Loading...
HomeMy WebLinkAbout2019-11-01 DEQsuet October 31. 2019 Engineering Manager DEQ -Boise Regional Office 1445 North Orchard Boise, ID 83706 RE: Ref.#19019 — Fairbourne Subdivision No. 1 Revised Dear Sir/Madam: Roger F. Greaves, P.E. 8248 W. Victory Road Boise, ID 83709 Phone(208)362-7345 Fax (208) 362-3858 roger.greaves@suez.com Enclosed is one (1) set of plans showing the proposed new water facilities for the above-mentioned project. I have reviewed and approved these plans as the qualified, licensed professional engineer representing SUEZ. This new water line extension project is a simple water main extension that is connected to existing water main facilities and does not require the addition of system components designed to control quantity or pressure, including, but not limited to, booster stations, new sources, pressure reducing stations, or reservoirs; and continues to provide the required pressure and quantity for the system. Based on hydraulic modeling, with the addition of the above referenced project, the system will maintain adequate service on maximum day with the largest unit out of service. SUEZ agrees to serve the project under the rules and regulations of the Idaho Public Utilities Commission and will own and operate the project after it is built and accepted for service, therefore sanitary restrictions for drinking water may be lifted. The enclosed plans and specifications comply with the facility standards and engineering standards of care and are hereby approved for construction. If you have any further questions or concerns, please do not hesitate to contact our office. Sincerely, Roger F. Greaves, P.E. Senior Project Manager cc: Civil Survey Consultants, Inc.