Loading...
HomeMy WebLinkAboutCost Share Permit No 036 with ACHD Street Lights Linder Rd. 1 ADA COUNTY HIGHWAY DISTRICT COST SHARE PERMIT 3775 Adams Street Garden City Idaho 83714 Phone (208) 387-6280 Facsimile (208) 387-6289 ACHD Contact Person: Name: David Rader 3775 Adams Street Garden City Idaho 83714 Phone: (208) 387-6249 Date of Permit: _______________, 2019 ACHD Project No.: 516019 Permit No.: 036 Capitalized terms that are not defined in this Permit shall have the meanings given to them in the ACHD Cost Share Ordinance No. 215. I. PARTNERING AGENCY INFORMATION This permit is granted to: City of Meridian Partnering Agency Contact Person: 33 E. Broadway Ave. Meridian, Idaho 83642 Caleb Hood 33 E. Broadway Ave. Meridian, Idaho 83642 Phone: (208) 489-0572 Email: chood@meridiancity.org II. ROAD PROJECT AND APPROVED NON-TRANSPORTATION COMPONENTS Name/Location of ACHD Road Project: Linder Road, Franklin Road to Pine Avenue, ACHD Project #516019, as depicted in the project plans attached hereto and incorporated herein as Exhibit A. Approved Non-Transportation Components: Pursuant to this Permit, ACHD authorizes, and, as a condition of issuing this Permit, requires, the following Non-Transportation Components: Design, Construction, and Perpetual Maintenance of Additional Street Lights within the Right- of-Way of Linder Road at Stations 6+66.24, 9+17.65, 11+05.00, 13+58.37, 15+56.41, and 17+51.28, as depicted on Exhibit A. ACHD authorizes and requires the design, construction, and perpetual maintenance of additional street lights (the “ Additional Lights ”) within the right- of -way of Linder Road at stations 6+66.24, 9+17.65, 11+05.00, 13+58.37, 15+56.41, and Meridian City Council Meeting Agenda November 6, 2019 – Page 374 of 610 2 17+51.28. In accordance with Ordinance 215, the foregoing Additional Lights are referred to herein as the “Non-Transportation Components.” III. ACQUISITION OF RIGHT-OF-WAY OR REAL PROPERTY Conditions of acquisition/contribution of right-of-way or real property by Partnering Agency and/or reimbursement to ACHD by Partnering Agency for said acquisition: ACHD has already acquired or is in the process of acquiring right-of-way or real property adequate for the Non-Transportation Components. Therefore, the acquisition of right-of-way or real property is not required of Partnering Agency. IV. DESIGN OF NON-TRANSPORTATION COMPONENTS Party responsible for obtaining plans/designs for Non-Transportation Components: ACHD has already completed plans/designs for the Non-Transportation Components. Therefore, plans/designs are not required of Partnering Agency. If Partnering Agency is responsible for providing plans/designs, deadline for submitting plans/designs to ACHD for approval: Not applicable due to the nature of the design. Allocation of design costs for Non-Transportation Components (including, if applicable, any credits provided to Partnering Agency and application of any federal funding) and time for reimbursement, if applicable: Partnering Agency shall be solely responsible for all design costs for the Non-Transportation Components, if any. Partnering Agency shall not be credited under this Permit for costs incurred for the design of the Non-Transportation Components. V. CONSTRUCTION OF NON-TRANSPORTATION COMPONENTS Description of construction work approved by ACHD to be completed by Partnering Agency (if applicable): (In addition to description, refer to designs and plans attached to this Permit as Exhibits, if applicable. If designs and plans are not complete at the time of issuance of this Permit, they must be approved in writing by ACHD and shall be incorporated into this Permit.) ACHD shall construct the Non -Transportation Components . Meridian City Council Meeting Agenda November 6, 2019 – Page 375 of 610 3 If Partnering Agency is responsible for all or a part of the construction of the Non- Transportation Components: a. Date for submitting Partnering Agency’s contractors and engineers to ACHD for approval: Not applicable due to the nature of the construction. b. Date for submitting