Loading...
HomeMy WebLinkAbout2010-10-31 MFDS. EAGLE ROAD P R O J E C T S I T E S H E L B U R N E E A S T S U B D I V I S I O N N O . 3 E . B O T T L N . E . V I C T O R Y R O A D S. CLOVERDALE ROAD E . A M I T Y R O A D E . B O T T D R . SHELBURNE EAST S U B D I V I S I O N N O . 3 MERIDIAN , I D A H O - 2 0 1 9 1 V I C I N I T Y M A P N O T T O S C A L E 2 C O N S T R U C T I O N S H E E T I N D E X 3 C O N S T R U C T I O N C O N T A C T I N F O R M A T I O N S U R V E Y O R 4 B E N C H M A R K A N D D A T U M D A T A C . 1 0 0 TITLE SHEET AND CONSTRUCTION NOTES 1 L A N D S O L U T I O N S , P C C O N T A C T : C L I N T H A N S E N 2 3 1 E . 5 T H A V E N U E , S T E . A M E R I D I A N , I D 8 3 6 4 2 P H O N E : ( 2 0 8 ) 2 8 8 - 2 0 4 0 E M A I L : C H A N S E N @ L A N D S O L U T I O N S . B I Z D A T U M D A T A H O R I Z O N T A L : N A D 8 3 ( A D J U S T E D T O T H E A D A C O U N T Y H . A . R . N S U R V E Y ) V E R T I C A L : N A V D 8 8 T h e s e p l a n s a n d / o r s p e c i f i c a t i o n s h a v e b e e n r e v i e w e d f o r c o m p l i a n c e w i t h M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f c a t i o n s . T h i s r e v i e w d o e s n o t r e l i e v e t h e o w n e r , e n g i n e e r , o r c o n t r a c t o r o f t h e r e s p o n s i b i l i t y t o d e s i g n a n d / o r c o n s t r u c t t h o s e f a c i l i t i e s i n c o m p l i a n c e w i t h a l l c u r r e n t a p p l i c a b l e f e d e r a l , s t a t e a n d l o c a l l a w s , r u l e s , r e g u l a t i o n s , o r d i n a n c e s , d e v e l o p m e n t a g r e e m e n t s , s p e c i f i c a t i o n s , o r d e r s o r a p p r o v a l s , a l l o f w h i c h t h e C i t y r e t a i n s t h e r i g h t t o e n f o r c e . I n c o n s i s t e n c i e s n o t n o t e d b y C i t y s t a f f s h a l l n o t b e c o n s t r u e d a s a p p r o v e d u n l e s s s p e c i f i c a l l y a d d r e s s e d i n w r i t i n g b y t h e C i t y . A n y p r o p o s e d r e v i s i o n t o t h e s e p l a n s m u s t b e s u b m i t t e d f o r r e v i e w a n d c o m p l i a n c e w i t h t h e M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f i c a t i o n s b e f o r e s a i d r e v i s i o n i s c o n s t r u c t e d . N a m e D a t e A P P R O V E D F O R C O N S T R U C T I O N T H E E N G I N E E R O F R E C O R D C E R T I F I E S T H A T T H E P L A N S A R E P R E P A R E D I N S U B S T A N T I A L C O N F O R M A N C E W I T H T H E A C H D P O L I C Y A N D S T A N D A R D S I N E F F E C T A T T H E T I M E O F P R E P A R A T I O N . T H E E N G I N E E R A C K N O W L E D G E S T H A T A C H D A S S U M E S N O L I A B I L I T Y F O R E R R O R S O R D E F I C I E N C I E S I N T H E D E S I G N . A L L V A R I A N C E S F R O M A C H D P O L I C Y S H A L L B E A P P R O V E D I N W R I T I N G . N O V A R I A N C E S W E R E A P P R O V E D F O R T H E P R O J E C T . N O T E A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n GENERAL CONSTRUCTION NOTES1.ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT VERSION OF THE IDAHO STANDARDS FOR PUBLICWORKS CONSTRUCTION (ISPWC), THE CITY OF MERIDIAN SUPPLEMENTAL SPECIFICATIONS TO THE ISPWC (AND ANY ADDENDUMS),MERIDIAN DESIGN STANDARDS, THE REQUIREMENTS OF THE ADA COUNTY HIGHWAY DISTRICT (ACHD), AND/OR THE REQUIREMENTSOF THE IDAHO TRANSPORTATION DEPARTMENT (ITD). THE MORE STRINGENT OF ANY OF THESE STANDARDS SHALL BE THECONTROLLING STANDARDS OR SPECIFICATIONS.2.THE CONTRACTOR SHALL HAVE A COPY OF THE LATEST CITY OF MERIDIAN STANDARD SPECIFICATIONS AND DRAWINGS ON SITE ORREADILY ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION (AVAILABLE ON THE WEBSITE). FAILURE TO HAVE ACCESS TO ACURRENT COPY OF THE STANDARD SPECIFICATIONS ON SITE COULD BE GROUNDS FOR A STOP WORK ORDER UNTIL THE SITUATIONIS RESOLVED.3.THE CONTRACTOR SHALL HAVE PLANS STAMPED “APPROVED FOR CONSTRUCTION” BY THE CITY OF MERIDIAN ON SITE AT ALLTIMES.4.ALL CONTRACTORS, SUBCONTRACTORS, AND UTILITY CONTRACTORS SHALL ATTEND A PRE-CONSTRUCTION CONFERENCE PRIORTO START OF WORK.5.CONTRACTORS SHALL NOTIFY THE APPROPRIATE AGENCY WHEN MATERIALS ARE ON SITE OR INSPECTION OF THE WORK ISREQUIRED. NO WORK MAY BEGIN ON ANY PROJECT WITHOUT TWENTY FOUR (24) HOUR PRIOR NOTICE.6.CONTACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS PRIOR TO THE REQUIRED TESTING. THE CONTRACTOR MAYNOT OPEN OR CLOSE WATER VALVES.7.ALL MATERIAL FURNISHED ON, OR FOR THE PROJECT MUST MEET THE MINIMUM REQUIREMENTS OF THE APPROVING AGENCIES. ATTHE REQUEST OF THE APPROVING AGENCY OR THE DESIGN ENGINEER, CONTRACTORS SHALL FURNISH PROOF THAT ALL MATERIALSINSTALLED ON THIS PROJECT MEET THE SPECIFICATION REQUIREMENTS SET FORTH IN GENERAL CONSTRUCTION NOTE NO. 1.8.WORK SUBJECT TO APPROVAL BY ANY GOVERNMENTAL AGENCY MUST BE APPROVED PRIOR TO (A) BACKFILLING TRENCHES FORPIPE; (B) PLACING OF AGGREGATE BASE; (C) PLACING OF CONCRETE; (D) PLACING OF ASPHALT PAVING.9.INSPECTION, APPROVAL AND FINAL ACCEPTANCE OF ALL WATER AND SEWER CONSTRUCTION SHALL BE BY THE PUBLIC WORKSDEPARTMENT, AND THEIR DECISION SHALL BE FINAL. SUCH INSPECTIONS SHALL NOT RELIEVE THE CONTRACTOR FROM THERESPONSIBILITY OF PERFORMING THE WORK IN AN ACCEPTABLE MANNER IN ACCORDANCE WITH THE DEQ/QLPE APPROVEDCONSTRUCTION PLANS.10.ANY DEVIATION FROM THE APPROVED PLANS AND SPECIFICATIONS MUST HAVE THE APPLICABLE AGENCY APPROVAL IN WRITINGPRIOR TO CONSTRUCTION.11.PRIOR TO BEGINNING INSTALLATION OF STREET LIGHTS, THE ELECTRICAL CONTRACTOR SHALL OBTAIN AN ELECTRICAL PERMITFROM THE BUILDING DIVISION OF THE MERIDIAN PUBLIC WORKS DEPARTMENT. ANY DEVIATION IN STREET LIGHT LOCATIONS FROMTHE APPROVED PLANS MUST BE APPROVED IN WRITING FROM THE CITY ENGINEER.12.THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY.  IT SHALL BE THERESPONSIBILITY OF THE CONTRACTOR TO INFORM ALL UTILITY COMPANIES OF THE CONSTRUCTION SCHEDULE.  THE CONTRACTORSHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK.  THE CONTRACTOR ASSUMESALL RESPONSIBILITY FOR ANY AND ALL DAMAGES CAUSED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALLUNDERGROUND UTILITIES.  CONTRACTOR SHALL CALL DIG LINE AT 1-800-342-1585 PRIOR TO ANY EXCAVATION.ROADWAY NOTES1.ALL CONTRACTORS WORKING WITHIN THE PUBLIC RO A D R I G H T - O F - W A Y A R E R E Q U I R E D T O S E C U R E A R I G H T - O F - W A Y CONSTRUCTION PERMIT FROM ACHD OR ITD AT LEAST TWEN T Y - F O U R ( 2 4 ) H O U R S P R I O R T O A N Y C O N S T R U C T I O N . 2.ACHD OR ITD WILL INSPECT ALL WORK WITHIN THE PUBLIC R I G H T S - O F - W A Y T O I N C L U D E U T I L I T Y T R E N C H E S A B O V E T H E P I P E Z O N E . 3.ALL CONSTRUCTION IN THE PUBLIC RIGHT-OF-WAY SHALL C O N F O R M T O T H E C U R R E N T E D I T I O N O F T H E I S P W C . A N D T H E A C H D SUPPLEMENTAL SPECIFICATIONS. NO EXCEPTIONS TO DISTR I C T P O L I C Y , S T A N D A R D S A N D T H E I S P W C . W I L L B E A L L O W E D U N L E S S SPECIFICALLY AND PREVIOUSLY APPROVED IN WRITING BY A C H D . 4.ADA COUNTY HIGHWAY DISTRICT WILL INSPECT ALL WORK W I T H I N T H E R I G H T - O F - W A Y , M E R I D I A N P U B L I C W O R K S W I L L I N S P E C T PRIVATE ROADS, PARKING LOTS, AND OTHER PAVING IMPRO V E M E N T S O U T S I D E T H E P U B L I C R I G H T - O F - W A Y . 5.SET THE TOPS OF ALL VALVE BOXES AND SEWER MANHOLES F L U S H W I T H T H E S L O P E O F T H E F I N I S H E D S T R E E T G R A D E S . 6.ADA COUNTY HIGHWAY DISTRICT WILL INSPECT AND APPR O V E A L L S T O R M D R A I N A G E I M P R O V E M E N T S . M E R I D I A N P U B L I C W O R K S WILL INSPECT STORM DRAINAGE IMPROVEMENTS SERVING P R I V A T E R O A D S , P A R K I N G L O T S , A N D O T H E R P A V I N G I M P R O V E M E N T S OUTSIDE THE PUBLIC RIGHT-OF-WAY.7.PLACE ALL WATER VALVES, BLOW-OFFS AND MANHOLES S O T H A T T H E Y D O N O T C O N F L I C T W I T H A N Y C O N C R E T E C U R B A N D GUTTER, VALLEY GUTTER, OR SIDEWALK IMPROVEMENTS.8.CONTACT ACHD INSPECTION SERVICES AT 387-6284 A MINIM U M O F 2 4 H O U R S P R I O R T O B E G I N N I N G C O N S T R U C T I O N . 9.ACTUAL FIELD CONDITIONS DURING CONSTRUCTION MAY RE Q U I R E A D D I T I O N A L P A V E M E N T R E P A I R B E Y O N D T H E L I M I T S S H O W N O N THE PLAN. THE FOLLOWING CONDITIONS ARE LISTED IN SEC T I O N 6 0 0 0 H I G H W A Y C U T S O F T H E A C H D P O L I C Y M A N U A L . 1)ALL ASPHALT MATCH LINES FOR PAVEMENT REPAIR S H A L L B E P A R A L L E L T O T H E C E N T E R L I N E O F T H E S T R E E T A N D I N C L U D E ANY AREA DAMAGED BY EQUIPMENT DURING TRENCHING O P E R A T I O N S . 2)IF THE CUMULATIVE DAMAGED PAVEMENT AREA EXCE E D S 5 0 % O F T H E T O T A L R O A D S U R F A C E , T H E C O N T R A C T O R S H A L L REPLACE THE ENTIRE ROADWAY SURFACE.3)CONTRACTOR SHALL REPLACE THE PAVEMENT SURFACE T O E N S U R E M A T C H L I N E D O E S N O T F A L L W I T H I N T H E W H E E L P A T H O F A LANE. MATCH LINE SHALL ONLY FALL IN THE CENTER O R E D G E O F A T R A V E L L A N E . 4)FLOWABLE FILL OR IMPORTED MATERIAL MAY BE REQUI R E D I F T H E N A T I V E T R E N C H M A T E R I A L I S D E E M E D U N S U I T A B L E B Y A C H D INSPECTOR, DOES NOT MEET COMPACTION STANDARDS O R T I M E I S A C R I T I C A L F A C T O R . 5)ANY EXCEPTIONS TO THESE RULES SHALL BE PRE-APPR O V E D I N W R I T I N G B Y D I S T R I C T S T A F F B E F O R E C O N S T R U C T I O N B E G I N S . SEWER NOTES1.CONSTRUCTION OF THE SEWER SYSTEM SHALL CONFORM T O T H E S T A N D A R D S I N T H E W A S T E W A T E R R U L E S ( I D A P A 5 8 . 0 1 . 1 6 ) A S WELL AS THE STANDARDS AND SPECIFICATIONS REFERRED T O I N G E N E R A L C O N S T R U C T I O N N O T E N O . 1 . 2.THE HORIZONTAL SEPARATION OF POTABLE WATER MAINS A N D N O N - P O T A B L E W A T E R M A I N S ( S A N I T A R Y S E W E R , S T O R M D R A I N , AND IRRIGATION) SHALL BE A MINIMUM OF TEN (10) F E E T . W H E R E I T I S N E C E S S A R Y F O R A P O T A B L E W A T E R M A I N A N D NON-POTABLE WATER MAIN TO CROSS WITH LESS THAN EI G H T E E N ( 1 8 ) I N C H E S O F V E R T I C A L S E P A R A T I O N , T H E C R O S S I N G S H A L L BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 O F T H E I D A H O R U L E S F O R P U B L I C D R I N K I N G W A T E R S Y S T E M S ( I D A P A 58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES ( I D A P A 5 8 . 0 1 . 1 6 ) . 3.THE HORIZONTAL SEPARATION OF NON-POTABLE SERVICES A N D P O T A B L E W A T E R S E R V I C E S O R P O T A B L E W A T E R M A I N S S H A L L B E A MINIMUM OF SIX (6) FEET. WHERE IT IS NECESSARY FOR A P O T A B L E W A T E R M A I N A N D N O N - P O T A B L E W A T E R M A I N T O C R O S S WITH LESS THAN EIGHTEEN (18) INCHES OF VERTICAL SEPA R A T I O N , T H E C R O S S I N G S H A L L B E C O N S T R U C T E D I N A C C O R D A N C E W I T H SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKI N G W A T E R S Y S T E M S ( I D A P A 5 8 . 0 1 . 0 8 ) A N D S E C T I O N 4 3 0 . 0 2 O F T H E WASTEWATER RULES (IDAPA 58.01.16).4.PLACE SEWER SERVICE LINES IN A SIX (6) INCH DIAMETER W A T E R C L A S S P I P E S L E E V E W H E R E V E R T H E S E R V I C E L I N E C R O S S E S A STORM WATER TREATMENT FACILITY (I.E., SEEPAGE BE D S , D R A I N A G E S W A L E S ) , R E F E R T O D E T A I L 7 O F T H E 2 0 1 7 A C H D STORMWATER DESIGN GUIDELINES. P R E S S U R E I R R I G A T I O N N O T E S 1 . T H E P R E S S U R I Z E D I R R I G A T I O N S Y S T E M M U S T B E B U I L T T O T H E S T A N D A R D S O F T H E I R R I G A T I O N D I S T R I C T I N W H I C H I T I S B E I N G C O N S T R U C T E D . 2 . I N S T A L L A R E D U C E D P R E S S U R E B A C K F L O W P R E V E N T E R I N A N Y C O N N E C T I O N B E T W E E N T H E P O T A B L E W A T E R S Y S T E M A N D T H E P R E S S U R E I R R I G A T I O N S Y S T E M . T H E D E V I C E M U S T B E A P P R O V E D B Y T H E I D A H O D E P A R T M E N T O F E N V I R O N M E N T A L Q U A L I T Y ( D E Q ) A N D T H E C I T Y O F M E R I D I A N W A T E R D E P A R T M E N T . W A T E R N O T E S 1 . C O N S T R U C T I O N O F T H E S E W E R S Y S T E M S H A L L C O N F O R M T O T H E S T A N D A R D S I N T H E W A S T E W A T E R R U L E S ( I D A P A A S W E L L A S T H E S T A N D A R D S A N D S P E C I F I C A T I O N S R E F E R R E D T O I N G E N E R A L C O N S T R U C T I O N N O T E N O . 1 . 2 . T H E H O R I Z O N T A L S E P A R A T I O N O F P O T A B L E W A T E R M A I N S A N D N O N - P O T A B L E W A T E R M A I N S ( S A N I T A R Y S E W E R , S T O R M D R A I N , A N D I R R I G A T I O N ) S H A L L B E A M I N I M U M O F T E N ( 1 0 ) F E E T . W H E R E I T I S N E C E S S A R Y F O R A P O T A B L E W A T E R M A I N A N D N O N - P O T A B L E W A T E R M A I N T O C R O S S W I T H L E S S T H A N E I G H T E E N ( 1 8 ) I N C H E S O F V E R T I C A L S E P A R A T I O N , T H E C R O S S I N G S H A L L B E C O N S T R U C T E D I N A C C O R D A N C E W I T H S E C T I O N 5 4 2 . 0 7 O F T H E I D A H O R U L E S F O R P U B L I C D R I N K I N G W A T E R S Y S T E M S ( I D A P A 5 8 . 0 1 . 0 8 ) A N D S E C T I O N 4 3 0 . 0 2 O F T H E W A S T E W A T E R R U L E S ( I D A P A 5 8 . 0 1 . 1 6 ) . 3 . T H E H O R I Z O N T A L S E P A R A T I O N O F N O N - P O T A B L E S E R V I C E S A N D P O T A B L E W A T E R S E R V I C E S O R P O T A B L E W A T E R M A I N S S H A L L B E A M I N I M U M O F S I X ( 6 ) F E E T . W H E R E I T I S N E C E S S A R Y F O R A P O T A B L E W A T E R M A I N A N D N O N - P O T A B L E W A T E R M A I N T O C R O S S W I T H L E S S T H A N E I G H T E E N ( 1 8 ) I N C H E S O F V E R T I C A L S E P A R A T I O N , T H E C R O S S I N G S H A L L B E C O N S T R U C T E D I N A C C O R D A N C E W I T H S E C T I O N 5 4 2 . 0 7 O F T H E I D A H O R U L E S F O R P U B L I C D R I N K I N G W A T E R S Y S T E M S ( I D A P A 5 8 . 0 1 . 0 8 ) A N D S E C T I O N 4 3 0 . 0 2 O F T H E W A S T E W A T E R R U L E S ( I D A P A 5 8 . 0 1 . 1 6 ) . 4 . P L A C E S E W E R S E R V I C E L I N E S I N A S I X ( 6 ) I N C H D I A M E T E R W A T E R C L A S S P I P E S L E E V E W H E R E V E R T H E S E R V I C E L I N E C R O S S E S A S T O R M W A T E R T R E A T M E N T F A C I L I T Y ( I . E . , S E E P A G E B E D S , D R A I N A G E S W A L E S ) , R E F E R T O D E T A I L 7 O F T H E 2 0 1 7 A C H D S T O R M W A T E R D E S I G N G U I D E L I N E S . 5 . T H E C O N T R A C T O R S H A L L B E R E S P O N S I B L E F O R P R O V I D I N G C O N T I N U O U S W A T E R S E R V I C E T O A L L E X I S T I N G W A T E R U S E R S A F F E C T E D B Y C O N S T R U C T I O N . I F W A T E R S E R V I C E M U S T B E I N T E R R U P T E D , T H E C O N T R A C T O R S H A L L C O O R D I N A T E W I T H T H E P U B L I C W O R K S I N S P E C T O R . N O R T H C I V I L I N N O V A T I O N S LOCATED IN IN THE NW 1 / 4 O F T H E S E 1 / 4 O F S E C T I O N 2 8 , T. 3 N., R. 1 E., B.M., M E R I D I A N , A D A C O U N T Y , I D A H O D E V E L O P E R S H E L B U R N E P R O P E R T I E S , L L C C O N T A C T : R A N D A L C L A R N O 7 4 4 0 E . P I N N A C L E P E A K R D . , S T E . 1 4 2 S C O T T S D A L E , A Z 8 5 2 2 5 P H O N E : ( 4 8 0 ) 4 0 1 - 0 8 0 0 E M A I L : R A N D Y @ C R I T E R I O N L A N D . C O M E N G I N E E R C I V I L I N N O V A T I O N S , P L L C C O N T A C T : B E N T H O M A S 1 0 4 3 E . P A R K B L V D . S T E . 1 0 1 B O I S E , I D 8 3 7 1 2 P H O N E : ( 2 0 8 ) 8 8 4 - 8 1 8 1 E M A I L : B E N @ C I V I L - I N N O V A T I O N S . C O M D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.100 (Title and Note Sheet).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 1 0 0 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 8 O F 2 2 C . 6 0 0 9 O F 2 2 C . 6 0 1 6 O F 2 2 C . 5 0 0 S T R E E T D E T A I L S 3 O F 2 2 C . 2 0 1 S T R E E T P R O F I L E S 7 O F 2 2 C . 5 0 1 4 O F 2 2 C . 3 0 0 S E W E R P L A N A N D P R O F I L E 5 O F 2 2 C . 4 0 0 W A T E R P L A N 2 O F 2 2 C . 2 0 0 S T R E E T A N D S T O R M D R A I N P L A N 1 O F 2 2 C . 1 0 0 T I T L E S H E E T A N D C O N S T R U C T I O N N O T E S S T R E E T A N D S T O R M D R A I N P L A N C . 2 0 2 S T R E E T P R O F I L E S C . 2 0 3 G R A D I N G P L A N C . 3 0 1 G R A D I N G P L A N S E W E R P L A N A N D P R O F I L E C . 4 0 1 S E W E R P L A N A N D P R O F I L E C . 4 0 2 S E W E R P L A N A N D P R O F I L E S C . 4 0 3 W A T E R P L A N I R R I G A T I O N P L A N I R R I G A T I O N P L A N C . 7 0 0 S T O R M D R A I N D E T A I L S C . 7 0 1 1 6 O F 2 2 1 7 O F 2 2 1 4 O F 2 2 1 1 O F 2 2 1 5 O F 2 2 1 2 O F 2 2 1 3 O F 2 2 1 0 O F 2 2 1 9 O F 2 2 1 8 O F 2 2 S T R E E T S T R I P I N G , S I G N A G E A N D L I G H T I N G P L A N C . 2 0 5 2 0 O F 2 2 C . 1 0 1 E X I S T I N G C O N D I T I O N P L A N C . 1 0 2 E X I S T I N G C O N D I T I O N P L A N 2 1 O F 2 2 C . 