Loading...
HomeMy WebLinkAboutEngineering Structures AIA G701 Fire Station 6 ConstructionDocument G701"- 2017 Change Order PROJECT: (Natne and address) CONTRACT INFORMATION: CHANGE ORDER INFORIdATION: Meridian Fin: Station It6 Contract Fur: Fire Station Change Omer NUmber: 02 Overland Rd and Locust Grove Date: V22r2018 Date: 091n'-7019 OWNER: (Nant e and address) ARCHITECT: (Name and address) CONTRACTOR: (Nonreand adidremv) City of Meridian Rice Ferns Miller & Pivot North Design Engineered Structures, Inc. 3330 E Louise Dr, Ste 300 Meridian, ID 93(A2 THE CONTRACT IS CHANGED AS FOLLOWS: (htsert a detailed description (ijf'the change and, ifopplkable, attach m-referencespeck erhfbrtr. Also include qgi evrd upon aa, usintends attributable to executed CrAmmiction Chart v Direictfacs) ESI Concrete: 1,065.04 Terra %Vest- 20,326.00 OH&P: 1,613.72 PR OR- Added Fire Hydrant 23,1104.76 The original Guaranteed Maximum Price was $ 4,4114,554.00 The net change by Previously authorized Change Orders $ 5,8189.10 The Guaranteed Maximum Price prior to tris Change Order was $ 4,410,443,10 The Guaranteed Maximum Price will be increased by this Change Order in the amount of S 23,004.76 The new Guaranteed Maximum Price including This Change Order will be S 4,433,417.86 The Contract Time will be increased by Zero (0) days. The now date of Substantial Completion will be NOTE: This Change Order does not include adjus-nnents to the Contract Sunt or Gum=teed Maxinturn Price, or the Contract Tithe, that have been authorized by Construction Change Directivre until the cost mid tinfe have been agreed upon by loth the Owner and Contractor, in %vhich case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Mgftally slgnod by Gunnar Gladics ON: C=US, _ E--yuunnas- otnorthdes n.co 1a ,p {,..,,,� O=mot <Jon�� i e use, A I11tllLmlr�'UdalAl�t[.S 03Gunnar Gladlcs Reason: i am approving this docunlel�t D ale: 2019.09.2611:21:57-06W SIGNATURE PRINTED NAME AND TITLE DATE Enpirecred Structures, Inc. 1 U'C 0111ai QV CONTRACTOR (ri-w ..r•�..a V�l1ER-y'Ferirr eta SIGNIATURE r SIGNATURE _ Mick Plociz- Project Manager Tam m �4 de W ee rcl, Modor PRINTED NAME AND TITLE PRINTED NAh1 ND TIRE DATE DATE ALA Document G701'° —2417. Copyrl9h1 rD 19713, 19.67, 2000 , 2001 and 21317 by The American Institute of Architects,Atl rights reserved. WARNING: This AIAI Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAI Document, or any portion of it, may result In severe civil and criminal penahies, and will be prosecuted to the maximum extent possible under the law. This document was produced by A1A software at 17:14:10 ET on 49t25r'2D19, under Cider too. 143134792a7 which expires on 49t18M20, and Is rant dor resale. User Notes: 1389ADAHAI CHANGE ORDER From: CITY OF MERIDIAN Project: City of Meridian Fire Station #6 - Meridian, ID 1435 W Overland Rd Meridian, ID 83642 To (Contractor): ENGINEERED STRUCTURES INC 3330 E LOUISE DR, STE 300 MERIDIAN, ID 83642 You are directed to make the following changes in this Contract: ESI Contract Number: 1010 - Owner Contract Number: Change Order#: 02 Change Order Date: 9/25/19 COR Description Amount 9 PR 08 Added Fire Hydrant 21,391.04 PR 08 -Light Pole Aprons -ESI Concrete 1,065.04 PR 08 - Terra West 20,326.00 1,613.72 Insurance 437.65 OHP 1,016.08 Bond 159.99 Total For Change Order: 02 23,004.76 Not valid until signed by both the Owner and the Architect. Signature of the Contractor indicates the Contractor's agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original Contract Sum was ............................................. $4,454,363.50 The net change by previously authorized Change Orders was ..................... $5,889.10 The Contract Sum prior to this Change Order was ...................................... $4,460,262.60 The Contract Sum will be increased by this Change Order ................................ $23,004.76 Thenew Contract Sum will be ....................................................... $4,483,257.36 The new Contract Completion date as of this Change Order will be 2/28/2020 Authorized By Owner: Accepted By Contractor: Architect: CITY OF MERIDIAN ENGINEERED STRUCTURES INC Pivot North Architecture 3330 E LOUISE DR, STE 300 1101 West Grove Street MERIDIAN, ID 83642 Boise, ID 83702 By: Date: l LS —aQ b� By: _ Date: By: _ Date: 1 ENGINEERED STRUCTURES INC Page 1 9/25/2019 4:21:12 PM M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 1 5 , 2 0 1 9 – P a g e 1 7 7 o f 2 9 4 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 1 5 , 2 0 1 9 – P a g e 1 7 8 o f 2 9 4 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 1 5 , 2 0 1 9 – P a g e 1 7 9 o f 2 9 4 City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Keith 07 - Impact Fund 2210 - Fire Admin From 10/1/2018 Through 9/30/2019 Amendments Budget with Actual Current Year Remaining Budget Remaining Budget Percent of Capital Outlay 92000 Cap Outlay - Bldgs & Struct 800,000.00 0.00 800,000.00 100.00% 10770 Fire Station 6 296,254.13 97,727.87 198,526.26 67.01% 10770.a Fire Station 6 Design & Consulting Services 362,258.15 362,258.15 0.00 0.00% 10770.b Fire Station 6 Construction Mgmt Services 4,431,276.35 4,431,276.35 0.00 0.00% 10770.d Fire Station 6 Commissioning Agent Services 11,600.00 11,600.00 0.00 0.00% 10770.e Materials Testing & Inspection - Fire Station 6 18,388.40 18,388.40 0.00 0.00% Total Capital Outlay 5,919,777.03 4,921,250.77 998,526.26 16.87% TOTAL EXPENDITURES 5,919,777.03 4,921,250.77 998,526.26 16.87% Date: 8/15/19 01:29:10 PM Page: 1 Meridian City Council Meeting Agenda October 15, 2019 – Page 180 of 294 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 1 5 , 2 0 1 9 – P a g e 1 8 1 o f 2 9 4