Partnering Agency’s contractors’ and engineers’ estimates to ACHD for approval: Not applicable due to the nature of the construction. c. Date for submitting Partnering Agency’s contractors’ and engineers’ contracts to ACHD for approval: Not applicable due to the nature of the construction. Any modifications to the deadlines set forth above must be approved in writing by ACHD . Allocation of construction costs for Non-Transportation Components, reconstruction costs of Transportation Components necessitated by the incorporation of Non-Transportation Components into the Road Project, ACHD construction, maintenance, administration, and overrun costs (including, if applicable, any credits provided to Partnering Agency and application of any federal funding), and time for reimbursement, if applicable: Partnering Agency shall be solely responsible for all construction costs of the Non- Transportation Components. Partnering Agency shall receive no credits in connection with the construction of the Non-Transportation Components. Partnering Agency shall reimburse ACHD for the actual cost of all materials used, the cost of the relocation of any utilities necessitated by the Non-Transportation Components, and any other costs associated with the construction and installation of the Non-Transportation Components. Payment by Partnering Agency shall be made to ACHD within 30 days following submission of an invoice by ACHD to Partnering Agency identifying such charges. Relocation of utilities to be completed by Partnering Agency (if any): Partnering Agency shall be solely responsible for the cost of relocating any utilities required in connection with the placement, incorporation, or construction of the Non-Transportation Components. Storm water provisions (if applicable): Upon a determination by ACHD that the incorporation into the Road Project of Partnering Agency’s Non-Transportation Components will have an adverse effect on storm water quantity or quality, Partnering Agency shall be solely responsible for either mitigating or funding the mitigation of any such adverse effects in a means determined by or acceptable to ACHD. Meridian City Council Meeting Agenda November 6, 2019 – Page 376 of 610 4 Schedule for completion of Road Project: At this time, ACHD’s schedule for completion of the Transportation and Non-Transportation Components of the Road Project completion is unknown, but estimated to be Summer 2020. VI. MAINTENANCE OF NON-TRANSPORTATION COMPONENTS Maintenance requirements of Non-Transportation Components by Partnering Agency: Partnering Agency shall be, and is hereby, granted a non-exclusive, revocable license to maintain, repair, and replace the Non-Transportation Components, subject to the provisions of this Permit and during the term of this Permit. Partnering Agency shall cause the Non-Transportation Components to be operated and maintained in good functioning order during the term of this Permit, in accordance with applicable law, the approved designs/plans, Partnering Agency’s landscape and irrigation standards and specifications, and industry standards. This obligation includes, without limitation, grass and lawn care, pruning or replacement of gravel, trees, and shrubs, clean-up of litter and debris, weed removal, and application for shrubs, trees, and groundcover, as applicable. Any replacement and/or installation by Partnering Agency of additional improvements shall be accomplished in accordance with designs, plans, and specifications approved in advance and in writing by ACHD, in its discretion, and as required to satisfy applicable laws, its policies, and good engineering and landscaping practices. Additional conditions: 1. This Permit does not extend to Partnering Agency the right to use any part of the ACHD Road Project area to the exclusion of ACHD for any use within its jurisdiction, authority, and discretion or of others to the extent authorized by law. 2. In accessing any part of the Road Project that has been accepted as an open public highway (as the term “highway” is defined in Idaho Code Section 40-109(5)), Partnering Agency’s authorized use is subject to the rights of the public to use the highway. 