2 0 4 E . B O T T D R . B R I D G E C R O S S I N G D E T A I L P L A N Beginning of Vertical CurveCatch BasinCurb FaceCubic FootCenterlineClean-Out (Sewer)ConnectionConstruct, ConstructionCoordinateCubic YardDrop Inlet Cable TelevisionDuctile Iron PipeEnd of CurveEnd of Curb ReturnEdge of GutterEngineer, EngineeringEdge of Pavement Electric Meter Back of WalkDiameterDIAECREGEPEMELEVENGRElevationDWEAECDIPDWGEachDrivewayDrawingEastingCYCONNCONSTCOORDDBLCTVDoubleCBCFCLCOCONCBWConcreteLPOHPPCP.C.C.PCCPEPIRRPCVC LTMAINTMHNNO.MW ISPWC IRRLBLFL IP GRHDPEHORIZHPINCLINV GM AbandonedAsphalt ConcreteAsbestos Cement PipeBeginning of CurveBeginning of Curb ReturnBench mark Acrylonitrile - Butadiene - StyreneACPBCBKBMAHALTBCRBVCBackAheadAlternateACABSABANABANDAbandonFHFSFTGGALVGLGBGIRRFLESMTEVCFGEXISTGrade Line, Ground LineLow PointPortland Cement ConcretePoint of Compound CurvaturePoint of Compound Vertical CurvePressurized Irrigation Overhead PowerPoint of Curvature MaintenancePolyethyleneMonitoring Well LeftManholeNorthingNumber High Density PolyethyleneIdaho Standards For PublicWorks Construction Iron PipeLinear Foot LengthPound Irrigation Gas MeterHorizontalHigh Point GradeIncludingInvertStationSTAStandardSquare YardTop of CurbTelephoneTransitionValve BoxVertical CurveWater Meter TopographyTOPOTRANSTYPVBVCVERTWMTypicalVertical TC STDSWSYTANTELSidewalk Dimension Ratio Storm Drain Seepage BedSanitary Sewer Signal Pole Square Foot (feet)Roof LineSPRKSSSFSPSECSectionRtRRSDSBRLRightSlopeRailroad End of Vertical CurveFire HydrantFlow LineFinished SurfaceGalvanizedGrade BreakGravity Irrigation Footing EasementFinished Grade Existing Property linePoint on CurvePower PolePavementRight-of-Way Point of Reverse CurvaturePounds per Square InchPoint of TangencyPolyvinyl Chloride PSIRPVCPVMTR/W PTRadius PLPOCPRCPPRBRibbon CurbRCRoll Curb STANDARD ABBREVIATIONSSTREET PLAN LEGENDTangentSprinklerStandard Thermoplastic PipeSand and Grease TrapSG SSDR S I PROPOSED 5' CONTOUR BOUNDARY LINERIGHT-OF-WAY LINEPROPERTY LOT LINE CENTERLINEPROPOSED 1' CONTOUREXISTING 5' CONTOUREXISTING 1' CONTOUR 26452644DRAINAGE SWALE EXISTING EDGE OF PAVEMENT0+00.00CENTERLINE STATIONINGPROPOSED VERTICAL CURB EPEXISTING STREET SIGNEXISTING STREET LIGHT PROPOSED ROLLED CURBEXISTING VERTICAL CURBEXISTING ROLLED CURBDIRECTION OF SURFACE FLOWPROPOSED TYPE II BARACADEPROPOSED TYPE III BARACADESEXISTING BARACADE D E T A C H E D ATTACHED P R O P O S E D P E D E S T R I A N R A M P W I T H A T T A C H E D S I D E W A L K P R O P O S E D P E D E S T R I A N R A M P W I T H D E T A C H E D S I D E W A L K DETACHEDDETACHED P R O P O S E D S E E P A G E B E D W I T H M O N I T O R I N G W E L L S P R O P O S E D S A N D A N D G R E A S E T R A P P R O P O S E D D R O P I N L E T E X I S T I N G S A N D A N D G R E A S E T R A P E X I S T I N G D R O P I N L E T PROPOSED STREET SIGN E X I S T I N G S T O R M D R A I N L I N E A N D M A N H O L E PROPOSED REVERSED VERTICAL CURB P R O P O S E D C O N C R E T E V A L L E Y G U T T E R SD P R O P O S E D S T O R M D R A I N L I N E A N D M A N H O L E PRESSURE IR R I G A T I O N P L A N L E G E N D P R O P O S E D G R A V I T Y I R R I G A T I O N L I N E A N D B O X GRAVITY IRRI G A T I O N P L A N L E G E N D E X I S T I N G G R A V I T Y I R R G A T I O N L I N E GIRR P R O P O S E D P R E S S U R E I R R I G A T I O N L I N E A N D V A L V E E X I S T I N G P R E S S U R E I R R I G A T I O N L I N E A N D S E R V I C E L I N E PIRR P R O P O S E D C O N C R E T E T H R U S T B L O C K P R O P O S E D W A T E R L I N E A N D V A L V E E X I S T I N G W A T E R L I N E A N D V A L V E W P R O P O S E D D O U B L E W A T E R M E T E R S E R V I C E L I N E P R O P O S E D S I N G L E W A T E R M E T E R S E R V I C E L I N E E X I S T I N G D O U B L E W A T E R M E T E R S E R V I C E L I N E E X I S T I N G S I N G L E W A T E R M E T E R S E R V I C E L I N E P R O P O S E D F I R E H Y D R A N T E X I S T I N G F I R E H Y D R A N T P R O P O S E D C O N C R E T E T H R U S T B L O C K E X I S T I N G C O N C R E T E T H R U S T B L O C K E X I S T I N G P R E S S U R E I R R I G A T I O N L I N E A N D V A L V E S E W E R P L A N L E G E N D S S S E R V I C E I N V E R T E L E V A T I O N S S P R O P O S E D S E W E R L I N E A N D S T A T I O N 1 0 P R O P O S E D S A N I T A R Y S E W E R L I N E A N D M A N H O L E S S P R O P O S E D S A N I T A R Y S E W E R L I N E A N D S E R V I C E S L S E R V I C E L E N G T H S C S E R V I C E C O N N E C T I O N E X I S T I N G S E W E R L I N E A N D M A N H O L E E X I S T I N G S E W E R L I N E A N D S E R V I C E STREET AND S T O R M D R A I N P L A N L E G E N D W A T E R P L A N L E G E N D PROPOSED VERTICAL TO ROLLED CURBTRANSITION SECTIONEXISTING STREET LIGHTPIRR S T R E E T S T R I P I N G , S I G N A G E A N D L I G H T I N G P L A N C . 2 0 6 2 2 O F 2 2 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 5 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 4 5 0 A N T L E R R I D G E S U B D I V I S I O N P H A S E 4 BREMERTON SUBDIVISION UNPLATTEDPARCEL NO. S1128131530UNPLATTEDPARCEL NO. S1128427880SDEXISTING BRIDGE CENTERLINE OF TEN MILE FEEDER CANALEXISTINGSHELBURNE EASTSUBD. NO. 1EXISTINGSHELBURNE EASTSUBD. NO. 1 E X I S T I N G G A R A G E ( T O R E M A I N ) N O T E : E X I S T I N G R E S I D E N C E A N D S H E D S , E T C . T O B E R E M O V E D N O T E : E X I S T I N G W E L L M U S T B E A B A N D O N E D F R O M D O M E S T I C U S E I N A C C O R D A N C E W I T H I D A H O D E P A R T M E N T O F W A T E R R E S O U R C E R E Q U I R E M E N T S , W I T H V E R I F I C A T I O N O F D I S C O N N E C T B Y M E R I D I A N P U B L I C W O R K S D E P A R T M E N T . C O N T A C T I D W R I F W E L L A B A N D O M E N T I S R E Q U I R E D . W E L L S M A Y B E U S E D F O R I R R I G A T I O N P U R P O S E S . N O T E : E X I S T I N G S H E D T O B E R E M O V E D N O T E : E X I S T I N G S H E D T O B E R E M O V E D N O T E : A P P R O X I M A T E L O C A T I O N O F E X I S T I N G S E P T I C T A N K . E X I S T I N G S E P T I C T A N K S M U S T B E A B A N D O N E D I N A C C O R D A N C E W I T H C E N T R A L D I S T R I C T H E A L T H D E P A R T M E N T R E Q U I R E M E N T S . N O T E : E X I S T I N G O V E R H E A D P O W E R ( T O B E R E L O C A T E D B Y O T H E R S ) NOTE:EXISTING OVERHEAD POWER(TO BE RELOCATED BY OTHERS) N O T E : E X I S T I N G O V E R H E A D P O W E R ( T O B E R E L O C A T E D B Y O T H E R S ) E. BOTT DR. EXIST. 50' RIGHT-OF-WAY N O T E : A P P R O X I M A T E L O C A T I O N O F E X I S T I N G S E P T I C T A N K . E X I S T I N G S E P T I C T A N K S M U S T B E A B A N D O N E D I N A C C O R D A N C E W I T H C E N T R A L D I S T R I C T H E A L T H D E P A R T M E N T R E Q U I R E M E N T S . D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.101 (Existing Condition Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 1 0 1 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 M A T C H L I N E - S E E S H E E T C . 1 0 2 MATCH LINE - SEE SHEET C.102 C . 1 0 1 EXISTING CONDITION PLAN 2 S C A L E : 1 " = 1 E X I S T I N G C O N D I T I O N P L A N 4 0 ' - 0 " H O R I Z O N T A L H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 6 0 N O R T H C I V I L I N N O V A T I O N S UNPLATTEDPARCEL NO. S1128438500 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 3 8 4 1 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 4 9 3 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 2 8 2 SD 14 BLOCK 13456789101112BLOCK 5BLOCK 51 EXISTING BRIDGECENTERLINE OF TEN MILE FEEDER CANAL E X I S T I N G R E S I D E N C E ( T O R E M A I N ) EXISTINGSHELBURNE EASTSUBD. NO. 1EXISTINGSHELBURNE EASTSUBD. NO. 1 S. SELATIR WAYE. FRATELLO ST. N O T E : E X I S T I N G R E S I D E N C E A N D S H E D S , E T C . T O B E R E M O V E D N O T E : E X I S T I N G W E L L M U S T B E A B A N D O N E D F R O M D O M E S T I C U S E I N A C C O R D A N C E W I T H I D A H O D E P A R T M E N T O F W A T E R R E S O U R C E R E Q U I R E M E N T S , W I T H V E R I F I C A T I O N O F D I S C O N N E C T B Y M E R I D I A N P U B L I C W O R K S D E P A R T M E N T . C O N T A C T I D W R I F W E L L A B A N D O M E N T I S R E Q U I R E D . W E L L S M A Y B E U S E D F O R I R R I G A T I O N P U R P O S E S . N O T E : A P P R O X I M A T E L O C A T I O N O F E X I S T I N G S E P T I C T A N K . E X I S T I N G S E P T I C T A N K S M U S T B E A B A N D O N E D I N A C C O R D A N C E W I T H C E N T R A L D I S T R I C T H E A L T H D E P A R T M E N T R E Q U I R E M E N T S . NOTE:EXISTING WELL MUST BE ABANDONED FROMDOMESTIC USE IN ACCORDANCE WITH IDAHODEPARTMENT OF WATER RESOURCEREQUIREMENTS, WITH VERIFICATION OFDISCONNECT BY MERIDIAN PUBLIC WORKSDEPARTMENT. CONTACT IDWR IF WELLABANDOMENT IS REQUIRED. WELLS MAYBE USED FOR IRRIGATION PURPOSES. N O T E : E X I S T I N G O V E R H E A D P O W E R ( T O B E R E L O C A T E D B Y O T H E R S ) NOTE:EXISTING OVERHEAD POWER(TO BE RELOCATED BY OTHERS) N O T E : E X I S T I N G O V E R H E A D P O W E R ( T O B E R E L O C A T E D B Y O T H E R S ) E. BOTT DR.EXIST. 50' RIGHT-OF-WAY N O T E : A P P R O X I M A T E L O C A T I O N O F E X I S T I N G S E P T I C T A N K . E X I S T I N G S E P T I C T A N K S M U S T B E A B A N D O N E D I N A C C O R D A N C E W I T H C E N T R A L D I S T R I C T H E A L T H D E P A R T M E N T R E Q U I R E M E N T S . D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.101 (Existing Condition Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 1 0 2 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 M A T C H L I N E - S E E S H E E T C . 1 0 1 MATCH LINE - SEE SHEET C.101 C . 1 0 2 EXISTING CONDITION PLAN 3 S C A L E : 1 " = 1 E X I S T I N G C O N D I T I O N P L A N 4 0 ' - 0 " H O R I Z O N T A L H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 6 0 N O R T H C I V I L I N N O V A T I O N S U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 5 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 4 5 0 A N T L E R R I D G E S U B D I V I S I O N P H A S E 4 BREMERTON SUBDIVISION UNPLATTEDPARCEL NO. S1128131530UNPLATTEDPARCEL NO. S1128427880SD SD EP EP GIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRR G I R R EP EP EPEPEPEP PIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRR PIRR P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R PIRRPIRR P I R R P I R R P I R R P I R R P I R R P I R R PIRR PIRR PIRR P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R PIRRPIRRPIRRPIRRPIRR 3 1 E P E G 6 2 2 5 BLOCK 6 4 2 0 2 1 2 B L O C K 8 1 B L O C K 9 1 2 B L O C K 7 1 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 BLO C K 7 2 3 4 5 6 B L O C K 9 E P E G 2 B C R = 2 8 ' 50.00' 4 1 . 0 0 ' EXISTING BRIDGE CENTERLINE OF TEN MILE FEEDER CANAL 10+00 11+00 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 4 + 0 0 1 5 + 0 0 16+00 17+00 17+87.35 1 0 + 0 0 1 1 + 0 0 S. TARADALE AVE. E . A W B R E Y S T . E . D A R B Y S T . E . B O T T D R . E. BOTT DR. S. TARADALE PL. 24+28.29, 18.00' LBEGIN CONST.(MATCH EXISTING)2706.71 VC24+45.51, 18.00' RBEGIN CONST.(MATCH EXISTING)2706.64 VCEXISTING GRAVELACCESS ROAD10' WIDE ASPHALT PATH(SEE SHEET C.202)EXISTING PAVEDACCESS ROAD25+53.86 2703.71 VC/GB/EVC 25+53.86 2703.29 LIP/GB/EVC25+62.50 2702.68 LIP/GB/BVC25+62.50 2703.10 VC/GB/BVC 2 7 + 1 1 . 6 5 2 7 0 0 . 0 4 V C / L P 26+35.50 2700.35 VC/GB/EVC 2 7 + 1 3 . 1 5 2 7 0 0 . 0 5 V C / G B / P C 26+35.50 2700.35 VC/GB/EVC 2 7 + 1 1 . 6 5 2 7 0 0 . 0 4 V C / L P 2 7 + 1 3 . 1 5 2 7 0 0 . 0 5 V C / G B / P C 2 7 + 6 1 . 0 2 2 7 0 0 . 2 6 V C / G B / P T 2 7 + 6 1 . 0 2 2 7 0 0 . 2 6 V C / G B / P T 2 8 + 0 8 . 4 6 2 7 0 0 . 4 5 V C / G B / P C 1 0 + 4 6 . 0 0 2 7 0 0 . 8 9 V C / G B / P T 2 8 + 0 8 . 4 6 2 7 0 0 . 4 5 V C / G B / P C 2 1 0 + 4 6 . 0 0 2 7 0 0 . 1 2 V C / G B / P T 1 0 + 5 1 . 0 0 2 6 9 9 . 8 6 R C B C R = 2 8 ' 1 0 + 5 1 . 0 0 2 7 0 0 . 7 4 R C / H P 1 0 + 5 1 . 0 0 2 7 0 0 . 7 4 R C / H P 1 0 + 4 6 . 0 0 2 7 0 0 . 9 0 V C / G B / P T 2 8 + 7 1 . 6 6 , 2 6 . 2 0 ' R 2 7 0 1 . 0 0 V C / H P 2 8 + 9 1 . 4 6 2 7 0 0 . 7 9 V C / G B / P C 2 B C R = 2 8 ' 2 8 + 9 1 . 4 6 2 7 0 0 . 7 9 V C / G B / P C B C R = 2 8 ' 2 1 0 + 4 6 . 0 0 2 7 0 0 . 1 2 V C / G B / P T 1 0 + 5 1 . 0 0 2 6 9 9 . 8 6 R C 18.00'18.00' 50.00'18.00'18.00' 1 3 . 5 ' 1 3 . 5 ' 13.5'13.5' 41.00'13.5'13.5' 41.00' 13.5'13.5' 4 1 . 0 0 ' 1 3 . 5 ' 1 3 . 5 ' 4 1 . 0 0 ' 1 3 . 5 ' 1 3 . 5 ' 4 1 . 0 0 ' 1 3 . 5 ' 1 3 . 5 ' 1.2% 1.8% 0.9% 0 . 9 % 0.4 % 0 . 9 % 3 2 9 + 9 3 . 5 0 , 1 8 . 0 0 ' L S U B D . B O U N D A R Y 2 7 0 0 . 7 8 F S 1.5% 1.8% 0.9% 1 . 4 % 0 . 7 % 1 8 . 0 0 ' 1 8 . 0 0 ' STA: 24+94.93, 25.00'L(RIGHT-OF-WAY) S T A : 2 7 + 6 1 . 0 2 , 2 5 . 0 0 ' L ( R I G H T - O F - W A Y ) EXIST. 50' R/W 1 2 : 1 P A V E M E N T T R A N S I T I O N ( M A T C H E X I S T I N G P V M T S E C T I O N ) 1 0 + 8 2 . 4 0 2 6 9 9 . 5 8 R C / G B / P C 1 0 + 9 8 . 4 9 2 6 9 9 . 4 4 R C / G B / P T 1 0 + 8 2 . 4 0 2 6 9 9 . 5 8 R C / G B / P C 1 0 + 9 8 . 4 9 2 6 9 9 . 4 4 R C / G B / P T 1 1 + 0 9 . 3 5 2 6 9 9 . 3 4 R C 1 5 + 4 0 . 6 0 2 6 9 6 . 9 9 R C 1 1 + 4 8 . 2 8 2 6 9 8 . 9 9 R C / G B / P C 1 0 + 4 5 . 5 1 2 6 9 8 . 9 8 R C / G B 1 0 + 4 1 . 3 9 2 6 9 8 . 9 5 R C 1 0 + 3 5 . 2 4 2 6 9 8 . 9 1 R C / G B / P T 1 1 + 6 4 . 8 5 , 2 0 . 8 7 ' L 2 6 9 8 . 8 1 F L / H P 1 1 1 + 7 5 . 5 8 2 6 9 8 . 7 4 R C / G B / P C 1 1 + 9 1 . 6 7 2 6 9 8 . 6 0 R C / G B / P T 1 1 + 6 9 . 4 3 2 6 9 8 . 8 0 R C 1 2 + 1 7 . 1 3 2 6 9 8 . 3 7 R C / G B 1 2 + 2 8 . 3 5 2 6 9 8 . 3 3 R C 1 2 + 8 8 . 3 5 2 6 9 8 . 0 8 R C 1 3 + 4 8 . 3 5 2 6 9 7 . 8 4 R C 1 4 + 0 8 . 3 5 2 6 9 7 . 6 0 R C 1 4 + 6 8 . 3 5 2 6 9 7 . 3 6 R C 1 4 + 7 6 . 6 7 2 6 9 7 . 3 3 R C / G B / P C 1 5 + 0 7 . 8 9 2 6 9 7 . 1 7 R C 1 5 + 2 6 . 0 1 2 6 9 7 . 0 7 R C 1 5 + 5 5 . 2 1 2 6 9 6 . 9 2 R C / G B / P T 1 5 + 5 5 . 2 1 2 6 9 6 . 9 2 R C / G B / P T 1 5 + 7 8 . 4 7 2 6 9 6 . 8 3 R C 1 6 + 0 6 . 7 1 2 6 9 6 . 7 1 R C 1 6 + 4 8 . 4 7 2 6 9 6 . 5 4 R C 1 3 + 9 0 . 1 7 2 6 9 7 . 6 8 R C 1 6 + 6 6 . 7 1 2 6 9 6 . 4 7 R C / L P 1 6 + 6 6 . 7 1 2 6 9 6 . 4 7 R C / L P 17+87.29, 13.50' LEND CONST.2697.60 RC 17+87.40, 13.50' REND CONST.2697.60 RC17+26.71 2696.83 RC/GB 17+26.71 2696.83 RC/GB 41.00' I N S T A L L 2 0 ' W I D E A S P H A L T D R I V E W A Y S E E D E T A I L O N D E T A I L S H E E T I N S T A L L S I D E W A L K W I T H 6 " C O N C R E T E INSTALL SIDEWALKWITH 6" CONCRETE 1 1 + 1 1 . 9 6 , 1 3 . 5 0 ' L E N D C O N S T . 2 6 9 9 . 5 7 R C 1 1 + 1 2 . 0 4 , 1 3 . 5 0 ' R E N D C O N S T . 2 6 9 9 . 5 7 R C 1 0 + 9 8 . 6 2 , 3 0 . 5 0 ' R ( M A T C H E X I S T . ) 2 6 9 8 . 6 9 E G 1 0 + 8 3 . 6 1 , 3 0 . 5 0 ' R ( M A T C H E X I S T . ) 2 6 9 8 . 5 1 E G 1 0 + 4 5 . 5 1 2 6 9 8 . 9 8 R C / G B 1 0 + 3 3 . 3 9 2 6 9 8 . 8 1 R C / G B / P T 1 2 + 1 7 . 1 3 2 6 9 8 . 3 7 R C / G B / P C B C R = 2 0 ' B C R = 2 0 ' 1 . 8 % 0 . 7 % 1 . 4 % 1. 3 % 0 . 4 % 1 . 1 % 3 0 + 3 7 . 7 0 , 1 9 . 6 7 ' R ( M A T C H E X I S T . ) 2 7 0 1 . 0 0 E P 3 0 + 3 7 . 7 0 , 7 . 9 5 ' R ( M A T C H E X I S T . ) 2 7 0 1 . 2 6 A C / C R O W N 3 0 + 3 7 . 7 0 , 2 . 8 5 ' L ( M A T C H E X I S T . ) 2 7 0 1 . 0 3 A C 2.2% 3 0 + 4 5 . 6 6 , 5 . 8 1 ' L 2 7 0 0 . 8 9 E P / G B E X I S T . G R A V E L D R I V E ( T O R E M A I N ) 2 9 + 9 3 . 6 1 , 1 8 . 0 0 ' R S U B D . B O U N D A R Y 2 7 0 0 . 7 8 F S 2 9 + 8 8 . 5 0 2 7 0 1 . 1 8 V C / G B 2 9 + 8 8 . 6 1 2 7 0 1 . 1 8 V C / G B 3 0 + 4 5 . 6 6 , 2 . 8 5 ' L ( M A T C H E X I S T . ) 2 7 0 0 . 9 9 A C 1 2 : 1 P A V E M E N T T R A N S I T I O N ( M A T C H E X I S T I N G P V M T S E C T I O N ) E X I S T . E . B O T T L N . ( T O R E M A I N ) GRAVEL DRIVEWAY(SEE SHEET C.202)GRAVEL D R I V E W A Y (SEE SH E E T C . 2 0 2 ) 1 5 + 0 7 . 8 9 , 2 3 . 0 5 ' R 2 6 9 7 . 3 4 F S / G B / P C 1 5 + 1 4 . 2 5 , 4 8 . 1 9 ' R 2 6 9 7 . 7 8 F S / G B / P T 1 5 + 2 6 . 6 6 , 8 2 . 7 3 ' R 2 6 9 8 . 2 3 F S / G B 1 5 + 2 1 . 2 5 , 2 5 . 7 4 ' R 2 6 9 7 . 2 8 F S / G B / P C 1 5 + 2 2 . 3 5 , 3 4 . 6 8 ' R 2 6 9 7 . 3 8 F S / G B / P T 1 5 + 3 3 . 5 2 , 7 3 . 0 8 ' R 2 6 9 7 . 8 3 F S / G B 1 0 ' 1 0 ' R = 2 0 ' 2 . 0 % 2 . 0 % 1.0% 1.0% 1 G R A V E L D R I V E W A Y ( 1 0 " O F 3 / 4 " M I N U S R O A D M I X O V E R C O M P A C T E D S U B G R A D E ) INSTALL 20' WIDE ASPHALT TURN-AR O U N D SEE DETAIL ON DETAIL SHEET S B 1 0 S D M H 1 0 D I 1 0 B D I 1 0 A SB 12A ACHD STOR M D R A I N EASEMENT D I 1 2 A D I 1 2 B 1 4 + 7 6 . 6 7 2 6 9 7 . 3 3 R C / G B / P C 4 4 4 4 4 4 4 1 1 + 1 2 . 0 0 2 7 0 0 . 4 8 R C EXISTINGSHELBURNE EASTSUBD. NO. 1EXISTINGSHELBURNE EASTSUBD. NO. 1 4 59 5 5 8 4 4 6 6 3 7 8 11 10 11 1 1 1 1 1 0 12 1 2 M W MW M W MW M W 1 1 + 6 0 . 1 7 2 7 0 0 . 2 8 R C / G B / P C 1 1 + 7 6 . 1 8 , 1 7 . 7 9 ' R 2 7 0 0 . 1 9 F L / H P 1 1 + 2 3 . 9 8 2 7 0 0 . 7 9 R C / G B / P C 11+54.76, 1 3 . 5 0 ' R 2700.93 R C 1 1 + 2 3 . 9 8 , 0 . 0 0 ' 2 7 0 0 . 8 1 A C / G B / P C AC H D S T O R M D R A I N E A S E M E N T 9 0 ° E X I S T I N G G A R A G E ( T O R E M A I N ) 5 24+94.68 2705.91 LIP/GB/PT 24+80.86 2706.48 VC/GB/BVCSTA: 24+19.20, 25.00'L(RIGHT-OF-WAY) 5 0 . 0 0 ' R / W 24+94.68 2705.91 LIP/GB/PT 30+50 23+0024+0025+00 26+00 2 7 + 0 0 28+00 29+00 30+00 24+80.86 2706.48 VC/GB/BVC STA: 24+43.57, 25.00'R(RIGHT-OF-WAY)STA: 24+96.56, 25.00'R(RIGHT-OF-WAY) 70.00' 4 7 . 0 0 ' 1 6 + 4 9 . 0 7 , 1 8 . 5 0 ' R 2 6 9 6 . 6 3 F S / G B 1 6 + 5 6 . 7 1 , 3 8 . 5 0 ' R 2 6 9 6 . 8 2 F S / G B / P T 1 6 + 5 6 . 7 1 , 5 8 . 5 0 ' R 2 6 9 7 . 0 2 F S / G B S B 1 2 B 16+84.35, 18.50' R 2696.67 FS/GB 16+76.71, 38. 5 0 ' R 2696.82 FS/G B / P T 16+76.71, 5 8 . 5 0 ' R 2697.02 FS/ G B S D M H 1 2 R = 3 0 ' ( T Y P . ) 2 9 + 9 3 . 5 3 , 1 0 . 1 5 ' L S U B D . B O U N D A R Y 2 7 0 0 . 9 0 F S D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.200 (Street Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 2 0 0 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 2 0 0 STREET AND STORM DRAIN PLAN 4 A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n S C A L E : 1 " = 1 S T R E E T A N D S T O R M D R A I N P L A N 4 0 ' - 0 " H O R I Z O N T A L H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 6 0 N O R T H C I V I L I N N O V A T I O N S 3 S T R E E T A N D S T O R M D R A I N D A T A S E E P A G E B E D N O . 1 2 D I 1 2 A C L S T A . 1 6 + 6 6 . 7 1 , 1 3 . 5 0 ' L T , E . A W B R E Y S T . D R O P I N L E T , A C H D S u p p l e m e n t a l D r a w i n g S D - 6 0 4 , T Y P E I V T O P O F C U R B = 2 6 9 6 . 4 7 1 2 " I N V O U T ( N ) = 2 6 9 3 . 2 2 I N S T A L L 2 3 . 3 2 L F 1 2 " P V C ( S D R - 3 5 ) @ 0 . 5 1 % T O D I 1 2 B Q ( 2 5 ) = 1 . 3 1 c f s Q ( 1 0 0 ) = 1 . 8 4 c f s S B 1 2 A 7 5 ' L x 1 5 ' W x 7 . 4 ' D S E E P A G E B E D S E E D E T A I L O N D E T A I L S H E E T D I 1 2 B C L S T A . 1 6 + 6 6 . 7 1 , 1 3 . 5 0 ' R T , E . A W B R E Y S T . D R O P I N L E T , A C H D S u p p l e m e n t a l D r a w i n g S D - 6 0 4 , T Y P E I V T O P O F C U R B = 2 6 9 6 . 4 7 1 2 " I N V I N ( S ) = 2 6 9 3 . 1 0 1 5 " I N V O U T ( N ) = 2 6 9 3 . 1 0 I N S T A L L 2 5 . 1 7 L F 1 5 " P V C ( S D R - 3 5 ) @ 0 . 5 2 % T O S D M H 1 2 Q ( 2 5 ) = 1 . 5 9 c f s Q ( 1 0 0 ) = 2 . 2 3 c f s S D M H 1 2 C L S T A . 1 6 + 6 6 . 7 1 , 4 0 . 0 0 ' R T , E . A W B R E Y S T . M A N H O L E , A C H D S u p p l e m e n t a l D r a w i n g S D - 6 1 1 R I M = 2 6 9 6 . 8 3 ( M A T C H F I N I S H E D S U R F A C E ) 1 5 " I N V I N ( S ) = 2 6 9 2 . 9 7 1 8 " I N V O U T ( N / W ) = 2 6 9 2 . 1 2 I N S T A L L 5 . 0 L F 1 8 " A D S N - 1 2 H P @ 0 . 0 0 % T O S B 1 2 A I N S T A L L 1 0 . 5 L F 1 8 " A D S N - 1 2 H P @ 0 . 0 0 % T O S B 1 2 B M A T C H L I N E - S E E S H E E T C . 2 0 1 R O A D W A Y C O N S T R U C T I O N K E Y N O T E S I N S T A L L 4 ' W I D E V A L L E Y G U T T E R P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 0 8 R E M O V E E X I S T I N G B A R R I C A D E S ( I F A P P L I C A B L E ) A N D S A W C U T A M I N I M U M O F 2 F E E T O F E X I S T I N G P A V E M E N T . R E F E R E N C E I S P W C S D - 3 0 1 A N D A C H D S U P P L E M E N T A L S T A N D A R D D R A W I N G S D - 3 0 3 A N D S D - 8 0 6 I N S T A L L P E D E S T R I A N R A M P P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 1 2 H , T Y P E " H 4 " , W / T A C T I L E W A R N I N G S U R F A C E F O R P E D E S T R I A N A C C E S S P E R A C H D S U P P L E M E N T A L D W G S D - 7 1 2 1 3 I N S T A L L 5 ' W I D E S I D E W A L K P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 0 9 4 1 2 1 0 I N S T A L L T Y P E I I I B A R R I C A D E A N D S I G N " S T R E E T T O B E E X T E N D E D I N T H E F U T U R E " A N D T H I C K E N E D E D G E A L U M I N U M W I T H S T R I P E D D E C A L S D E C A L S P E R A C H D S U P P L E M E N T A L S D - 1 1 3 2 B 1 1 I N S T A L L T Y P E I I B A R R I C A D E W I T H K I C K P L A T E A N D T H I C K E N E D E D G E A L U M . W I T H S T R I P E D D E C A L S P E R A C H D S U P P L E M E N T A L S D - 1 1 3 2 A I N S T A L L P E D E S T R I A N R A M P P E R I S P W C D R A W I N G S D - 7 1 2 A , W / T A C T I L E W A R N I N G S U R F A C E F O R P E D E S T R I A N A C C E S S P E R A C H D S U P P L E M E N T A L D W G S D - 7 1 2 2 6 I N S T A L L 5 ' V E R T I C A L T O R O L L E D C U R B T R A N S I T I O N S E C T I O N P E R I S P W C S D - 7 0 7 , M O D I F I E D . S E E D E T A I L O N D E T A I L S H E E T N O T E : S E E S H E E T S C . 