HomeMy WebLinkAboutTask Order No. 11027 Keller Associates Master Agreement Professional Services Well 18 Water Treatment Facility DesignTASK ORDER NO. 11027
Pursuant to the
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN (OWNER) AND KELLER ASSOCIATES (ENGINEER)
This Task Order is made this Pday of October 2019 and entered into by and between
the City of Meridian, a municipal corporation organized under the laws of the State of
Idaho, hereinafter referred to as "City", and accepted by KELLER ASSOCIATES,
hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and
conditions contained in the Master Agreement (category 1d) between the above
mentioned parties dated October 1, 2017. The Project Name for this Task Order is as
follows:
CITY OF
MERIDIAN
Well 18 Water Treatment Facility — Design
PROJECT UNDERSTANDING
The City intends to construct a new water treatment facility at the existing Well 18 site. The
project will include the demolition of the existing well building, construction of a new CMU
building to house the well pump and new pressure treatment vessel with associated facilities.
The City intends to utilize a greensand (or similar technology) system for treating approximately
1,800 gallons per minute (gpm) from Well 18.
The Engineer will perform the following tasks for the Well 18 Water Treatment Facility:
• Task 1 — Project Management and Administration
• Task 2 — Pilot Test Support
• Task 3 — Public Meetings and Outreach
• Task 4 — Water Treatment Equipment Procurement Package
• Task 5 — Bidding Assistance for Water Treatment Equipment Procurement
• Task 6 — Survey and Mapping
• Task 7 — Preliminary Engineering Report
• Task 8 — Final Design
• Task 9 — Bidding Assistance
• Task 10 —Agency Coordination and Permitting
Task Order 11027 Well 18 Water Treatment Page 1 of 9
Keller Associates
M
e
r
i
d
i
a
n
C
i
t
y
C
o
u
n
c
i
l
M
e
e
t
i
n
g
A
g
e
n
d
a
O
c
t
o
b
e
r
8
,
2
0
1
9
–
P
a
g
e
1
6
7
o
f
2
5
3
M
e
r
i
d
i
a
n
C
i
t
y
C
o
u
n
c
i
l
M
e
e
t
i
n
g
A
g
e
n
d
a
O
c
t
o
b
e
r
8
,
2
0
1
9
–
P
a
g
e
1
6
8
o
f
2
5
3
M
e
r
i
d
i
a
n
C
i
t
y
C
o
u
n
c
i
l
M
e
e
t
i
n
g
A
g
e
n
d
a
O
c
t
o
b
e
r
8
,
2
0
1
9
–
P
a
g
e
1
6
9
o
f
2
5
3
M
e
r
i
d
i
a
n
C
i
t
y
C
o
u
n
c
i
l
M
e
e
t
i
n
g
A
g
e
n
d
a
O
c
t
o
b
e
r
8
,
2
0
1
9
–
P
a
g
e
1
7
0
o
f
2
5
3
M
e
r
i
d
i
a
n
C
i
t
y
C
o
u
n
c
i
l
M
e
e
t
i
n
g
A
g
e
n
d
a
O
c
t
o
b
e
r
8
,
2
0
1
9
–
P
a
g
e
1
7
1
o
f
2
5
3
M
e
r
i
d
i
a
n
C
i
t
y
C
o
u
n
c
i
l
M
e
e
t
i
n
g
A
g
e
n
d
a
O
c
t
o
b
e
r
8
,
2
0
1
9
–
P
a
g
e
1
7
2
o
f
2
5
3
M
e
r
i
d
i
a
n
C
i
t
y
C
o
u
n
c
i
l
M
e
e
t
i
n
g
A
g
e
n
d
a
O
c
t
o
b
e
r
8
,
2
0
1
9
–
P
a
g
e
1
7
3
o
f
2
5
3
CITY OF MERIDIAN
BY:
Dated: 10-B-2019
City Project Manager:
Dean Stacey
Task Order 11027 Well 18 Water Treatment
Keller Associates
KELLER ASSOCIATES, INC.
BY:
pJw-
/lAfthtl RLep,&oe, ?Ruv10^L
Dated: W /3 /2ol4
Page 9 of 9