3. The rights granted hereunder are subject to and subordinate to the rights of holders of easements of records and the statutory rights of utilities to use the right-of-way. 4. This Permit does not preclude or impede the ability of ACHD to enter into or grant easements or license agreements allowing third parties to access the Road Project area, or the ability of ACHD to redesign, reconstruct, relocate, maintain, and improve the Road Project and right-of-way as it determines necessary, in its sole discretion. 5. In consideration of the license granted by this Permit, Partnering Agency expressly covenants and agrees that the license granted herein is temporary and merely a permissive use of the ACHD right-of- way pursuant to the terms of this Permit. Partnering Agency assumes the risk that the license granted herein may be terminated before Partnering Agency has realized the economic benefit of the cost of installing, constructing, repairing, or maintaining the Non-Transportation Components, and by signing and accepting this Perm it, Partnering Agency hereby waive s and estops itself from a sserting any claim, Meridian City Council Meeting Agenda November 6, 2019 – Page 377 of 610 5 including damages or reimbursement, that the license is in any way irrevocable because Partnering Agency has expended funds on the Non-Transportation Components and the Permit has not been in effect for a period sufficient for Partnering Agency to realize the economic benefit from such expenditures. 6. In the event Partnering Agency fails to replace, repair, maintain, and care for the Non-Transportation Components, ACHD shall have the following remedies in addition to any other recovery in law or in equity, provided that ACHD first gives Partnering Agency 30 days’ notice and Partnering Agency fails to remedy such failure: (i) ACHD may revoke this Permit; (ii) ACHD may replace, maintain, and/or care for the Non-Transportation Components, and Partnering Agency shall reimburse ACHD fully for all associated costs; (iii) ACHD may remove, alter, redesign, or reconstruct the Non-Transportation Components or any part of the ACHD Road Project (including without limitation the right-of-way), or in the case of landscaping, replace the Non-Transportation Components with hardscape, and Partnering Agency shall reimburse ACHD fully for all associated costs; and (iv) ACHD may refuse to issue any further Cost Share Permits or any other permits for future ACHD Road Projects until Partnering Agency complies with the conditions of the Permit. In addition, in the event of an emergency caused by Partnering Agency’s failure to perform required maintenance, ACHD may immediately perform any and all emergency repairs or take other measures in connection with an emergency, and Partnering Agency shall reimburse ACHD fully for all associated costs. VII. TERM Term of Permit: Perpetual, until terminated or revoked pursuant to the provisions of this Permit. Upon termination or revocation of this Permit, upon the request of ACHD, Partnering Agency will either, as directed by ACHD, (i) promptly remove the Non-Transportation Components and restore the underlying area to at least the condition present as of the date of this Permit, repairing and restoring all portions of ACHD’s right-of-way, personal property, and real property, if any, that are damaged during such removal activities; or (ii) reimburse ACHD for its cost of redesigning, replacing, and/or reconstructing the right-of-way or real property underlying the Non-Transportation Components. Any portion of the Non-Transportation Components that remain in ACHD right-of-way or on ACHD real property 90 days after the termination or revocation of this Permit shall be deemed abandoned, and ACHD shall have the right to remove them or redesign, replace, and reconstruct the right-of-way or real property underlying them and charge all costs to Partnering Agency. VIII. ADDITIONAL PROVISIONS APPLICABLE TO PROJECT Additional provisions: This Permit provides the terms upon which the incorporation of the Non-Transportation Components into the Road Project are approved. Meridian City Council Meeting Agenda November 6, 2019 – Page 378 of 610 6 IX. GENERAL CONDITIONS OF PERMIT 1. This Permit is issued conditioned upon Partnering Agency’s compliance with ACHD’s Cost Share Ordinance No. 215 and all certifications made by Partnering Agency pursuant to this Permit. 