2 0 5 A N D C . 2 0 6 F O R S T R E E T S T R I P I N G , S I G N A G E A N D L I G H T I N G P L A N . I N S T A L L 5 ' C U R B T E R M I N U S P E R I S P W C S D - 7 0 7 7 I N S T A L L 7 ' W I D E S I D E W A L K P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 0 9 5 I N S T A L L C O N C R E T E D R I V E W A Y W I T H R A M P E D S I D E W A L K P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 1 0 B 8 I N S T A L L C O N C R E T E D R I V E W A Y F O R G R A D E S G R E A T E R T H A N 6 % P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 1 0 E 9 S B 1 2 B 5 0 ' L x 1 5 ' W x 7 . 4 ' D S E E P A G E B E D S E E D E T A I L O N D E T A I L S H E E T MATCH LINE - SEE SHEET C.201 2 S T R E E T A N D S T O R M D R A I N D A T A S E E P A G E B E D N O . 1 0 D I 1 0 A C L S T A . 2 7 + 1 1 . 6 5 , 1 8 . 0 0 ' L T , E . B O T T D R . D R O P I N L E T , A C H D S u p p l e m e n t a l D r a w i n g S D - 6 0 1 , T Y P E I T O P O F C U R B = 2 7 0 0 . 0 4 1 2 " I N V O U T ( S ) = 2 6 9 6 . 5 4 I N S T A L L 3 2 . 3 2 L F 1 2 " P V C ( S D R - 3 5 ) @ 0 . 5 3 % T O D I 1 0 B Q ( 2 5 ) = 0 . 4 5 c f s Q ( 1 0 0 ) = 0 . 6 3 c f s S B 1 0 5 7 . 0 ' L x 1 5 . 0 ' W x 6 . 5 ' D S E E P A G E B E D S E E D E T A I L O N D E T A I L S H E E T D I 1 0 B C L S T A . 2 7 + 1 1 . 6 5 , 1 8 . 0 0 ' R T , E . B O T T D R . D R O P I N L E T , A C H D S u p p l e m e n t a l D r a w i n g S D - 6 0 1 , T Y P E I T O P O F C U R B = 2 7 0 0 . 0 4 1 2 " I N V I N ( N ) = 2 6 9 6 . 3 7 1 2 " I N V O U T ( S ) = 2 6 9 6 . 3 7 I N S T A L L 4 . 4 2 L F 1 2 " P V C ( S D R - 3 5 ) @ 0 . 6 8 % T O S D M H 1 0 Q ( 2 5 ) = 0 . 7 3 c f s Q ( 1 0 0 ) = 1 . 0 1 c f s S D M H 1 0 C L S T A . 2 7 + 1 1 . 6 5 , 2 3 . 7 5 ' R T , E . B O T T D R . M A N H O L E , A C H D S u p p l e m e n t a l D r a w i n g S D - 6 1 1 R I M = 2 7 0 0 . 1 5 ( M A T C H F I N I S H E D S U R F A C E ) 1 2 " I N V I N ( N ) = 2 6 9 6 . 3 4 1 8 " I N V O U T ( W ) = 2 6 9 5 . 4 9 I N S T A L L 5 . 0 0 L F 1 8 " A D S N - 1 2 H P @ 0 . 0 0 % T O S B 1 0 R O A D W A Y C O N S T R U C T I O N N O T E S 1 . A s p h a l t R e p a i r A n d W i d e n i n g C o n s t r u c t i o n S h a l l C o n f o r m T o I S P W C S t a n d a r d D e t a i l S D - 3 0 1 , A n d A C H D S u p p l e m e n t a l S t a n d a r d D e t a i l s S D - 3 0 3 A n d S D - 8 0 6 . 2 . S i d e w a l k C r o s s S l o p e s S h a l l N o t E x c e e d 2 . 0 % P e r A d a R e q u i r e m e n t s . T h e r e A r e N o T o l e r a n c e s A l l o w e d . UNPLATTEDPARCEL NO. S1128438500 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 3 8 4 1 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 4 9 3 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 2 8 2 SD 14 BLOCK 13456789101112BLOCK 5BLOCK 51 SD GIRR G I R R EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP E P PIRRPIRR PIRR P I R R P I R R P I R R P I R R PIRRPIRRPIRRPIRR P I R R P I R R P I R R P I R R PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRR P I R R P I R R P I R R P I R R P I R R P I R R 3 1 8 E P E G 6 2 2 5 BLOCK 64127891011 B L O C K 6 1 3 1 4 1 5 1 6 1 7 1 9 2 0 2 1 B L O C K 6 2 B L O C K 8 1 11 2 B L O C K 7 1 E P E G 2 B C R = 2 8 ' 50.00' 4 1 . 0 0 ' EXISTING BRIDGECENTERLINE OF TEN MILE FEEDER CANAL 1 0 + 0 0 1 1 + 0 0 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 4 + 0 0 E . B O T T D R . S. TARADALE PL. S. TARADALE PL. 24+28.29, 18.00' LBEGIN CONST.(MATCH EXISTING)2706.71 VC24+45.51, 18.00' RBEGIN CONST.(MATCH EXISTING)2706.64 VCEXISTING GRAVELACCESS ROAD10' WIDE ASPHALT PATH(SEE SHEET C.202)EXISTING PAVEDACCESS ROAD25+53.86 2703.71 VC/GB/EVC 25+53.86 2703.29 LIP/GB/EVC25+62.50 2702.68 LIP/GB/BVC25+62.50 2703.10 VC/GB/BVC 27+11.65 2700.04 VC/LP26+35.50 2700.35 VC/GB/EVC 27+13.15 2700.05 VC/GB/PC26+35.50 2700.35 VC/GB/EVC27+11.65 2700.04 VC/LP27+13.15 2700.05 VC/GB/PC 27+61.02 2700.26 VC/GB/PT 27+61.02 2700.26 VC/GB/PT2 8 + 0 8 . 4 6 2 7 0 0 . 4 5 V C / G B / P C 1 0 + 4 6 . 0 0 2 7 0 0 . 8 9 V C / G B / P T 2 8 + 0 8 . 4 6 2 7 0 0 . 4 5 V C / G B / P C 2 1 0 + 4 6 . 0 0 2 7 0 0 . 1 2 V C / G B / P T 1 0 + 5 1 . 0 0 2 6 9 9 . 8 6 R C B C R = 2 8 ' 1 0 + 5 1 . 0 0 2 7 0 0 . 7 4 R C / H P 1 0 + 5 1 . 0 0 2 7 0 0 . 7 4 R C / H P 1 0 + 4 6 . 0 0 2 7 0 0 . 9 0 V C / G B / P T 2 8 + 7 1 . 6 6 , 2 6 . 2 0 ' R 2 7 0 1 . 0 0 V C / H P 2 8 + 9 1 . 4 6 2 7 0 0 . 7 9 V C / G B / P C 2 B C R = 2 8 ' 2 8 + 9 1 . 4 6 2 7 0 0 . 7 9 V C / G B / P C B C R = 2 8 ' 2 1 0 + 4 6 . 0 0 2 7 0 0 . 1 2 V C / G B / P T 1 0 + 5 1 . 0 0 2 6 9 9 . 8 6 R C 18.00'18.00' 18.00' 1 3 . 5 ' 1 3 . 5 ' 4 1 . 0 0 ' 1 3 . 5 ' 1 3 . 5 ' 41.00' 13.5'13.5' 4 1 . 0 0 ' 1 3 . 5 ' 1 3 . 5 ' 1.2% 1.8% 0.9% 0 . 9 % 0.4 % 0 . 9 % 3 2 9 + 9 3 . 5 0 , 1 8 . 0 0 ' L S U B D . B O U N D A R Y 2 7 0 0 . 7 8 F S 1.5% 1.8% 0.9% 1 . 4 % 0 . 7 % 18.00'18.00'STA: 24+94.93, 25.00'L(RIGHT-OF-WAY)STA: 27+61.02, 25.00'L(RIGHT-OF-WAY) EXIST. 50' R/W 1 2 : 1 P A V E M E N T T R A N S I T I O N ( M A T C H E X I S T I N G P V M T S E C T I O N ) 1 0 + 8 2 . 4 0 2 6 9 9 . 5 8 R C / G B / P C 1 0 + 8 2 . 4 0 2 6 9 9 . 5 8 R C / G B / P C 1 0 + 9 8 . 4 9 2 6 9 9 . 4 4 R C / G B / P T 1 1 + 4 8 . 2 8 2 6 9 8 . 9 9 R C / G B / P C 3 0 + 3 7 . 7 0 , 1 9 . 6 7 ' R ( M A T C H E X I S T . ) 2 7 0 1 . 0 0 E P 3 0 + 3 7 . 7 0 , 7 . 9 5 ' R ( M A T C H E X I S T . ) 2 7 0 1 . 2 6 A C / C R O W N 3 0 + 3 7 . 7 0 , 2 . 8 5 ' L ( M A T C H E X I S T . ) 2 7 0 1 . 0 3 A C 2.2% 3 0 + 4 5 . 6 6 , 5 . 8 1 ' L 2 7 0 0 . 8 9 E P / G B E X I S T . G R A V E L D R I V E ( T O R E M A I N ) 2 9 + 9 3 . 6 1 , 1 8 . 0 0 ' R S U B D . B O U N D A R Y 2 7 0 0 . 7 8 F S 2 9 + 8 8 . 5 0 2 7 0 1 . 1 8 V C / G B 2 9 + 8 8 . 6 1 2 7 0 1 . 1 8 V C / G B 3 0 + 4 5 . 6 6 , 2 . 8 5 ' L ( M A T C H E X I S T . ) 2 7 0 0 . 9 9 A C 1 2 : 1 P A V E M E N T T R A N S I T I O N ( M A T C H E X I S T I N G P V M T S E C T I O N ) E X I S T . E . B O T T L N . ( T O R E M A I N ) GRAVEL DRIVEWAY(SEE SHEET C.202)GRAVEL DRIVEWAY(SEE SHEET C.202)SB 10 SDMH 10DI 10B DI 10A 4 4 4 1 1 + 1 2 . 0 0 2 7 0 0 . 4 8 R C 4 59 558 4 6 6 7 812 1 2 MWMW 1 1 + 7 1 . 6 7 2 7 0 0 . 2 3 R C 1 3 + 0 2 . 4 5 2 7 0 0 . 3 1 R C 1 3 + 7 2 . 5 1 2 7 0 1 . 3 5 R C 1 3 + 0 3 . 8 3 2 7 0 0 . 3 2 R C / G B / P T 1 3 + 0 3 . 8 3 2 7 0 0 . 3 2 R C / G B / P T 1 2 + 3 4 . 5 0 2 6 9 9 . 9 6 R C / L P 1 2 + 3 2 . 9 6 2 6 9 9 . 9 7 R C / G B / P R C 1 1 + 6 3 . 5 8 2 7 0 0 . 2 6 R C / G B / P C 1 1 + 6 0 . 1 7 2 7 0 0 . 2 8 R C / G B / P C 1 0 + 4 5 . 5 3 2 7 0 0 . 4 4 R C / G B 1 0 + 3 5 . 5 9 2 7 0 0 . 3 6 R C 1 1 + 7 6 . 1 8 , 1 7 . 7 9 ' R 2 7 0 0 . 1 9 F L / H P B C R = 2 0 ' 1 1 0 + 4 5 . 5 3 2 7 0 0 . 4 4 R C / G B 11+23.98 2700.79 RC/GB/PC11+23.04, 13.50' L2700.79 RC/GB/PC11+57.41, 40.68' L2700.98 RC/GB/PC 11+68.57, 15.47' R 2701.01 RC/GB/PT 11+54.76, 13.50' R 2700.93 RC11+59.63, 13.74' R 2700.96 RC11+89.57, 29.63' R 2701.15 RC/GB/PC10+97.65 2700.67 RC11+98.52, 38.78' R 2701.23 RC12+22.16, 47.95' R 2701.40 RC12+47.32, 39.47' R 2701.52 RC/HP12+68.00, 0.00'2701.33 RC12+67.51, 6.87' L 2701.31 RC12+31.01, 46.72' L2701.07 RC 12+16.83, 0.00'2701.95 AC/GB/PT11+54.76, 0.00'2700.95 AC/GB/PCC 11+23.98, 0.00'2700.81 AC/GB/PC 10+00 11+0012+001.5%1.8%2.1%2.8%2.0%2.0%1.4%2.7%1.9%0.4%0.4%0.4%0.4%1 0 + 3 6 . 9 5 2 7 0 0 . 3 3 R C / G B / P T 1 2 + 3 4 . 5 0 2 6 9 9 . 9 6 R C / L P 1 2 + 3 1 . 9 5 2 6 9 9 . 9 7 R C / G B / P C B C R = 2 0 ' 1 . 2 % 0 . 9 % 1 . 8 % 0 . 9 % 0.7 % 0 . 4 % 1 0 + 3 2 . 5 9 2 7 0 0 . 3 3 R C / G B / P T 3 1 DI 11B DI 11A S D M H 1 1 S B 1 1 A M W MW M W M W ACHD S T O R M D R A I N EASEM E N T ACHD STORM DRAIN EASEMENT SB 11B BCR=28'BCR=48'R=50'12+30.76, 92.50' R18" INV = 2695.50 1 3 + 1 7 . 4 9 , 3 2 . 2 6 ' R 1 8 " I N V = 2 6 9 5 . 5 0 1 3 + 8 5 . 8 3 , 1 3 . 5 0 ' R 2 7 0 1 . 5 5 R C / G B / P C 14 + 0 9 . 2 9 , 2 6 . 2 1 ' R 27 0 1 . 7 1 R C / G B / P T 14+56. 7 5 , 4 7 . 4 5 ' R 2702.0 0 R C 14+ 8 0 . 5 4 , 3 6 . 6 2 ' R 270 2 . 1 4 R C 1 4 + 9 7 . 5 0 , 0 . 0 0 ' 2 7 0 2 . 3 6 R C / H P 1 3 + 8 5 . 8 3 , 1 3 . 5 0 ' L 2 7 0 1 . 5 5 R C / G B / P C 1 4 + 0 9 . 2 9 , 2 6 . 2 1 ' L 2 7 0 1 . 7 1 R C / G B / P T 1 4 + 5 0 . 6 4 , 4 7 . 9 9 ' L 2 7 0 1 . 9 7 R C 1 4 + 7 6 . 2 1 , 3 9 . 8 8 ' L 2 7 0 2 . 1 1 R C 90° 9 0 ° 9 3 . 1 ° 1 4 + 8 3 . 1 4 , 4 1 . 0 5 ' L 2 7 0 2 . 2 3 E P / P C 1 4 + 8 3 . 1 0 , 4 0 . 9 9 ' L 2 7 0 2 . 2 3 F S / E P 1 4 + 9 1 . 4 0 , 4 5 . 8 7 ' L 2 7 0 2 . 4 9 E P / P T 1 5 + 0 1 . 3 5 , 1 0 . 9 9 ' L 2 7 0 2 . 4 0 F S / E P R = 1 0 ' E X I S T I N G R E S I D E N C E ( T O R E M A I N ) 1 4 + 4 9 . 5 0 , 0 . 0 0 ' 2 7 0 2 . 8 4 A C / G B 0 . 5 % 0.5 % 0.5 % 0 . 5 % 2. 9 % 2 . 9 % 1.5% 2 . 3 % 2 . 3 % 2 . 0 % 2 . 0 % B C R = 4 8 ' B C R = 2 8 ' B C R = 2 8 ' EXISTINGSHELBURNE EASTSUBD. NO. 1EXISTINGSHELBURNE EASTSUBD. NO. 1 4 44S. SELATIR WAYE. FRATELLO ST.5 2 . 4 % 6 . 8 % 1 2 + 2 9 . 5 0 2 6 9 9 . 9 8 R C 12+20.00, 0.00'2702.00 AC/HP 1 2 + 3 2 . 9 6 2 6 9 9 . 9 7 R C / G B / P R C 1 3 + 8 6 . 8 3 , 1 3 . 5 2 ' R 2 7 0 1 . 5 5 R C 4 R=300'E. CLEARY CT.24+94.68 2705.91 LIP/GB/PT 24+80.86 2706.48 VC/GB/BVCSTA: 24+19.20, 25.00'L(RIGHT-OF-WAY)50.00' R/W 24+94.68 2705.91 LIP/GB/PT 30+50 24+0025+00 26+00 27+00 28+00 29+00 30+00 24+80.86 2706.48 VC/GB/BVC STA: 24+43.57, 25.00'R(RIGHT-OF-WAY)STA: 24+96.56, 25.00'R(RIGHT-OF-WAY) 2 9 + 9 3 . 5 3 , 1 0 . 1 5 ' L S U B D . B O U N D A R Y 2 7 0 0 . 9 0 F S D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.200 (Street Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 2 0 1 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 2 0 1 STREET AND STORM DRAIN PLAN 5 A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n S C A L E : 1 " = 1 S T R E E T A N D S T O R M D R A I N P L A N 4 0 ' - 0 " H O R I Z O N T A L H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 6 0 N O R T H C I V I L I N N O V A T I O N S M A T C H L I N E - S E E S H E E T C . 2 0 0 MATCH LINE - SEE SHEET C.200 2 S T R E E T A N D S T O R M D R A I N D A T A S E E P A G E B E D N O . 1 1 D I 1 1 A C L S T A . 1 2 + 3 4 . 5 0 , 1 3 . 5 0 ' L T , S . T A R A D A L E P L . D R O P I N L E T , A C H D S u p p l e m e n t a l D r a w i n g S D - 6 0 4 , T Y P E I V T O P O F C U R B = 2 6 9 9 . 9 6 1 2 " I N V O U T ( W ) = 2 6 9 6 . 7 1 I N S T A L L 2 3 . 3 2 L F 1 2 " P V C ( S D R - 3 5 ) @ 1 . 0 7 % T O D I 1 1 B Q ( 2 5 ) = 1 . 1 8 c f s Q ( 1 0 0 ) = 1 . 6 5 c f s S B 1 1 A 6 0 . 0 ' L x 1 5 . 0 ' W x 7 . 5 ' D S E E P A G E B E D S E E D E T A I L O N D E T A I L S H E E T D I 1 1 B ( D O U B L E I N E T S ) C L S T A . 1 2 + 3 4 . 5 0 , 1 3 . 5 0 ' R T , S . T A R A D A L E P L . D R O P I N L E T , A C H D S u p p l e m e n t a l D r a w i n g S D - 6 0 4 , T Y P E I V T O P O F C U R B = 2 6 9 9 . 9 6 1 2 " I N V I N ( E ) = 2 6 9 6 . 4 6 1 2 " I N V O U T ( W ) = 2 6 9 6 . 4 6 I N S T A L L 1 0 . 3 4 L F 1 2 " P V C ( S D R - 3 5 ) @ 1 . 0 6 % T O S D M H 1 1 Q ( 2 5 ) = 2 . 2 2 c f s Q ( 1 0 0 ) = 3 . 1 0 c f s S D M H 1 1 C L S T A . 1 2 + 3 4 . 5 0 , 2 5 . 1 7 ' R T , S . T A R A D A L E P L . M A N H O L E , A C H D S u p p l e m e n t a l D r a w i n g S D - 6 1 1 R I M = 2 7 0 0 . 1 4 ( M A T C H F I N I S H E D S U R F A C E ) 1 2 " I N V I N ( E ) = 2 6 9 6 . 3 5 1 8 " I N V O U T ( W / S ) = 2 6 9 5 . 4 5 I N S T A L L 6 . 3 7 L F 1 8 " A D S N - 1 2 H P @ 0 . 0 0 % T O S B 1 1 A I N S T A L L 5 . 0 0 L F 1 8 " A D S N - 1 2 H P @ 0 . 0 0 % T O S B 1 1 B S B 1 1 B 8 2 . 0 ' L x 1 5 . 0 ' W x 7 . 5 ' D S E E P A G E B E D S E E D E T A I L O N D E T A I L S H E E T R O A D W A Y C O N S T R U C T I O N K E Y N O T E S I N S T A L L 4 ' W I D E V A L L E Y G U T T E R P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 0 8 R E M O V E E X I S T I N G B A R R I C A D E S ( I F A P P L I C A B L E ) A N D S A W C U T A M I N I M U M O F 2 F E E T O F E X I S T I N G P A V E M E N T . R E F E R E N C E I S P W C S D - 3 0 1 A N D A C H D S U P P L E M E N T A L S T A N D A R D D R A W I N G S D - 3 0 3 A N D S D - 8 0 6 I N S T A L L P E D E S T R I A N R A M P P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 1 2 H , T Y P E " H 4 " , W / T A C T I L E W A R N I N G S U R F A C E F O R P E D E S T R I A N A C C E S S P E R A C H D S U P P L E M E N T A L D W G S D - 7 1 2 1 3 I N S T A L L 5 ' W I D E S I D E W A L K P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 0 9 4 1 2 1 0 I N S T A L L T Y P E I I I B A R R I C A D E A N D S I G N " S T R E E T T O B E E X T E N D E D I N T H E F U T U R E " A N D T H I C K E N E D E D G E A L U M I N U M W I T H S T R I P E D D E C A L S D E C A L S P E R A C H D S U P P L E M E N T A L S D - 1 1 3 2 B 1 1 I N S T A L L T Y P E I I B A R R I C A D E W I T H K I C K P L A T E A N D T H I C K E N E D E D G E A L U M . W I T H S T R I P E D D E C A L S P E R A C H D S U P P L E M E N T A L S D - 1 1 3 2 A I N S T A L L P E D E S T R I A N R A M P P E R I S P W C D R A W I N G S D - 7 1 2 A , W / T A C T I L E W A R N I N G S U R F A C E F O R P E D E S T R I A N A C C E S S P E R A C H D S U P P L E M E N T A L D W G S D - 7 1 2 2 6 I N S T A L L 5 ' V E R T I C A L T O R O L L E D C U R B T R A N S I T I O N S E C T I O N P E R I S P W C S D - 7 0 7 , M O D I F I E D . S E E D E T A I L O N D E T A I L S H E E T N O T E : S E E S H E E T S C . 2 0 5 A N D C . 2 0 6 F O R S T R E E T S T R I P I N G , S I G N A G E A N D L I G H T I N G P L A N . I N S T A L L 5 ' C U R B T E R M I N U S P E R I S P W C S D - 7 0 7 7 I N S T A L L 7 ' W I D E S I D E W A L K P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 0 9 5 I N S T A L L C O N C R E T E D R I V E W A Y W I T H R A M P E D S I D E W A L K P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 1 0 B 8 I N S T A L L C O N C R E T E D R I V E W A Y F O R G R A D E S G R E A T E R T H A N 6 % P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 1 0 E 9 R O A D W A Y C O N S T R U C T I O N N O T E S 1 . A s p h a l t R e p a i r A n d W i d e n i n g C o n s t r u c t i o n S h a l l C o n f o r m T o I S P W C S t a n d a r d D e t a i l S D - 3 0 1 , A n d A C H D S u p p l e m e n t a l S t a n d a r d D e t a i l s S D - 3 0 3 A n d S D - 8 0 6 . 2 . S i d e w a l k C r o s s S l o p e s S h a l l N o t E x c e e d 2 . 0 % P e r A d a R e q u i r e m e n t s . T h e r e A r e N o T o l e r a n c e s A l l o w e d . SD SD SD SD SDSD TOB TOB SD SD SD SD E P E P E G E G E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P EP EP EP EP EP EP EP EP P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R 6 2 5 B L O C K 6 4 E P 25+00 2 6 + 0 0 2 7 + 0 0 E. BOTT DR.EXISTING BRIDGE(TO REMAIN)24+28.29, 18.00' LBEGIN CONST.(MATCH EXISTING)2706.71 VCEXISTING GRAVEL ACCESS ROAD(TO REMAIN) 1 0 ' W I D E A S P H A L T P A T H S E E D E T A I L O N D E T A I L S H E E T EXISTING PAVED ACCESS ROAD(TO REMAIN)STA: 24+94.93, 25.00'L(RIGHT-OF-WAY)25+08.72, 25.00' L 2705.66 FS/EP24+93.52, 25.00' L 2706.00 FS/EP/GB24+83.92, 25.00' L 2706.58 FS/GB25+08.72, 17.21' L 2705.52 FL24+94.68, 17.21' L 2705.85 FL/PT1.8%1.7%6.8%7.2%24+38.05, 0.00'BEGIN CONST.(MATCH EXISTING)2706.57 AC24+45.51, 18.00' RBEGIN CONST.(MATCH EXISTING)2706.64 VC24+47.96, 25.00' RBEGIN CONST.(MATCH EXISTING)2706.75 FS 24+22.11, 27.07' LBEGIN CONST.(MATCH EXISTING)2706.91 FS24+83.92, 18.00' L 2706.46 VC/GB24+80.86, 18.00' L 2706.48 VC/GB/BVC24+94.68, 16.00' L 2705.91 VC/GB/PT 24+44.38, 18.00' L 2706.64 VC 24+44.38, 25.00' L 2706.76 FS/PCCR=50'1.7%1.8% 1 . 8 % 1 . 8 % 1 . 8 % 1.8%0.8%1.7%1.7%1.7%24+80.86, 18.00' R 2706.48 VC/GB/BVC 24+94.68, 16.00' R 2705.91 VC/GB/PT24+93.82, 17.21' R 2705.86 FL24+86.68, 18.00' R 2706.43 VC/GB24+86.68, 25.00' R 2706.55 FS/GB24+93.85, 25.00' R 2706.00 FS/EG/GB25+11.72, 25.00' R 2705.56 FS/EG 2 5 + 2 1 . 7 2 , 2 5 . 0 0 ' R 2 7 0 5 . 1 9 F S / E G / G B 2 5 + 2 7 . 7 2 , 2 5 . 0 0 ' R 2 7 0 5 . 3 8 F S / G B / P C 24+94.68, 25.00' R 2705.99 FS/GB/PT 24+93.59, 17.21' L 2705.86 FL24+93.88, 80.18' R(MATCH EXIST)2704.15 EG 25+01.14, 51.17' R 2704.94 EG 25+10.47, 39.95' R 2704.82 EP/GB/PRC 4.9% 3 . 3 % 2 5 + 2 0 . 3 3 , 4 1 . 6 2 ' R 2 7 0 4 . 6 4 E P / G B / P R C 1.8%25+09.14, 64.97' R 2703.68 EP/GB/PT 4.5% 5 . 0 % 2 5 + 1 9 . 1 2 , 6 4 . 3 6 ' R 2 7 0 3 . 5 0 E P / G B / P T 2 5 + 2 3 . 0 7 , 4 7 . 0 0 ' R 2 7 0 3 . 5 0 F G / G B 25+10.03, 79.34' R 2702.97 EP/GB 4.9% 4 . 9 % 2 5 + 2 0 . 0 1 , 7 8 . 7 3 ' R 2 7 0 2 . 7 9 E P / G B 2 5 + 2 5 . 0 0 , 7 8 . 4 2 ' R 2 7 0 2 . 6 9 F G / G B 1.8 % 1 . 8 % 2 . 0 % 2 . 3 % 2 . 3 % 2 5 + 2 1 . 8 0 , 1 0 7 . 8 8 ' R 2 7 0 2 . 1 3 E P / G B 2 5 + 1 1 . 8 2 , 1 0 8 . 5 0 ' R 2 7 0 2 . 3 1 E P / G B 1 . 8 % 2 . 0 % 2 5 + 2 6 . 7 9 , 1 0 7 . 5 8 ' R 2 7 0 2 . 0 3 F G / G B 24+98.92, 93.96' R(MATCH EXIST)2703.04 NG25+01.34, 100.24' R(MATCH EXIST)2702.52 NG25+06.83, 108.80' R(MATCH EXIST)2702.41 NG 1 0 . 7 % 2.9%7.5%25+09.03, 79.40' R 2702.99 FG/GB 25+08.15, 65.04' R 2703.70 FG/GB 25+09.48, 39.79' R 2704.84 FG/GB 2 5 + 2 1 . 3 1 , 4 1 . 7 8 ' R 2 7 0 4 . 6 2 F G / G B 2 5 + 2 0 . 1 2 , 6 4 . 3 0 ' R 2 7 0 3 . 4 8 F G / G B 7.8%9.0%15.5%5.5% 2 . 1 % 2 5 + 1 0 . 8 2 , 1 0 8 . 5 6 ' R 2 7 0 2 . 3 3 F G / G B 0 . 0 % 0 . 0 % 2 5 + 9 3 . 8 1 , 4 7 . 0 0 ' R 2 7 0 1 . 3 6 F G / G B 2 6 + 5 8 . 8 1 , 4 7 . 0 0 ' R 2 7 0 1 . 0 9 F G / G B 2 7 + 1 3 . 0 7 , 4 7 . 0 0 ' R 2 7 0 0 . 8 5 F G / G B MATCH EXIST.3:1 MAX.CENTERLINE OFTEN MILEFEEDER CANAL MATCH EXIST.24+94.68, 17.21' R 2705.85 FL/GB/PT25+21.72, 17.21' R 2705.05 FL 25+27.72, 18.00' R 2705.26 VC/GB1.8% 1 . 8 % 1 . 7 % 3 . 3 % 3 . 2 % 6.6%7.0%25+35. 5 7 , 1 8 . 0 0 ' R 2704.8 6 V C / F S / P C 2 5 + 5 3 . 8 6 , 1 8 . 0 0 ' R 2 7 0 3 . 7 1 V C / G B / E V C 2 5 + 6 2 . 5 0 , 1 8 . 0 0 ' R 2 7 0 3 . 1 0 V C / G B / B V C 2 5 + 6 2 . 7 0 , 2 6 . 0 0 ' R 2 7 0 3 . 2 4 F S / G B / P T 2 5 + 6 2 . 7 0 , 3 1 . 0 0 ' R 2 7 0 3 . 3 3 F S / G B / P T 1 . 8 % 5 . 6 % 6 . 4 % 5 . 1 % 2 5 + 4 4 . 3 8 , 2 7 . 8 6 ' R 2 7 0 4 . 2 9 F S / G B / P R C R = 5 0 ' R = 5 0 ' R = 5 5 ' 2 5 + 7 2 . 1 9 , 2 5 . 0 0 ' L 2 7 0 2 . 1 1 F S / E P 2 5 + 7 3 . 4 7 , 3 9 . 1 2 ' L ( M A T C H E X I S T . ) 2 7 0 1 . 5 2 E P / C O N C 2 5 + 8 8 . 0 4 , 3 7 . 0 4 ' L ( M A T C H E X I S T . ) 2 7 0 1 . 