Loading...
HomeMy WebLinkAboutKeller Associates Master Agreement Professional Services Well 18 Water Treatment Facility Design Task Order No. 11027TASK ORDER NO. 11027 Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND KELLER ASSOCIATES (ENGINEER) This Task Order is made this Pday of October 2019 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by KELLER ASSOCIATES, hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (category 1d) between the above mentioned parties dated October 1, 2017. The Project Name for this Task Order is as follows: CITY OF MERIDIAN Well 18 Water Treatment Facility — Design PROJECT UNDERSTANDING The City intends to construct a new water treatment facility at the existing Well 18 site. The project will include the demolition of the existing well building, construction of a new CMU building to house the well pump and new pressure treatment vessel with associated facilities. The City intends to utilize a greensand (or similar technology) system for treating approximately 1,800 gallons per minute (gpm) from Well 18. The Engineer will perform the following tasks for the Well 18 Water Treatment Facility: • Task 1 — Project Management and Administration • Task 2 — Pilot Test Support • Task 3 — Public Meetings and Outreach • Task 4 — Water Treatment Equipment Procurement Package • Task 5 — Bidding Assistance for Water Treatment Equipment Procurement • Task 6 — Survey and Mapping • Task 7 — Preliminary Engineering Report • Task 8 — Final Design • Task 9 — Bidding Assistance • Task 10 —Agency Coordination and Permitting Task Order 11027 Well 18 Water Treatment Page 1 of 9 Keller Associates M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 8 , 2 0 1 9 – P a g e 1 6 7 o f 2 5 3 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 8 , 2 0 1 9 – P a g e 1 6 8 o f 2 5 3 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 8 , 2 0 1 9 – P a g e 1 6 9 o f 2 5 3 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 8 , 2 0 1 9 – P a g e 1 7 0 o f 2 5 3 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 8 , 2 0 1 9 – P a g e 1 7 1 o f 2 5 3 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 8 , 2 0 1 9 – P a g e 1 7 2 o f 2 5 3 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a O c t o b e r 8 , 2 0 1 9 – P a g e 1 7 3 o f 2 5 3 CITY OF MERIDIAN BY: Dated: 10-B-2019 City Project Manager: Dean Stacey Task Order 11027 Well 18 Water Treatment Keller Associates KELLER ASSOCIATES, INC. BY: pJw- /lAfthtl RLep,&oe, ?Ruv10^L Dated: W /3 /2ol4 Page 9 of 9