2. This Permit is subject to the provisions of state and federal law and ACHD’s Cost Share Ordinance No. 215, in effect as of the date of issuance of this Permit (the “Applicable Law”). In the event of any conflict between this Permi t and Applicable Law, Applicable Law shall govern. In the event that any part of the obligations of Partnering Agency or of ACHD in connection with the Road Project are determined to be illegal or unenforceable by a court of competent jurisdiction, the remaining obligations of Partnering Agency set forth in this Permit shall still be applicable. Future amendments and restatements of the Cost Share Ordinance shall not be applicable to this Permit. 3. If any portion of the ACHD Road Project (including without limitation any portion of the right- of-way) is damaged as a result of Partnering Agency’s action or inaction with regard to the construction, operation, and/or maintenance of the Non-Transportation Components or the failure or neglect to construct, operate, and/or maintain the Non-Transportation Components, then Partnering Agency shall, at its sole cost and expense, correct such deficiency and restore the area to the same condition it was in prior thereto, and if Partnering Agency or its successors or assigns shall fail or neglect to commence such correction and restoration within 24 hours of notification thereof, ACHD may proceed to do so, in which event Partnering Agency shall reimburse ACHD for the costs and expenses thereof, including, without limitation, reasonable compensation for the use of staff and equipment of ACHD. 4. Partnering Agency shall be liable to ACHD for any and all damages, fines, fees, obligations to third parties, costs, expenses, attorney fees, or any other liabilities whatsoever resulting from Partnering Agency’s failure to comply with any provision of this Permit and/or Cost Share Ordinance No. 215. Without limiting the foregoing in any manner, in the event Partnering Agency fails to comply with any provision of this Permit, then following any applicable notice and opportunity to cure set forth herein, ACHD shall have the right, in addition to all other rights and remedies elsewhere in this Permit, to redesign, replace, and/or reconstruct the Non- Transportation Components and/or the right-of-way or real property underlying the Non- Transportation Components, and in such event, Partnering Agency shall reimburse ACHD for all associated costs. The obligations in this Section shall survive the expiration, revocation, and/or cancellation of this Permit for any reason. 5. Partnering Agency may delegate any of its responsibilities hereunder to any third party so long as it gives prior written notice to ACHD that specifies in detail what responsibilities are being delegated and identifies the third party. Notwithstanding any delegation to a third party, Partnering Agency shall remain and shall be ultimately responsible for the third party’s compliance with the terms of this Permit, and no delegation shall absolve Partnering Agency of any duties or obligations of this Permit in any way. In addition, Partnering Agency fully assumes all legal risks of determining whether any such delegation is proper under applicable law and/or regulations, and shall not be absolved of any responsibilities under this Permit if it is unable to complete or maintain any such delegation for any reason. Meridian City Council Meeting Agenda November 6, 2019 – Page 379 of 610 7 6. Partnering Agency will protect, defend, indemnify, and hold ACHD and its officers, directors, employees, members, and agents harmless from and against any and all liability, suits, losses, damages, claims, actions, costs, and expenses of any nature, including court costs and attorney fees, arising from or out of any acts or omissions of Partnering Agency, its agents, or contractors related to or in connection with the Non-Transportation Components and the exercise of any privileges or performance of any obligations by Partnering Agency pursuant to the terms of this Permit. Partnering Agency’s obligations in this Section shall survive the expiration, revocation, and/or cancellation of this Permit for any reason. 