0 5 E P / C O N C 2 5 + 8 6 . 9 4 , 2 5 . 0 0 ' L 2 7 0 1 . 2 9 F S / E P / G B 2 5 + 8 7 . 5 6 , 2 5 . 0 0 ' L 2 7 0 1 . 2 6 F S / G B 2 5 + 9 3 . 5 6 , 2 5 . 0 0 ' L 2 7 0 1 . 4 5 F S / G B 2 5 + 9 3 . 5 6 , 1 8 . 0 0 ' L 2 7 0 1 . 3 3 V C / G B 2 5 + 8 7 . 5 6 , 1 7 . 2 1 ' L 2 7 0 1 . 1 2 F L 2 5 + 6 2 . 5 0 , 1 6 . 0 0 ' L 2 7 0 2 . 6 8 L I P / G B / B V C 2 5 + 5 3 . 8 6 , 1 6 . 0 0 ' L 2 7 0 3 . 2 9 L I P / G B / E V C 2 5 + 9 3 . 5 6 , 1 7 . 2 1 ' L 2 7 0 0 . 8 5 F L 1 . 7 % 3 . 1 % 3 . 2 % 2 6 + 3 5 . 5 0 , 1 8 . 0 0 ' L 2 7 0 0 . 3 5 V C / G B / E V C 2 6 + 3 5 . 5 0 , 1 8 . 0 0 ' R 2 7 0 0 . 3 5 V C / G B / E V C 2 . 0 % EXI S T I N G H O U S E (T O R E M A I N ) E X I S T I N G C O N C R E T E D R I V E W A Y ( T O R E M A I N ) E X I S T I N G G R A V E L D R I V E W A Y ( T O R E M A I N ) EXISTING SHELBURNE EASTSUBDIVISION NO. 1 2 6 + 3 5 . 5 0 , 2 6 . 0 0 ' R 2 7 0 0 . 5 1 F S / G B / E V C 1 . 8 % 2 . 0 % 2 6 + 3 5 . 5 0 , 2 5 . 0 0 ' L 2 7 0 0 . 4 7 F S / G B / E V C 2 6 + 3 5 . 5 0 , 3 1 . 0 0 ' R 2 7 0 0 . 6 0 F S / G B / E V C 1 . 7 % 5 0 ' R I G H T - O F - W A Y 1 8 . 0 0 ' 7 . 0 0 ' 1 8 . 0 0 ' 8 . 0 0 ' 5 . 0 0 ' 1 . 0 0 ' 18.00'18.00'7.00'7.00' 2 5 . 0 0 ' 2 5 . 0 0 ' 2 7 + 1 3 . 1 5 , 1 8 . 0 0 ' L 2 7 0 0 . 0 5 V C / G B / P C 2 7 + 1 3 . 1 5 , 2 5 . 0 0 ' L 2 7 0 0 . 1 7 F S / G B / P C 2 6 + 9 3 . 8 5 , 1 7 . 2 1 ' L 2 6 9 9 . 6 3 F L 2 7 + 1 1 . 6 5 , 1 8 . 0 0 ' R 2 7 0 0 . 0 4 V C / L P 2 7 + 1 3 . 1 5 , 1 8 . 0 0 ' R 2 7 0 0 . 0 5 V C / G B / P C 2 7 + 1 3 . 1 5 , 3 1 . 0 0 ' R 2 7 0 0 . 3 0 F S / G B / P C 2 7 + 1 3 . 1 5 , 2 6 . 0 0 ' R 2 7 0 0 . 2 1 F S / G B / P C 2 7 + 1 1 . 6 5 , 2 6 . 0 0 ' R 2 7 0 0 . 2 0 F S / L P 2 7 + 1 1 . 6 5 , 3 1 . 0 0 ' R 2 7 0 0 . 2 9 F S / L P 1 . 8 % 2 . 0 % 1 . 7 % 2 7 + 1 1 . 6 5 , 2 5 . 0 0 ' L 2 7 0 0 . 1 6 F S / L P 2 7 + 1 1 . 6 5 , 1 8 . 0 0 ' L 2 7 0 0 . 0 4 V C / G B / P C 2 6 + 7 7 . 8 5 , 1 7 . 2 1 ' L 2 6 9 9 . 7 0 F L 2 6 + 7 0 . 8 5 , 1 8 . 0 0 ' L 2 7 0 0 . 2 1 V C / G B 2 6 + 7 0 . 8 5 , 2 5 . 0 0 ' L 2 7 0 0 . 3 3 F S / G B 2 6 + 7 7 . 8 5 , 2 5 . 0 0 ' L 2 6 9 9 . 8 4 F S / G B 2 6 + 9 9 . 8 5 , 2 5 . 0 0 ' L 2 7 0 0 . 2 1 F S / G B 2 6 + 9 9 . 8 5 , 1 8 . 0 0 ' L 2 7 0 0 . 0 9 F S / G B 2 6 + 9 3 . 8 5 , 2 5 . 0 0 ' L 2 6 9 9 . 7 7 F S / G B 2 6 + 7 7 . 9 5 , 2 9 . 3 1 ' L ( M A T C H E X I S T . ) 2 7 0 0 . 7 3 E G 2 6 + 9 3 . 1 9 , 2 7 . 5 0 ' L ( M A T C H E X I S T . ) 2 7 0 0 . 6 0 E G 1 . 8 % 1 . 7 % 7 . 3 % 7 . 4 % 1 . 8 % 1 . 7 % 7 . 0 % 7 . 1 % E . B O T T D R . N O T A P A R T S B 1 0 D I 1 0 B D I 1 0 A S D M H 1 0 A C H D S T O R M D R A I N E A S E M E N T 2 . 0 % M W M W MATCH EXIST. EXIST. 50' RIGHT-OF-WAY OVERHEAD POWERTO BE RELOCATEDTYP. (BY OTHERS) 4 . 1 % 3 . 2 % 2706 2 7 0 5 2 7 0 4 2 7 0 1 2 7 0 2 2 7 0 3 2 7 0 0 2 7 0 0 2701 2702 2704 2706 2 7 0 0 2705 2 7 0 4 2 7 0 3 4 9 5 5 8 8 12 4 5 5 STA: 24+19.20, 25.00'L(RIGHT-OF-WAY)STA: 24+96.56, 25.00'R(RIGHT-OF-WAY)STA: 24+43.57, 25.00'R(RIGHT-OF-WAY)D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.202 (E. Bott Dr. Bridge Crossing Detail Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 2 0 2 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 2 0 2 E. BOTT DR. BRIDGE CROSSING DETAIL PLAN 6 A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n S C A L E : 1 " = 1 E . B O T T D R . D E T A I L P L A N 1 0 ' - 0 " H O R I Z O N T A L H O R I Z O N T A L S C A L E I N F E E T 0 1 0 2 0 5 1 0 1 5 N O R T H C I V I L I N N O V A T I O N S R O A D W A Y C O N S T R U C T I O N K E Y N O T E S I N S T A L L 4 ' W I D E V A L L E Y G U T T E R P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 0 8 R E M O V E E X I S T I N G B A R R I C A D E S ( I F A P P L I C A B L E ) A N D S A W C U T A M I N I M U M O F 2 F E E T O F E X I S T I N G P A V E M E N T . R E F E R E N C E I S P W C S D - 3 0 1 A N D A C H D S U P P L E M E N T A L S T A N D A R D D R A W I N G S D - 3 0 3 A N D S D - 8 0 6 I N S T A L L P E D E S T R I A N R A M P P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 1 2 H , T Y P E " H 4 " , W / T A C T I L E W A R N I N G S U R F A C E F O R P E D E S T R I A N A C C E S S P E R A C H D S U P P L E M E N T A L D W G S D - 7 1 2 1 3 I N S T A L L 5 ' W I D E S I D E W A L K P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 0 9 4 1 2 1 0 I N S T A L L T Y P E I I I B A R R I C A D E A N D S I G N " S T R E E T T O B E E X T E N D E D I N T H E F U T U R E " A N D T H I C K E N E D E D G E A L U M I N U M W I T H S T R I P E D D E C A L S D E C A L S P E R A C H D S U P P L E M E N T A L S D - 1 1 3 2 B 1 1 I N S T A L L T Y P E I I B A R R I C A D E W I T H K I C K P L A T E A N D T H I C K E N E D E D G E A L U M . W I T H S T R I P E D D E C A L S P E R A C H D S U P P L E M E N T A L S D - 1 1 3 2 A I N S T A L L P E D E S T R I A N R A M P P E R I S P W C D R A W I N G S D - 7 1 2 A , W / T A C T I L E W A R N I N G S U R F A C E F O R P E D E S T R I A N A C C E S S P E R A C H D S U P P L E M E N T A L D W G S D - 7 1 2 2 6 I N S T A L L 5 ' V E R T I C A L T O R O L L E D C U R B T R A N S I T I O N S E C T I O N P E R I S P W C S D - 7 0 7 , M O D I F I E D . S E E D E T A I L O N D E T A I L S H E E T N O T E : S E E S H E E T S C . 2 0 5 A N D C . 2 0 6 F O R S T R E E T S T R I P I N G , S I G N A G E A N D L I G H T I N G P L A N . I N S T A L L 5 ' C U R B T E R M I N U S P E R I S P W C S D - 7 0 7 7 I N S T A L L 7 ' W I D E S I D E W A L K P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 0 9 5 I N S T A L L C O N C R E T E D R I V E W A Y W I T H R A M P E D S I D E W A L K P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 1 0 B 8 I N S T A L L C O N C R E T E D R I V E W A Y F O R G R A D E S G R E A T E R T H A N 6 % P E R A C H D S U P P L E M E N T A L D R A W I N G S D - 7 1 0 E 9 E . B O T T D R . P R O F I L E - S T A 2 2 + 5 0 . 0 0 T O 3 0 + 5 0 . 0 0 2695 2700 2705 2710 2715 2720 2 6 9 5 2 7 0 0 2 7 0 5 2 7 1 0 2 7 1 5 2 7 2 0 22+5023+0024+00 2 5 + 0 0 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 3 0 + 0 0 3 0 + 5 0 2705.122705.012704.19 2704.41 2706.52 2704.25 2706.12 2703.31 2703.88 2701.14 2700.97 2701.07 2700.19 2700.99 2699.99 2700.64 2700.11 2700.70 2700.32 2700.87 2700.52 2701.06 2700.72 2701.13 2700.92 2701.07 P C : 2 7 + 1 3 . 1 5 PT: 24+94.68 PT: 27+61.02 7 . 1 2 % 0 . 4 1 % 0 . 4 5 % 0 . 4 5 % 0 . 4 0 % P V I S T A : 2 5 + 1 7 . 3 6 P V I E L E V : 2 7 0 6 . 2 1 K : 1 0 . 9 6 L V C : 7 3 . 0 0 BVCS: 24+80.86 BVCE: 2706.38 EVCS: 25+53.86 EVCE: 2703.61 P V I S T A : 2 5 + 9 9 . 0 0 P V I E L E V : 2 7 0 0 . 4 0 K : 1 0 . 8 8 L V C : 7 3 . 0 0 BVCS: 25+62.50 BVCE: 2703.00 EVCS: 26+35.50 EVCE: 2700.25 STA = 29+93.56 - SUBDIVISION BOUNDARY ELEV = 2701.10 - END CONSTRUCTION STA = 27+61.02 - GRADE BREAK ELEV = 2700.16 STA = 27+11.65 - LOW POINT ELEV = 2699.94 STA = 23+98.26ELEV = 2706.75 STA = 24+94.68 ELEV = 2706.23 STA = 27+13.15 ELEV = 2699.95 E X I S T I N G G R O U N D A T C E N T E R L I N E F I N I S H E D G R A D E A T C E N T E R L I N E ELEV = 2700.52 STA = 28+49.96 - S. TARADALE PL./AVE. 0.45%STA = 22+98.26ELEV = 2706.74STA = 23+50.00 - HIGH POINTELEV = 2706.97STA = 24+38.05 - SUBDIVISION BOUNDARYELEV = 2706.57 - BEGIN CONSTRUCTION0.45%EXISTING GRADEAT CENTERLINE(PER SHELBURNEEAST SUBD. NO. 1)EXISTINGBRIDGE P A V E M E N T T I E T O M A T C H E X I S T . ( S E E P L A N V I E W F O R E L E V A T I O N S ) 1 2 " S D 4 " P I 1 2 " G I R R S . T A R A D A L E A V E . A N D E . A W B R E Y S T . P R O F I L E 2690 2695 2700 2705 2710 2715 2 6 9 0 2 6 9 5 2 7 0 0 2 7 0 5 2 7 1 0 2 7 1 5 9+5010+0011+0012+0013+00 1 4 + 0 0 1 5 + 0 0 1 6 + 0 0 1 7 + 0 0 1 8 + 0 0 2700.872700.522698.032699.892698.292699.442698.202698.992698.342698.542698.312698.262698.212698.06 2697.62 2697.86 2697.71 2697.66 2697.18 2697.46 2696.96 2697.23 2696.79 2696.97 2696.80 2696.76 2696.78 2696.56 2697.00 2696.69 2697.32 2697.15 2.00% 0 . 4 0 % 0 . 6 0 % 1 . 2 7 % 0 . 5 2 % 0 . 4 0 % 0.90%ELEV = 2700.52STA = 10+00.00 - E. BOTT DR.STA = 10+16.00 - GRADE BREAKELEV = 2700.20 STA = 17+87.35 - SUBDIVISION BOUNDARY ELEV = 2697.62 - END CONSTRUCTION STA = 16+66.71 - LOW POINT ELEV = 2696.49 STA = 12+17.13 - GRADE BREAKELEV = 2698.39 STA = 14+76.67 - GRADE BREAK ELEV = 2697.35 STA = 15+55.21 - GRADE BREAK ELEV = 2696.94 STA = 17+26.71 - GRADE BREAK ELEV = 2696.85 PC: 10+82.40PT: 10+98.49PC: 11+75.58PT: 11+91.67 PC: 14+76.67 PT: 15+55.21 ELEV = 2698.69STA = 11+83.63 - E. DARBY ST.STA = 10+82.40ELEV = 2699.60STA = 10+98.49ELEV = 2699.46STA = 11+75.58ELEV = 2698.76STA = 11+91.67ELEV = 2698.62 F I N I S H E D G R A D E A T C E N T E R L I N E E X I S T I N G G R O U N D A T C E N T E R L I N E 1 2 " S D 4 " P I 4 " P I 4" PI E . D A R B Y S T . P R O F I L E 2 6 9 5 2 7 0 0 2 7 0 5 2 7 1 0 2 7 1 5 2 6 9 5 2 7 0 0 2 7 0 5 2 7 1 0 2 7 1 5 9 + 5 0 1 0 + 0 0 1 1 + 0 0 1 1 + 5 0 2698.27 2698.69 2698.64 2699.04 2698.96 2699.48 1 . 9 7 % 1 . 7 8 % 0 . 8 9 % ELEV = 2698.69 STA = 10+00.00 - S. TARADALE AVE. STA = 10+13.51 - CL VALLEY GUTTER ELEV = 2698.33 STA = 10+45.51 - GRADE BREAK ELEV = 2699.00 STA = 11+12.00 - SUBDIVISION BOUNDARY ELEV = 2699.59 - END CONSTRUCTION E X I S T I N G G R O U N D A T C E N T E R L I N E F I N I S H E D G R A D E A T C E N T E R L I N E D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.203 (Street Profiles).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 2 0 3 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 2 0 3 STREET PROFILES 7 H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 V E R T I C A L S C A L E I N F E E T 0 4 8 2 4 A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n S . T A R A D A L E P L . P R O F I L E 2 6 9 5 2 7 0 0 2 7 0 5 2 7 1 0 2 7 1 5 2695 2700 2705 2710 2715 9 + 5 0 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 4 + 0 0 15+0015+50 2700.87 2700.52 2699.71 2700.74 2699.66 2700.55 2699.81 2700.34 2700.04 2700.13 2700.46 2700.06 2700.96 2700.32 2701.04 2701.03 2702.71 2701.85 2703.37 2702.832702.89 PC: 11+63.58 PT: 13+03.83 P R C : 1 2 + 3 2 . 9 6 ELEV = 2700.52 STA = 10+00.00 - E. BOTT DR. STA = 10+18.00 - CL VALLEY GUTTER ELEV = 2700.07 STA = 12+34.50 - LOW POINT ELEV = 2699.98 STA = 14+49.50 ELEV = 2702.84 CENTER CUL-DE-SAC STA = 14+95.50ELEV = 2702.15LIP OF GUTTER STA = 13+85.83 - GRADE BREAK ELEV = 2701.57 2 . 0 0 % 1 . 8 1 % 1.50% 0 . 5 2 % 1 . 5 0 % 1 . 9 9 % 0 . 4 3 % STA = 11+63.58 ELEV = 2700.28 STA = 13+03.83 - GRADE BREAK ELEV = 2700.34 F I N I S H E D G R A D E A T C E N T E R L I N E E X I S T I N G G R O U N D A T C E N T E R L I N E ELEV = 2700.15 STA = 11+93.69 - E. CLEARY CT. 1 2 " S D 6 " P I STA = 12+32.96 ELEV = 2699.99 STA = 10+51.00 - HIGH POINT ELEV = 2700.76 E . C L E A R Y C T . P R O F I L E 2 6 9 5 2 7 0 0 2 7 0 5 2 7 1 0 2 7 1 5 2 6 9 5 2 7 0 0 2 7 0 5 2 7 1 0 2 7 1 5 9 + 5 0 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 2699.97 2700.15 2701.88 2700.48 2700.46 2700.70 2700.77 2700.93 2701.12 2701.64 2701.47 2701.27 2 . 0 2 % 1 . 8 0 % 1 . 9 2 % 0 . 4 5 % 1 . 5 2 % PC: 11+23.98 PCC: 11+54.76 PT: 12+16.83PI: 12+20 STA = 10+45.53 - GRADE BREAK ELEV = 2700.46 ELEV = 2700.15 STA = 10+00.00 - S. TARADALE PL. STA = 10+13.53 - CL VALLEY GUTTER ELEV = 2699.79 STA = 11+54.76 - GRADE BREAK ELEV = 2700.95 STA = 12+17.75 ELEV = 2701.90 CENTER CUL-DE-SAC STA = 12+60.75 ELEV = 2701.09 LIP OF GUTTER STA = 11+23.98 ELEV = 2700.81 E X I S T I N G G R O U N D A T C E N T E R L I N E F I N I S H E D G R A D E A T C E N T E R L I N E D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.203 (Street Profiles).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 2 0 4 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 2 0 4 STREET PROFILES 8 A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 V E R T I C A L S C A L E I N F E E T 0 4 8 2 4 121314BLOCK 11234BLOCK 5 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 5 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 4 5 0 A N T L E R R I D G E S U B D I V I S I O N P H A S E 4 BREMERTON SUBDIVISION UNPLATTEDPARCEL NO. S1128131530UNPLATTEDPARCEL NO. S1128427880EXISTINGSTREET LIGHT EXISTINGSTREET LIGHTEXISTINGSTREET LIGHT EP EP EP EP EPEPEPEP 3 1 E P E G 6 2 2 5 BLOCK 6 4 2 0 2 1 2 B L O C K 8 1 B L O C K 9 1 2 B L O C K 7 1 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 BLO C K 7 2 3 4 5 6 B L O C K 9 E P E G INSTALL TYPE IISTREET LIGHT(53710C) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 1 C ) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 2 C ) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 3 C ) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 4 C ) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 5 C ) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 6 C ) EXISTING SHELBURNEEAST SUBD. NO. 1 EXISTING SHELBURNEEAST SUBD. NO. 1E. BOTT DR. S. TARADALE AVE. E . A W B R E Y S T . E . D A R B Y S T . 3 5 4 6 1 0 2 L F 6 4 6 L F 7 5 6 L F 3 4 5 3 4 5 6405 LF 6 3 1 1 L F 7 5 6 L F 2 2 2 2 EXISTING STRIPINGPER SHELBURNEEAST SUBD. NO. 1 EXISTING STRIPINGPER SHELBURNEEAST SUBD. NO. 1 1 2 2 1 5 4 3 D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.205 (Street Striping_Signage_Lighting Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 2 0 5 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 2 0 5 STREET STRIPING, SIGNAGE AND LIGHTING PLAN 9 S C A L E : 1 " = H O R I Z O N T A L 1 S T R E E T S T R I P I N G , S I G N A G E A N D L I G H T I N G P L A N 4 0 ' - 0 " H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 6 0 E x i s t i n g T y p e I I S t r e e t L i g h t L I G H T I N G P L A N L E G E N D C i t y O f M e r i d i a n T y p e I I S t r e e t L i g h t - 2 5 ' S q u a r e S t e e l A n c h o r B a s e P o l e E l e c t r i c a l S e r v i c e B o x E l e c t r i c a l T r a n s f o r m e r S T R E E T L I G H T N O T E S 1 . A L L S T R E E T L I G H T C O N S T R U C T I O N S H A L L B E D O N E I N A C C O R D A N C E W I T H T H E C U R R E N T V E R S I O N O F T H E I S P W C , T H E M E R I D I A N S U P P L E M E N T A L S P E C I F I C A T I O N S T O T H E I S P W C , A N D T H E N A T I O N A L E L E C T R I C C O D E . 2 . A S T R E E T L I G H T I N G E L E C T R I C A L P E R M I T S H A L L B E O P E N E D P R I O R T O S T A R T I N G W O R K . U S E T H E O N L I N E C I T I Z E N P O R T A L A T H T T P S : / / C I T I Z E N P O R T A L . M E R I D I A N C I T Y . O R G / C I T I Z E N A C C E S S / T O O P E N A P E R M I T A N D R E Q U E S T I N S P E C T I O N S . 3 . I N S T A L L A T I O N W I L L R E Q U I R E I N S P E C T I O N S F O R T H E C O N C R E T E B A S E R E I N F O R C I N G , B E D D I N G , B A C K F I L L , A N D F O R T H E P O L E A N D A S S O C I A T E D W I R I N G . 4 . S T R E E T L I G H T B A S E S S H A L L B E L O C A T E D 1 0 ’ M I N . F R O M T R E E S , 5 ’ M I N . F R O M F I R E H Y D R A N T S A N D 2 ’ M I N . F R O M W A T E R M E T E R S . 5 . K E E P A C C U R A T E N O T E S O F C O N D U I T , J U N C T I O N B O X L O C A T I O N S . A T T A C H A R E D L I N E D A S B U I L T D R A W I N G O F T H I S P L A N S H E E T T O T H E S T R E E T L I G H T I N G E L E C T R I C A L P E R M I T , O R S U B M I T A H A R D C O P Y T O T H E M E R I D I A N P U B L I C W O R K S D E P A R T M E N T P R I O R T O R E Q U E S T I N G F I N A L I N S P E C T I O N . 6 . C O N T A C T T H E C I T Y T R A N S P O R T A T I O N A N D U T I L I T Y C O O R D I N A T O R ( 2 0 8 ) 8 9 8 – 5 5 0 0 F O R Q U E S T I O N S R E G A R D I N G U T I L I T Y C O N F L I C T S , O R T O A C C E S S L O C K E D M E T E R P E D E S T A L S . 7 . S T R E E T L I G H T S A L O N G E . B O T T D R . S H A L L B E M E T E R E D . R O A D W A Y S T R I P I N G A N D S I G N A G E C O N S T R U C T I O N N O T E S : I N S T A L L 3 0 " x 3 0 " S T O P S I G N P E R M U T C D R 1 - 1 , W I T H S T R E E T N A M E S I G N P E R A C H D D W G . T S - 1 1 1 4 . 1 3 4 5 I N S T A L L 1 2 " x 8 " N O P A R K I N G S I G N " B I K E L A N E " P E R M U T C D R 7 - 9 . 7 I N S T A L L 1 2 " x 1 8 " N O P A R K I N G S I G N P E R M U T C D R 8 - 3 . 2 6 I N S T A L L B I K E L A N E S Y M B O L P E R A C H D D W G . N O . T S - 1 1 1 3 . I N S T A L L B I K E L A N E A R R O W P E R A C H D D W G . N O . T S - 1 1 1 3 . I N S T A L L 8 " W I D E W H I T E B I K E L A N E S T R I P E 6 ' F R O M B A C K O F C U R B . I N S T A L L 8 " W I D E W H I T E B I K E L A N E A T I N T E R S E C T I O N S T R I P E P E R A C H D D W G . N O . T S - 1 1 1 2 ( D E T A I L N O . 1 2 ) . R O A D W A Y S T R I P I N G A N D S I G N A G E N O T E S 1 . P r i o r T o P l a c e m e n t O f A n y P a v e m e n t M a r k i n g s , C o n t a c t A C H D I n s p e c t i o n F o r V e r i f i c a t i o n O f C o m p l i a n c e W i t h P o l i c y A n d E x i s t i n g P a v e m e n t M a r k i n g s . 2 . S i g n C o n t r a c t o r s O t h e r T h a n A C H D M u s t B e B o n d e d W i t h A C H D A n d M u s t O b t a i n A N o - C h a r g e R i g h t - O f - W a y P e r m i t . T h e s e p l a n s a n d / o r s p e c i f i c a t i o n s h a v e b e e n r e v i e w e d f o r c o m p l i a n c e w i t h M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f c a t i o n s . T h i s r e v i e w d o e s n o t r e l i e v e t h e o w n e r , e n g i n e e r , o r c o n t r a c t o r o f t h e r e s p o n s i b i l i t y t o d e s i g n a n d / o r c o n s t r u c t t h o s e f a c i l i t i e s i n c o m p l i a n c e w i t h a l l c u r r e n t a p p l i c a b l e f e d e r a l , s t a t e a n d l o c a l l a w s , r u l e s , r e g u l a t i o n s , o r d i n a n c e s , d e v e l o p m e n t a g r e e m e n t s , s p e c i f i c a t i o n s , o r d e r s o r a p p r o v a l s , a l l o f w h i c h t h e C i t y r e t a i n s t h e r i g h t t o e n f o r c e . I n c o n s i s t e n c i e s n o t n o t e d b y C i t y s t a f f s h a l l n o t b e c o n s t r u e d a s a p p r o v e d u n l e s s s p e c i f i c a l l y a d d r e s s e d i n w r i t i n g b y t h e C i t y . A n y p r o p o s e d r e v i s i o n t o t h e s e p l a n s m u s t b e s u b m i t t e d f o r r e v i e w a n d c o m p l i a n c e w i t h t h e M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f i c a t i o n s b e f o r e s a i d r e v i s i o n i s c o n s t r u c t e d . N a m e D a t e A P P R O V E D F O R C O N S T R U C T I O N M A T C H L I N E - S E E S H E E T C . 