Loading...
HomeMy WebLinkAboutParamount Subdivision No. 07 FP-05-030 BEFORE THE MERIDIAN CITY COUNCIL CIC May 17, 2005 IN THE MATTER OF THE APPLICATION OF PARAMOUNT DEVELOPMENT, INc. FOR APPROVAL OF 40 SINGLE- FAMILY RESIDENTIAL BUILDING LOTS ON 10.49 ACRES IN AN R-8 ZONE LOCATED EAST OF NORTH LINDER ROAD AND NORTH OF WEST MCMILLAN ROAD IN THE NE ';4 OF THE SW ';4 OF T. 4N., R. lW., SECTION 25. CASE NO. FP-05-030 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council for Final Plat approval pursuant to Meridian City Code § 12-3-7 on May 17, 2005, and the Council finding that the Administrative Review is complete from Sonya Allen, Assistant City Planner for the Planning and Zoning Department, and Michael Cole, Development Services Coordinator for the Public Works Department, dated: Hearing Date: May 17,2005, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of "PLAT SHOWING PARAMOUNT SUBDIVISION NO.7 LOCATED IN TRE NE \4 OFTRE SW ';4 OF SECTIONT. 4N.,R. lW., SECTION 25, BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO 2005, HANDWRITTEN DATE: 04/14/05, SHEET I OF 3, ENGINEERING ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR PARAMOUN SUBDIVISION NO.7 1 (FP-O5-030) Page 1 00 NORTHWEST, LLC", PARAMOUNT DEVELOPMENT, INc., Developer, is Conditionally Approved subject to those conditions of Staff comments as set forth in the Memorandum to the Mayor and City Council from Sonya Allen, Assistant City Planner for the Planning and Zoning Department and Michael Cole, Development Services Coordinator for the Public Works Department, dated: Hearing Date: May 17,2005, listing 11 SITE SPECIFIC REQUIREMENTS/FINAL PLAT and 15 GENERAL REQUIREMENTS, a true and correct copy of which is attached hereto marked Exhibit "A", and consisting of 4 pages, and by this reference incorporated herein, and the response letter from Paramount Development, Inc., a true and correct copy of which is attached hereto marked Exhibit "Boo and consisting of I page, and by this reference incorporated herein, and the response letter from Engineering Northwest, LLC, a true and correct copy of which is attached hereto marked Exhibit "Coo and consisting of 2 pages, and by this reference incorporated herein. 2. The final plat upon which there is contained the Certification and signature of the City Clerk and the City Engineer verifYing that the plat meets the City's requirements shall be signed only at such time as: 1. The Plat dimensions are approved by the City Engineer; and 2. The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR PARAMOUN SUBDIVISION NO.7 1 (FP-05-030) Page 2 00 The Applicant is hereby notified that pursuant to Idaho Code 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest in real property which may be adversely affected by this decision may, within twenty-eight (28) days after the date of this decision and order, seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. By action ofthe City Council at its regular meeting held on the n~ day of H(hl ,2005. By: .~ fIlMJ- Dated: 0- ø -05 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR PARAMOUN SUBDIVISION NO.7 1 (FP-05-030) Page 3 of3 MAYOR T,mmyd,W",rd ot(eridi~ ') "- ID4 T""",",""V~ = PUBLIC WORKS BUILDING DEPARTMENT (208) 898.5500. Fox (208)898-955] CITY COUNCIL MEMBERS K,ithBhd Clui,tin, Donn,]] Shoun Wordl, Char]" M. Roun"", PLANNING AND ZONING DEPARTMENT (208)884-5533 . FAX 888-6854 STAFF REPORT: Hearing Date: May 17, 2005 To: Mayor, City Council and Planning & Zoning Commission Sonya Allen, Assistant City Planner J-f Michael Cole, Development Services Coordinator M C. From: Re: Paramount Subdivision No.7 Final Plat approval of Forty (40) Single-Family Residential Building Lots on 10.49 Acres in an R-8 Zone, by Paramount Development, Inc. (File No. FP-05- 030). We have reviewed the above referenced submittals and offer the following comments, as conditions of approval. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATION SUMMARY & LOCATION The applicant, Paramount Development Inc., has applied for Final Plat approval of 40 single- family residential building lots on 10.49 acres of land for Paramount Subdivision No.7. The zoning designation for the proposed subdivision is R-8 (Medium Density Residential). This phase of the subdivision will have a gross density of 3.81 d.u.lacre and a net density of 4.92 d.u.lacre. Paramount Subdivision No.7 is located approximately ';4 mile east ofN. Linder Rd. and \4 mile south of Chin den Blvd., in the SW \4 of Section 25, T.4N., R.IW. There is no common area proposed within this phase of Paramount Subdivision. The pressurized irrigation system within this development is to be owned and maintained by the Paramount Homeowners Association. A Conditional Use Permit (Planned Development) was approved for this subdivision that allowed for a reduction in the minimum lot size from 6,500 s.f. to 5,500 s.f.; front setbacks reduced from 15' for living areas to 10'; street side setbacks reduced from 20' to 10'; and a reduction in street frontage from 65' to 50'. The final plat for this phase shows a total of eight (8) building lots fewer than was approved with the preliminary plat and the lots were subsequently made larger. Staff has no concerns with the proposed changes because the resulting density stills falls within the target density desired in the FP-O5-030 Exhibit "A" Paramount Sub7 FP.doc Mayor & City Council Hearing Date: March 29, 2005 Page 2 Comprehensive Plan. The submitted final plat still substantially complies with the approved Preliminary Plat. Staff recommends approval of the final plat for Paramount Subdivision No.7 with the comments and conditions stated in this report. SITE SPECIFIC COMMENTS I FINAL PLAT 1. Applicant is to meet all terms of the approved preliminary plat (PP-03-004), conditional use permit (CUP-03-008) and development agreement (Inst. No. 103137116). 2. The applicant has indicated that the Paramount Homeowners Association will own and maintain the pressure irrigation system within this development. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water. If a creek or well source is not available, a single-point connection to the culinary water system shall be required. Plans and specifications for the irrigation system shall be reviewed by the Public Works Department as part of the development plan review process, and a draft copy of the pressurized irrigation system O&M manual must be submitted prior to plan approval. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the irrigable common areas prior . to signature on the [mal plat by the Meridian City Engineer. 3. Permanent perimeter fencing is required along the northern and western boundaries of this phase. Submit a fencing plan with a detail of the proposed fence. Temporary construction fencing to contain debris shall be installed along the eastern and southern boundaries of this phase unless fencing already exists at the subdivision boundaries. 4. Sanitary sewer service and municipal water to this site shall be via extensions from existing mains in previous phases. Applicant will be responsible to construct the sewer and water mains to and through this proposed development, thereby making them available to adjacent properties. Subdivision designer to coordinate main sizing and routing with the Public Works Department. Applicant shall execute City of Meridian standard forms of easements, for any mains that are required to provide service. 5. Graphically depict a 14.5-foot wide Public Utilities, Drainage and Irrigation easement along the western property lines of Lots 16,17,18,19; Block 4. The extra width is necessary to accommodate an irrigation main shown on the construction to be installed 9.5 feet off of the property line. 6. The applicant shall depict on the face of the plat the "Real Point of Beginning." 7. Revise or add the following notes on the face of the plat dated 4/14/05, prepared by Engineering Northwest: FP-O5-0JO Exhibit "A" Paramount Sub7 FP.doc 4. Mayor & City Council Hearing Date: March 29, 2005 Page 3 (11.) Include recorded instrument number 8. Developer shall coordinate mailbox locations with the Meridian Post Office. 9. Please submit a copy of the Ada County Street Name Committee's "Final" letter for the street names and lot & block numbering. Make all corrections necessary to comply. 10. Please submit all updated groundwaterlsoils monitoring data to the Public Works Department for review. Any drainage areas (detention/retention basins) must be designed to ensure that water is retained only during IOO-year storm events, and for a period of time not to exceed 24 hours. Side slopes within drainage areas shall not exceed 3: I. Any portion of a drainage area not improved with sod/grass seed (or other approved landscaping) shall not count towards the required open space area. The project engineer should pay close attention to the results of field studies determining the groundwater, soil type & and characteristics during the design and construction phases. The engineer shall be required to certifY that the street centerline elevations are set a minimum of 3-feet above the highest established normal groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least I-foot above. 