7. In the event the Non-Transportation Components will or may necessitate future maintenance, repair, relocation, or replacement that is not the subject of this Permit, ACHD shall in its discretion issue Partnering Agency an amended or an additional Cost Share Permit to perform such work. 8. ACHD shall at all times have the right to relocate, reconstruct, remove, or redesign any and all improvements that are part of the Road Project. ACHD will use its best efforts to advise Partnering Agency of any anticipated actions within the Road Project that would be likely to cause a relocation, modification, or other adaptation of any of the Non-Transportation Components, and the parties, to the extent reasonably possible, shall agree to a priority schedule regarding the same and shall attempt to cooperate with respect to planning and coordination as related to any such relocation, modification, or other adaptation of any of the Non-Transportation Components. If ACHD ultimately determines that any part of the Road Project must be relocated, reconstructed, removed, or redesigned, then Partnering Agency, at its sole cost and expense, shall be responsible for relocating, reconstructing, removing, or redesigning the Non- Transportation Components, as required by ACHD, which shall be accomplished by Partnering Agency according to designs, plans, and specifications approved by ACHD in writing prior to any such work. Partnering Agency may also elect to remove all or a part of the Non-Transportation Components in lieu of any relocation, modification, or adaptation. Partnering Agency assumes any and all costs of itself and ACHD relating to any future relocation of the Non-Transportation Components. 9. ACHD shall at all times have the right to revoke this and any other Cost Share Permit granted to Partnering Agency to access any Highway, Public Right-of-Way or real property. In addition, ACHD may immediately perform any and all emergency repairs or take other measures in connection with an emergency, in which case Partnering Agency shall reimburse ACHD fully for all associated costs. 10. This Permit shall immediately be revocable and/or cancelable by ACHD by providing written notice to Partnering Agency upon the occurrence of any of the following: (i) a determination by ACHD that any of the information submitted by Partnering Agency in the Cost Share Application is false or inaccurate in any manner; (ii) a determination by ACHD that Partnering Agency has failed to comply with any term or provision of this Permit or any other permit granted by ACHD to Partnering Agency; or (iii) a determination by ACHD that Partnering Agency has failed to replace, maintain, and/or care for the Non-Transportation Components as required by the terms of this Permit. Except in an emergency situation, ACHD shall provide Partnering Agency with 30 days’ notice of the issue and an opportunity to comply prior to exercising such rights. 11. The issuance of this Permit shall in no way obligate ACHD to provide Partnering Agency with additional permits or rights, nor shall ACHD be obligated to utilize provisions or rights set forth in this Permit in connection with additional permits or rights that it may elect to provide to Partnering Agency in the future. Meridian City Council Meeting Agenda November 6, 2019 – Page 380 of 610 12. All exhibits and any addenda to this Permit are incorporated herein. 