70
Industrial and Commercial
Light areas
0.80
Heavy areas
0.90
Parks, Cemeteries
0.10-0.25
Playgrounds
0.20-0.35
Railroad yard areas
0.20-0.40
Unimproved areas
0.10-0.30
Streets
Asphalt
0.95
Concrete
0.95
Brick
0.95
Roofs
0.95
Gravel
0.75
Fields: Sandy soil
Soil Type
Slope
A B C D
Flat: 0.291
0.04 0.07 0.11 0.
Average: 2.65.
0.09 0.12 0.15 0.
Stee :>69�
0.13 0.18 0.23 0.
Adapted from ASCE
H:\12018\ID-1336-1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael O\ACHD_SD_CALCS_Seepage Bed Al 10/28/2019,9:41 AM
Version 9.0, December 2016
I Project Name Seepage Bed Al
2 Enter number of Seepage Beds (25 max) 1
3 Design Storm 100
4 Weighted Runoff Coefficient C 0.80 Link to: 0'Vq,vTR55
5 Area A (Acres) 1.00 acres
6 Approved discharge rate (if applicable) 0.00 cfs
7 Design Vol W/15% Sediment V 3,180 ft
8 Set Total Design Width of All Drain Rock
W
25.0 ft
9 Set Total Design Depth of All Drain Rock
D
7.0 ft
Rock Only, Do Not Include Filter Sand Depth or
Cover
10 Void Ratio of Drain Rock
Voids
0.4
0.4 for 1.5"-2" drain rock and 3/4" Chips
-
11 Design Infiltration Rate (8 in/hr max)
Perc
2.40 in/hr
12 Size of WQ Perf Pipe (Perf 1800)
Dia pipe
18 in
13 Size of Overflow Perf Pipe (Perls 360°), REQD if
Q100>3.3 cfs
in
14 Calculate Total Storage per Foot
Spf
70.2
It3/ft
Spf=Apf=WxD-Ap,ff_pjp,xVoids+l/2 Perf-Area
15 Calculate Design Length
L
45
46 ft
Override Value Required for Chambers
16 Variable Infiltration Window L
SWL
46
ft
17 Variable Infiltration Window W
SWW
25.0
ft
18 Time to Drain
12.4 hours
90% volume in 48 -hours minimum
_
EW
19 Length of WQ& Overflow Perf Pipes
46
ft
20 Perf Pipe Checks. Qperf >= Qpeak
where Qperf-CdxAxd(2xgxH)
H:\!2018\ID-1336-1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael 0\ACHD_SD_CALCS_See00JbE @6M 9:44 AM
Version 9.0, December 2016
ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These
calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
ii
;Calculate Post -Development Flows (for pre -development flows, Increase number of storage facilities to create new tab)
User Input in yellow cells.
1 Project Name Seepage Bed A2
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100
4 Enter number of storage facilities (25 max)
5 Area of Drainage Subbasin (SF or Acres) SF
Acres
6 Determine the Weighted Runoff Coefficient (C)
C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg
Click to Show More Subbasins ❑
Subbasin
Type of Surface
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
1
Subbasin 2
3
4
5
6
7
8
9
10
50,529
Light areas
0.80
Heavy areas
0.90
Parks, Cemeteries
0.10.0.25
Playgrounds
0.20-0.35
Railroad yard areas
1.16
Unimproved areas
0.10-0.30
Streets
Asphalt
0.95
Concrete
0.95
Brick
0.68
Roofs
0.95
Gravel
0.75
Fields: Sandy soil
Soil Type
Slope
A B C D
Flat: 0-2%
0.68
Average: 2-6Y
0.09 0.12. 0.15 0.
Stee :>6ga
0.13 0.18 0.23 0.
Adapted from ASCE
7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default User Calculate
10 min [10 Min.