11. Staffs failure to cite specific ordinance provisions or terms of the approved development agreement, preliminary plat or conditional use permit does not relieve the Applicant of responsibility for compliance. GENERAL REOUIREMENTS 1. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per City Ordinance 12-4-13. Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can't be obtained, alternative plans will be reviewed and approved by the meridian City Engineer prior to final plat signature. 2. Street signs are to be in place, water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. 3. Street signs are to be in place, water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. All development improvements, including sewer, fencing, micro-paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. FP-O5-0JO ExhibÜ"A" Paramount Sub7 FP.doç Mayor & City Council Hearing Date: March 29, 2005 Page 4 5. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat per Resolution 02-374. 6. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes such as landscape irrigation. 7. All grading of the site shall be preformed in conformance with MCC 11-12-3H. 8. One-hundred-watt, high-pressure sodium streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at subdivider's expense. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity are determined after power designs are completed by Idaho Power Company. The street light contractor shall obtain design and permit from the Public Works Department prior commencing installations. 9. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 10. Applicant's engineer will be required to submit a signed, stamped statement certifYing that all street finish centerline elevations are set a minimum of three feet above the highest established normal groundwater elevation. 11. Coordinate fIre hydrant placement with the city of Meridian Public Works department. 12. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 13. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. 14. All development features shall comply with the Americans with Disabilities Act and the Fair Housing Act. 15. Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were rernoved. Required landscaping trees will not be considered as replacement trees for those trees that have to be removed. STAFF RECOMMENDATION Staff recommends approval of the fmal plat for Paramount Subdivision No.7 with the above stated comments and conditions. FP-O5-OJO Exhibit "A" Paramount Sub7 FP.doc ~..' 05/16/05 .. 11-------.-- .. II . . ... . . n 17; 49 FAX 208 377 8962 -- -'- P.ARÄM 0 U NT May 16, 2005 Mayor Tammy DeWeerd Meridian City Council 33 E. Idaho Ave. Meridian, ill 83642 RE: Paramount Subdivision No.7 Dear Mayor and City Council: I have reviewed the staff report for the final plat ofParamoWlt SubdivisionNo. 7. I am in agreement with stairs recommended conditions and ask for your approval consistent with those conditions. ~ David Turnbull President Cc: Anna Powell Bruce Freckleton Pa,amounlDevelopmet.tlnc. - 11601 W,F:rplo..,D,I.e 8 Sullel00 . Boise. Idaho 83713 _w.Da'ømount-idøho.com - TeleplwII' (208) 378---4000 . Fax (108) 377-8961 hh,h"",,," ~001 05-17-'0516:48 FRm1-Engineering N.W. 2083765556 T-041 P002/003 F-ll1 EnJ(ineerinl( NorthWest, LLC " N.Ance'to! Place, Suite ]80 Boise, Idaho 83704 May 17,2005 (208) 376.5000 . Fax (208) 376-5556 Mayor and City Council City of Meridian 660 E. Watertower, Suite 200 Meridian, ID 83642 Re: File No. FP-05-030 ParamoWlt Subdivision No.7 I am writing on behave of our client, Paramount Development Inc., who have indicated to us their acceptance of the conditions of approval as outlined by staff for the above referenced. Our response to the City's Site Specific Comments for this project are as follows: City of Meridian - Site SÞecific Comments I Final Plat I) 2) All terms of the approved Preliminary Plat (PP-03-004), Conditional Use Permit (CUP-03. 008) and Development Agreement (Inst. No. 103137116) have been met. The Paramount Homeowners Association will own and maintain the pressure irrigation systern within this development. A single-point connection to culinary water as a secondary supply was constructed in phases I and 3. Temporary construction fencing will be provided as required. Agree. A IS.foot wide Public Utilities, Drainage and Irrigation easement along the western property lines of Lots 16 through 19, Block 4 has been added to the plat. The Real Point of Beginning has been added to the face of the plat. Face of plat - Notes a. (11.) Development Agreement Instrument No. 103137116 has been added. Mailbox locations will be coordinated with the Meridian Po~t Office. An Ada County Street Name Committee Final letter will be submitted to the City prior to signature by the City Engineer. No basins are being used in this phase. Agree. 