2 0 6 MATCH LINE - SEE SHEET C.206 14 BLOCK 13456789101112BLOCK 5BLOCK 51UNPLATTEDPARCEL NO. S1128438500 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 3 8 4 1 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 4 9 3 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 2 8 2 S. SELATIR WAY EXISTINGSTREET LIGHTEXISTING STREET LIGHT EXISTINGSTREET LIGHTEXISTINGSTREET LIGHT EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP E P 3 1 8 E P E G 6 2 2 5 BLOCK 64127891011 B L O C K 6 1 3 1 4 1 5 1 6 1 7 1 9 2 0 2 1 B L O C K 6 2 B L O C K 8 1 11 2 B L O C K 7 1 E P E G INSTALL TYPE IISTREET LIGHT(53710C) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 1 C ) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 7 C ) INSTALL TYPE IISTREET LIGHT(53719C) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 8 C ) I N S T A L L T Y P E I I S T R E E T L I G H T ( 5 3 7 1 2 C ) EXISTING SHELBURNEEAST SUBD. NO. 1 EXISTING SHELBURNEEAST SUBD. NO. 1 E. BOTT DR. S. TARADALE PL. E . C L E A R Y C T . 3 5 4 6 1 0 2 L F 6 4 6 L F 7 5 6 L F 3 4 5 3 4 5 6405 LF6311 LF 7 5 6 L F EXISTING STRIPINGPER SHELBURNEEAST SUBD. NO. 1 EXISTING STRIPINGPER SHELBURNEEAST SUBD. NO. 1 1 2 2 1 2 2 2 2 543D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.205 (Street Striping_Signage_Lighting Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 2 0 6 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 2 0 6 STREET STRIPING, SIGNAGE AND LIGHTING PLAN 1 0 S C A L E : 1 " = H O R I Z O N T A L 1 S T R E E T S T R I P I N G , S I G N A G E A N D L I G H T I N G P L A N 4 0 ' - 0 " H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 6 0 E x i s t i n g T y p e I I S t r e e t L i g h t L I G H T I N G P L A N L E G E N D C i t y O f M e r i d i a n T y p e I I S t r e e t L i g h t - 2 5 ' S q u a r e S t e e l A n c h o r B a s e P o l e E l e c t r i c a l S e r v i c e B o x E l e c t r i c a l T r a n s f o r m e r S T R E E T L I G H T N O T E S 1 . A L L S T R E E T L I G H T C O N S T R U C T I O N S H A L L B E D O N E I N A C C O R D A N C E W I T H T H E C U R R E N T V E R S I O N O F T H E I S P W C , T H E M E R I D I A N S U P P L E M E N T A L S P E C I F I C A T I O N S T O T H E I S P W C , A N D T H E N A T I O N A L E L E C T R I C C O D E . 2 . A S T R E E T L I G H T I N G E L E C T R I C A L P E R M I T S H A L L B E O P E N E D P R I O R T O S T A R T I N G W O R K . U S E T H E O N L I N E C I T I Z E N P O R T A L A T H T T P S : / / C I T I Z E N P O R T A L . M E R I D I A N C I T Y . O R G / C I T I Z E N A C C E S S / T O O P E N A P E R M I T A N D R E Q U E S T I N S P E C T I O N S . 3 . I N S T A L L A T I O N W I L L R E Q U I R E I N S P E C T I O N S F O R T H E C O N C R E T E B A S E R E I N F O R C I N G , B E D D I N G , B A C K F I L L , A N D F O R T H E P O L E A N D A S S O C I A T E D W I R I N G . 4 . S T R E E T L I G H T B A S E S S H A L L B E L O C A T E D 1 0 ’ M I N . F R O M T R E E S , 5 ’ M I N . F R O M F I R E H Y D R A N T S A N D 2 ’ M I N . F R O M W A T E R M E T E R S . 5 . K E E P A C C U R A T E N O T E S O F C O N D U I T , J U N C T I O N B O X L O C A T I O N S . A T T A C H A R E D L I N E D A S B U I L T D R A W I N G O F T H I S P L A N S H E E T T O T H E S T R E E T L I G H T I N G E L E C T R I C A L P E R M I T , O R S U B M I T A H A R D C O P Y T O T H E M E R I D I A N P U B L I C W O R K S D E P A R T M E N T P R I O R T O R E Q U E S T I N G F I N A L I N S P E C T I O N . 6 . C O N T A C T T H E C I T Y T R A N S P O R T A T I O N A N D U T I L I T Y C O O R D I N A T O R ( 2 0 8 ) 8 9 8 – 5 5 0 0 F O R Q U E S T I O N S R E G A R D I N G U T I L I T Y C O N F L I C T S , O R T O A C C E S S L O C K E D M E T E R P E D E S T A L S . 7 . S T R E E T L I G H T S A L O N G E . B O T T D R . S H A L L B E M E T E R E D . R O A D W A Y S T R I P I N G A N D S I G N A G E C O N S T R U C T I O N N O T E S : I N S T A L L 3 0 " x 3 0 " S T O P S I G N P E R M U T C D R 1 - 1 , W I T H S T R E E T N A M E S I G N P E R A C H D D W G . T S - 1 1 1 4 . 1 3 4 5 I N S T A L L 1 2 " x 8 " N O P A R K I N G S I G N " B I K E L A N E " P E R M U T C D R 7 - 9 . 7 I N S T A L L 1 2 " x 1 8 " N O P A R K I N G S I G N P E R M U T C D R 8 - 3 . 2 6 I N S T A L L B I K E L A N E S Y M B O L P E R A C H D D W G . N O . T S - 1 1 1 3 . I N S T A L L B I K E L A N E A R R O W P E R A C H D D W G . N O . T S - 1 1 1 3 . I N S T A L L 8 " W I D E W H I T E B I K E L A N E S T R I P E 6 ' F R O M B A C K O F C U R B . I N S T A L L 8 " W I D E W H I T E B I K E L A N E A T I N T E R S E C T I O N S T R I P E P E R A C H D D W G . N O . T S - 1 1 1 2 ( D E T A I L N O . 1 2 ) . R O A D W A Y S T R I P I N G A N D S I G N A G E N O T E S 1 . P r i o r T o P l a c e m e n t O f A n y P a v e m e n t M a r k i n g s , C o n t a c t A C H D I n s p e c t i o n F o r V e r i f i c a t i o n O f C o m p l i a n c e W i t h P o l i c y A n d E x i s t i n g P a v e m e n t M a r k i n g s . 2 . S i g n C o n t r a c t o r s O t h e r T h a n A C H D M u s t B e B o n d e d W i t h A C H D A n d M u s t O b t a i n A N o - C h a r g e R i g h t - O f - W a y P e r m i t . T h e s e p l a n s a n d / o r s p e c i f i c a t i o n s h a v e b e e n r e v i e w e d f o r c o m p l i a n c e w i t h M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f c a t i o n s . T h i s r e v i e w d o e s n o t r e l i e v e t h e o w n e r , e n g i n e e r , o r c o n t r a c t o r o f t h e r e s p o n s i b i l i t y t o d e s i g n a n d / o r c o n s t r u c t t h o s e f a c i l i t i e s i n c o m p l i a n c e w i t h a l l c u r r e n t a p p l i c a b l e f e d e r a l , s t a t e a n d l o c a l l a w s , r u l e s , r e g u l a t i o n s , o r d i n a n c e s , d e v e l o p m e n t a g r e e m e n t s , s p e c i f i c a t i o n s , o r d e r s o r a p p r o v a l s , a l l o f w h i c h t h e C i t y r e t a i n s t h e r i g h t t o e n f o r c e . I n c o n s i s t e n c i e s n o t n o t e d b y C i t y s t a f f s h a l l n o t b e c o n s t r u e d a s a p p r o v e d u n l e s s s p e c i f i c a l l y a d d r e s s e d i n w r i t i n g b y t h e C i t y . A n y p r o p o s e d r e v i s i o n t o t h e s e p l a n s m u s t b e s u b m i t t e d f o r r e v i e w a n d c o m p l i a n c e w i t h t h e M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f i c a t i o n s b e f o r e s a i d r e v i s i o n i s c o n s t r u c t e d . N a m e D a t e A P P R O V E D F O R C O N S T R U C T I O N M A T C H L I N E - S E E S H E E T C . 2 0 5 MATCH LINE - SEE SHEET C.205 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 5 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 4 5 0 A N T L E R R I D G E S U B D I V I S I O N P H A S E 4 BREMERTON SUBDIVISION UNPLATTEDPARCEL NO. S1128131530UNPLATTEDPARCEL NO. S1128427880SD121314BLOCK 11234BLOCK 5 SD EP EP GIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRR G I R R EP EP EPEPEPEP 3 1 E P E G 6 2 2 5 BLOCK 6 4 2 0 2 1 2 B L O C K 8 1 B L O C K 9 1 2 B L O C K 7 1 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 BLO C K 7 2 3 4 5 6 B L O C K 9 E P E G CENTERLINE OF TEN MILE FEEDER CANAL S. TARADALE AVE. E . A W B R E Y S T . E . B O T T D R . E. BOTT DR. S. TARADALE PL. EXISTINGSHELBURNE EASTSUBD. NO. 1EXISTINGSHELBURNE EASTSUBD. NO. 1 2 7 0 0 2 7 0 0 270127022703270427052706 27012 7 0 1 2 7 0 0 2697 2 6 9 8 2 6 9 9 2 6 9 9 2 7 0 1 2 7 0 0 27 0 0 2 6 9 9 269 9 2 7 0 0 2698 2 6 9 7 2697 E . D A R B Y S T . EXISTING BRIDGE 2 7 0 1 2 6 9 8 2 6 9 8 2697 26972697 2697 2 6 9 7 2698 2 6 9 9 2 7 0 0 2 7 0 1 2 7 0 1 D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.300 (Grading Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 3 0 0 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 M A T C H L I N E - S E E S H E E T C . 3 0 1 MATCH LINE - SEE SHEET C.301 C . 3 0 0 GRADING PLAN 1 1 G R A D I N G C O N S T R U C T I O N N O T E S 1 . P r i o r T o C o m m e n c i n g S i t e G r a d i n g O r F o u n d a t i o n E x c a v a t i o n s , A l l B u i l d i n g A r e a s A n d F i l l A r e a s S h o u l d B e S t r i p p e d O f A l l D e b r i s , V e g e t a t i o n , A n d U n d o c u m e n t e d F i l l . 2 . F i l l P l a c e d T o D e v e l o p B u i l d i n g P a d s S i t e G r a d i n g S h o u l d M e e t T h e R e q u i r e m e n t s F o r G e n e r a l F i l l . G e n e r a l F i l l U s e d F o r S i t e G r a d i n g M a y B e O b t a i n e d F r o m O n - S i t e E x c a v a t i o n s O r A p p r o v e d B o r r o w S o u r c e s . G e n e r a l F i l l S h a l l C l a s s i f y A c c o r d i n g T o A S T M D 2 4 8 7 A S G W , G P , G C , G M , S W , S P , S C , S M , M L , C l ( O r C o m b i n a t i o n s O f T h e s e S u c h A s S P - S M ) M a t e r i a l s . I n A d d i t i o n , T h e G e n e r a l F i l l M a t e r i a l S h a l l H a v e A M a x i m u m P a r t i c l e S i z e L e s s T h a n 4 I n c h e s A n d S h a l l B e F r e e O f E x c e s s M o i s t u r e , O r g a n i c M a t t e r A n d D e b r i s . 3 . M a t e r i a l s T h a t A r e F r o z e n , C o n t a m i n a t e d , C o n t a i n E x c e s s M o i s t u r e , O r g a n i c M a t t e r ( S u c h A s S t r i p p i n g O r R o o t s ) . T r a s h , D e b r i s , S t o n e s L a r g e r T h a n 4 I n c h e s , O r T h a t C l a s s i f y B y A S T M D 2 4 8 7 A S C H , M H , P T , O L , A n d A r e N o t S u i t a b l e F o r G e n e r a l F i l l . 4 . A f t e r T h e R e m o v a l O f A l l V e g e t a t i o n A n d P r i o r T o A n y P l a c e m e n t O f G e n e r a l F i l l , T h e E x p o s e d S u b g r a d e S h o u l d B e U n i f o r m l y S c a r i f i e d T o A M i n i m u m D e p t h O f 8 I n c h e s , M o i s t u r e - C o n d i t i o n e d A s N e c e s s a r y , A n d C o m p a c t e d T o A M i n i m u m O f 9 5 % O f T h e M a x i m u m D r y D e n s i t y I n A c c o r d a n c e W i t h A S T M D 6 9 8 . 5 . A f t e r S i t e P r e p a r a t i o n I s C o m p l e t e d , G e n e r a l F i l l S h o u l d B e P l a c e d I n 8 - i n c h M a x i m u m L o o s e H o r i z o n t a l L i f t s A n d C o m p a c t e d T o A t L e a s t 9 5 % O f T h e M a x i m u m D r y D e n s i t y A s D e t e r m i n e d B y A S T M D 6 9 8 - S t a n d P r o c t o r C o m p a c t i o n T e s t . E a c h L i f t A t E a c h B u i l d i n g P a d S h o u l d B e D o c u m e n t e d F o r D e n s i t y . 6 . G e n e r a l F i l l P l a c e d W i t h i n R o a d w a y E m b a n k m e n t s S h o u l d B e P l a c e d I n 8 - i n c h M a x i m u m L o o s e H o r i z o n t a l L i f t s A n d C o m p a c t e d T o A t L e a s t 9 5 % O f T h e M a x i m u m D r y D e n s i t y A s D e t e r m i n e d B y T h e A S T M D 6 9 8 - S t a n d a r d P r o c t o r C o m p a c t i o n T e s t . 7 . A l l E x i s t i n g I r r i g a t i o n D i t c h e s , T e s t P i t s , F o u n d a t i o n s , A n d D r a i n F i e l d s S h a l l B e R e - E x c a v a t e d T o N a t i v e S o i l A n d B a c k f i l l e d W i t h S t r u c t u r a l F i l l P e r I S P W C S p e c i f i c a t i o n s . P r o v i d e S o i l s D a t a T o V e r i f y N a t i v e M a t e r i a l M e e t s T h e R e q u i r e m e n t s F o r E n g i n e e r e d F i l l P e r I S P W C S p e c i f i c a t i o n s A n d A C o p y O f T h e C o m p a c t i o n T e s t s . S C A L E : 1 " = 1 G R A D I N G P L A N 4 0 ' - 0 " H O R I Z O N T A L H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 6 0 N O R T H C I V I L I N N O V A T I O N S UNPLATTEDPARCEL NO. S1128438500 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 3 8 4 1 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 4 9 3 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 2 8 2 SD 14 BLOCK 13456789101112BLOCK 5BLOCK 51 SD GIRR G I R R EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP E P 3 1 8 E P E G 6 2 2 5 BLOCK 64127891011 B L O C K 6 1 3 1 4 1 5 1 6 1 7 1 9 2 0 2 1 B L O C K 6 2 B L O C K 8 1 11 2 B L O C K 7 1 E P E G CENTERLINE OF TEN MILE FEEDER CANAL E . B O T T D R . S. TARADALE PL. S. TARADALE PL. E. CLEARY CT.EXISTINGSHELBURNE EASTSUBD. NO. 1EXISTINGSHELBURNE EASTSUBD. NO. 1 S. SELATIR WAYE. FRATELLO ST. 2700 2 7 0 0 2700 270127022703270427052706 2701270127022702270227032703 2 7 0 2 2 7 0 2 2 7 0 0 2701 2700 2 7 0 1 2 7 0 0 2700 2 7 0 0 EXISTING BRIDGE 2 7 0 1 2 7 0 0 2 7 0 1 2 7 0 1 2702 2 7 0 2 D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.300 (Grading Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 3 0 1 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 M A T C H L I N E - S E E S H E E T C . 3 0 0 MATCH LINE - SEE SHEET C.300 C . 3 0 1 GRADING PLAN 1 2 G R A D I N G C O N S T R U C T I O N N O T E S 1 . P r i o r T o C o m m e n c i n g S i t e G r a d i n g O r F o u n d a t i o n E x c a v a t i o n s , A l l B u i l d i n g A r e a s A n d F i l l A r e a s S h o u l d B e S t r i p p e d O f A l l D e b r i s , V e g e t a t i o n , A n d U n d o c u m e n t e d F i l l . 2 . F i l l P l a c e d T o D e v e l o p B u i l d i n g P a d s S i t e G r a d i n g S h o u l d M e e t T h e R e q u i r e m e n t s F o r G e n e r a l F i l l . G e n e r a l F i l l U s e d F o r S i t e G r a d i n g M a y B e O b t a i n e d F r o m O n - S i t e E x c a v a t i o n s O r A p p r o v e d B o r r o w S o u r c e s . G e n e r a l F i l l S h a l l C l a s s i f y A c c o r d i n g T o A S T M D 2 4 8 7 A S G W , G P , G C , G M , S W , S P , S C , S M , M L , C l ( O r C o m b i n a t i o n s O f T h e s e S u c h A s S P - S M ) M a t e r i a l s . I n A d d i t i o n , T h e G e n e r a l F i l l M a t e r i a l S h a l l H a v e A M a x i m u m P a r t i c l e S i z e L e s s T h a n 4 I n c h e s A n d S h a l l B e F r e e O f E x c e s s M o i s t u r e , O r g a n i c M a t t e r A n d D e b r i s . 3 . M a t e r i a l s T h a t A r e F r o z e n , C o n t a m i n a t e d , C o n t a i n E x c e s s M o i s t u r e , O r g a n i c M a t t e r ( S u c h A s S t r i p p i n g O r R o o t s ) . T r a s h , D e b r i s , S t o n e s L a r g e r T h a n 4 I n c h e s , O r T h a t C l a s s i f y B y A S T M D 2 4 8 7 A S C H , M H , P T , O L , A n d A r e N o t S u i t a b l e F o r G e n e r a l F i l l . 4 . A f t e r T h e R e m o v a l O f A l l V e g e t a t i o n A n d P r i o r T o A n y P l a c e m e n t O f G e n e r a l F i l l , T h e E x p o s e d S u b g r a d e S h o u l d B e U n i f o r m l y S c a r i f i e d T o A M i n i m u m D e p t h O f 8 I n c h e s , M o i s t u r e - C o n d i t i o n e d A s N e c e s s a r y , A n d C o m p a c t e d T o A M i n i m u m O f 9 5 % O f T h e M a x i m u m D r y D e n s i t y I n A c c o r d a n c e W i t h A S T M D 6 9 8 . 5 . A f t e r S i t e P r e p a r a t i o n I s C o m p l e t e d , G e n e r a l F i l l S h o u l d B e P l a c e d I n 8 - i n c h M a x i m u m L o o s e H o r i z o n t a l L i f t s A n d C o m p a c t e d T o A t L e a s t 9 5 % O f T h e M a x i m u m D r y D e n s i t y A s D e t e r m i n e d B y A S T M D 6 9 8 - S t a n d P r o c t o r C o m p a c t i o n T e s t . E a c h L i f t A t E a c h B u i l d i n g P a d S h o u l d B e D o c u m e n t e d F o r D e n s i t y . 6 . G e n e r a l F i l l P l a c e d W i t h i n R o a d w a y E m b a n k m e n t s S h o u l d B e P l a c e d I n 8 - i n c h M a x i m u m L o o s e H o r i z o n t a l L i f t s A n d C o m p a c t e d T o A t L e a s t 9 5 % O f T h e M a x i m u m D r y D e n s i t y A s D e t e r m i n e d B y T h e A S T M D 6 9 8 - S t a n d a r d P r o c t o r C o m p a c t i o n T e s t . 7 . A l l E x i s t i n g I r r i g a t i o n D i t c h e s , T e s t P i t s , F o u n d a t i o n s , A n d D r a i n F i e l d s S h a l l B e R e - E x c a v a t e d T o N a t i v e S o i l A n d B a c k f i l l e d W i t h S t r u c t u r a l F i l l P e r I S P W C S p e c i f i c a t i o n s . P r o v i d e S o i l s D a t a T o V e r i f y N a t i v e M a t e r i a l M e e t s T h e R e q u i r e m e n t s F o r E n g i n e e r e d F i l l P e r I S P W C S p e c i f i c a t i o n s A n d A C o p y O f T h e C o m p a c t i o n T e s t s . S C A L E : 1 " = 1 G R A D I N G P L A N 4 0 ' - 0 " H O R I Z O N T A L H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 6 0 N O R T H C I V I L I N N O V A T I O N S SEWER P R O F I L E - E . B O T T D R . 2680 2685 2690 2695 2700 2705 2710 2 6 8 0 2 6 8 5 2 6 9 0 2 6 9 5 2 7 0 0 2 7 0 5 2 7 1 0 9+5010+0011+0012+0013+00 1 4 + 0 0 1 5 + 0 0 1 6 + 0 0 1 7 + 0 0 EXIST. SSMH 9 (60" DIA.)STA = 10+00.00 (E)STA = 12+00.04 (N/S)RIM = 2705.998" INV IN = 2682.95 (E)8" INV IN = 2682.95 (N)8" INV OUT = 2682.85 (S)81.32 LF 8" PVC @ 0.41%EXIST. SSMH 25 (60" DIA.)STA = 10+86.32RIM = 2706.468" INV IN = 2683.38 (SE)8" INV OUT = 2683.28 (W)155.40 LF 8" PVC @ 0.41%EXIST. SSHM 26 (60" DIA.)STA = 12+46.72RIM = 2706.458" INV IN = 2684.11 (E)8" INV OUT = 2684.01 (NW)94.87 LF 8" PVC @ 0 . 4 0 % E X I S T . S S M H 2 7 ( 6 0 " D I A . ) S T A = 1 3 + 4 6 . 5 9 R I M = 2 7 0 5 . 6 3 8 " I N V I N = 2 6 8 4 . 5 9 ( E ) ( B L O C K - O U T ) 8 " I N V O U T = 2 6 8 4 . 4 9 ( W ) 2 2 1 . 1 3 L F 8 " P V C @ 0 . 4 0 % S S M H 1 ( 4 8 " D I A . ) S T A = 1 5 + 7 2 . 2 2 R I M = 2 6 9 9 . 8 7 8 " I N V I N = 2 6 8 5 . 5 8 ( E ) 8 " I N V O U T = 2 6 8 5 . 4 8 ( W ) 1 0 0 . 6 3 L F 8 " P V C @ 0 . 4 1 % S S M H 2 ( 4 8 " D I A . ) S T A = 1 6 + 7 6 . 8 5 ( W ) S T A = 1 0 + 0 0 . 0 0 ( N / S ) R I M = 2 7 0 0 . 2 9 8 " I N V I N = 2 6 8 6 . 0 9 ( N ) 8 " I N V I N = 2 6 8 6 . 0 9 ( S ) 8 " I N V O U T = 2 6 8 5 . 9 9 ( W ) E X I S T I N G G R O U N D A T P I P E C E N T E R L I N E F I N I S H E D G R A D E A T P I P E C E N T E R L I N E E X I S T I N G S L E E V E 1 2 " S D EXISTING 8" P V C PER SHELBUR N E EAST SUBD. N O . 1 EXISTING GRADE ATPIPE CENTERLINEPER SHELBURNEEAST SUBD. NO. 1EXISTING BRIDGE 12" SD6" PI8" W SD 1314BLOCK 1 15131234BLOCK 5 SD GIRRGIRR G I R R E P E P E P E P E P E P E P E P PIRRPIRR P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R S S S S S S W W S S S S S S S S S S S S S S SSSSSSSS PIRR PIRR PIRR P I R R P I R R P I R R 3 W W W 6 2 2 5 B L O C K 6 4 1 9 2 0 2 1 B L O C K 6 2 B L O C K 8 1 1 2 B L O C K 7 1 W W W SS SS SS SS SS W W W W W 22 10 111213 1 4 1 5 1 6 10 11 10 11 ! ! ! ! S. SELATIR WAY S. SELATIR WAYE. BOTT DR. E . B O T T D R . S. TARADALE PL. EXIST. SSHM 26 EXIST. SSMH 25EXIST. SSMH 9 E X I S T . S S M H 2 7 S S M H 1 S S M H 2 1 0 ' 1 2 ' 1 3 ' 12'10' 1 6 7 . 8 ° 1 7 0 . 9 ° 9 1 . 5 ° 9 0 . 0 ° EXISTING SHELBURNE EASTSUBDIVISION NO. 1 EXISTING SHELBURNE EASTSUBDIVISION NO. 1 N O T A P A R T 7 . 5 0 ' 7 . 5 0 ' S I = 2 6 9 3 . 9 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 0 + 6 9 S I = 2 6 9 3 . 7 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 1 + 3 2 S I = 2 6 9 3 . 8 A T R / W S L = 3 8 . 5 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 0 + 6 1 S I = 2 6 9 4 . 1 A T R / W S L = 3 8 . 5 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 1 + 1 9 S I = 2 6 9 4 . 4 A T R / W S L = 5 4 . 5 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 1 + 7 0 S I = 2 6 9 4 . 6 A T R / W S L = 5 9 . 