Estimated Runoff Coefficients for Various Surface
Type of Surface
Runoff Coefficients "t
Business
Downtown areas
0.70-0.95
Urban neighborhoods
0.50-0,70
Residential
Single Family
0.35-0.50
Multi -family
0.60-0.75
Residential (rural)
0.25-0.40
Apartment Dwelling Areas
0.70
Industrial and Commercial
Light areas
0.80
Heavy areas
0.90
Parks, Cemeteries
0.10.0.25
Playgrounds
0.20-0.35
Railroad yard areas
0.20-0.40
Unimproved areas
0.10-0.30
Streets
Asphalt
0.95
Concrete
0.95
Brick
0.95
Roofs
0.95
Gravel
0.75
Fields: Sandy soil
Soil Type
Slope
A B C D
Flat: 0-2%
0.04 0.07 0.11 0.
Average: 2-6Y
0.09 0.12. 0.15 0.
Stee :>6ga
0.13 0.18 0.23 0.
Adapted from ASCE
H:\12018\ID-1336-1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael 0\ACHD_SD_CALCS_Seepage Bed A2 10/28/2019,9:52 AM
Version 9.0, December 2016
1 Project Name Seepage Bed A2
2 Enter number of Seepage Beds (25 m
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Design Vol W/15%Sediment
8 Set Total Design Width of All Drain Rock
1
0.68 Link to: oV
QV TR55
1.1.6 acres
0.00 cls
V 3,140 It,
W 15.0 It
9 Set Total Design Depth of All Drain Rock D
Rock Only, Do Nlot Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
7.0 ft
0.4
1.1 Design Infiltration Rate (8 in/hr max) Pere 2.40 in/hr
12 Size of WQ Perf Pipe (Perf 1.80°) Dia pipe 18 in
13 Size of Overflow Perf Pipe (Perls 360°), RLQD if Q100>3.3 cls in
14 Calculate Total Storage per Foot Spf 42.2 ft'/ft
Spf=Apf=WxD-Ap,, r;Pt,xVoids i 1/2 Perf_Area
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90% volume in 48 -hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxV(2xgxH)
L 74 75 ft
SWL 75 It
SWW 15.0 It
12.6 hours
75 ft
H:\12018\ID-1336-1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael 0\ACHD_SD_CALCS_See0@JbE V@dK 9:53 AM
Version 9.0, December 2016
ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These
calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
Calculate post -Development Flows (for pre -development flows, Increase number of storage facilities to create new tab)
User Input in yellow cells.
1 Project Name Seepage Bed B1
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100
4 Enter number of storage facilities (25 max)
5 Area of Drainage Subbasin (SF or Acres) SF
Acres
6 Determine the Weighted Runoff Coefficient (C)
C=((C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg
Click to Show More Subbasins ❑
Subbasin
Type of Surface
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
1
Subbasin 2
3
4
5
6
7
8
9
10
35,284
0
0.80
Heavy areas
0.90
Parks, Cemeteries
0.10-0.25
Playgrounds
0.20.0.35
Railroad yard areas
0.81
Unimproved areas
0.10.0.30.
Streets
Asphalt
0.95
Concrete
0.95
Brick
0.74
0.00
0.95
Gravel
0.75
Fields: Sandy soil
Soil Type
Slope
A B C D
Flat: 0-2%
0,7a
Average: 2.6%
0.09 0.12 0.15 0,
Steep:s66i,
0.13 0.18 0.23 0.
Adapted from ASCE
7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default User calculate
10 min [10 Min.-�
Estimated Runoff Coefficients for Various Surfac,
Type of Surface
Runoff Coefficients "t
Business
Downtown areas
0.70-0.95
Urban neighborhoods
0,50-0.70
Residential
Single Family
0.35.0.50
Multi -family
0.60.0.75
Residential (rural)
0.25.0.40
Apartment Dwelling Areas
0.70
Industrial and Commercial
Llghtareas
0.80
Heavy areas
0.90
Parks, Cemeteries
0.10-0.25
Playgrounds
0.20.0.35
Railroad yard areas
0.20-0.40
Unimproved areas
0.10.0.30.
Streets
Asphalt
0.95
Concrete
0.95
Brick
0.95
Roofs
0.95
Gravel
0.75
Fields: Sandy soil
Soil Type
Slope
A B C D
Flat: 0-2%
0.04 0.07 0.11 0.
Average: 2.6%
0.09 0.12 0.15 0,
Steep:s66i,
0.13 0.18 0.23 0.