13. This Permit is conditioned upon the signature of ACHD and Partnering Agency below. SIGNATURES This Cost Share Permit is issued by the Ada County Highway District on the date set forth above: Ada County Highway District: The person signing below represents that he or she has the authority on behalf of ACHD to issue this Permit and bind ACHD to the terms set forth herein. By: Bruce S. Wong Its: Director City of Meridian: Acceptance/certification by Partnering Agency: The person signing below represents that he or she has the authority on behalf of Partnering Agency to accept and agree to the terms of this Permit and bind P nering Agency to the terms set forth herein. By: Tammy L. de Weerd Its: Mayor Exhibits Exhibit A Project Plans 7" 4" 9" LANDSCAPE DIRT AREA SOD AREA SOD AREA SOD AREA SIG CAB 24" RCP TOP=84.22 I N V = 8 3 . 9 3 INV=82.65 I NV=8 2 .6 8 INV=91.37 1 2 " R C P I NV=9 1 .4 0 I NV=9 1 .5 6 2 4 " R C P I NV=8 2 .8 9 INV=82.87 INV=82.71 INV=96.39 ? ? INV=94.46 INV=96.60INV=96.78INV=94.68 INV=94.11 W/UD WM W/UD 18" RCP 1 8 " 1 8 " H D P E 18" HPDE 18" RCP 18" RCP 12" 1 2 " 1 2 " 12" RCP 18" 4+003+002+00 3775 Adams Street, Boise, Idaho, 83714 www.achdidaho.org Ada County Highway District Project Number:Project Title: Last Revised Dec. 2012 0 20 40 60 Plan Scale Revisions:Design By:Drawn By:Date:Survey By:Date:Date: 516019 LINDER RD, FRANKLIN RD TO PINE AVE CIVIL SURVEY 05/26/20164/18/2018 4/18/2018 Of 59Sheet Linder Road F r a n k l i n R o a d N O T E S TRAFFIC SIGNAL IMPROVEMENTS. INFORMATION SHOWN ON THIS SHEET IS ACCURATE ONLY FOR ATIONAL, UNLESS OTHERWISE APPROVED BY ACHD. REMAIN IN OPERATION UNTIL THE NEW SIGNAL IS FULLY OPER- THE EXISTING SIGNAL CONTROL OR A TEMPORARY SIGNAL SHALL CONDUIT LOCATIONS AND CONDUIT SCHEDULE. REFER TO TRAFFIC SIGNAL DETAILS SHEET FOR SIGNAL MATERIALS, INSTALLATION. SIGNAL POLES SHALL BE FIELD VERIFIED BY ACHD PRIOR TO THE LOCATIONS OF THE SIGNAL CABINET, SERVICE PEDESTAL AND REQUIREMENTS. SYMBOL LEGEND, CONSTRUCTION DETAILS AND INSTALLATION REFER TO ACHD STANDARD TRAFFIC DETAILS (TS SERIES) FORC1. 2. 3. 4. 5. E C D D E E E E O N L Y 30"x36" R3-5R LinderRd 100S 100N SNS R d 1 6 0 0 1 5 0 0 SNS F r a n k l i n W CONDUIT AND CONDUCTOR SCHEDULE POWER SOURCE IS EXISTING POWER POLE TO BE RELOCATED. INTERCEPT EXISTING CONDUIT WITH PROPOSED CONDUIT. FIBER FUSION SPLICE AND TERMINATION DETAILS. REFER TO TRAFFIC SIGNAL INTERCONNECT DETAILS SHEET FOR BY ITEM 1131.01.01.D. AND TERMINATING INTERCONNECT CABLE WILL BE PAID FOR INTERCONNECT AND LIGHTING SHEETS. INSTALLING, SPLICING BE PAID FOR BY SEPARATE BID ITEMS AS SHOWN ON THE INTERCONNECT CONDUIT, JUNCTION BOXES AND VAULTS WILL F F 47 R d 1 5 0 0 1 6 0 0 F r a n k l i n W SNS L i n d e r R d 1 0 0 N 1 0 0 S SNS Y I E L D O N G R E E N L E F T T U R N (REMOVE) Y I E L D O N G R E E N L E F T T U R N (REMOVE) Y I E L D O N G R E E N L E F T T U R N YIELD ON GREEN LEFT TURN (REMOVE) (REMOVE) 1 2" 2" SPARE 1-12F 2 #8, 1 #6 BARE (LIGHTING)2 3 4 2" 2" 2" 2" 5 2" 2"6 7 2" (EX.) 8 SPARE 2 #8, 1 #6 BARE (LIGHTING) 4-12C (VEH/PED) 2" 2"9 10 2" 2" 2" 2" 11 2"2 #6 (SERVICE) 12 SPARE 2 #8, 1 #6 BARE (LIGHTING) 13 2" 2" 2" 14 15 1 1/2" (EX.) 2" (EX.) 2 #8, 1 #6 BARE (EXISTING LIGHTING) 2-12C (EXISTING VEH/PED) 16 2"3 #3 (POWER) 17 2" 15 7 17 6 5 2 2 SPARE 2 #8, 1 #6 BARE (LIGHTING) 1-12C (VEH), 2-5C (PED) SPARE 4-12C (VEH/PED) 2-12C (VEH), 4-5C (PED) 2 #8, 1 #6 BARE (LIGHTING) 1-12C (VEH), 1-5C (PED) 2 #8, 1 #6 BARE (LIGHTING) 1-12C (VEH), 1-5C (PED) 1 18 4 3 19 18 8 9 14 16 NO.CONDUCTORSCONDUIT CABINET AREA DETAIL 9 8 14 16 18 19 6 11 12 10 13 18 2"1-5C (PED) 34 SPARE 1-COAX/5C (DETECTION) 2-12F 1-3CS (EMERGENCY PREEMPT DETECTOR) 1-COAX/5C (DETECTION) 1-3CS (EMERGENCY PREEMPT DETECTOR) 1-COAX/5C (EXISTING DETECTION) SPARE 2-COAX/5C (EXISTING DETECTION), 1-COAX/2C (EXISTING CCTV) SPARE 4-COAX/5C (DETECTION), 1-COAX/2C (CCTV) 3-12F 2-3CS (EMERGENCY PREEMPT DETECTOR) 1-12F (EXISTING) 19 2" 2" SPARE 1-12F (EXISTING) L. Venard L. Venard POLE D POLE E POLE APOLE C POLE A 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" O N L Y 30"x36" R3-5R POLE F POLE B 1. 