Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Kreizenbeck, LLC for Homecourt Bay 5 Remodel AIA Change Order 001
1A T11 Document G701 -2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: City of Meridian Homecourt Bay 5 Contract For: General Construction Change Order Number: 001 Remodel 936 West Taylor Street, Meridian, Idaho Date: 11/29/2018 Date: 9/03/2019 83642 OWNER: (Nance and address) City of Meridian 33 East Broadway Avenue Meridian, Idaho 83642 ARCHITECT: (Name and address) Insight Architects 2238 S. Broadway Avenue Boise, Idaho 83706 CONTRACTOR: (Name and address) Kreizenbeck, LLC dba Kreizenbeck Constructors 11724 West Executive Drive Boise, Idaho 83713 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Connstritction Change Directives) Provide all labor, materials and equipment necessary to install a new Tarkett Omnisports 7.1 mm flooring system in Court 5 area where designed. Pricing includes standard floor preparation, "Tarkolay" sheeting under the sports flooring, vented base, and aluminum transitions to concrete. Pricing does not include any additional floor coverings or floor treatments in Court 5. ADD $82,094.00 The original Contract Sum was $ 660,704.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 660,704.00 The Contract Sum will be increased by this Change Order in the amount of $ 82,094.00 The new Contract Sum including this Change Order will be $ 742,798.00 The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Insight Architects ARCHITECT (Fir•»n name) SIGNATURE Dana Kauffman- Principal PRINTED NAME AND TITLE Sept 3, 2019 DATE Kreizenbeck, LLC dba Kreizenbeck City of Meridian Constructors COT COR ("n•nt nt ame),� OWNER name S TURE SIGNATURE M,V46- &XA;W- &a/A<1CL m M LA de Itileerc�� I"la�0 PRINTED NAME AND TITLE PRINTED NA ND TITLE 091v31�9 q -16 -117 DATE DATE AIA Document G701 TN —2017. Copyright© 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:21:42 MT on 09103/2019 under Order No. 8449633179 which expires on 12/2812019, and is not for resale. User Notes: (3B9ADA64) Meridian City Council Meeting Agenda September 10, 2019 – Page 200 of 225 CHANGE ORDER NO. PROJECT NO. CHANGE ORDER DATE: EFFECTIVE DATE: CONTRACTOR: PROJECT: Description of additional work : (attach additional pages if needed) WHO REQUESTED THE CHANGE City Contractor WHY IS THE CHANGE NECESSARY Check all that apply Unforeseen / Hidden Conditions Scope Change Error with the Plans and/or Specifications Other - describe below Explanation: Check all that apply The work is in the area of the original contract and a conflict with the on-site contractor is probable and would make coordination of work difficult and bidding unreasonable. Time is of the essence and bidding would require the contractor to stop work and the City would face costly standby fees therefore making bidding disadvantageous Emergency Work to correct unsafe conditions. Other - describe below Explanation: (attached additional pages if needed) CHANGE ORDER 10713.E.2 9/4/2019 9/4/2019 CITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 1 Kreizenbeck Constructors, LLC Homecourt Bay 5 Renovations - CMGC Services Labor and materials to install Tarkett Omnisports 7.1mm Flooring in Bay 5. This is phase 2 of the remodel as planned and budgeted. The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. REASON FOR CHANGE ORDER VS. BIDDING ADDITIONAL WORK Page 1 of 2 Meridian City Council Meeting Agenda September 10, 2019 – Page 201 of 225 Original Contract Price:Original Contract Times:160 days Net changes form previous Change Orders (calendar days) No. No. No. to No. 0 days Net Increase (decrease) of this Change Order: (calendar days)` 92 days Total Days (Increase /decrease) to date: (calendar days) 92 days New Contract Times with all Approved Change Orders: (calendar days) 252 days ACCEPTED: By: Date: RECOMMENDED:DATE APPROVED BY COUNCIL (If required) NO SIGNATURE REQUIRED DATE: METHOD OF COST DETERMINATION / COST ANALYSIS OR VERIFICATION: Budget Available (Attach Report) Budget Information: Budget FY Amendment: Date Submitted to Clerk for Agenda:Approval Date: Purchase Order No.Date Issued: Net changes from previous Change Orders Total Change (Increase / decrease) to date: $0.00Note change order numbers here Note change order numbers here CHANGE IN CONTRACT TIMES: Net Increase (decrease) of this Change Order: $82,094.00 By: Garrett White CHANGE IN CONTRACT PRICE: $660,704.00 $82,094.00 See AIA Change Order Form Kreizenbeck Constructors, LLC $742,798.00 Date: APPROVED: (City Purchasing Manager) By: Keith Watts Purchasing Use Only Subcontractor bids plus CM Fee of 5.25% pre-negotiated in original contract. Enter dollar amount of changes here Enter dollar amount of this chamge order New Contract Price with all Approved Change Orders: (City Project Manager) Date: Page 2 of 2 Meridian City Council Meeting Agenda September 10, 2019 – Page 202 of 225