1 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 1 7 7.50' S I = 2 6 9 2 . 9 A T R / W S L = 3 5 . 6 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 0 + 8 9 ( 4 " P V C @ 2 % M I N . ) 7 . 5 0 ' EXISTING 8 " P V C PER SHELB U R N E EAST SUB D . N O . 1 D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.400 (Sewer Plan and Profiles).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 4 0 0 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 4 0 0 SEWER PLAN AND PROFILE 1 3 T h e s e p l a n s a n d / o r s p e c i f i c a t i o n s h a v e b e e n r e v i e w e d f o r c o m p l i a n c e w i t h M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f c a t i o n s . T h i s r e v i e w d o e s n o t r e l i e v e t h e o w n e r , e n g i n e e r , o r c o n t r a c t o r o f t h e r e s p o n s i b i l i t y t o d e s i g n a n d / o r c o n s t r u c t t h o s e f a c i l i t i e s i n c o m p l i a n c e w i t h a l l c u r r e n t a p p l i c a b l e f e d e r a l , s t a t e a n d l o c a l l a w s , r u l e s , r e g u l a t i o n s , o r d i n a n c e s , d e v e l o p m e n t a g r e e m e n t s , s p e c i f i c a t i o n s , o r d e r s o r a p p r o v a l s , a l l o f w h i c h t h e C i t y r e t a i n s t h e r i g h t t o e n f o r c e . I n c o n s i s t e n c i e s n o t n o t e d b y C i t y s t a f f s h a l l n o t b e c o n s t r u e d a s a p p r o v e d u n l e s s s p e c i f i c a l l y a d d r e s s e d i n w r i t i n g b y t h e C i t y . A n y p r o p o s e d r e v i s i o n t o t h e s e p l a n s m u s t b e s u b m i t t e d f o r r e v i e w a n d c o m p l i a n c e w i t h t h e M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f i c a t i o n s b e f o r e s a i d r e v i s i o n i s c o n s t r u c t e d . N a m e D a t e A P P R O V E D F O R C O N S T R U C T I O N H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 V E R T I C A L S C A L E I N F E E T 0 4 8 2 4 S E W E R N O T E S P O T A B L E / N O N - P O T A B L E C R O S S I N G . S E E S E W E R A N D W A T E R N O T E S N O . 2 A N D 3 O N S H E E T C . 1 0 0 S E W E R S E R V I C E T O B E P L A C E D I N W A T E R C L A S S P I P E . S E E S E W E R N O T E N O . 4 O N S H E E T C . 1 0 0 . ! * S C A L E : 1 " = H O R I Z O N T A L V E R T I C A L A N D 1 " = 1 S E W E R P L A N A N D P R O F I L E 4 0 ' - 0 " 4 ' - 0 " N O R T H C I V I L I N N O V A T I O N S S E E S H E E T C . 4 0 1 S E E S H E E T C . 4 0 2 S E W E R P R O F I L E - S . T A R A D A L E A V E . A N D E . A W B R E Y S T . 2 6 8 5 2 6 9 0 2 6 9 5 2 7 0 0 2 7 0 5 2685 2690 2695 2700 2705 9 + 5 0 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 4 + 0 0 15+0016+0017+0018+0018+50 E X I S T I N G G R O U N D A T P I P E C E N T E R L I N E F I N I S H E D G R A D E A T P I P E C E N T E R L I N E S S M H 2 ( 4 8 " D I A . ) S T A = 1 0 + 0 0 . 0 0 ( N / S ) S T A = 1 6 + 7 6 . 8 5 ( W ) R I M = 2 7 0 0 . 2 9 8 " I N V I N = 2 6 8 6 . 0 9 ( N ) 8 " I N V I N = 2 6 8 6 . 0 9 ( S ) 8 " I N V O U T = 2 6 8 5 . 9 9 ( W ) 1 8 3 . 0 7 L F 8 " P V C @ 0 . 4 0 % S S M H 3 ( 4 8 " D I A . ) S T A = 1 1 + 8 7 . 0 7 ( N / S ) S T A = 1 0 + 0 0 . 0 0 ( W ) R I M = 2 6 9 8 . 6 1 8 " I N V I N = 2 6 8 6 . 9 3 ( N ) 8 " I N V I N = 2 6 8 6 . 9 3 ( W ) 8 " I N V O U T = 2 6 8 6 . 8 3 ( S ) 3 1 1 . 7 4 L F 8 " P V C @ 0 . 4 0 % SSMH 4 (48" DIA.)STA = 15+02.80RIM = 2697.178" INV IN = 2688.28 (N W ) 8" INV OUT = 2688.18 ( S ) 33.21 LF 8" PVC @ 0.42%SSMH 5 (48" DIA.)STA = 15+40.01RIM = 2696.958" INV IN = 2688.52 (W)8" INV OUT = 2688.42 (SE)234.29 LF 8" PVC @ 0.40%SSMH 6 (48" DIA.)STA = 17+78.30RIM = 2697.348" INV IN = 2689.56 (W)8" INV OUT = 2689.46 (E)8.00 LF 8" PVC @ 0.50% 8 " W 8 " W 4 " P I 4 " P I 4" PISSCO 2 (T-TYPE)(PER STD. DWG. S1)STA = 17+88.30RIM = 2697.478" INV OUT = 2689.60 (E)4" PI12" SD S D EP EP GIRR GIRR GIRR GIRR GI R R GI R R GI R R GI R R GI R R GI R R GI R R GI R R G I R R PIRR PIRR PIRR PIRR PI R R PI R R PI R R PI R R PI R R PI R R PI R R PI R R PI R R PIRR PIRR PIRR PIRR PIRR PIRRPIRRPIRRPIRR PIRR PIRR PIRR PIRR PIRRPIRR PIRRPIRRPIRRPIRR SS SS SS W W WWWW W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSS W W SS SS SS SS SS SS PI R R P I R R PIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRR PI R R 1 W W W EP EG 2 2 0 2 1 2 B L O C K 8 1 B L O C K 9 2 B L O C K 7 1 3 4 5 6 7 8 91011121314BLOCK 7 2 3 4 5 6 B L O C K 9 W SS SS W W W W 1 4 1 5 16 1 0 1 1 1 2 1 3 1 4 151617 1 0 ! ! ! ! ! ! ! ! ! !!!!!!! ! E. AWBEY ST. S . T A R A D A L E A V E . E. BOTT DR. E . B O T T D R . E. DARBY ST. S I = 2 6 9 2 . 9 A T R / W S L = 3 5 . 6 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 0 + 8 9 S I = 2 6 9 2 . 5 A T R / W S L = 3 6 . 4 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 1 + 4 0 S I = 2 6 9 1 . 8 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 1 1 S I = 2 6 9 1 . 5 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 6 8 S I = 2 6 9 1 . 3 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 3 + 2 8 S I = 2 6 9 1 . 0 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 3 + 8 8 SI = 2690.6 AT R/WSL = 37.5' TO CAP(4" PVC @ 2% MIN.)SC = 14+95SI = 2690.3 AT R/WSL = 37.5' TO CAP(4" PVC @ 2% MIN.)SC = 15+48SI = 2690.2 AT R/WSL = 38.0' TO CAP(4" PVC @ 2% MIN.)SC = 16+14SI = 2690.5 AT R / W SL = 23.0' TO C A P (4" PVC @ 2% MI N . ) SC = 17+58 SI = 2690.2 AT R / W SL = 23.0' TO C A P (4" PVC @ 2% M I N . ) SC = 16+98 SI = 2690.0 AT R / W SL = 23.0' TO C A P (4" PVC @ 2% M I N . ) SC = 16+38 SI = 2690.1 AT R / W SL = 23.0' TO C A P (4" PVC @ 2% M I N . ) SC = 15+78 S I = 2 6 9 1 . 4 A T R / W S L = 2 3 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 8 9 S I = 2 6 9 2 . 6 A T R / W S L = 2 4 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 0 + 6 9 7.50' 7.50' 7.50'7.50' 11.65'7.50'7.50'7.50'7.50' 6 . 5 0 ' 7 . 5 0 ' S S M H 2 S S M H 1 S S M H 3 S S C O 1 SSMH 4SSMH 5SSMH 6 8 8 . 5 ° 9 0 . 0 ° 135.0°135.0°180.0° 9 1 . 5 ° 9 0 . 0 ° SI = 2690.39 AT R/WSI = 2692.58 AT CAPSL = 85.4' TO CAP(4" PVC @ 2% MIN.)SC = 15+1515.00 LF 4" PVC @ 2.00%INSTALL PRIVATE SEWER CLEAN-OUTSTA 15+31.97, 63.45' RRIM = 2697.83(MATCH FS)INV THRU = 2692.28 INSTALL PRIVATE SEWE R C L E A N - O U T STA 15+15.10, 46.57' RRIM = 2697.57 (MATCH F S ) INV THRU = 2691.20 23.86 LF 4" PVC @ 4.53%46.57 LF 4" PVC @ 4.51 % INSTALL PRIVATE SEWER CLEAN-OUTSTA 15+20.10, 47.33' RRIM = 2697.56(MATCH FS)INV THRU = 2690.73 SI = 2690.11 AT R/WSI = 2692.78 AT CAPSL = 107.1' TO CAP(4" PVC @ 2% MIN.)SC = 15+2059.79 LF 4" PVC @ 3.43%47.33 LF 4" PVC@ 3.40%135.0°10' MIN.'5'5'3'! S I = 2 6 9 3 . 9 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 0 + 6 9 7.50' 1011 11.65'13.8' 11.00' S I = 2 6 9 0 . 8 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 4 + 4 8 SSCO 2 ! D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.400 (Sewer Plan and Profiles).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 4 0 1 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 4 0 1 SEWER PLAN AND PROFILE 1 4 H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 V E R T I C A L S C A L E I N F E E T 0 4 8 2 4 S E W E R N O T E S P O T A B L E / N O N - P O T A B L E C R O S S I N G . S E E S E W E R A N D W A T E R N O T E S N O . 2 A N D 3 O N S H E E T C . 1 0 0 S E W E R S E R V I C E T O B E P L A C E D I N W A T E R C L A S S P I P E . S E E S E W E R N O T E N O . 4 O N S H E E T C . 1 0 0 . ! * T h e s e p l a n s a n d / o r s p e c i f i c a t i o n s h a v e b e e n r e v i e w e d f o r c o m p l i a n c e w i t h M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f c a t i o n s . T h i s r e v i e w d o e s n o t r e l i e v e t h e o w n e r , e n g i n e e r , o r c o n t r a c t o r o f t h e r e s p o n s i b i l i t y t o d e s i g n a n d / o r c o n s t r u c t t h o s e f a c i l i t i e s i n c o m p l i a n c e w i t h a l l c u r r e n t a p p l i c a b l e f e d e r a l , s t a t e a n d l o c a l l a w s , r u l e s , r e g u l a t i o n s , o r d i n a n c e s , d e v e l o p m e n t a g r e e m e n t s , s p e c i f i c a t i o n s , o r d e r s o r a p p r o v a l s , a l l o f w h i c h t h e C i t y r e t a i n s t h e r i g h t t o e n f o r c e . I n c o n s i s t e n c i e s n o t n o t e d b y C i t y s t a f f s h a l l n o t b e c o n s t r u e d a s a p p r o v e d u n l e s s s p e c i f i c a l l y a d d r e s s e d i n w r i t i n g b y t h e C i t y . A n y p r o p o s e d r e v i s i o n t o t h e s e p l a n s m u s t b e s u b m i t t e d f o r r e v i e w a n d c o m p l i a n c e w i t h t h e M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f i c a t i o n s b e f o r e s a i d r e v i s i o n i s c o n s t r u c t e d . N a m e D a t e A P P R O V E D F O R C O N S T R U C T I O N S C A L E : 1 " = H O R I Z O N T A L V E R T I C A L A N D 1 " = 1 S E W E R P L A N A N D P R O F I L E 4 0 ' - 0 " 4 ' - 0 " N O R T H C I V I L I N N O V A T I O N S S E E S H E E T C . 4 0 0 SEE SHEET C.402 S E W E R P R O F I L E - S . T A R A D A L E P L . 2685 2690 2695 2700 2705 2 6 8 5 2 6 9 0 2 6 9 5 2 7 0 0 2 7 0 5 9+5010+0011+0012+0 0 1 3 + 0 0 1 4 + 0 0 1 5 + 0 0 1 5 + 5 0 SSMH 2 (48" DIA.)STA = 10+00.00 (N/S)STA = 16+76.85 (W)RIM = 2700.298" INV IN = 2686.09 (N)8" INV IN = 2686.09 (S)8" INV OUT = 2685.99 (W)187.67 LF 8" PVC @ 2.86%SSMH 7 (48" DI A . ) STA = 11+91.6 7 ( N / S ) STA = 10+00.0 0 ( W ) RIM = 2700.008" INV IN = 2691 . 5 6 ( S ) 8" INV IN = 2691 . 5 6 ( W ) 8" INV OUT = 26 9 1 . 4 6 ( N ) S S M H 8 ( 4 8 " D I A . ) S T A = 1 2 + 3 8 . 7 9 R I M = 2 6 9 9 . 9 1 8 " I N V I N = 2 6 9 1 . 9 7 ( S ) 8 " I N V O U T = 2 6 9 1 . 8 7 ( N ) 2 3 0 . 3 6 L F 8 " P V C @ 0 . 7 2 % S S M H 9 ( 4 8 " D I A . ) S T A = 1 4 + 7 3 . 1 5 R I M = 2 7 0 2 . 3 0 8 " I N V O U T = 2 6 9 3 . 6 3 ( N ) 4 " I N V I N = 2 6 9 3 . 9 7 ( S ) E X I S T I N G G R O U N D A T P I P E C E N T E R L I N E F I N I S H E D G R A D E A T P I P E C E N T E R L I N E 8" W 6" PI43.12 LF 8" PVC @ 0.72 % 12 " S D UNPLATTED PARCEL NO. S1128438410 1 1 1 2 B L O C K 5 SD GIRR GIRR GIRR E P EPEPEPEPEP E P EPEPEPEP E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P EP PIRR PIRR PIRR PIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRSSSSSSWWSSSSSSSSSSSSSSSSSSSSSS PI R R PI R R PI R R PI R R PI R R PI R R PI R R PI R R PI R R PI R R PIRR PIRR PIRRPIRRPIRRPIRR P I R R P I R R P I R R P I R R P I R R P I R R P I R R PI R R PIRR PIRR PIRR PIRR PIRR PIRR3 1 8 WWW62 25BLOCK 6 4 1 2 7 8 9 1 0 1 1 B L O C K 6 1 3 1 4 1 5 1 6 1 7 192021BLOCK 62BLOCK 8 11 1 2BLOCK 7 1WW W SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W SS W W W W W W W W W SS SS SS SS SS SS SSW141516 10 11101112 1 3 1 4 !!!!!! ! ! ! ! ! !!! ! ! S . T A R A D A L E P L . E. BOTT DR.E. BOTT DR.E. CLEARY CT.SI = 2692.9 AT R/WSL = 35.6' TO CAP(4" PVC @ 2% MIN.)SC = 10+89SI = 2692.5 AT R/WSL = 36.4' TO CAP(4" PVC @ 2% MIN.)SI = 2692.6 AT R/WSL = 24.0' TO CAP(4" PVC @ 2% MIN.)SC = 10+69 SSMH 2SSMH 1 91.5°90.0°SI = 2693.9 AT R/WSL = 38.0' TO CAP(4" PVC @ 2% MIN.)SC = 10+69SI = 2693.7 AT R/WSL = 38.0' TO CAP(4" PVC @ 2% MIN.)SC = 11+32SI = 2693.4 A T R / W SL = 37.1' TO C A P (4" PVC @ 2% M I N . ) SC = 12+00 S I = 2 6 9 3 . 4 A T R / W S L = 3 6 . 4 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 5 8 S I = 2 6 9 4 . 1 A T R / W S L = 3 5 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 3 + 2 8 S I = 2 6 9 5 . 1 A T R / W S L = 5 7 . 4 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 4 + 0 2 S I = 2 6 9 5 . 5 A T R / W S L = 6 7 . 1 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 4 + 5 7 S I = 2 6 9 5 . 6 A T R / W S L = 2 9 . 2 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 4 + 7 3 S I = 2 6 9 5 . 4 A T R / W S L = 5 5 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 4 + 6 6 S I = 2 6 9 5 . 2 A T R / W S L = 5 5 . 4 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 4 + 1 7 SI = 2693.8 AT R/WSL = 38.5' TO CAP(4" PVC @ 2% MIN.)SC = 10+61SI = 2694.1 AT R/WSL = 38.5' TO CAP(4" PVC @ 2% MIN.)SC = 11+19SI = 2694.4 AT R/WSL = 54.5' TO CAP(4" PVC @ 2% MIN.)SC = 11+70SI = 2694.6 AT R/WSL = 59.1' TO CAP(4" PVC @ 2% MIN.)SC = 12+17 S I = 2 6 9 4 . 8 A T R / W S L = 3 5 . 2 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 3 7 S I = 2 6 9 4 . 6 A T R / W S L = 6 8 . 9 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 0 2 90.0°8 1 . 7 ° 1 7 1 . 6 ° 1 8 0 . 0 ° 154 . 5 ° S S M H 1 0 S S M H 1 1 7.50' 4.50' 8. 0 0 ' 7.50'7.50'7.50'S S M H 7 S S M H 8 S S M H 9 7.50'13.56'1011 1 2 1 2 11.59' 1 7 . 0 0 ' D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.400 (Sewer Plan and Profiles).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 4 0 2 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 4 0 2 SEWER PLAN AND PROFILE 1 5 H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 V E R T I C A L S C A L E I N F E E T 0 4 8 2 4 S E W E R N O T E S P O T A B L E / N O N - P O T A B L E C R O S S I N G . S E E S E W E R A N D W A T E R N O T E S N O . 2 A N D 3 O N S H E E T C . 1 0 0 S E W E R S E R V I C E T O B E P L A C E D I N W A T E R C L A S S P I P E . S E E S E W E R N O T E N O . 4 O N S H E E T C . 1 0 0 . ! * T h e s e p l a n s a n d / o r s p e c i f i c a t i o n s h a v e b e e n r e v i e w e d f o r c o m p l i a n c e w i t h M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f c a t i o n s . T h i s r e v i e w d o e s n o t r e l i e v e t h e o w n e r , e n g i n e e r , o r c o n t r a c t o r o f t h e r e s p o n s i b i l i t y t o d e s i g n a n d / o r c o n s t r u c t t h o s e f a c i l i t i e s i n c o m p l i a n c e w i t h a l l c u r r e n t a p p l i c a b l e f e d e r a l , s t a t e a n d l o c a l l a w s , r u l e s , r e g u l a t i o n s , o r d i n a n c e s , d e v e l o p m e n t a g r e e m e n t s , s p e c i f i c a t i o n s , o r d e r s o r a p p r o v a l s , a l l o f w h i c h t h e C i t y r e t a i n s t h e r i g h t t o e n f o r c e . I n c o n s i s t e n c i e s n o t n o t e d b y C i t y s t a f f s h a l l n o t b e c o n s t r u e d a s a p p r o v e d u n l e s s s p e c i f i c a l l y a d d r e s s e d i n w r i t i n g b y t h e C i t y . A n y p r o p o s e d r e v i s i o n t o t h e s e p l a n s m u s t b e s u b m i t t e d f o r r e v i e w a n d c o m p l i a n c e w i t h t h e M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f i c a t i o n s b e f o r e s a i d r e v i s i o n i s c o n s t r u c t e d . N a m e D a t e A P P R O V E D F O R C O N S T R U C T I O N S C A L E : 1 " = H O R I Z O N T A L V E R T I C A L A N D 1 " = 1 S E W E R P L A N A N D P R O F I L E 4 0 ' - 0 " 4 ' - 0 " N O R T H C I V I L I N N O V A T I O N S SEE SHEET C.400 SEE SHEET C.401 GIRRGIRRGIRRGIRRGIRRGIRRPIRRPIRRPIRRPIRRPIRRPIRR PIRRPIRRPIRRPIRR W W SSSSSSSSSSSSSSSSWWSSSSSSSSSS2BLOCK 812BLOCK 7 1 3 4 5 6WW111213!!!!!!S. TARADALE AVE.SI = 2692.9 AT R/WSL = 35.6' TO CAP(4" PVC @ 2% MIN.)SC = 10+89 SI = 2692.5 AT R/WSL = 36.4' TO CAP(4" PVC @ 2% MIN.)SC = 11+40 SI = 2691.8 AT R/WSL = 38.0' TO CAP(4" PVC @ 2% MIN.)SC = 12+11 SI = 2691.5 AT R/WSL = 38.0' TO CAP(4" PVC @ 2% MIN.)SC = 12+68 SI = 2691.3 AT R/WSL = 38.0' TO CAP(4" PVC @ 2% MIN.)SC = 13+28SI = 2691.4 AT R/WSL = 23.0' TO CAP(4" PVC @ 2% MIN.)SC = 12+89SI = 2692.6 AT R/WSL = 24.0' TO CAP(4" PVC @ 2% MIN.)SC = 10+69 7.50'7.50'6.50'7.50'88.5°90.0°SSMH 3SSCO 17.50'1011 E. DARBY ST.11.00'!SEWER PROFILE - E. DARBY ST.2685 2690 2695 2700 2705268526902695270027059+5010+0011+0011+50 FINISHED GRADE ATPIPE CENTERLINEEXISTING GROUND ATPIPE CENTERLINE102.59 LF 8" PVC @ 0.41%SSCO 1 (T-TYPE)(PER STD. DWG. S1)STA = 11+04.59RIM = 2699.468" INV OUT = 2687.35 (E)SSMH 3STA = 10+00.00 (W)STA = 11+87.07 (N/S)RIM = 2698.618" INV IN = 2686.93 (N)8" INV IN = 2686.93 (W)8" INV OUT = 2686.83 (S) S E W E R P R O F I L E - E . C L E A R Y C T . 2 6 9 0 2 6 9 5 2 7 0 0 2 7 0 5 2 6 9 0 2 6 9 5 2 7 0 0 2 7 0 5 9 + 5 0 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 2 3 . 7 6 L F 8 " P V C @ 0 . 4 0 % S S M H 1 0 S T A = 1 1 + 2 7 . 7 6 R I M = 2 7 0 0 . 7 2 8 " I N V I N = 2 6 9 2 . 1 6 ( S W ) 8 " I N V O U T = 2 6 9 2 . 0 6 ( E ) 1 0 4 . 8 4 L F 8 " P V C @ 0 . 6 0 % S S M H 1 1 S T A = 1 2 + 3 6 . 6 0 R I M = 2 7 0 1 . 4 6 8 " I N V O U T = 2 6 9 2 . 7 9 ( N E ) S S M H 7 S T A = 1 0 + 0 0 . 0 0 ( W ) S T A = 1 1 + 9 1 . 6 7 ( N / S ) R I M = 2 7 0 0 . 0 0 8 " I N V I N = 2 6 9 1 . 5 6 ( S ) 8 " I N V I N = 2 6 9 1 . 5 6 ( W ) 8 " I N V O U T = 2 6 9 1 . 4 6 ( N ) E X I S T I N G G R O U N D A T P I P E C E N T E R L I N E F I N I S H E D G R A D E A T P I P E C E N T E R L I N E E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P E P PIRR PIRR PIRR PIRR PIRR PIRR P I R R P I R R P I R R P I R R P I R R P I R R 3 1 8 6 2 5 B L O C K 6 4 7 8 9 1 6 1 7 1 9 2 0 B L O C K 6 1 W W W SSSSSSSS SS SS SS SS W SS W WWW W W W S S S S S S S S S S S S S S W 1112 13 ! ! ! ! ! ! ! ! ! ! ! S. TARADALE PL. E . C L E A R Y C T . 7 . 5 0 ' 7 . 5 0 ' S I = 2 6 9 3 . 9 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S I = 2 6 9 3 . 7 A T R / W S L = 3 8 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 1 + 3 2 S I = 2 6 9 3 . 4 A T R / W S L = 3 7 . 1 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 0 0 S I = 2 6 9 3 . 4 A T R / W S L = 3 6 . 4 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 5 8 S I = 2 6 9 4 . 1 A T R / W S L = 3 5 . 0 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 3 + 2 8 S I = 2 6 9 3 . 8 A T R / W S L = 3 8 . 5 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 0 + 6 1 S I = 2 6 9 4 . 1 A T R / W S L = 3 8 . 5 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 1 + 1 9 S I = 2 6 9 4 . 4 A T R / W S L = 5 4 . 5 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 1 + 7 0 S I = 2 6 9 4 . 6 A T R / W S L = 5 9 . 1 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 1 7 S I = 2 6 9 4 . 8 A T R / W S L = 3 5 . 2 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 3 7 S I = 2 6 9 4 . 6 A T R / W S L = 6 8 . 9 ' T O C A P ( 4 " P V C @ 2 % M I N . ) S C = 1 2 + 0 2 9 0 . 0 ° 8 1 . 7 ° 1 7 1 . 6 ° 1 5 4 . 5 ° 8.00' 7.50' S S M H 1 0 S S M H 1 1 S S M H 7 S S M H 8 1 0 1 1 1 2 1 2 1 3 . 5 6 ' 1 1 . 5 9 ' 4 . 5 0 ' 7 . 5 0 ' 1 7 . 0 0 ' D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.400 (Sewer Plan and Profiles).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 4 0 3 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 4 0 3 SEWER PLAN AND PROFILES 1 6 H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 V E R T I C A L S C A L E I N F E E T 0 4 8 2 4 SCALE: 1" = HORIZONTALVERTICALAND 1" =1SEWER PLAN AND PROFILE40' - 0"4' - 0" S E W E R N O T E S P O T A B L E / N O N - P O T A B L E C R O S S I N G . S E E S E W E R A N D W A T E R N O T E S N O . 2 A N D 3 O N S H E E T C . 