2. NOTE: ON A WEEKEND. EXISTING FIBER OPTIC IS DISCONNECTED FOR A MAXIMUM OF 48 HOURS FIBER OPTIC: CONTRACTOR SHALL SCHEDULE WORK TO ENSURE THAT SPLICES OF SIGNAL WIRING ARE ALLOWED. ARE NOT LONG ENOUGH TO ALLOW JUNCTION BOX RELOCATIONS. NO EXISTING CABLE RUNS MAY NEED TO BE REPLACED WITH NEW IF THEY APRIL 18, 2018 ORIGINAL SIGNED ON HIGHWAY DISTRICT ADA COUNTY ORIGINAL ON FILE AT Meridian City Council Meeting Agenda November 6, 2019 – Page 382 of 610 T3N, R1W, Sect. 11 T3N, R1W, Sect. 12 Linder Road F r a n k l i n R o a d 48 M a t c h L i n e S t a . 7 + 5 0 L. Venard L. Venard SPARE (INSTALL #12 LOCATE WIRE) 12 STAND FIBER 2-2" RPC 1-#6 BARE 2-#8 2" RPC 1-#6 BARE 2-#8 2" RPC 1-#6 BARE 2-#8 2" RPC (ACHD) Top of Foundation Elev: 2599.26 Arm Length: Vertical Attachment Mounting Height: 40' Luminaire Pole Sta. 3+48.64, 61.38' Lt. (ACHD) Top of Foundation Elev: 2599.74 Arm Length: 15' Mounting Height: 35' Luminaire Pole Sta. 4+95.54, 44.75' Lt.(City of Meridian) Elev: 2597.18 Top of Foundation Arm Length: 12' Mounting Height: 35' Luminaire Pole Sta. 6+66.24, 45.25' Lt. N O T E S Traffic Signal and Illumination System Complete, Item 1131.01.0115 18 Install Traffic Signal Interconnect Conduit (Trench), Item 1131.01.02.A 19 Install Traffic Signal Interconnect Junction Box, Item 1131.01.03 20 Install Traffic Signal Interconnect Cable, Item 1131.01.05 21 Install Street Lighting Conduit, Item 1131.01.07 22 Install Street Lighting Junction Box, Item 1131.01.08 15 18 20 21 22 22 21 21 E i g h t M i l e L a t e r a l HIGHWAY DISTRICT ADA COUNTY ORIGINAL ON FILE AT MARCH 11, 2019 ORIGINAL SIGNED ON 7" 4"8" 16" EB AREA 9" 10" SIGN SIG CAB 14" 11"7" 20"12" 10"24"8"10" 4" 4" 4 F T W O O D 12" 7" 10" 14" 24" RCP 1 2 " R C P 2 4 " R C P BUILDING W 4 F T W I R E W WM W/UD WM 6 0 " R C P W/UD WM 12" PVC 18" RCP 1 8 " 1 8 " H D P E 18" HPDE 1 2 " R C P 12"12" RCP 18" RCP 18" RCP STUB 1 2 " R C P 12" 12" 8 " 8 " 1 2 " 1 2 " 12" 12" RCP 18" 24" STEEL CASING 12" 15" 4 0 + 0 0 7+006+00 5+00 4+003+002+00 3775 Adams Street, Boise, Idaho, 83714 www.achdidaho.org Ada County Highway District Project Number:Project Title: Last Revised Dec. 2012 0 20 40 60 Plan Scale Revisions:Design By:Drawn By:Date:Survey By:Date:Date: 516019 LINDER RD, FRANKLIN RD TO PINE AVE CIVIL SURVEY 05/26/20163/11/2019 3/11/2019 Of 59Sheet P V C 1 8 " R C P 6 0 " RCP 60" 12" PVC 12" PVC 60" RCP R C P 6 0 " PVC 18" Meridian City Council Meeting Agenda November 6, 2019 – Page 383 of 610 4"6"11" 10" 4 F T W O O D 10" S I G N 12" S I G N 9"10" 14" 10" 22" 18" 12" 14" 5" BUILDING 12"10" 10" 6 F T W O O D 4 F T W O O D 4FT CLF W 24" W BUILDING SIGN 4" 6 F T W O O D 4FT WOOD 22" 26" GARAGE 14"11"14" W/UD R S R I R R W/UD W/UD WM W/UD 8 " 15"15" 12"12" 8 " 12" 6 " 8 " 6 " 12"12" 12" 12+0011+0010+009+008+00 5 0 + 0 0 6 0 + 0 0 8 9 . 8 6 8 9 . 7 9 9 0 . 2 8 9 0 . 3 0 9 0 . 3 5 9 0. 4 7 9 0 . 4 4 9 0 . 4 2 9 0. 3 4 8 9 . 7 6 8 9 . 8 4 u s e f o r w a l l 8 9 . 8 3 8 9. 7 9 8 9 . 7 5 8 9 . 7 9 8 9 . 8 7 8 9 . 8 3 8 9 . 9 0 9 0. 3 2 t b c 9 0 . 6 4 9 0 . 2 2 3775 Adams Street, Boise, Idaho, 83714 www.achdidaho.org Ada County Highway District Project Number:Project Title: Last Revised Dec. 2012 0 20 40 60 Plan Scale Revisions:Design By:Drawn By:Date:Survey By:Date:Date: 516019 LINDER RD, FRANKLIN RD TO PINE AVE CIVIL SURVEY 05/26/20164/18/2018 4/18/2018 Of 59Sheet M a t c h L i n e S t a . 7 + 5 0 T3N, R1W, Sect. 11 T3N, R1W, Sect. 12 Linder Road M a t c h L i n e S t a . 1 2 + 5 0 1-#6 BARE 2-#8 2" RPC 1-#6 BARE 2-#8 2" RPC SPARE (INSTALL #12 LOCATE WIRE) 12 STAND FIBER 2-2" RPC 49 1-#6 BARE 2-#8 2" RPC BY OTHERS BE REMOVED EXISTING LUMINAIRE TO BY OTHERS BE REMOVED EXISTING LUMINAIRE TO L. Venard L. Venard (City of Meridian) Elev: 2594.19 Top of Foundation Arm Length: 12' Mounting Height: 35' Luminaire Pole Sta. 9+17.65, 45.25' Lt. (City of Meridian) Elev: 2590.18 Top of Foundation Arm Length: 12' Mounting Height: 35' Luminaire Pole Sta. 11+05.00, 45.75' Lt. N O T E S Traffic Signal and Illumination System Complete, Item 1131.01.0115 18 Install Traffic Signal Interconnect Conduit (Trench), Item 1131.01.02.A 19 Install Traffic Signal Interconnect Junction Box, Item 1131.01.03 20 Install Traffic Signal Interconnect Cable, Item 