3) 4) 5) 6) 7) 8) 9) 10) 11) General ReQuirements I) 2) 3) 4) 5) 6) Agree. Agree. Agree. Agree. All review fees will be paid by the developer prior t~ture of the final plat. There are no known existing domestic wens and/oiseptic s:Ys"1:ems..t~e removed within ~~= " Stteetlights will be installed at subdivider's expense per City of Meridian requirements. No engineered backfill is required on this project. See attached certification letter finished centerline elevations /3' ground water elevation. 7) 8) 9) E\hd,,¡ "('" 05-17-'05 16:48 FROM-Engineering N.W. 2083765556 T-041 P003/003 F-111 10) 11) Fire hydrant locations have been coordinated and approved with the City of Meridian Public Works Superintendent There are nO existing trees over 4" in caliper for this project. Should you have any questions or need anyrhing else feel free to give me a can. Thank you, if!.~ Exhibit "(:" 2 ~u' 05/16/05 17: 49 FAX 208 377 8962 "8_.____- OM. 0 00 -:- -"- P.ARÄM auNT May 16, 2005 Mayor Tammy DeWeerd. Meridian City Council 33 E. Idaho Ave. Meridian, ID 83642 RE; Paramount Subdivision No.7 Dear MaYOT and City Council: ~001 I have reviewed the slaffreport for the final plat of Paramount Subdivision No.7. I am in agreement with staffs recommended conditions and ask for your apprQval consistent with those conditions. ~ David Tumbull President Cc: Anna Powell Bruce Freckleton Pa'amounrDevelopmentl".. . LZ601 w..&:pIo,.,D,¡.e . Suilel00 . Boise.ldoho 83713 """".Da'Dmo"nt-idø/",.com . r.tep¡'ol" (208) 378-4000 . J'øx (108) 377-8962 hh;b;l"U" 05-17-'0516:48 FROM-Engineering N,W, 2083765556 T-041 PØ02/003 F-111 [inl[ineerinl[ NorthWest, LLC ,1-'1 N- Ancestor Place, Suire 180 Boise, Idaho 83704 May 17,2005 (208) 376.5000. Fax (208) 376-5556 Mayor and City Council CityofMerídian 660 E. Watertower, Suite 200 Meridian, ID 83642 Re: File No. FP-05-030 Paramount Subdivision No.7 I am writing on behave of our client, Paramount Development Inc., who have indicated to us their acceptance of the conditions of approval as outlined by staff for the above referenced. Our response to the City's Site Specific Comments for this project are as follows: City of Meridian - Sitc SDcclûc Comments 1 Final Plat I) 2) All terms of the approved Preliminary Plat (pP-03-004), Conditional Use Permit (CUP-03- 008) and Development Agreement (Inst. No. 103137116) have been met. The Paramount Homeowners Association will own and maintain the pressure irrigation system within this development. A single-point connection to culinary water as a secondary supply was constructed in phases I and 3. Temporary construction fencing wìl1 be provided as required. Agree. A IS-foot wide Public Utilities, Drainage and Irrigation easement along the western property lines of10ts 16 through 19, Block 4 has been added to the plat. The Real Point of Beginning has been added to the face of the plat. Face ofpiat - Notes a. (11.) Developrnent Agreement Instrument No. 103137116 has been added. Mailbox locations will be coordinated with the Meridian Post Office. An Ada County Street Name Committee Fina11etter will be submitted to the City prior to signature by the City Engineer. No basins are being used in this phase. Agree. 3) 4) 5) 6) 7) 8) 9) 10) 11) General ReQuirements I) 2) 3) 4) 5) 6) 7) 8) 9) Agree. Agree. Agree. Agree. All review fees will be paid by the developer prior t~ureofthe final plat. There are no known existing domestic wells andIolseptic sYSLems.t~e removed withi~ this project. Streetlights will be installed at subdivider's expense per City of Meridian requirements. No engineered backfill is required on this project. See attached certification letter finished centerline elevations 13' ground water elevation. E,h,b" "('" 05-17-'0516:48 FROM-Engineering N,W. 2083765556 T-041 P003/003 F-111 10) 11) Fire hydrant locations have been coordinated and approved with the City of Meridian Public Works Superintendent. There are no existing trees over 4" in caliper for this project. Should you have any questions or need anything else feel free to give me a call. TI",ok yo, ~ tf&R Exhibit "C" 2