1 0 0 S E W E R S E R V I C E T O B E P L A C E D I N W A T E R C L A S S P I P E . S E E S E W E R N O T E N O . 4 O N S H E E T C . 1 0 0 . ! * T h e s e p l a n s a n d / o r s p e c i f i c a t i o n s h a v e b e e n r e v i e w e d f o r c o m p l i a n c e w i t h M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f c a t i o n s . T h i s r e v i e w d o e s n o t r e l i e v e t h e o w n e r , e n g i n e e r , o r c o n t r a c t o r o f t h e r e s p o n s i b i l i t y t o d e s i g n a n d / o r c o n s t r u c t t h o s e f a c i l i t i e s i n c o m p l i a n c e w i t h a l l c u r r e n t a p p l i c a b l e f e d e r a l , s t a t e a n d l o c a l l a w s , r u l e s , r e g u l a t i o n s , o r d i n a n c e s , d e v e l o p m e n t a g r e e m e n t s , s p e c i f i c a t i o n s , o r d e r s o r a p p r o v a l s , a l l o f w h i c h t h e C i t y r e t a i n s t h e r i g h t t o e n f o r c e . I n c o n s i s t e n c i e s n o t n o t e d b y C i t y s t a f f s h a l l n o t b e c o n s t r u e d a s a p p r o v e d u n l e s s s p e c i f i c a l l y a d d r e s s e d i n w r i t i n g b y t h e C i t y . A n y p r o p o s e d r e v i s i o n t o t h e s e p l a n s m u s t b e s u b m i t t e d f o r r e v i e w a n d c o m p l i a n c e w i t h t h e M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f i c a t i o n s b e f o r e s a i d r e v i s i o n i s c o n s t r u c t e d . N a m e D a t e A P P R O V E D F O R C O N S T R U C T I O N S C A L E : 1 " = H O R I Z O N T A L V E R T I C A L A N D 1 " = 2 S E W E R P L A N A N D P R O F I L E 4 0 ' - 0 " 4 ' - 0 " NORTH CIVIL INNOVATIONS N O R T H C I V I L I N N O V A T I O N S SEWER NOTES POTABLE/NON-POTA B L E C R O S S I N G . S E E S E W E R A N D WATER NOTES NO. 2 A N D 3 O N S H E E T C . 1 0 0 SEWER SERVICE TO B E P L A C E D I N W A T E R C L A S S P I P E . SEE SEWER NOTE N O . 4 O N S H E E T C . 1 0 0 . !*HORIZONTAL SCALE IN FEET 040802040VERTICAL SCALE IN FEET 04824 SEE SHEET C.401 S E E S H E E T C . 4 0 2 S E E S H E E T C . 4 0 2 SEE SHEET C.401 SD EP EP GIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRR G I R R EP EP EPEPEPEP PIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRR PIRR P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R PIRRPIRR P I R R P I R R P I R R P I R R P I R R P I R R S S S S S S W W W W W W W W W W W SS SS SS SS S S S S S S SSSS S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSS S S S S S S W W SSSSSSSSSSSS PIRR PIRR PIRR P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R PIRRPIRRPIRRPIRRPIRR 3 1 W WW E P E G 6 2 2 5 BLOCK 6 4 2 0 2 1 2 B L O C K 8 1 B L O C K 9 1 2 B L O C K 7 1 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 BLO C K 7 2 3 4 5 6 B L O C K 9 W SS SS SS SS W W W W E P E G U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 5 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 4 5 0 A N T L E R R I D G E S U B D I V I S I O N P H A S E 4 BREMERTON SUBDIVISION UNPLATTEDPARCEL NO. S1128131530UNPLATTEDPARCEL NO. S1128427880SD121314BLOCK 11234BLOCK 5EXIST. SHELBURNEEAST SUBD. NO. 1 CENTERLINE OF TEN MILE FEEDER CANAL ! ! KE11 K H V 6 T 6 K K E22 K B 46 LF 8" PVC15'E. BOTT DR. S. TARADALE PL. E . B O T T D R . E . D A R B Y S T . S. TARADALE AVE. E . A W B R E Y S T . T EXIST. SHELBURNEEAST SUBD. NO. 1EXIST. BRIDGE 104 LF 8" PVC 6 7 L F 8 " P V C 1 2 1 L F 8 " P V C 124 LF 8" PVC 179 LF 8" PVC 37 LF 8" PVC 247 LF 8" PVC 2 0 9 L F 8 " P V C K E 1 1 V 8 T 8 V 8 K V 6 T 6 K H K W S 2 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! 2 7 L F 8 " P V C 38 LF 8" PVC 27 LF 8" PVC V 8 T 8 V 8 K V 6 T 6 K H K 1 2 0 L F 8 " P V C W S 2 W S 2 W S 2 E 1 1 K E 1 1 K W S 2 ! E 2 2 E 1 1 K E 1 1 K H S W 2 W S 2 WS2 KB V 6 T 6 V 8 K 12'10' 12'10' 7 . 5 0 ' 7 . 5 0 ' 7 . 5 0 ' 7 . 5 0 ' 7 . 5 0 ' 7.50' 6.50' 7.50'7.50' 25' MIN. 2 5 ' M I N . EXIST. 8" WATERPER SHELBURNEEAST SUBD. NO. 1 W S 1 W S 1 11.65' 22 LF 8" PVC K 1 1 . 6 5 ' E 2 2 ! 1 3 . 8 ' W S 2 1 2 L F 6 " P V C 1 2 L F 6 " P V C 14 LF 6" P V C 13.00' 1 2 L F 6 " P V C K E 1 1 2 6 L F 8 " P V C 2 6 L F 8 " P V C 1 1 . 0 0 ' K E 1 1 L INSTALL 35 LF OF 12" x 3/8"STEEL PIPE SLEEVED:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.500 (Water Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 5 0 0 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 5 0 0 WATER PLAN 1 7 S C A L E : 1 " = H O R I Z O N T A L 1 W A T E R P L A N 4 0 ' - 0 " H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 N O R T H C I V I L I N N O V A T I O N S T h e s e p l a n s a n d / o r s p e c i f i c a t i o n s h a v e b e e n r e v i e w e d f o r c o m p l i a n c e w i t h M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f c a t i o n s . T h i s r e v i e w d o e s n o t r e l i e v e t h e o w n e r , e n g i n e e r , o r c o n t r a c t o r o f t h e r e s p o n s i b i l i t y t o d e s i g n a n d / o r c o n s t r u c t t h o s e f a c i l i t i e s i n c o m p l i a n c e w i t h a l l c u r r e n t a p p l i c a b l e f e d e r a l , s t a t e a n d l o c a l l a w s , r u l e s , r e g u l a t i o n s , o r d i n a n c e s , d e v e l o p m e n t a g r e e m e n t s , s p e c i f i c a t i o n s , o r d e r s o r a p p r o v a l s , a l l o f w h i c h t h e C i t y r e t a i n s t h e r i g h t t o e n f o r c e . I n c o n s i s t e n c i e s n o t n o t e d b y C i t y s t a f f s h a l l n o t b e c o n s t r u e d a s a p p r o v e d u n l e s s s p e c i f i c a l l y a d d r e s s e d i n w r i t i n g b y t h e C i t y . A n y p r o p o s e d r e v i s i o n t o t h e s e p l a n s m u s t b e s u b m i t t e d f o r r e v i e w a n d c o m p l i a n c e w i t h t h e M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f i c a t i o n s b e f o r e s a i d r e v i s i o n i s c o n s t r u c t e d . N a m e D a t e A P P R O V E D F O R C O N S T R U C T I O N M A T C H L I N E - S E E S H E E T C . 5 0 1 MATCH LINE - SEE SHEET C.501 2 C O N S T R U C T I O N K E Y N O T E S W A T E R P L A N V 6 V a l v e , 6 " G a t e T 8 T e e , 8 " x 8 " x 8 " W S 1 3 / 4 " S i n g l e W a t e r S e r v i c e P e r C i t y O f M e r i d i a n S t a n d a r d D r a w i n g N o . W 1 & W 2 W S 2 3 / 4 " D o u b l e W a t e r S e r v i c e P e r C i t y O f M e r i d i a n S t a n d a r d D r a w i n g N o . W 1 & W 3 H F i r e H y d r a n t A s s e m b l y C o m p l e t e P e r C i t y o f M e r i d i a n S t a n d a r d D r a w i n g N o . W 8 ( A l s o S e e C i t y o f M e r i d i a n S t a n d a r d D r a w i n g N o . W 9 f o r W a t e r S e r v i c e / F i r e H y d r a n t L o c a t i o n ) K P . C . C . T h r u s t B l o c k ( A s R e q u i r e d E v e n I f N o t S h o w n ) E 1 1 E l b o w , 8 " , 1 1 1 / 4 ° E 9 0 E l b o w , 8 " , 9 0 ° T 6 T e e , 8 " x 8 " x 6 " E 2 2 E l b o w , 8 " , 2 2 1 / 2 ° E 4 5 E l b o w , 8 " , 4 5 ° T A f t e r T e s t i n g A n d A p p r o v a l , R e m o v e E x i s t i n g B l o w - O f f A n d C o n n e c t t o E x i s t i n g W a t e r M a i n V 8 V a l v e , 8 " G a t e B T e m p o r a r y 2 " B l o w - O f f A s s e m b l y P e r C i t y O f M e r i d i a n S t a n d a r d D r a w i n g N o . W 1 3 R 1 R e d u c e r , 8 " x 6 " W A T E R L I N E N O T E S P O T A B L E / N O N - P O T A B L E C R O S S I N G . S E E W A T E R N O T E S N O . 2 A N D 3 O N S H E E T C . 1 0 0 N O T E : M I D S E C T I O N W A T E R M A I N S S H A L L H A V E 5 F E E T O F C O V E R , A L L O T H E R S S H A L L H A V E 4 F E E T O F C O V E R . ! L I n s t a l l L e a k D e t e c t i o n M e t e r i n g S t a t i o n P e r C i t y O f M e r i d i a n S t a n d a r d D r a w i n g W 1 4 . SD GIRR G I R R EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP E P PIRRPIRR PIRR P I R R P I R R P I R R P I R R PIRRPIRRPIRRPIRR P I R R P I R R P I R R P I R R S S S S S S W W SS SS SS SS SS SS SS SSSSSSSS PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRR P I R R P I R R P I R R P I R R P I R R P I R R 3 1 8 WWW E P E G 6 2 2 5 BLOCK 64127891011 B L O C K 6 1 3 1 4 1 5 1 6 1 7 1 9 2 0 2 1 B L O C K 6 2 B L O C K 8 1 11 2 B L O C K 7 1 WWWW SSSSSSSSSSSSSS SS SS SS SS SS SS W W W W W SS W WWWWW W W W SS SS SS SS S S S S S S W E P E G UNPLATTEDPARCEL NO. S1128438500 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 3 8 4 1 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 4 9 3 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 2 8 2 SD 14 BLOCK 13456789101112BLOCK 5BLOCK 51 EXIST. SHELBURNEEAST SUBD. NO. 1CENTERLINE OF TEN MILE FEEDER ! !KE11 KHV6T6KKE2246 LF 8" PVC15'E. BOTT DR. S. TARADALE PL. E. CLEARY C T . E . B O T T D R . S. TARADALE PL. TEXIST. SHELBURNEEAST SUBD. NO. 1 EAST SUBD. NO. 1S. SELATIR WAYE. FRATELLO ST.EXIST. BRIDGE 104 LF 8" PVC 67 LF 8" PVC 1 2 1 L F 8 " P V C 124 LF 8" PVC 179 LF 8" PVC KE11 V 8 T 8 V 8 K V 6 T 6 K H K ! ! ! ! ! ! ! !!! ! ! ! ! ! ! ! W S 2 12'10' 12'10' 7 . 5 0 ' 7 . 5 0 ' 7 . 5 0 ' 25' MIN.EXIST. 8" WATERPER SHELBURNEEAST SUBD. NO. 1 W S 2 W S 2 W S 2 WS2WS2 V 8 T 8 V 8 K 7 4 L F 8 " P V C K H K V 6 K R 1 3 L F 6 " P V C 1 9 L F 6 " P V C 235 LF 8" PVC KE90 53 LF 8" PVC150 LF 8" P V C W S 2 KE22 7 . 5 0 ' 7 . 5 0 ' 25' MIN. 7.50'8.00' 7 . 5 0 ' 4 . 5 0 ' W S 2 14 LF 6" PVC13.00' 1 2 L F 6 " P V C 8 LF 8" PVC 9 L F 8 " P V C K E 1 1 5 2 L F 8 " P V C 1 3 . 5 6 ' 1 1 . 5 9 ' 2 5 ' M I N . K E 1 1 7 . 5 0 ' 4 . 5 0 ' KE45E11E22K23 LF 8" PVCE11KT6V6K KH41 LF 8" PVC 10 LF 6" PVC 104 LF 8" PVC KE90KV8KV8 L INSTALL 35 LF OF 12" x 3/8"STEEL PIPE SLEEVE74 LF 8" PVC T17.00'20' WIDE CITY OF MERIDIANWATER EASEMENT (TYP.)10'40 LF 8" PVC !D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.500 (Water Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 5 0 1 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 5 0 1 WATER PLAN 1 8 M A T C H L I N E - S E E S H E E T C . 5 0 0 MATCH LINE - SEE SHEET C.500 S C A L E : 1 " = H O R I Z O N T A L 1 W A T E R P L A N 4 0 ' - 0 " H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 N O R T H C I V I L I N N O V A T I O N S T h e s e p l a n s a n d / o r s p e c i f i c a t i o n s h a v e b e e n r e v i e w e d f o r c o m p l i a n c e w i t h M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f c a t i o n s . T h i s r e v i e w d o e s n o t r e l i e v e t h e o w n e r , e n g i n e e r , o r c o n t r a c t o r o f t h e r e s p o n s i b i l i t y t o d e s i g n a n d / o r c o n s t r u c t t h o s e f a c i l i t i e s i n c o m p l i a n c e w i t h a l l c u r r e n t a p p l i c a b l e f e d e r a l , s t a t e a n d l o c a l l a w s , r u l e s , r e g u l a t i o n s , o r d i n a n c e s , d e v e l o p m e n t a g r e e m e n t s , s p e c i f i c a t i o n s , o r d e r s o r a p p r o v a l s , a l l o f w h i c h t h e C i t y r e t a i n s t h e r i g h t t o e n f o r c e . I n c o n s i s t e n c i e s n o t n o t e d b y C i t y s t a f f s h a l l n o t b e c o n s t r u e d a s a p p r o v e d u n l e s s s p e c i f i c a l l y a d d r e s s e d i n w r i t i n g b y t h e C i t y . A n y p r o p o s e d r e v i s i o n t o t h e s e p l a n s m u s t b e s u b m i t t e d f o r r e v i e w a n d c o m p l i a n c e w i t h t h e M e r i d i a n C i t y S t a n d a r d s a n d S p e c i f i c a t i o n s b e f o r e s a i d r e v i s i o n i s c o n s t r u c t e d . N a m e D a t e A P P R O V E D F O R C O N S T R U C T I O N 2 C O N S T R U C T I O N K E Y N O T E S W A T E R P L A N V 6 V a l v e , 6 " G a t e T 8 T e e , 8 " x 8 " x 8 " W S 1 3 / 4 " S i n g l e W a t e r S e r v i c e P e r C i t y O f M e r i d i a n S t a n d a r d D r a w i n g N o . W 1 & W 2 W S 2 3 / 4 " D o u b l e W a t e r S e r v i c e P e r C i t y O f M e r i d i a n S t a n d a r d D r a w i n g N o . W 1 & W 3 H F i r e H y d r a n t A s s e m b l y C o m p l e t e P e r C i t y o f M e r i d i a n S t a n d a r d D r a w i n g N o . W 8 ( A l s o S e e C i t y o f M e r i d i a n S t a n d a r d D r a w i n g N o . W 9 f o r W a t e r S e r v i c e / F i r e H y d r a n t L o c a t i o n ) K P . C . C . T h r u s t B l o c k ( A s R e q u i r e d E v e n I f N o t S h o w n ) E 1 1 E l b o w , 8 " , 1 1 1 / 4 ° E 9 0 E l b o w , 8 " , 9 0 ° T 6 T e e , 8 " x 8 " x 6 " E 2 2 E l b o w , 8 " , 2 2 1 / 2 ° E 4 5 E l b o w , 8 " , 4 5 ° T A f t e r T e s t i n g A n d A p p r o v a l , R e m o v e E x i s t i n g B l o w - O f f A n d C o n n e c t t o E x i s t i n g W a t e r M a i n V 8 V a l v e , 8 " G a t e B T e m p o r a r y 2 " B l o w - O f f A s s e m b l y P e r C i t y O f M e r i d i a n S t a n d a r d D r a w i n g N o . W 1 3 R 1 R e d u c e r , 8 " x 6 " W A T E R L I N E N O T E S P O T A B L E / N O N - P O T A B L E C R O S S I N G . S E E W A T E R N O T E S N O . 2 A N D 3 O N S H E E T C . 1 0 0 N O T E : M I D S E C T I O N W A T E R M A I N S S H A L L H A V E 5 F E E T O F C O V E R , A L L O T H E R S S H A L L H A V E 4 F E E T O F C O V E R . ! L I n s t a l l L e a k D e t e c t i o n M e t e r i n g S t a t i o n P e r C i t y O f M e r i d i a n S t a n d a r d D r a w i n g W 1 4 . U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 5 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 4 5 0 A N T L E R R I D G E S U B D I V I S I O N P H A S E 4 BREMERTON SUBDIVISION UNPLATTEDPARCEL NO. S1128131530UNPLATTEDPARCEL NO. S1128427880SD121314BLOCK 11234BLOCK 5 SD EP EP GIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRRGIRR G I R R EP EP EPEPEPEP PIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRR PIRR P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R PIRRPIRR P I R R P I R R P I R R P I R R P I R R P I R R S S S S S S W W W W W W W W W W W SS SS SS SS S S S S S S SSSS S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSS S S S S S S W W SSSSSSSSSSSS PIRR PIRR PIRR P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R PIRRPIRRPIRRPIRRPIRR 3 1 W WW E P E G 6 2 2 5 BLOCK 6 4 2 0 2 1 2 B L O C K 8 1 B L O C K 9 1 2 B L O C K 7 1 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 BLO C K 7 2 3 4 5 6 B L O C K 9 W SS SS SS SS W W W W E P E G EXIST. SHELBURNEEAST SUBD. NO. 1 CENTERLINE OF TEN MILE FEEDER CANALE. BOTT DR. S. TARADALE PL. E . B O T T D R . E . D A R B Y S T . S. TARADALE AVE. E . A W B R E Y S T . EXIST. SHELBURNEEAST SUBD. NO. 1EXIST. BRIDGEEXIST. 6" PRESSUREIRRIGATION PERSHELBURNEEAST SUBD. NO. 1 I N S T A L L G I R R B O X 1 ( 4 ' x 4 ' ) R I M = 2 7 0 2 . 9 0 1 2 " I N V I N ( S ) = 2 6 9 6 . 2 5 1 2 " I N V O U T ( N ) = 2 6 9 6 . 2 5 I N S T A L L E N D S E C T I O N 1 2 " I N V I N = 2 6 9 8 . 3 0 ( M A T C H E X I S T . ) I N S T A L L 6 2 . 9 2 L F 1 2 " P V C C - 9 0 0 @ 3 . 2 6 % I N S T A L L G I R R B O X 2 ( 4 ' x 4 ' ) R I M = 2 6 9 9 . 8 5 1 2 " I N V I N ( S ) = 2 6 9 4 . 1 5 1 2 " I N V O U T ( N ) = 2 6 9 4 . 1 5 I N S T A L L 3 0 2 . 7 3 L F 1 2 " P V C @ 0 . 6 9 % 5.00' I N S T A L L 3 0 6 . 0 9 L F 1 2 " P V C @ 0 . 2 5 % I N S T A L L G I R R B O X 3 ( 4 ' x 4 ' ) R I M = 2 6 9 9 . 4 0 1 2 " I N V I N ( S ) = 2 6 9 3 . 4 0 1 2 " I N V O U T ( N ) = 2 6 9 3 . 4 0 I N S T A L L 1 3 . 6 2 L F 1 2 " P V C @ 0 . 3 7 % I N S T A L L E N D S E C T I O N 1 2 " I N V I N = 2 6 9 3 . 3 5 N2T612 LF6" PVC 206 LF 6" PVC R1 E 5 K V 6 K S L 6 V 6 K T 6 R 1 S 1 V 4 N 1 K V 4 N 1 K S L 4 6 6 L F 4 " P V C 9 L F 4 " P V C 9 L F 4 " P V C T 4 K S 1 1 0 6 L F 4 " P V C 5 7 L F 4 " P V C 4 8 L F 4 " P V C 363 LF 4" PVC 253 LF 4" PVC 4 0 5 L F 4 " P V C 111 LF 4" PVC41 LF 4" PVC111 LF 4" PVC 2 5 6 L F 4 " P V C 4 2 L F 4 " P V C 1 0 8 L F 4 " P V C 5.00' 5.00' 5.00' 8 1 L F 6 " P V C 5 7 L F 6 " P V C 1 1 0 L F 6 " P V C S 1 S 1 S 1 S1S1 S 1 5 . 0 0 ' 9 . 0 0 ' V 4 K S L 4 V 4 K S 1 S 1 R 1 5.00' 5.00' C 4 K T 4 K 3.00' 5 . 0 0 ' 9 . 0 0 ' 5 . 0 0 ' 9 . 0 0 ' 5.00' S 1 S 1 S1 S 1 S 1 S 1 S 1 S 1 S 1 S 1 S 1 S 1 S 1 S 1 S1 S 1 S 1 S 1 S 1 E 4 K E4K V 4 E 1 S L 4 V 4 K E 1 K 5.00' 5.00'V4K SL4 V4K E4 KK K D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.600 (Irrigation Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 6 0 0 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 6 0 0 IRRIGATION PLAN 1 9 M A T C H L I N E - S E E S H E E T C . 6 0 1 MATCH LINE - SEE SHEET C.601 S C A L E : 1 " = H O R I Z O N T A L 1 P R E S S U R E I R R I G A T I O N P L A N 4 0 ' - 0 " H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 2 C O N S T R U C T I O N K E Y N O T E S P R E S S U R E I R R I G A T I O N P L A N N O R T H C I V I L I N N O V A T I O N S S L 4 P r e s s u r e I r r i g a t i o n S l e e v e , 8 " P V C , C - 9 0 0 V 4 V a l v e , 4 " G a t e E 1 E l b o w , 4 " , 1 1 1 / 4 ° N 2 C o n n e c t T o E x i s t i n g P r e s s u r e I r r i g a t i o n M a i n N 1 D e f l e c t P i p e P e r M a n u f a c t u r e r s S p e c i f i c a t i o n s K P . C . C . T h u r s t B l o c k ( A s R e q u i r e d E v e n I f N o t S h o w n ) V 6 V a l v e , 6 " G a t e E 5 E l b o w , 6 " , 1 1 1 / 4 ° E 6 E l b o w , 6 " , 2 2 - 1 / 2 ° S L 6 P r e s s u r e I r r i g a t i o n S l e e v e , 1 2 " P V C , C - 9 0 0 C 4 P l u g O r C a p , 4 " S 1 3 / 4 " P r e s s u r e I r r i g a t i o n S e r v i c e P e r N M I D S t a n d a r d D e t a i l - T y p e " A " R i s e r E 8 E l b o w , 6 " , 9 0 ° E 7 E l b o w , 6 " , 4 5 ° R 1 R e d u c e r , 6 " x 4 " T 6 T e e , 6 " E 4 E l b o w , 4 " , 9 0 ° E 2 E l b o w , 4 " , 2 2 1 / 2 ° P R E S S U R E I R R I G A T I O N N O T E S : 1 . T H E P R E S S U R E I R R I G A T I O N I N T H I S S U B D I V I S I O N W I L L B E O W N E D A N D O P E R A T E D B Y T H E H O M E O W N E R S A S S O C I A T I O N . 2 . A C O N N E C T I O N B E T W E E N T H E P R E S S U R E I R R I G A T I O N A N D D O M E S T I C W A T E R S Y S T E M W A S I N S T A L L E D A S P A R T O F T H E S H E L B U R N E S U B D I V I S I O N N O . 2 ( B A C K U P S O U R C E F O R T H E P R E S S U R E I R R I G A T I O N ) . A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n T 4 T e e , 4 " E 3 E l b o w , 4 " , 4 5 ° 1'6"48"6"TOP BOX ELEV. (RIM)6"4'-0"SECTION A-A PLANINV OUTINV INSUMP 6"4'-0"6"AASEE PLANS FOR PIPE SIZES,NOTE:1.SEE THIS SHEET FOR PIPE SIZES, ELEVATIONS, AND DIRECTION OF FLOW.2.BOXES SHALL BE CONSTRUCTED TO BE WATERTIGHT.3TYPICAL CONCRETE 4' x 4' IRRIGATION WITH 1' SUMPNOT TO SCALE 6"6"ELEVATIONS AND LOCATIONS CENTERLINE STATIONINGSTRUCTURE CONTROLPOINT (CENTER OF BOX)FOUR 12"x 4" ANCHOR BOLTSWITH WASHERS EXPANDED METAL LID (59"x59")2'2' UNPLATTEDPARCEL NO. S1128438500 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 3 8 4 1 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 4 9 3 0 0 U N P L A T T E D P A R C E L N O . S 1 1 2 8 4 1 7 2 8 2 SD 14 BLOCK 13456789101112BLOCK 5BLOCK 51 SD GIRR G I R R EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP E P PIRRPIRR PIRR P I R R P I R R P I R R P I R R PIRRPIRRPIRRPIRR P I R R P I R R P I R R P I R R S S S S S S W W SS SS SS SS SS SS SS SSSSSSSS PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRRPIRR P I R R P I R R P I R R P I R R P I R R P I R R 3 1 8 WWW E P E G 6 2 2 5 BLOCK 64127891011 B L O C K 6 1 3 1 4 1 5 1 6 1 7 1 9 2 0 2 1 B L O C K 6 2 B L O C K 8 1 11 2 B L O C K 7 1 WWWW SSSSSSSSSSSSSS SS SS SS SS SS SS W W W W W SS W WWWWW W W W SS SS SS SS S S S S S S W E P E G EXIST. SHELBURNEEAST SUBD. NO. 1CENTERLINE OF TEN MILE FEEDER E. BOTT DR. S. TARADALE PL. E. CL E A R Y C T . E . B O T T D R . S. TARADALE PL. EXIST. SHELBURNEEAST SUBD. NO. 1 EAST SUBD. NO. 1S. SELATIR AVE.E. FRATELLO ST.EXIST. BRIDGEEXIST. 