1131.01.05 21 Install Street Lighting Conduit, Item 1131.01.07 22 Install Street Lighting Junction Box, Item 1131.01.08 18 20 18 20 19 21 21 21 22 22 APRIL 18, 2018 ORIGINAL SIGNED ON HIGHWAY DISTRICT ADA COUNTY ORIGINAL ON FILE AT Meridian City Council Meeting Agenda November 6, 2019 – Page 384 of 610 5" S I G N 6" 5" 7" 6" 6" 6" 6" 6" S I G N 4 F T C L F 32" W 20" BUILDING 24" 5" 7" 10" 8" 10"14" 9"10" ROCK SIGNS 8" BUILDING W 4" 3" 18" 24" 4FT CLF BUILDING TRANS. W/UD WM WM BO W/UD 12" CMP W/UD 15" 15" 15" 8 " W 8 " 12"12"12" 8 " 12" 12" 12" D R Y 8 " WM WM 17+0016+0015+0014+0013+00 7 1 + 0 0 3775 Adams Street, Boise, Idaho, 83714 www.achdidaho.org Ada County Highway District Project Number:Project Title: Last Revised Dec. 2012 0 20 40 60 Plan Scale Revisions:Design By:Drawn By:Date:Survey By:Date:Date: 516019 LINDER RD, FRANKLIN RD TO PINE AVE CIVIL SURVEY 05/26/20164/18/2018 4/18/2018 Of 59Sheet T3N, R1W, Sect. 11 T3N, R1W, Sect. 12 Linder Road M a t c h L i n e S t a . 1 7 + 5 0 M a t c h L i n e S t a . 1 2 + 5 0 1-#6 BARE 2-#8 2" RPC SPARE (INSTALL #12 LOCATE WIRE) 12 STAND FIBER 2-2" RPC 1-#6 BARE 2-#8 2" RPC 1-#6 BARE 2-#8 2" RPC 50 L. Venard L. Venard (City of Meridian) Elev: 2589.55 Top of Foundation Arm Length: 12' Mounting Height: 35' Luminaire Pole Sta. 13+58.37, 42.75' Lt. (City of Meridian) Elev: 2588.37 Top of Foundation Arm Length: 12' Mounting Height: 35' Luminaire Pole Sta. 15+56.41, 42.75' Lt. N O T E S Traffic Signal and Illumination System Complete, Item 1131.01.0115 18 Install Traffic Signal Interconnect Conduit (Trench), Item 1131.01.02.A 19 Install Traffic Signal Interconnect Junction Box, Item 1131.01.03 20 Install Traffic Signal Interconnect Cable, Item 1131.01.05 21 Install Street Lighting Conduit, Item 1131.01.07 22 Install Street Lighting Junction Box, Item 1131.01.08 18 20 21 21 21 22 22 22 APRIL 18, 2018 ORIGINAL SIGNED ON HIGHWAY DISTRICT ADA COUNTY ORIGINAL ON FILE AT Meridian City Council Meeting Agenda November 6, 2019 – Page 385 of 610 B A R B E D W I R E 12" 9" B A R B E D W I R E BARBED WIRE B A R B W I R E 8" 12" 12" 2 4 " C M P 24" CMP 12" RCP 1 2 " R C P 1 2 " R C P 1 2 " R C P W/UD W/UD 3 6 " R C P 36" RCP 15" 1 0 " S T U B 24" STEEL CASING 12" 12" 3775 Adams Street, Boise, Idaho, 83714 www.achdidaho.org Ada County Highway District Project Number:Project Title: Last Revised Dec. 2012 0 20 40 60 Plan Scale Revisions:Design By:Drawn By:Date:Survey By:Date:Date: 516019 LINDER RD, FRANKLIN RD TO PINE AVE CIVIL SURVEY 05/26/20164/18/2018 4/18/2018 Of 59Sheet 22+0021+0020+0019+0018+00 T3N, R1W, Sect. 11 T3N, R1W, Sect. 12 Linder Road M a t c h L i n e S t a . 1 7 + 5 0 SPARE (INSTALL #12 LOCATE WIRE) 12 STAND FIBER 2-2" RPC 51 B I D D I C K S T R E E T L. Venard L. Venard (City of Meridian) Top of Foundation Elev: 2587.51 Arm Length: 12' Mounting Height: 35' Luminaire Pole Sta. 17+51.26, 44.25' Lt. AT PINE AVE TO TRAFFIC SIGNAL CABINET IN EXISTING CONDUIT INSTALL 12 STRAND FIBER TO REMAIN EXISTING LUMINAIRE BY OTHERS TO BE REMOVED EXISTING LUMINAIRE N O T E S Traffic Signal and Illumination System Complete, Item 1131.01.0115 18 Install Traffic Signal Interconnect Conduit (Trench), Item 1131.01.02.A 19 Install Traffic Signal Interconnect Junction Box, Item 1131.01.03 20 Install Traffic Signal Interconnect Cable, Item 1131.01.05 21 Install Street Lighting Conduit, Item 1131.01.07 22 Install Street Lighting Junction Box, Item 1131.01.08 18 20 20 AQUA FIBER PINK FIBER VIOLET FIBER YELLOW FIBER BLACK FIBER RED FIBER WHITE FIBER SLATE FIBER BROWN FIBER GREEN FIBER ORANGE FIBER BLUE FIBER AQUA FIBER PINK FIBER VIOLET FIBER YELLOW FIBER BLACK FIBER RED FIBER WHITE FIBER SLATE FIBER BROWN FIBER GREEN FIBER ORANGE FIBER BLUE FIBER TERMINATION (TYPICAL) FIBER OPTIC CABLE IN CABINET INTERCONNECT PANEL EXISTING 24 POSITION LINDER FROM FRANKLIN & 12-FIBER CABLE AT LINDER AND PINE EXISTING 12-FIBER CABLE CABINET TERMINATION DETAIL NOT TO SCALE APRIL 18, 2018 ORIGINAL SIGNED ON HIGHWAY DISTRICT ADA COUNTY ORIGINAL ON FILE AT Meridian City Council Meeting Agenda November 6, 2019 – Page 386 of 610