Adapted from ASCE
H:\12018\ID-1336-1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael 0\ACHD_SD_CALCS_Seepage Bed B1 10/28/2019, 9:54 AM
Version 9.0, December 2016
1 Project Name Seepage Bed B1
2 Enter number of Seepage Beds (25
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Design Vol W/15% Sediment
8 Set'] otal Design Width of All Drain hock
1
300
0.74 Link to: OV
QV TR55
0.81 aa -es
C- 'a
0.00 cfs
V 2,382 ft3
W 15.0 ft
9 Set Total Design Depth of All Drain Rock D 7.0 ft
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock Voids 0.4
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max) Perc 2.40 in/hr
12 Size of WQ Perf Pipe (Pert 180(') Dia pipe 18 in
13 Size of Overflow Perf Pipe (Perls 360°), REQD if Q100>3.3 cfs in
14 Calculate Total Storage per Fool Spf 42.2 ftl/ft
Spf=Apf=WxD-Ar„ri_P;roxVoids+3./2 Perf–Area
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90% volume in 48 -hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf - Qpeak;
where Qperf=CdxAxV(2xgxH)
L 56 57 ft
SWL 57 ft
SWW 15.0 ft
12.5 hours
onlaffm
57 ft
H:\!2018\ID-1336-1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael 0\ACHD_SD_CALCS_See"Ji�8101% 9:55 AM
Version 9.0, December 2016
ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These
calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted.
(calculate Post -Development Flows (for pre -development flows, Increase number of storage facilities to create new tab)
User Input in yellow cells.
1 Project Name Seepage Bed B2
2 Is area drainage basin map provided? YES
(map must be included with stormwater calculations)
3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100
4 Enter number of storage facilities (25 max)
5 Area of Drainage Subbasin (SF or Acres) Acres
Acres
6 Determine the Weighted Runoff Coefficient (C)
C=((C1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg
Click to Show More Subbasins ❑
Subbasin
Runoff Coefficients "1
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
1
Subbasin 2
3
4
5
6
7
8
9
10
0.75
0.25-0.40
Apartment Dwelling Areas
0.70
Industrial and Commercial
Light areas
0.75
Heavy areas
0.90
Parks, Cemeteries
0.10-0.25
Playgrounds
0.20-0.35
0.80
Railroad yard areas
0.20-0.40
Unimproved areas
0.10.0.30
Streets
0.80
0.95
Concrete
0.95
Brick
0.95
Roofs
............_.....
7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default user calculate
10 min [10 Min.
Estimated Runoff Coefficients for Various Surfac
Type of Surface
Runoff Coefficients "1
_
Business
Downtown areas
0.70-0.95
Urban neighborhoods
0.50-0.70
Residential
Single Family
0.35.0.50
Multi -family
0.60-0.75
Residential (rural)
0.25-0.40
Apartment Dwelling Areas
0.70
Industrial and Commercial
Light areas
0.80
Heavy areas
0.90
Parks, Cemeteries
0.10-0.25
Playgrounds
0.20-0.35
Railroad yard areas
0.20-0.40
Unimproved areas
0.10.0.30
Streets
Asphalt
0.95
Concrete
0.95
Brick
0.95
Roofs
0.95
Gravel
0.75
Fields: Sandy soil
Soil Type
Slope
AB
C D
Flat: 04;G
0.04
o.07
0.11 0.
Average: 2.6%
0.09
0.12
0.15 0,
Steep:>W,
0.13
0.18
0.23 0.
Adapted from ASCE
H:\12018\ID-1336.1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael 0\ACRD SD_CALCS_Seepage Bed B2 10/28/2019,9:56 AM
Version 9.0, December 2016
I Project Name Seepage Bed B2
2 Enter number of Seepage Beds (25 max) 1
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Design Vol W/15%Sediment
8 Set Total Design Width of All Drain Rock
1.00
0.80 Link to: LOW
QV TR55 1
0.75 acres t
0.00 ds
V 2,385 ft3
W 20.0 ft
9 Set Total Design Depth of All Drain Rock D 7.0 ft
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock Voids 0.4
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max) Perc 2.40 in/hr
12 Size of WQ Perf Pipe (Perf 1.80") Dia pipe 18 in
13 Size of Over Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in
14 Calculate Total Storage per Foot
Spf=Apf=WxD-Apps p;r,exVoidsil/2 Perf—Area
15 Calculate Design Length
Override Value Required for Chambers
1.6 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90% volume in 48 -hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxV(2xgxH)
Spf 56.2 W/ft
L 42 45 ft
SWL 45 ft
SWW 20.0 ft
11.9 hours
MINWOM
45 ft
TM
H:\12018\ID-1336-1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael O\ACHD_SD_CALCS_See�®JZ'Sj'@dam 9:56 AM
Version 9.0, December 2016
ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These
calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations In order to be accepted.