6" PRESSUREIRRIGATION PERSHELBURNEEAST SUBD. NO. 1 I N S T A L L G I R R B O X 1 ( 4 ' x 4 ' ) R I M = 2 7 0 2 . 9 0 1 2 " I N V I N ( S ) = 2 6 9 6 . 2 5 1 2 " I N V O U T ( N ) = 2 6 9 6 . 2 5 I N S T A L L E N D S E C T I O N 1 2 " I N V I N = 2 6 9 8 . 3 0 ( M A T C H E X I S T . ) I N S T A L L 6 2 . 9 2 L F 1 2 " P V C C - 9 0 0 @ 3 . 2 6 % N2T612 LF6" PVC 206 LF 6" PVC R1 E5 K V 6 K S L 6 V 6 K T 6 R 1 S 1 V 4 N 1 K V 4 N 1 K S L 4 6 6 L F 4 " P V C 9 L F 4 " P V C 9 L F 4 " P V C T 4 K S 1 1 0 6 L F 4 " P V C 5 7 L F 4 " P V C 4 8 L F 4 " P V C 626 LF 4" PVC 2 4 7 L F 4 " P V C 68 LF 4" PVC 61 LF 4" PVC 126 LF 4" PVC 90 LF 4" PVC 163 LF 4" PVC 5.00' 5.00' 5.00' 8 1 L F 6 " P V C 5 7 L F 6 " P V C 1 1 0 L F 6 " P V C 5 . 0 0 ' 5.00' 5.00'5.00'5.00'5.00'5.00'5.00' S 1 S1 S 1 S1S1S1S1S1S1S1 S 1 S 1 S 1 S 1 S 1 S 1 S 1 N1N1T4KKC4E1KE1KE3K E 4 5 . 0 0 ' 9 . 0 0 ' V 4 K S L 4 V 4 K S 1 S 1 R 1 5.00' 5.00' C 4 K K S 1 FUTURE SHELBURNESOUTH SUBDIVISION F U T U R E S H E L B U R N E S O U T H S U B D I V I S I O N K185 LF 4" PVC34 LF 4" PVC S 1 K D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.600 (Irrigation Plan).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 6 0 1 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 C . 6 0 1 IRRIGATION PLAN 2 0 M A T C H L I N E - S E E S H E E T C . 6 0 0 MATCH LINE - SEE SHEET C.600 S C A L E : 1 " = H O R I Z O N T A L 1 P R E S S U R E I R R I G A T I O N P L A N 4 0 ' - 0 " H O R I Z O N T A L S C A L E I N F E E T 0 4 0 8 0 2 0 4 0 N O R T H C I V I L I N N O V A T I O N S A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n 2 C O N S T R U C T I O N K E Y N O T E S P R E S S U R E I R R I G A T I O N P L A N S L 4 P r e s s u r e I r r i g a t i o n S l e e v e , 8 " P V C , C - 9 0 0 V 4 V a l v e , 4 " G a t e E 1 E l b o w , 4 " , 1 1 1 / 4 ° N 2 C o n n e c t T o E x i s t i n g P r e s s u r e I r r i g a t i o n M a i n N 1 D e f l e c t P i p e P e r M a n u f a c t u r e r s S p e c i f i c a t i o n s K P . C . C . T h u r s t B l o c k ( A s R e q u i r e d E v e n I f N o t S h o w n ) V 6 V a l v e , 6 " G a t e E 5 E l b o w , 6 " , 1 1 1 / 4 ° E 6 E l b o w , 6 " , 2 2 - 1 / 2 ° S L 6 P r e s s u r e I r r i g a t i o n S l e e v e , 1 2 " P V C , C - 9 0 0 C 4 P l u g O r C a p , 4 " S 1 3 / 4 " P r e s s u r e I r r i g a t i o n S e r v i c e P e r N M I D S t a n d a r d D e t a i l - T y p e " A " R i s e r E 8 E l b o w , 6 " , 9 0 ° E 7 E l b o w , 6 " , 4 5 ° R 1 R e d u c e r , 6 " x 4 " T 6 T e e , 6 " E 4 E l b o w , 4 " , 9 0 ° E 2 E l b o w , 4 " , 2 2 1 / 2 ° P R E S S U R E I R R I G A T I O N N O T E S : 1 . T H E P R E S S U R E I R R I G A T I O N I N T H I S S U B D I V I S I O N W I L L B E O W N E D A N D O P E R A T E D B Y T H E H O M E O W N E R S A S S O C I A T I O N . 2 . A C O N N E C T I O N B E T W E E N T H E P R E S S U R E I R R I G A T I O N A N D D O M E S T I C W A T E R S Y S T E M W A S I N S T A L L E D A S P A R T O F T H E S H E L B U R N E S U B D I V I S I O N N O . 2 ( B A C K U P S O U R C E F O R T H E P R E S S U R E I R R I G A T I O N ) . T 4 T e e , 4 " E 3 E l b o w , 4 " , 4 5 ° ACHD SIDEWALK EASEMENT RIGHT OF WAYRIGHT OF WAY RIGHT OF WAY ACHD SIDEWALK EASEMENT ACHD SIDEWALK EASEMENT 2 . 0 ' ACHD SIDEWALK EASEMENT ACHD SIDEWALKEASEMENT PROPERTY LINE C . 7 0 0 2 1 STREET DETAILS 1TYPICAL STREET SECTION (ATTACHED SIDEWALK)NOT TO SCALE - E. AWBREY ST., S. TARADALE AVE., S. TARADALE PL., E. DARBY ST. AND E. CLEARY CT.C4" OF 3/4" MINUS CRUSHED GRAVEL BASE10" OF 6" MINUS PIT RUNCOMPACTED STABLE SUBGRADE CL11.5'5'SIDEWALK2'1.75%2%2-1/2" OF ASPHALTIC PAVEMENT(SP-3, 0.50 INCH (12") MIX, PG 58-28)ROLLED CURB AND GUTTER PER ACHDSUPPLEMENTAL DWG. SD-702EXTEND ROAD BA S E M A T E R I A L S 6" PAST CURB AN D G U T T E R ( T Y P . ) 5" THICK CON C R E T E S I D E W A L K P E R ACHD SUPPLE M E N T A L D W G . S D - 7 0 9 4" OF 3/4" MIN U S C R U S H E D G R A V E L 27'11.5'5'SIDEWALK2'1.75%2%3:1 MAX.3:1 MAX.RIGHT OF WAY2.0'3:1 M A X . 3:1 M A X . 41' RIGHT-OF-WAY N O T E : S E E S H E E T C . 2 0 0 F O R L O C A T I O N , D I S T A N C E S A N D O F F S E T S 6 A S P H A L T D R I V E W A Y D E T A I L N O T T O S C A L E 2 0 ' - 0 " 2 % 1 ' - 0 " 1 ' - 0 " E X T E N D R O A D B A S E M A T E R I A L S 6 " P A S T C U R B A N D G U T T E R ( T Y P . ) 8 " T H I C K R I B B O N C U R B ( T Y P . ) PROPERTY LINE 8 " T H I C K R I B B O N C U R B ( T Y P . ) 3 : 1 M A X . 3 : 1 M A X . 2 1 / 2 " A S P H A L T I C P A V E M E N T 1 0 " O F 3 / 4 " M I N U S C R U S H E D G R A V E L C O M P A C T E D S T A B L E S U B G R A D E F L O W L I N E S T A N D A R D V E R T I C A L C U R B ( A C H D S D - 7 0 1 ) S T A N D A R D R O L L E D C U R B ( A C H D S D - 7 0 2 ) 5 ' - 0 " T R A N S I T I O N S E C T I O N P R E F O R M E D E X P A N S I O N J O I N T M A T E R A I L S H A L L B E I N S T A L L E D A T B O T H E N D S O F T R A N S I T I O N S E C T I O N 8 V E R T I C A L T O R O L L E D C U R B T R A N S I T I O N S E C T I O N N O T T O S C A L E - I S P W C S T A N D A R D D R A W I N G S D - 7 0 7 , M O D I F I E D 1 8 ' - 0 " A S P H A L T D R I V E W A Y A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.700 (Details).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 7 0 0 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 ROLLED CURB AND GUTTER PER ACHDSUPPLEMENTAL DWG. SD-702 RIGHT OF WAY2.0' RIGHT OF WAY 7 ' 2 ' 1 6 ' 2 ' 1 6 ' 1 ' 5 ' RIGHT OF WAY 3 6 ' S I D E W A L K 5 S T R E E T S E C T I O N ( D E T A C H E D S I D E W A L K ) N O T T O S C A L E - 5 0 ' R I G H T O F W A Y - E . B O T T D R . ( S T A 2 8 + 9 1 . 4 6 T O S T A 2 9 + 8 8 . 5 0 ) 1 . 7 5 % V E R T I C A L C U R B A N D G U T T E R P E R A C H D S U P P L E M E N T A L D E T A I L S D - 7 0 1 ( S E E P L A N S H E E T S F O R L O C A T I O N S ) V E R T I C A L C U R B A N D G U T T E R P E R A C H D S U P P L E M E N T A L D E T A I L S D - 7 0 1 ( S E E P L A N S H E E T S F O R L O C A T I O N S ) 5 " T H I C K C O N C R E T E S I D E W A L K P E R A C H D S U P P L E M E N T A L D E T A I L S D - 7 0 9 4 " O F 3 / 4 " M I N U S C R U S H E D G R A V E L 3 : 1 M A X . 3 : 1 M A X . 2 % 2 % C L RIGHT OF WAY 7 ' 1 ' 5 ' S I D E W A L K 1 . 7 5 % 3 : 1 M A X . 3 : 1 M A X . 5 0 ' R I G H T - O F - W A Y 4 " O F 3 / 4 " M I N U S C R U S H E D G R A V E L 3 " A S P H A L T I C P A V E M E N T ( S P - 3 , 0 . 5 0 I N C H ( 1 / 2 " ) M I X , P G 6 4 - 2 8 ) 2 0 " O F 6 " M I N U S P I T R U N C O M P A C T E D S T A B L E S U B G R A D E E X T E N D R O A D B A S E M A T E R I A L S 6 " P A S T C U R B A N D G U T T E R ( T Y P . ) N O T E : 1 . S I D E W A L K C R O S S S L O P E S S H A L L N O T E X C E E D 2 . 0 % 2 . N O T O L E R A N C E S W I L L B E A L L O W E D NOTE:1.SIDEWALK CROSS SLOPES SHALL NOT EXCEED 2.0%2.NO TOLERANCES WILL BE ALLOWED3TYPICAL STREET SECTION (AT EXISTING BRIDGE CROSSING)NOT TO SCALE - E. BOTT DR.7'VARIES7'3" ASPHALTIC PAVEMENT4" MIN. OF 3/4" MINUSCRUSHED GRAVEL2%2%SIDEWALK V A R I E S SIDEWALK1.75%NON-IRRIGATEDLANDSCAPINGOVER BRIDGE(TYPICAL)18'18'VERTICAL CURB AND GUTTER PER ACHDSUPPLEMENTAL DETAIL SD-701 5" THICK CONCRETE SIDEWALK1.75%36'EXISTING CULVERT 3 : 1 M A X . 3 : 1 M A X . 5 ' 2'16'2'16'36'2STREET SECTION (ATTACHED SIDEWALK)NOT TO SCALE - E. BOTT DR. (STA 24+44.38 TO STA 25+27.72)VERTICAL CURB AND GUTTER PER ACHDSUPPLEMENTAL DETAIL SD-701(SEE PLAN SHEETS FOR LOCATIONS)VERTICAL CURB AND GUTTER PER ACHDSUPPLEMENTAL DETAIL SD-701(SEE PLAN SHEETS FOR LOCATIONS) 5 " T H I C K C O N C R E T E S I D E W A L K P E R A C H D S U P P L E M E N T A L D E T A I L S D - 7 0 9 4 " O F 3 / 4 " M I N U S C R U S H E D G R A V E L 2%2%CL4" OF 3/4" MINUS CRUSHED GRAVEL 3" ASPHALTIC PAVEMENT(SP-3, 0.50 INCH (1/2") MIX,PG 64-28)20" OF 6" MINUS PIT RUNCOMPACTED STABLE SUBGRADE E X T E N D R O A D B A S E M A T E R I A L S 6 " P A S T C U R B A N D G U T T E R ( T Y P . ) NOTE:1.SIDEWALK CROSS SLOPES SHALL NOT EXCEED 2.0%2.NO TOLERANCES WILL BE ALLOWED 1.75%3:1 MAX.3:1 MAX.1' LANDING 7'SIDEWALK 7 ' 2 ' 1 6 ' 2 ' 1 6 ' 1 ' 5 ' 3 6 ' S I D E W A L K 4 S T R E E T S E C T I O N ( A T T A C H E D S I D E W A L K L E F T - D E T A C H E D S I D E W A L K R I G H T ) N O T T O S C A L E - 5 0 ' R I G H T O F W A Y - E . B O T T D R . ( S T A 2 5 + 6 2 . 5 0 T O S T A 2 8 + 0 8 . 4 6 ) 1 . 7 5 % V E R T I C A L C U R B A N D G U T T E R P E R A C H D S U P P L E M E N T A L D E T A I L S D - 7 0 1 ( S E E P L A N S H E E T S F O R L O C A T I O N S ) V E R T I C A L C U R B A N D G U T T E R P E R A C H D S U P P L E M E N T A L D E T A I L S D - 7 0 1 ( S E E P L A N S H E E T S F O R L O C A T I O N S ) 5 " T H I C K C O N C R E T E S I D E W A L K P E R A C H D S U P P L E M E N T A L D E T A I L S D - 7 0 9 4 " O F 3 / 4 " M I N U S C R U S H E D G R A V E L 3 : 1 M A X . 3 : 1 M A X . 2 % 2 % C L 5 0 ' R I G H T - O F - W A Y 4 " O F 3 / 4 " M I N U S C R U S H E D G R A V E L 3 " A S P H A L T I C P A V E M E N T ( S P - 3 , 0 . 5 0 I N C H ( 1 / 2 " ) M I X , P G 6 4 - 2 8 ) 2 0 " O F 6 " M I N U S P I T R U N C O M P A C T E D S T A B L E S U B G R A D E E X T E N D R O A D B A S E M A T E R I A L S 6 " P A S T C U R B A N D G U T T E R ( T Y P . ) N O T E : 1 . S I D E W A L K C R O S S S L O P E S S H A L L N O T E X C E E D 2 . 0 % 2 . N O T O L E R A N C E S W I L L B E A L L O W E D 1 . 7 5 % 3 : 1 M A X . 3 : 1 M A X . 1 ' L A N D I N G 7 ' S I D E W A L K 1.7 5 % 3 : 1 M A X . 3 : 1 M A X . 7 ' SIDE W A L K 1 ' L A N D I N G 1 ' L A N D I N G 2 ' 1 ' L A N D I N G 2 ' ACHD SIDEWALK EASEMENT 1 ' L A N D I N G 2 ' V A R I E S S E E P L A N S H E E T F O R W I D T H S A N D L O C A T I O N S 7 A S P H A L T T U R N - A R O U N D S E C T I O N N O T T O S C A L E 4 " O F 3 / 4 " M I N U S C R U S H E D G R A V E L B A S E 1 0 " O F 6 " M I N U S P I T R U N C O M P A C T E D S T A B L E S U B G R A D E 2 - 1 / 2 " O F A S P H A L T I C P A V E M E N T ( S P - 3 , 0 . 5 0 I N C H ( 1 2 " ) M I X , P G 5 8 - 2 8 ) CL 2 ' 2' C . 7 0 1 2 2 STORM DRAIN DETAILS A D A C O U N T Y H I G H W A Y D I S T R I C T D A T E : B y S t a m p i n g A n d S i g n i n g T h e I m p r o v e m e n t P l a n s , T h e R e g i s t e r e d E n g i n e e r E n s u r e s T h e D i s t r i c t T h a t T h e P l a n s C o n f o r m T o A l l D i s t r i c t P o l i c i e s A n d S t a n d a r d s . V a r i a n c e s O r W a i v e r s M u s t B e S p e c i f i c a l l y A n d P r e v i o u s l y A p p r o v e d B y T h e D i s t r i c t I n W r i t i n g . A c c e p t a n c e O f T h e I m p r o v e m e n t P l a n s B y T h e D i s t r i c t D o e s N o t R e l i e v e T h e R e g i s t e r e d E n g i n e e r O f T h e s e R e s p o n s i b i l i t i e s . B Y : P l a n s A r e A c c e p t e d F o r P u b l i c S t r e e t C o n s t r u c t i o n D:\Civil Innovations Projects\2019\19-0114-SE1 Shelburne East 1\200 - Construction Drawings\205 - Construction\PHASE III\19-0114-SE3 C.700 (Details).dwg B e n j a m i n P . T h o m a s 1 0 / 0 3 / 1 9 THESE DRAWINGS, OR ANY PORTION OR EXTENSION THEREOF, SHALL NOT BE USED OR REPRODUCED ON ANY PROJECT WITHOUT WRITTEN CONSENT FROM CIVIL INNOVATIONS, PLLC REVISIONS DESCRIPTIONNO.BY DATE CIVIL INNOVATIONS, PLLC 1043 E. PARK BLVD. STE 101 BOISE, ID 83712 PHONE: (208) 884-8181 www.civil-innovations.com I S S U E D A T E 1 9 - 0 1 1 4 - S E 3 C . 7 0 1 S H E E T O F C H E C K E D B Y D R A W N B Y D E S I G N E D B Y D W G F I L E P R O J E C T N O . H O R I Z . S C A L E V E R T . S C A L E 1 0 / 0 3 / 1 9 SHELBURNE EAST SUBDIVISION NO. 3 MERIDIAN, IDAHO B T J T A B T A S S H O W N A S S H O W N 2 2 18" PIPE PERFORATION SCHEDULE 45°90°45°3/8" PERFORATIONS IN VALLYS OFCORRUGATED PIPE. 5 EA.18" DIA. CORRUGATED HDPE ORPVC WALL DRAIN PIPE. A . 1 SE E P A G E B E D N O . A . 2 A . 3 A . 4 L SE E P A G E B E D D E S I G N N O T E S : 1. S O I L S A N D G R O U N D W A T E R I N F O R M A T I O N P R O V I D E D B Y M A T E R I A L S T E S T I N G A N D I N S P E C T I O N D A T E D M A R C H 2 0 1 5 . G R O U N D W A T E R W A S N O T E N C O U N T E R E D I N A N Y T E S T P I T S O R O B S E R V A T I O N S W E L L S . C O N T R A C T O R S H A L L N O T I F Y T H E E N G I N E E R I M M E D I A T E L Y I F G R O U N D W A T E R I S E N C O U N T E R E D W I T H I N 3 F E E T O F T H E B O T T O M O F T H E D E S I G N E L E V A T I O N S F O R A N Y I N F I L T R A T I O N F A C I L I T Y . 2. D E S I G N I N F I L T R A T I O N R A T E I S 6 . 0 I N C H E S P E R H O U R . 3. C O N T R A C T O R T O H A V E A P E R C O L A T I O N T E S T P E R F O R M E D B Y A S O I L S E N G I N E E R A F T E R S E E P A G E T R E N C H I S F U L L Y E X C A V A T E D . I F T H E T E S T R E S U L T I S L E S S T H A N T H E D E S I G N I N F I L T R A T I O N R A T E , C O N T R A C T O R M A Y N E E D T O B L A S T O R B O R E T O C R E A T E A C O N D U I T F O R D R A I N A G E O R H A V E T H E S Y S T E M R E D E S I G N E D T O A C H I E V E T H E R E Q U I R E D I N F I L T R A T I O N R A T E . P E R C O L A T I O N T E S T T O B E W I T N E S S E D B Y A C H D I N S P E C T I O N S T A F F . 4. 1 0 0 - Y E A R D E S I G N S T O R M R U N O F F V O L U M E : S E E P A G E B E D N O . 1 0 : R E Q U I R E D S T O R A G E V O L U M E = 2 , 2 2 5 C . F . S E E P A G E B E D N O . 1 1 A & 1 1 B : R E Q U I R E D S T O R A G E V O L U M E = 6 , 4 0 0 C . F . S E E P A G E B E D N O . 1 2 A & 1 2 B : R E Q U I R E D S T O R A G E V O L U M E = 5 , 5 6 1 C . F . D W ( L O W E S T F G ) ( L E N G T H ) ( W I D T H ) ( D E P T H ) 1 S E E P A G E B E D N O S . 1 0 - 1 2 D E T A I L N O T T O S C A L E A . 5 S E E P A G E B E D T A B L E STORM DRAIN MARKER NOTES:1.STORM DRAIN ELECTRONIC MARKERS SHALL BE INSTALLED AT ALL FOUR CORNERS OF THE SEEPAGE BEDS.2.CONTRACTOR SHALL COORDINATE WITH ACHD INSPECTION FOR PLACEMENT OF MARKERS DURINGCONSTRUCTION AND PRIOR TO BACKFILLING. 1 0 2 7 0 0 . 0 4 2 6 9 5 . 4 9 2 6 9 0 . 5 0 2 6 9 2 . 0 0 2 6 9 8 . 5 0 5 7 . 0 ' 1 5 . 0 ' 6 . 5 ' SEEPAGE BED CONSTRUCTION NOTES:1.CONTACT DESIGN ENGINEER FOR SEEPAGE BED REDESIGN IF GROUNDWATER IS ENCOUNTERED ABOVE MAXHSGW ELEVATION.2.ALL VAULTS, MANHOLES, AND SAND & GREASE TRAPS SHALL BE HS25 OR GREATER LOAD RATED.3.WRAP TOP AND SIDES OF BED WITH NON WOVEN GEOTEXTILE FABRIC.4.ALL GEOTEXTILE SEAMS SHALL OVERLAP 1 FOOT MINIMUM.5.ANY BEDROCK ENCOUNTERED DURING SEEPAGE BED CONSTRUCTION SHALL BE BLASTED.6.SEEPAGE BED WIDTH SHALL REMAIN CONSTANT.7.SEE BMP 01 FOR SAND & GREASE TRAP DETAILS.8.FOR SEEPAGE BEDS IN THE PUBLIC RIGHT-OF-WAY:A) A MINIMUM OF 1-FT COVER FROM TOP OF BED TO ROAD SUBGRADE IS REQUIRED.B) BACKFILL OVER BED TO SUBGRADE WITH 6"-8" MINUS PIT RUN GRAVEL.C) WOVEN GEOTEXTILE FABRIC REQUIRED OVER TOP OF BED.D) IF LESS THAN 1-FT OF COVER FROM TOP OF BED TO SUBGRADE, ANGULAR 3/4" TO 2" ROCK IS REQUIREDWITH MINIMUM 50% SINGLE FRACTURED FACE IN PLACE OF 2" DRAIN ROCK.E) FULL ROADWAY SECTION IS REQUIRED OVER SEEPAGE BEDS. SEEPAGE BEDS SHALL NOT EXTEND ABOVESUBGRADE.9.FOR SEEPAGE BEDS OUTSIDE THE PUBLIC RIGHT-OF-WAY: A MINIMUM OF 1.5-FT COVER FROM TOP OF BED TOFINISHED GRADE IS REQUIRED. C A P E N D A . 2 A . 3 N O T R E E S O R S H R U B S O V E R S E E P A G E B E D 4" OF 3/4" PIPE BEDDING A . 5 M I N . E X C A V A T I O N 5' (MIN.) OF 18" SOLID WALL PIPE 5' TRANSITION FROM SOLIDWALL TO PERFORATED PIPE W A . 2 A . 3 M I N . E X C A V A T I O N A . 5 A . 4 D 1 . 5 ' A . 1 / A . 1 - 1 N O N W O V E N G E O T E X T I L E P E R S E C T . 8 2 0 0 B M P 2 0 O N T O P A N D S I D E S O F S E E P A G E B E D . O V E R L A P O F 1 ' M I N I M U M . 18" NON-PERFO R A T E D P I P E INV. = A . 3 5 ' - 0 " M I N . M O N I T O R I N G W E L L ( G R O U N D W A T E R O B S E R V A T I O N W E L L ) - S E E D E T A I L S D - 6 2 7 O N T H I S S H E E T A . 1 / A . 1 - 1 A . 4 L S E E P A G E B E D P R O F I L E V I E W N A T I V E B A C K F I L L I N 6 " L I F T S C O M P A C T E D T O 9 5 % P R O C T O R D E N S I T Y 2 ' - 0 " 1 8 " P E R F O R A T E D P I P E I N V . = A . 3 18" NON-PERF O R A T E D P I P E INV. = A . 3 M O N I T O R I N G W E L L S E E N O T E S T H I S S H E E T L 5 0 ' 5 ' W M O N I T O R I N G W E L L S E E N O T E S T H I S S H E E T W 1 W 2 C A P E N D INSTALL STORM DRAIN ELECTRONIC MARKERS ATALL FOUR CORNERS. SEE STORM DRAIN MARKERNOTES ON THIS SHEET. 2' 1 8 " P E R F O R A T E D P I P E I N V . = A . 3 INLET FROM STORM DRAIN MANHOLE(SEE PLANS FOR LOCATIONS) S E E P A G E B E D S E C T I O N V I E W A N G U L A R 3 / 4 " - 2 " R O C K N O T R E E S O R S H R U B S O V E R S E E P A G E B E D N A T I V E B A C K F I L L I N 6 " L I F T S C O M P A C T E D T O 9 5 % P R O C T O R D E N S I T Y 5' MIN. S E E P A G E B E D P L A N V I E W 1 1 A 2 6 9 9 . 9 6 2 6 9 5 . 4 5 2 6 8 9 . 4 5 2 6 9 0 . 9 5 2 6 9 8 . 4 5 6 0 . 0 ' 1 5 . 0 ' 7 . 5 ' C A P E N D H I G H G R O U N D W A T E R 3 ' M I N . 1 1 B 2 6 9 9 . 9 6 8 2 . 0 ' 1 2 A 2 6 9 6 . 4 7 2 6 9 2 . 1 2 2 6 8 6 . 0 0 2 6 8 7 . 5 0 2 6 9 4 . 9 0 A S T M C 3 3 F I L T E R S A N D S E E P A G E B E D A R E A S E E P A G E B E D A R E A A S T M C 3 3 F I L T E R S A N D INLET FROM STORM DRAIN MANHOLE(SEE PLANS FOR LOCATIONS) A N G U L A R 3 / 4 " - 2 " R O C K A N G U L A R 3 / 4 " - 2 " R O C K 1 2 B 2 6 9 6 . 4 7 MONITORING WELL NOTES:1.THE MONITORING WELL LOCATED OUTSIDE OF THE SEEPAGE BED SHALL EXTEND A MINIMUM OF 1 FOOT BELOW THEBOTTOM OF THE SEEPAGE BED AND SHALL BE INSTALLED WITHIN THE PROPOSED SIDEWALK A MINIMUM OF 50' PAST THEEND OF SEEPAGE BED. SEE ACHD SUPPLEMENTAL DRAWING DETAIL SD-627 ON THIS SHEET. A . 1 - 1 2 7 0 0 . 6 8 2 7 0 0 . 7 9 2 7 0 0 . 7 9 2 6 9 7 . 0 2 2 6 9 7 . 0 2 ( H I G H E S T F G ) 3 . 7 5 ' V A R I E S 1 1 . 2 5 ' V A R I E S W 1 ( W I D T H ) W 2 ( W I D T H ) (W 1 / W 2 " V A R I E S " = P I P E A N G L E D T H R U S E E P A G E B E D , SE E S T R E E T A N D S T O R M D R A I N P L A N F O R L O C A T I O N ) 2 6 9 5 . 4 5 2 6 8 9 . 4 5 2 6 9 0 . 9 5 2 6 9 8 . 4 5 1 5 . 0 ' 7 . 5 ' V A R I E S V A R I E S 7 5 . 0 ' 1 5 . 0 ' 7 . 4 ' 5 0 . 0 ' 1 5 . 0 ' 7 . 4 ' 7 . 5 ' 7 . 5 ' 7 . 5 ' 7 . 5 ' 2 6 9 2 . 1 2 2 6 8 6 . 0 0 2 6 8 7 . 5 0 2 6 9 4 . 9 0