[Calculate Post -Development flows (for pre -development flows, Increase number of storage facilities to create new tab)
User Input In yellow cells.
1 Project Name Seepage Bed CS
2 Is area drainage basin map provided? YES
(map must be Included with stormwater calculations)
3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100
4 Enter number of storage facilities (25 max)
5 Area of Drainage Subbasin (SF or Acres) SF
Acres
6 Determine the Weighted Runoff Coefficient (C)
C=I(CixAl)+(C2xA2)+(CnxAn))/A Weighted Avg
Click to Show More Subbasins ❑
Subbasin
Type of Surface
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
Subbasin
1
Subbasin 2
3
4
5
6
7
8
9
30
28,745
Light areas
0.80
Heavy areas
0.90
Parks, Cemeteries
0.10.0.25
Playgrounds
0.20.0.35
Railroad yard areas
0.66
Unimproved areas
0.10.0.30
Streets
Asphalt
0.95
Concrete
0.95
Brick
0.90
Roofs
0.95
Gravel
0.75
Fields: Sandy soil
Soil Type
Slope
A 8 C D
Flat: O-2%
0.90
Average: 2-6%
0.09 0.12 0.15 0..
Steep:>6Y
0.13 0.18 0,23 0.
Adapted from ASCE
7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default User calculate
10 min [10 Min.
Estimated Runoff Coefficients for Various Surface
Type of Surface
Runoff Coefficients "I
Business
Downtown areas
0.70-0.95
Urban neighborhoods
0.50-0.70
Residential
Single Family
0.35-0.50
Multi -family
0.60.0.75
Residential (rural)
0.25.0.40
Apartment Dwelling Areas
0.70
Industrial and Commercial
Light areas
0.80
Heavy areas
0.90
Parks, Cemeteries
0.10.0.25
Playgrounds
0.20.0.35
Railroad yard areas
0.20.0.40
Unimproved areas
0.10.0.30
Streets
Asphalt
0.95
Concrete
0.95
Brick
0.95
Roofs
0.95
Gravel
0.75
Fields: Sandy soil
Soil Type
Slope
A 8 C D
Flat: O-2%
0.04 OW 0.11 0.
Average: 2-6%
0.09 0.12 0.15 0..
Steep:>6Y
0.13 0.18 0,23 0.
Adapted from ASCE
H;\12018\ID-1336-1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael O\ACHD_SD_CALCS_Seepage Bed C1 10/28/2019,9:57 AM
Version 9.0, December 2016
1 Project Name Seepage Bed C1
2 Enter number of Seepage Beds (25
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Design Vol W/1.5% Sediment V
100
0.90
0.66 acres
0.00 cfs
2,360
8 Set rota) Design Width of All Drain Rock W 20.0 ft
9 Set Total Design Depth of All Drain Rock D 7.0 ft
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Pock Voids 0.4
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max) Pei c 2.40 in/hr
1.2 Size of WQ Perf Pipe (Perf 180°) Dia pipe 18 in
13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in
14 Calculate total Storage per Foot Spf
Spf=Apf=WxD-Ap"rf p;pexVoids+l/2 Perf—Area
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90% volume in 48 -hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qaeri >= Qpeak;
where Qperf-CdxAxV(2xgxH)
1
Link to: Q.V
QV TR55 1
ft3
56.2 ft3/ft
43 ft
H:\!2018\ID-1336-1808 Eagle View Plaza\Project Data\02 CAD\2.01 Base Files\Working\Michael 0\ACHD_SD_CALCS_See"JHJ@8M 9:58 AM
Version 9.0, December 2016